I OUISIANA 142 DELAAONDE Smm P O W E R S L I G H T/ P O BOX 6008. NEW ORLEANS. LOUISLANA 70174. (504) 366-2345
$E00shsSIU May 26, 1983 W3I83 -0194 Q-3-A35.07.37 Mr. John T. Collins, Regional Administrator, Region IV j
l
". S. Nuclear Regulatory Comnission I ~ ]hh j
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 h
JW - l 1983 {
1
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 W'
l Significant Construction Deficiency No. 37 W"
" Temperature Detectors (RTD's) Failures" Sixth Interim Report
REFERENCE:
LP&L letter W3I82-0095 dated November 5, 1982
Dear Mr. Collins:
5 The above referenced letter indicated submittal of a Final Report to the USNRC no later than Fay 27, 1983.
At the present time, four (4) thermowells and seven (7) RTD's (of the 22 total RTD's) remain to be installed to complete corrective action. Due to restrictions p hced on entering the RTD cabinets during testing, completion of corrective action is anticipated by July 25, 1983.
Therefore, a Final Peport will be submitted to the USNRC by August 12, 1983.
Very truly ours,
/
F. J. Drummond Project Support tbnager - Nuclear FJD/RWP/ MAL:keh cc:
- 1) Director 3)
Mr. E. L. Blake
@'fice of Inspection & Enforcement U..S. Nuclear, Regulatory Commission Edshington, D. C.
20555 g
- 2) Direccar 4)
Mr. W. M. Stevenson f
Office of Management
'Information and Program Control i
yV.S.NuclearRegulatoryCommission Washington, D. C.
20555 e,
, ;.Ik.
f, PhR.AOCCK 5
8304070159 800526
\\