{{#Wiki_filter:I OUISIANA                142 DELAAONDE Smm P O W E R S L I G H T/ P O BOX 6008 . NEW ORLEANS. LOUISLANA 70174 . (504) 366-2345
                      $E00shsSIU                                    May 26, 1983 W3I83 -0194 Q-3-A35.07.37 Mr. John T. Collins, Regional Administrator, Region IV                                                  j    l
                                                                                                          ]hh j
                      ". S. Nuclear Regulatory Comnission                                          I~
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012                                                            h
 
==SUBJECT:==
Waterford SES Unit No. 3 1    JW - l 1983
{
Docket No. 50-382                                                  W' Significant Construction Deficiency No. 37                            W"                          l
                                    " Temperature Detectors (RTD's) Failures"                        -
Sixth Interim Report
 
==REFERENCE:==
LP&L letter W3I82-0095 dated November 5, 1982
 
==Dear Mr. Collins:==
 
5 The above referenced letter indicated submittal of a Final Report to the USNRC no later than Fay 27, 1983.
At the present time, four (4) thermowells and seven (7) RTD's (of the 22 total RTD's) remain to be installed to complete corrective action. Due to restrictions p hced on entering the RTD cabinets during testing, completion of corrective action is anticipated by July 25, 1983.
Therefore, a Final Peport will be submitted to the USNRC by August 12, 1983.
Very truly ours,
                            /
F. J. Drummond Project Support tbnager - Nuclear FJD/RWP/ MAL:keh cc:    1) Director                                              3)  Mr. E. L. Blake
                                  @'fice of Inspection & Enforcement U..S. Nuclear, Regulatory Commission gEdshington, D. C.        20555
: 2) Direccar                                            4)    Mr. W. M. Stevenson f                                Office of Management i
                                'Information and Program Control yV.S.NuclearRegulatoryCommission Washington, D. C.        20555 e,    , ;.Ik.
f , PhR.AOCCK 5
      \
8304070159 800526 05000582 S' w N%
o PDR    ,                                                            'T E-A/      >
v            ,,      u                                                                                                  do}}

Latest revision as of 00:15, 21 February 2020

Sixth Interim Rept of Significant Const Deficiency 37 Re Failures of Resistance Temp Detectors (Rtd).Due to Restrictions Placed on Entering RTD Cabinets During Testing, Submittal of Final Rept Delayed Until 830812
ML20023E071
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/26/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0194, W3I83-194, NUDOCS 8306070169
Download: ML20023E071 (1)


Text

I OUISIANA 142 DELAAONDE Smm P O W E R S L I G H T/ P O BOX 6008 . NEW ORLEANS. LOUISLANA 70174 . (504) 366-2345

$E00shsSIU May 26, 1983 W3I83 -0194 Q-3-A35.07.37 Mr. John T. Collins, Regional Administrator, Region IV j l

]hh j

". S. Nuclear Regulatory Comnission I~

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 h

SUBJECT:

Waterford SES Unit No. 3 1 JW - l 1983

{

Docket No. 50-382 W' Significant Construction Deficiency No. 37 W" l

" Temperature Detectors (RTD's) Failures" -

Sixth Interim Report

REFERENCE:

LP&L letter W3I82-0095 dated November 5, 1982

Dear Mr. Collins:

5 The above referenced letter indicated submittal of a Final Report to the USNRC no later than Fay 27, 1983.

At the present time, four (4) thermowells and seven (7) RTD's (of the 22 total RTD's) remain to be installed to complete corrective action. Due to restrictions p hced on entering the RTD cabinets during testing, completion of corrective action is anticipated by July 25, 1983.

Therefore, a Final Peport will be submitted to the USNRC by August 12, 1983.

Very truly ours,

/

F. J. Drummond Project Support tbnager - Nuclear FJD/RWP/ MAL:keh cc: 1) Director 3) Mr. E. L. Blake

@'fice of Inspection & Enforcement U..S. Nuclear, Regulatory Commission gEdshington, D. C. 20555

2) Direccar 4) Mr. W. M. Stevenson f Office of Management i

'Information and Program Control yV.S.NuclearRegulatoryCommission Washington, D. C. 20555 e, , ;.Ik.

f , PhR.AOCCK 5

\

8304070159 800526 05000582 S' w N%

o PDR , 'T E-A/ >

v ,, u do