ML19340E260: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:._._ m_            _ _ . _    m        . _.m    _____ _ _ _ - . .                      ._..~____m                  _ _ _        m _      _ _ _ _ - - .          . . - _ _ . . _  ___m__              _ .          . _ _ .
NRC FORM J66                                                                                                                                    U. S. NUCLE AR REGUL ATORY COMMISSION i                                                                                          LICENSEE EVENT REPORT
]
CONTROL BLOCK: l l      l      l    l  l lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) j lo lil IN l E l F l C l S l 1 l@l 010 l010 lo lo lo 10 lo l0 lo26 l@l4                                                                            26 l1LICEN5E Il 11TD l1  PE JO l@lb 7 L Al 1 t>8l@
j      7      8 9              LICENSEE CODE                  14        15                    LICEN5t NuvutM j      CON'T O i              S$RU LL_j@l 015101010121815                                        68 l@ll 69 1210171810 l@ll 1211171810  14        75        REPORT D ATE                  80 l@
7      8                          60              61                  DOCKET NUVSER                                  EVENT DATE j                  EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h FOTTI I During normal operation. a leak develooed in the weld which cnnnects the demine -                                                                                                                        l I
10131 I              alized water flush line to the discharge manifold of Charoina Pumo CH-1B.                                                                                                    Charoino i                    f
; IOI4II                    oumos CH-1 A and CH-lC were coerable. therefore the reouirements of Technical Soeci- 1 l l0is1 I                    fication 2.2 were met.                                    A similar event is described in LER 78-021.                                                                                      I 4
[T171 1                                                                                                                                                                                                          I
) 10131 1                                                                                                                                                                                                                l i
I I
1 10 l s 1 I                                                                                                                                                                                                    80 7      es SYSTEM                  CAUSE          CAUSE                                                                COYP.              VALV E CODE                    CODE      SUSCODE                      COMPONENT CODE                        SU8 CODE            SUSCODE l0lsl                                  l Pl Cl@ [Lj@ lC l@ l Pl Il Pl El Xl XI@ [Aj@ W @                                                              19                  20 7      8                              9          10              11            12                13                                18 i                                                                                              SEQUE NTI AL                            OCCURRENCE                REPORT                                REVISION EVENT YEAR                                    REPORT NO.                                    CODE                    TYPE                                  N O.
L
:                  @ ,a=E R RO
_ 21 18 10 I 22 l-l 23 10 13 11 I 24                26 Ld 27 10131 28        29 W
JO L-]
31 lo_!
32                            ,
,                  T K N A                ON            C N PL NT              MET                        HOURS            S8 IT              FOR          8.      SUPPL R                      MA F CTURER l3J@lLJ@                                LLJ@                  LLj@            10 10 10 10 I                    Ly_J@            l_nJ@                LAJ@                      Lt  19 19 1947l@
i                    33              34                    35                    36              31                      40      41              42                    43                      44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li10i l            The probable cause of the weld leak was piping vibration. The crack in the weld                                                                                                                I j ii iii I                    was repaired and charging pump CH-1B was returned to service.                                                                                An engineering                                  I l i, ,,i 1                  evaluation is being performed on the problem of vibration of the flushing line                                                                                                                I i,i3i l                (EEAR FC-80-89).                                                                                                                                                                          I I
LuaJ8 9l 7                                                                                                                                                                                                            80 STA S                      % POWER                            OTHER STATUS                  DIS O RY                                  DISCOVERY DESCRIPTION Ii I s l [E_j@ l 017 l 5 l@l                                              NA                          l    W    @l**            Operator Observation                                                            l ACTIVITY          CO# TENT AELE AEED OF HE LEASE                                  AMOUNT OF ACTIVITY                                                                LOCATION OF RELEASE LLLcj Lz_J @ LLJ@l                                        NA                                          l          l          NA 80 I
7    8 9                      to            11                                                  44          45 i                      PERSONNEL E XPOSURES i                      NUV8 E H                      TYPE          DESCRIPTION i i    10 10 10 l@Lz_j@l                                                NA                                                                                                                                  l PERSONNi L i.uu'n'iES                                                                                                                                                                                          l NuveE a                      OtSCn. prion @
I i -                                                              NA                                                                                                                                          l 7      8  9 10 10 10 18I12        11                                                                                                                                                                          80 LOSS OF on DAVAGE TO F ACILITY TYPE            DESCRIPflON i 9    [7_j@l                          NA                                                                                                                                                                    l 7      8 9                  10                                                                                                                                                                                80
                                      '"                                                                                                                                                    NRC USE ONLY                    ,
,          2 o    dl ISSui"@'''Et5CaiPT.ON                  NA                                        7 @ 810106o                                                          l        ((lllllllllllj 7      a 9                  10                                                                                                                                  sa 69                                        80 5 J0hn J. Tesarek                                                pgong:              402-426-4011                                      {
NAYE G{ PREPARER
 
LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 1 Safety Analysis During normal operation, a leak was observed in the weld which con-nects the demineralized water flush line to the discharge manifold of Charging Pump CH-18. Charging pumps CH-1A and CH-1C were operable during the time that CH-1B was recoved from service for repair of the weld, therefore, the requirements of Technical Specification 2.2 were met.
There was no significant radiation exposure to plant personnel or activity released.
1
 
LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 2 Corrective Action M.0. 8098 was initiated to repair the weld which connects the Jemineralized water flush line to the discharge manifold of Charging Pump CH-1B. The weld crack was ground out and the area was rewelded.
The weld was dye penetrant checked and hydrotested. Charging pump CH-1B was then returned to service.
An engineering evaluation is being performed on the problem of vibration of the demineralized water flush line (reference EEAR FC      89).
I i
1 L
 
LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 3 Failure Data A previous related incident is detailed in LER 78-021.
.}}

Latest revision as of 21:24, 15 March 2020

LER 80-031/03L-0:on 801207,during Normal Operation,Leak Developed in Weld Connecting Demineralized Water Flush Line to Discharge Manifold of Charging Pump.Caused by Probable Piping Vibration.Crack Repaired & Pump Returned to Svc
ML19340E260
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/17/1980
From: Tesarek J
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19340E257 List:
References
LER-80-031-03L, LER-80-31-3L, NUDOCS 8101060769
Download: ML19340E260 (4)


Text

._._ m_ _ _ . _ m . _.m _____ _ _ _ - . . ._..~____m _ _ _ m _ _ _ _ _ - - . . . - _ _ . . _ ___m__ _ . . _ _ .

NRC FORM J66 U. S. NUCLE AR REGUL ATORY COMMISSION i LICENSEE EVENT REPORT

]

CONTROL BLOCK: l l l l l l lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) j lo lil IN l E l F l C l S l 1 l@l 010 l010 lo lo lo 10 lo l0 lo26 l@l4 26 l1LICEN5E Il 11TD l1 PE JO l@lb 7 L Al 1 t>8l@

j 7 8 9 LICENSEE CODE 14 15 LICEN5t NuvutM j CON'T O i S$RU LL_j@l 015101010121815 68 l@ll 69 1210171810 l@ll 1211171810 14 75 REPORT D ATE 80 l@

7 8 60 61 DOCKET NUVSER EVENT DATE j EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h FOTTI I During normal operation. a leak develooed in the weld which cnnnects the demine - l I

10131 I alized water flush line to the discharge manifold of Charoina Pumo CH-1B. Charoino i f

IOI4II oumos CH-1 A and CH-lC were coerable. therefore the reouirements of Technical Soeci- 1 l l0is1 I fication 2.2 were met. A similar event is described in LER 78-021. I 4

[T171 1 I

) 10131 1 l i

I I

1 10 l s 1 I 80 7 es SYSTEM CAUSE CAUSE COYP. VALV E CODE CODE SUSCODE COMPONENT CODE SU8 CODE SUSCODE l0lsl l Pl Cl@ [Lj@ lC l@ l Pl Il Pl El Xl XI@ [Aj@ W @ 19 20 7 8 9 10 11 12 13 18 i SEQUE NTI AL OCCURRENCE REPORT REVISION EVENT YEAR REPORT NO. CODE TYPE N O.

L

@ ,a=E R RO

_ 21 18 10 I 22 l-l 23 10 13 11 I 24 26 Ld 27 10131 28 29 W

JO L-]

31 lo_!

32 ,

, T K N A ON C N PL NT MET HOURS S8 IT FOR 8. SUPPL R MA F CTURER l3J@lLJ@ LLJ@ LLj@ 10 10 10 10 I Ly_J@ l_nJ@ LAJ@ Lt 19 19 1947l@

i 33 34 35 36 31 40 41 42 43 44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li10i l The probable cause of the weld leak was piping vibration. The crack in the weld I j ii iii I was repaired and charging pump CH-1B was returned to service. An engineering I l i, ,,i 1 evaluation is being performed on the problem of vibration of the flushing line I i,i3i l (EEAR FC-80-89). I I

LuaJ8 9l 7 80 STA S  % POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION Ii I s l [E_j@ l 017 l 5 l@l NA l W @l** Operator Observation l ACTIVITY CO# TENT AELE AEED OF HE LEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE LLLcj Lz_J @ LLJ@l NA l l NA 80 I

7 8 9 to 11 44 45 i PERSONNEL E XPOSURES i NUV8 E H TYPE DESCRIPTION i i 10 10 10 l@Lz_j@l NA l PERSONNi L i.uu'n'iES l NuveE a OtSCn. prion @

I i - NA l 7 8 9 10 10 10 18I12 11 80 LOSS OF on DAVAGE TO F ACILITY TYPE DESCRIPflON i 9 [7_j@l NA l 7 8 9 10 80

'" NRC USE ONLY ,

, 2 o dl ISSui"@Et5CaiPT.ON NA 7 @ 810106o l ((lllllllllllj 7 a 9 10 sa 69 80 5 J0hn J. Tesarek pgong: 402-426-4011 {

NAYE G{ PREPARER

LER No.80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 1 Safety Analysis During normal operation, a leak was observed in the weld which con-nects the demineralized water flush line to the discharge manifold of Charging Pump CH-18. Charging pumps CH-1A and CH-1C were operable during the time that CH-1B was recoved from service for repair of the weld, therefore, the requirements of Technical Specification 2.2 were met.

There was no significant radiation exposure to plant personnel or activity released.

1

LER No.80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 2 Corrective Action M.0. 8098 was initiated to repair the weld which connects the Jemineralized water flush line to the discharge manifold of Charging Pump CH-1B. The weld crack was ground out and the area was rewelded.

The weld was dye penetrant checked and hydrotested. Charging pump CH-1B was then returned to service.

An engineering evaluation is being performed on the problem of vibration of the demineralized water flush line (reference EEAR FC 89).

I i

1 L

LER No.80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 3 Failure Data A previous related incident is detailed in LER 78-021.

.