ML16305A388: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(16 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16305A388
| number = ML16305A388
| issue date = 11/08/2016
| issue date = 11/08/2016
| title = Summary of October 18, 2016 Meeting With Nextera Energy Point Beach, Llc, To Discuss Containment Dome Truss License Amendment Request For Point Beach Nuclear Plant, UNIT NOS. 1 AND 2 (TAC NOS. MF8403 AND MF8404)
| title = Summary of October 18, 2016 Meeting with Nextera Energy Point Beach, Llc, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (TAC Nos. MF8403 and MF8404)
| author name = Chawla M L
| author name = Chawla M
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 4
| page count = 4
| project = CAC:MF8403, CAC:MF8404, TAC:MF8403
| stage = Meeting
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 8, 2016 LICENSEE:      NextEra Energy Point Beach, LLC FACILITY:      Point Beach Nuclear Plant, Unit Nos. 1 and 2
==SUBJECT:==
==SUMMARY==
OF OCTOBER 18, 2016 MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF8403 AND MF8404)
On October 18, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra) (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of this meeting was for the NRC staff to discuss with NextEra the licensee's proposed license amendment request (LAR) to assess the adequacy of the Point Beach Nuclear Plant (PBNP), Unit Nos. 1 and 2, containment dome truss licensing basis. The pupose of this LAR is to resolve non-conformances with the PBNP dome truss, which resulted from a legacy condition during the original construction. The LAR would provide the evaluation for a revised seismic analysis methodology for the dome truss and supported components. It would also establish structural acceptance criteria for seismic and thermal loading. The licensee stated that the LAR would be risk-informed and would meet the guidance in Regulatory Guide 1.174, Rev. 2, "An approach for using probabilistic risk assessment in risk-informed descision on plant-specfic changes to the licensing basis."
The licensee gave a presentation of its planned submittal. There is no precedence for this LAR and the approach appeared to be complex in nature. The NRC staff asked numerous questions regarding the unique approach, and discussed the possibility of conducting a site audit. The licensee provided the schedule for the submittal as the first quarter of 2017 to be implemented prior to the next outage for PBNP, Unit No. 1. However, the impact, if any, of an extended review due to the unique approach proposed by the licensee was also discussed.
The meeting notice and agenda, dated September 23, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML16291A289. A list of the meeting attendees is enclosed. The licensee provided slides for the presentation (ADAMS Accession No. ML16291A177), which were attached to the meeting notice prior to the meeting.
There were no members of the public in attendance, physically or via bridgeline; and public meeting feedback forms were not requested by anyone.
Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.chawla@nrc.gov.
Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
==Enclosure:==
List of Attendees cc w/enclosure: Distribution via Listserv
LIST OF ATTENDEES OCTOBER 18. 2016. PUBLIC MEETING NEXTERA ENERGY POINT BEACH. LLC REGARDING POINT BEACH NUCLEAR PLANT. UNIT NOS. 1 AND 2 TO DISCUSS CONTAINMENT DOME TRUSS STRUCTURE LAR Nuclear Regulatory Commission, Office    of Nuclear Reactor Regulation Division            Name                Title Division of Operating          Mahesh Chawla        Project Manager, Project Manager (PM)
Reactor Licensing (DORL)
David Wrona          Branch Chief (BC)
Division of Engineering (DE)  Jessie Quichocho    BC, Mechanical Civil Engineering Branch (EMCB)
Dan Hoang            Structural Engineer (EMCB)
Kamal Manely        Senior Technical Advisor Division of Risk Assessment    Joseph Giitter      Director (ORA)
C.J.Fong            Team Leader Shilp Vasavada      Reliability and Risk Analyst Nuclear Regulatory Commission, Office of New Reactors Division of Site Safety and    Nilesh Chokshi      Consultant Environmental Analysis Mahmoud              Project Engineer Jardaneh NextEra Enerav Point Beach, LLC Point Beach Nuclear Plant      Steve Catron        Fleet Licensing Manager Mike Millen          Director Regulatory Projects Lori Christensen    Licensinq Project Manaqer Rich LaPlante        Senior Design Engineer Anil Julka          Fleet PRA Manager Phone Participants NRC/Division of                Farhad Farzam        Senior Structural Engineer Engineering/EMCB NRC Reqion 3                  Jim Neurauter        Senior Reactor Inspector NRC Region 3                  John Bozga          Reactor Inspector Enclosure
ML16305A388 OFFICE DORL/LPL3-1 /PM    DORL/LPL3-1/LA DE/EMCB/BC    ORA/AP LA/BC    DORL/LPL3-1 /BC DORL/LPL3-1 /PM NAME      MChawla        SRohrer        JQuichocho    SRosenberg      DWrona          MChawla DATE      11/1/16        11/1/16        11/3/16        11/2/16          11/4/16        11/8/16}}

Latest revision as of 13:38, 30 October 2019

Summary of October 18, 2016 Meeting with Nextera Energy Point Beach, Llc, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (TAC Nos. MF8403 and MF8404)
ML16305A388
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/08/2016
From: Mahesh Chawla
Plant Licensing Branch III
To:
Point Beach
References
CAC MF8403, CAC MF8404
Download: ML16305A388 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 8, 2016 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF OCTOBER 18, 2016 MEETING WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF8403 AND MF8404)

On October 18, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra) (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.

The purpose of this meeting was for the NRC staff to discuss with NextEra the licensee's proposed license amendment request (LAR) to assess the adequacy of the Point Beach Nuclear Plant (PBNP), Unit Nos. 1 and 2, containment dome truss licensing basis. The pupose of this LAR is to resolve non-conformances with the PBNP dome truss, which resulted from a legacy condition during the original construction. The LAR would provide the evaluation for a revised seismic analysis methodology for the dome truss and supported components. It would also establish structural acceptance criteria for seismic and thermal loading. The licensee stated that the LAR would be risk-informed and would meet the guidance in Regulatory Guide 1.174, Rev. 2, "An approach for using probabilistic risk assessment in risk-informed descision on plant-specfic changes to the licensing basis."

The licensee gave a presentation of its planned submittal. There is no precedence for this LAR and the approach appeared to be complex in nature. The NRC staff asked numerous questions regarding the unique approach, and discussed the possibility of conducting a site audit. The licensee provided the schedule for the submittal as the first quarter of 2017 to be implemented prior to the next outage for PBNP, Unit No. 1. However, the impact, if any, of an extended review due to the unique approach proposed by the licensee was also discussed.

The meeting notice and agenda, dated September 23, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML16291A289. A list of the meeting attendees is enclosed. The licensee provided slides for the presentation (ADAMS Accession No. ML16291A177), which were attached to the meeting notice prior to the meeting.

There were no members of the public in attendance, physically or via bridgeline; and public meeting feedback forms were not requested by anyone.

Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.chawla@nrc.gov.

Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES OCTOBER 18. 2016. PUBLIC MEETING NEXTERA ENERGY POINT BEACH. LLC REGARDING POINT BEACH NUCLEAR PLANT. UNIT NOS. 1 AND 2 TO DISCUSS CONTAINMENT DOME TRUSS STRUCTURE LAR Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Mahesh Chawla Project Manager, Project Manager (PM)

Reactor Licensing (DORL)

David Wrona Branch Chief (BC)

Division of Engineering (DE) Jessie Quichocho BC, Mechanical Civil Engineering Branch (EMCB)

Dan Hoang Structural Engineer (EMCB)

Kamal Manely Senior Technical Advisor Division of Risk Assessment Joseph Giitter Director (ORA)

C.J.Fong Team Leader Shilp Vasavada Reliability and Risk Analyst Nuclear Regulatory Commission, Office of New Reactors Division of Site Safety and Nilesh Chokshi Consultant Environmental Analysis Mahmoud Project Engineer Jardaneh NextEra Enerav Point Beach, LLC Point Beach Nuclear Plant Steve Catron Fleet Licensing Manager Mike Millen Director Regulatory Projects Lori Christensen Licensinq Project Manaqer Rich LaPlante Senior Design Engineer Anil Julka Fleet PRA Manager Phone Participants NRC/Division of Farhad Farzam Senior Structural Engineer Engineering/EMCB NRC Reqion 3 Jim Neurauter Senior Reactor Inspector NRC Region 3 John Bozga Reactor Inspector Enclosure

ML16305A388 OFFICE DORL/LPL3-1 /PM DORL/LPL3-1/LA DE/EMCB/BC ORA/AP LA/BC DORL/LPL3-1 /BC DORL/LPL3-1 /PM NAME MChawla SRohrer JQuichocho SRosenberg DWrona MChawla DATE 11/1/16 11/1/16 11/3/16 11/2/16 11/4/16 11/8/16