June 2002 Monthly Operating Report for Columbia Generating Station
ML022000463
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/11/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02-02-109
Download: ML022000463 (3)


Text

ENERGY NORTH WEST PO. Box 968

  • Richland, Washington 99352-0968 July 11, 2002 G02-02-109 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JUNE 2002 Transmitted herewith is the Monthly Operating Report for the month of June 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Oxen (Mail Drop 927M)

Plant General Manager Attachment cc:

E.W. Merschoff-NRC RIV J.B. Hickman - NRR B.J. Benney - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA 1399

OPERATING STATUS REPORT for Columbia Generating Station Date:

July 1, 2002 Docket: 50-397 Reporting Period: June 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWe):

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 720.0 720.0 0.0 551,646 YEAR 4,127.8 4,111.5 0.0 4,241,573 CUMULATIVE 115,278.5 111,954.5 3,274.7 110,513,058 None

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

6.
7.
8.

9.

1153 1107

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: July 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: June, 2002

SUMMARY

The plant began and ended the month at power operation.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Down(2)

Comments N/A