ML19305E868: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 23: Line 23:
Very truly yours,
Very truly yours,
                                                                       ~
                                                                       ~
                                                  , .
f ja c[S m F. L. Clayton, Jr.
f ja c[S m F. L. Clayton, Jr.
FLCJr/TNE:aw cc:    Mr. R. A. Thomas                                                                      l Mr. G. F. Trowbridge s  I
FLCJr/TNE:aw cc:    Mr. R. A. Thomas                                                                      l Mr. G. F. Trowbridge s  I I
                                                                                              ;
I
                                                                                              .
A}}
A}}

Latest revision as of 23:33, 21 February 2020

Responds to NRC 800410 Ltr Requesting That Proposed Tech Specs Be Submitted for Sections 3.0.3 & 3.0.5.Current Tech Specs Include Section 3.0.3.Proposed Tech Spec Change Re 3.0.5 to Be Submitted by 800530
ML19305E868
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/13/1980
From: Clayton F
ALABAMA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8005200548
Download: ML19305E868 (1)


Text

Alabama Power Company 600 North 18th S*reet Post Office Box 2641 Birmingham Alabama 35291 Telephone 205 323-5341 C

nk (boWei,hffin, Alabama Power May 13, 1980 the sournern eiectre system Docket No. 50-348 - Unit 1 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. D. G. Eisenhut Gentlemen:

Your letter dated April 10, 1980, requested that proposed technical specifications be submitted for Sections 3.0.3 and 3.0.5 for the Joseph M.

Farley Nuclear Plant. Our current technical specifications include a Section 3.0.3, similar to the one in your letter, so this revision is not necessary. Alabama Power Company plans to submit a variation of the requested Technical Specification 3.0.5 in the near future, but due to a rework of the wording in this change, more time is required than allowed in your letter.

A proposed technical specification change on this subject will be submitted by May 30, 1980.

Very truly yours,

~

f ja c[S m F. L. Clayton, Jr.

FLCJr/TNE:aw cc: Mr. R. A. Thomas l Mr. G. F. Trowbridge s I I

A