GO2-03-026, January 2003 Monthly Operating Report for Columbia Generating Station
| ML030520086 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/12/2003 |
| From: | Oxenford W Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GO2-03-026 | |
| Download: ML030520086 (3) | |
Text
ENERGY NORTHWEST P0. Box 968 w Richland, Washington 99352-0968 February 12, 2003 G02-03-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT JANUARY 2003
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of January 2003 as required by Technical Specification 5.6.4.
Respectfully, WS Oxenford Plant General Manager Mail Drop 927M Attachment cc:
EW Merschoff - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399
OPERATING STATUS REPORT for Columbia Generating Station Date:
February 1, 2003 Docket: 50-397 Reporting Period: January 2003 Utility
Contact:
Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity - summer (Net MWe):
Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 744.0 744.0 0.0 830,827 YEAR CUMULATIVE 744.0 120,439.5 744.0 117,115.5 0.0 3,274.7 830,827 116,083,606
- 10.
Challenges to safety/relief valves:
- 1.
- 2.
- 3.
- 4.
5.
- 6.
- 7.
- 8.
9.
1153 1107 None
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: February 1, 2003 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: January, 2003
SUMMARY
- The plant began and ended the month at power operation.
(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)
Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.
Date S: Scheduled (Hours)
Reason (1)
Down(2)
Comments N/A w