|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML101340788 | | | number = ML101340788 |
| | issue date = 06/02/2010 | | | issue date = 06/02/2010 |
| | title = Summary of Tele Conf Call Held on 4/14/10, Btw Usnrc and APS, Concerning D-RAI Pertaining to the PVNGS, Units 1,2 and 3, License Renewal Application | | | title = Summary of Tele Conf Call Held on 4/14/10, Btw USNRC and APS, Concerning D-RAI Pertaining to the PVNGS, Units 1,2 and 3, License Renewal Application |
| | author name = Regner L M | | | author name = Regner L |
| | author affiliation = NRC/NRR/DLR/RPB2 | | | author affiliation = NRC/NRR/DLR/RPB2 |
| | addressee name = | | | addressee name = |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:June 2, 2010 LICENSEE: Arizona Public Service Company | | {{#Wiki_filter:June 2, 2010 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3 |
| | |
| FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF TELEPHONE CONFERENCE CALL HELD ON APRIL 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on April 14, 2010, to discuss and clarify the staff's draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI. | | OF TELEPHONE CONFERENCE CALL HELD ON APRIL 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on April 14, 2010, to discuss and clarify the staffs draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs draft RAI. provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant, including a brief description on the status of the item. |
| Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant, including a brief description on the status of the item.
| | The applicant had an opportunity to comment on this summary. |
| | | /RA/ |
| The applicant had an opportunity to comment on this summary. | | Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530 |
| /RA/
| |
| Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc w/encls: See next page | | As stated cc w/encls: See next page |
| | |
| ML101340788 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR
| |
|
| |
|
| NAME IKing LRegner DWrona LRegner | | ML101340788 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IKing LRegner DWrona LRegner DATE 05/24/10 05/24/10 05/26/10 06/02/10 |
|
| |
|
| DATE 05/24/10 05/24/10 05/26/10 06/02/10 Memorandum to Arizona Public Service Company from L. Regner dated June 2, 2010
| | Memorandum to Arizona Public Service Company from L. Regner dated June 2, 2010 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF TELEPHONE CONFERENCE CALL HELD ON APRIL 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION | | OF TELEPHONE CONFERENCE CALL HELD ON APRIL 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION: |
| : HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource -------------
| | HARD COPY: |
| L. Regner D. Drucker R. Hall B. Mizuno, OGC R. Treadway, RIV G. Pick, RIV | | DLR RF E-MAIL: |
| | | PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource |
| ENCLOSURE 1 TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 14, 2010 PARTICIPANTS AFFILIATIONSLisa Re gner U.S. Nuclear Re gulator y Commission (NRC) James Gavula NRC
| | ------------- |
| | | L. Regner D. Drucker R. Hall B. Mizuno, OGC R. Treadway, RIV G. Pick, RIV |
| An gela Krainik Arizona Public Service Com p an y (APS) Glenn Michael APS Eric Blocher Strate gic Teamin g and Resource Sharin g (STARS) Alliance
| |
|
| |
|
| ENCLOSURE 2 DRAFT REQUESTS FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (PVNGS) LICENSE RENEWAL APPLICATION APRIL 14, 2010
| | TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 14, 2010 PARTICIPANTS AFFILIATIONS Lisa Regner U.S. Nuclear Regulatory Commission (NRC) |
| | James Gavula NRC Angela Krainik Arizona Public Service Company (APS) |
| | Glenn Michael APS Eric Blocher Strategic Teaming and Resource Sharing (STARS) Alliance ENCLOSURE 1 |
|
| |
|
| The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on April 14, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application (LRA). | | DRAFT REQUESTS FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (PVNGS) |
| DRAFT RAI B2.1.6-1 Flow-Accelerated Corrosion | | LICENSE RENEWAL APPLICATION APRIL 14, 2010 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on April 14, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application (LRA). |
| | DRAFT RAI B2.1.6-1 Flow-Accelerated Corrosion |
|
| |
|
| ===Background=== | | ===Background=== |
| In its discussion of aging effects for cavitation erosion for treated water, EPRI 1010639, "Non-Class 1 Mechanical Implementation Guideline and Mechanical Tools, Revision 4," | | In its discussion of aging effects for cavitation erosion for treated water, EPRI 1010639, Non-Class 1 Mechanical Implementation Guideline and Mechanical Tools, Revision 4, Appendix A, Section 3.1.6, Erosion and Flow Accelerated Corrosion, states, in part, that cavitation erosion is considered a design deficiency, which will be detected and corrected during current operation, and therefore, is not an applicable aging effect for the period of extended operation. However, in the same appendix, Section 4.1, Assumptions, No. 9 states, in part, that the above statement is an assumption, and notes an exception when the cavitation occurs in infrequently operated systems, and states in these cases, plant specific consideration may need to be addressed in the aging management review. |
| Appendix A, Section 3.1.6, "Erosion and Flow Accelerated Corrosion," states, in part, that cavitation erosion is considered a design deficiency, which will be detected and corrected during current operation, and therefore, is not an applicable aging effect for the period of extended operation. However, in the same appendix, Section 4.1, "Assumptions," No. 9 states, in part, that the above statement is an assumption, and notes an exception when the cavitation occurs in infrequently operated systems, and states in these cases, plant specific consideration may need to be addressed in the aging management review. | | In addition, the Generic Aging Lessons Learned (GALL) Report, Table IX.E, Aging Effects notes that loss of material may be due to several causes and erosion is specifically included. The GALL Report, Table IX.F, Significant Aging Mechanisms, defines both cavitation, and erosion; however, the GALL Report does not include any specific items that address loss of material due to cavitation erosion. Since the GALL Report also does not include an aging management program to manage this specific aging effect, a plant-specific program would be needed to manage loss of material due to cavitation erosion. |
| In addition, the Generic Aging Lessons Learned (GALL) Report, Table IX.E, Aging Effects notes that "loss of material" may be due to several causes and erosion is specifically included. The GALL Report, Table IX.F, Significant Aging Mechanisms, defines both cavitation, and erosion; however, the GALL Report does not include any specific items that address loss of material due to cavitation erosion. Since the GALL Report also does not include an aging management program to manage this specific aging effect, a plant-specific program would be needed to manage loss of material due to cavitation erosion. | | Issue During a review of operating experience at PVNGS, the NRC identified CRDR 2932507, which documents a through-wall leak in piping immediately downstream of a valve in the high pressure safety injection recirculation line due to erosion by damaging cavitation. Within this document, CRAI 2964170 indicated that the Flow-Accelerated Corrosion (FAC) Program was to inspect, using UT, those components potentially susceptible to cavitation erosion as identified in the apparent cause evaluation. In addition, the FAC program was to be revised to include examination of portions of all three units HPSI train B recirculation piping every 18 months in order to assess cavitation erosion. Based on PVNGS operating experience, the exception noted above in EPRI 1010639, regarding infrequently operated systems, appears to apply. As such, the EPRI document indicates that a plant-specific consideration needs to be addressed in the aging management review. As described in CRDR 2932507, a monitoring program has been implemented to manage the identified aging effect. |
| | | ENCLOSURE 2 |
| Issue During a review of operating experience at PVNGS, the NRC identified CRDR 2932507, which documents a through-wall leak in piping immediately downstream of a valve in the high pressure safety injection recirculation line "due to erosion by damaging cavitation." Within this document, CRAI 2964170 indicated that the Flow-Accelerated Corrosion (FAC) Program was to inspect, using UT, those components potentially susceptible to cavitation erosion as identified in the apparent cause evaluation. In addition, the FAC program was to be revised to include examination of portions of all three unit's HPSI train "B" recirculation piping every 18 months in order to assess cavitation erosion. Based on PVNGS' operating experience, the exception noted above in EPRI 1010639, regarding infrequently operated systems, appears to apply. As such, the EPRI document indicates that a plant-specific consideration needs to be addressed in the aging management review. As described in CRDR 2932507, a monitoring program has been implemented to manage the identified aging effect. Request 1) Provide the aging effect evaluation, as described in NEI 95-10, Industry Guidelines for License Renewal Rule, Figure 4.2-1, which considered the operating experience documented in CRDR 2932507. | |
| : 2) Provide the aging management review performed for any components determined to be susceptible to the aging effect caused by cavitation erosion as identified in CRDR 2932507. Provide the technical evaluation that was performed, which included or excluded components for further consideration.
| |
| : 3) Provide a description of the aging management program, that will be used to manage the effects of aging associated with cause(s) identified in CRDR 2932507, and address the ten elements of the program as indicated in the SRP-LR, Appendix A.1, Aging Management Review.
| |
| | |
| Discussion
| |
| : Following discussion with the applicant, the staff determined that the cavitation erosion identified in the draft RAI was a design issue and not an aging effect requiring aging management for this system. The applicant is monitoring the condition under the existing FAC program. The question is out of the scope of license renewal and will not be issued formally.
| |
| | |
| Palo Verde Nuclear Generating Station, Units 1, 2, and 3 cc: Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ 85040 Mr. Ron Barnes, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. John C. Taylor, Director, Nuclear Generation El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Highway, Bldg. D21 San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ 85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100
| |
|
| |
|
| Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX 78701-3326
| | Request |
| | : 1) Provide the aging effect evaluation, as described in NEI 95-10, Industry Guidelines for License Renewal Rule, Figure 4.2-1, which considered the operating experience documented in CRDR 2932507. |
| | : 2) Provide the aging management review performed for any components determined to be susceptible to the aging effect caused by cavitation erosion as identified in CRDR 2932507. |
| | Provide the technical evaluation that was performed, which included or excluded components for further consideration. |
| | : 3) Provide a description of the aging management program, that will be used to manage the effects of aging associated with cause(s) identified in CRDR 2932507, and address the ten elements of the program as indicated in the SRP-LR, Appendix A.1, Aging Management Review. |
| | Discussion: Following discussion with the applicant, the staff determined that the cavitation erosion identified in the draft RAI was a design issue and not an aging effect requiring aging management for this system. The applicant is monitoring the condition under the existing FAC program. The question is out of the scope of license renewal and will not be issued formally. |
|
| |
|
| Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Station 7602 Phoenix, AZ 85072-2034}} | | Palo Verde Nuclear Generating Station, Units 1, 2, and 3 cc: |
| | Mr. Steve Olea Mr. John C. Taylor, Director, Nuclear Arizona Corporation Commission Generation 1200 W. Washington Street El Paso Electric Company Phoenix, AZ 85007 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter, Senior Counsel Southern California Edison Company Mr. James Ray Law Department, Generation Resources Public Service Company of New Mexico P.O. Box 800 2401 Aztec NE, MS Z110 Rosemead, CA 91770 Albuquerque, NM 87107-4224 Senior Resident Inspector Mr. Geoffrey M. Cook U.S. Nuclear Regulatory Commission Southern California Edison Company P.O. Box 40 5000 Pacific Coast Highway, Bldg. D21 Buckeye, AZ 85326 San Clemente, CA 92672 Regional Administrator, Region IV Mr. Robert Henry U.S. Nuclear Regulatory Commission Salt River Project 612 E. Lamar Blvd., Suite 400 6504 E. Thomas Road Arlington, TX 76011-4125 Scottsdale, AZ 85251 Chairman Mr. Jeffrey T. Weikert Maricopa County Board of Supervisors Assistant General Counsel 301 W. Jefferson, 10th Floor El Paso Electric Company Phoenix, AZ 85003 Mail Location 167 123 W. Mills Mr. Aubrey V. Godwin, Director El Paso, TX 79901 Arizona Radiation Regulatory Agency 4814 S. 40th Street Mr. Eric Tharp Phoenix, AZ 85040 Los Angeles Department of Water & Power Southern California Public Power Authority Mr. Ron Barnes, Director P.O. Box 51111, Room 1255-C Regulatory Affairs Los Angeles, CA 90051-0100 Palo Verde Nuclear Generating Station Mail Station 7636 Mr. Brian Almon P.O. Box 52034 Public Utility Commission Phoenix, AZ 85072-2034 William B. Travis Building P.O. Box 13326 Mr. Dwight C. Mims, Vice President 1701 N. Congress Avenue Regulatory Affairs and Plant Improvement Austin, TX 78701-3326 Palo Verde Nuclear Generating Station Mail Station 7605 Mr. Randall K. Edington P.O. Box 52034 Executive Vice President Phoenix, AZ 85072-2034 Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Station 7602 Phoenix, AZ 85072-2034}} |
|
---|
Category:Meeting Summary
MONTHYEARML24282A9072024-10-17017 October 2024 Summary of June 28, 2024, Pre-submittal Meeting with Arizona Public Service Company to Discuss a Planned License Amendment Request Changes to Technical Specifications 3.5.1 and 3.5.2 ML24271A3052024-10-0404 October 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss a LAR to Modify the TS 5.6.5 List of Allowable Methodologies for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML23258A1402023-09-27027 September 2023 Summary of August 31, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Planned Submittal of License Renewal Commitment Regarding Alloy 600 Management Program Plan at Palo Verde Station, Units 1, 2, & 3 ML23150A1982023-06-0505 June 2023 Summary of 5/25/2023, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME, Section XI Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde, Units 1, 2, and 3 ML23097A0692023-04-14014 April 2023 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request Regarding Containment Temperature and Safety Injection Tank Volume at Palo Verde Units 1, 2, and 3 ML23095A0932023-04-0606 April 2023 Summary of April 4, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station ML23072A0312023-03-14014 March 2023 March 1, 2023, Summary of Meeting with Arizona Public Service Company to Discuss Proposed 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22314A2742022-11-15015 November 2022 October 27, 2022 Meeting with Arizona Public Service Company to Discuss Proposed LAR to Adopt TSTF-107, Revision 4, Separate Control Rods That Are Untrippable Versus Inoperable, for Palo Verde, Units 1, 2, & 3 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22098A0322022-04-20020 April 2022 Summary of April 6, 2022, Public Meeting with Arizona Public Service Company to Discuss Upcoming License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-487 (EPID L-LRM-0025) ML21347A9522021-12-14014 December 2021 Summary of December 9, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR to Adopt TSTF-567, Add Containment TS to Address GSI-191 Issues for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21333A0022021-12-0202 December 2021 Summary of Pre-Submittal Meeting with Arizona Public Service Company RIPE Exemption for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21278A5462021-10-13013 October 2021 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request No. 68 for Certain ASME Code Piping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21245A4152021-09-0808 September 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Exemption to Eliminate Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station ML21168A2632021-06-24024 June 2021 Summary of June 16, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming Relief Request No. 67, Extension of Containment Tendon Inservice Testing from 10 Years to 20 Years for Palo Verde Nuclear Generating Station, U ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21134A0002021-05-18018 May 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Order License Transfer from Pnm to Salt River Project Agriculture Improvement and Power District for Palo Verde, Units 1 and 2 and the ISFSI ML21061A3202021-03-10010 March 2021 Summary of February 25, 2021, Public Meeting with Nuclear Energy Institute to Further Discuss the Inclusion of TSTF-425 Under the Risk-Informed Process for Evaluations Initiative ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21011A2742021-01-26026 January 2021 Summary of January 6, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR Regarding Containment Integrated Leak Rate Test Permanent Extension to 15 Years for Palo Verde Nuclear Generating Station, Units 1, 2, an ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19219A6122019-08-13013 August 2019 Summary of July 11, 2019, Teleconference with APS to Discuss Proposed License Amendment Request to Revise the Emergency Plan for Palo Verde Nuclear Generating Station ML17353A1902017-12-29029 December 2017 Summary of 12/12/2017, Public Meeting with Arizona Public Service Company, on Proposed Relief Request 50 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML16088A0602016-04-15015 April 2016 3/24/16 Summary of Pre-application Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML16028A3942016-02-12012 February 2016 Summary of Prelicensing Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML16011A0582016-01-21021 January 2016 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15306A2352015-11-13013 November 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Degraded Voltage Relay Setpoints License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15286A0282015-10-23023 October 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (CAC MF6600-MF6602) ML15268A1312015-10-0505 October 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15239B3222015-09-0909 September 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15244B0772015-09-0101 September 2015 Summary of Annual Assessment Meeting with Arizona Public Service Regarding Palo Verde Nuclear Generating Station 2014 Performance ML15173A2892015-06-30030 June 2015 June 9, 2015, Summary of Category 1 Public Meeting with Arizona Public Service Company to Discuss Palo Verde Nuclear Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned NTTF Recommendation ML15140A3142015-06-16016 June 2015 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (TAC MF5843-MF584 ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal ML15078A0052015-03-25025 March 2015 Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications ML14150A1772014-06-0202 June 2014 Summary of Conference Call Regarding Spring 2014 Steam Generator Tube Inspections ML14136A0582014-06-0202 June 2014 5/14/2014 Summary of Meeting with Arizona Public Service Company to Discuss Flooding Hazard Reevaluation Extension Request for Palo Verde, Units 1, 2, and 3; Near-Term Task Force Recommendation 2.1 ML14099A4692014-04-21021 April 2014 Summary of 4/2/2014 Pre-Application Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom Mounted Instrumentation to End-of-Unit Life ML13333B5742013-12-0505 December 2013 Summary of 11/1/2013 Conference Call Regarding the Fall 2013 Steam Generator Tube Inspections ML13330A5732013-12-0505 December 2013 Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13312A5402013-11-18018 November 2013 11/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13311B1832013-11-18018 November 2013 Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13234A0052013-08-26026 August 2013 8/21/2013 - Summary of Preapplication Meeting with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13203A0852013-08-0505 August 2013 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 (TAC Nos. MF1932-MF1934) ML13161A2522013-06-26026 June 2013 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831) ML13154A4502013-06-26026 June 2013 Summary of Meeting Via Conference Call with Arizona Public Service Co. to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME816 ML13154A4322013-06-13013 June 2013 5/30/13 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF083 ML12244A2152012-09-20020 September 2012 8/30/2012 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 2024-09-27
[Table view] Category:Memoranda
MONTHYEARML24297A6392024-10-30030 October 2024 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21061A3202021-03-10010 March 2021 Summary of February 25, 2021, Public Meeting with Nuclear Energy Institute to Further Discuss the Inclusion of TSTF-425 Under the Risk-Informed Process for Evaluations Initiative ML21006A3242021-01-0707 January 2021 Approval of the Risk-Informed Process for Evaluations ML19120A1972019-04-26026 April 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for Arizona Public Service Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 73.30(b) and 10 CFR 72.30(c) for Palo Verde ISFSI ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17128A4522017-05-0808 May 2017 Lessons Learned from Modeling the Flex Steam Generator Feed Pump for Palo Verde Nuclear Generating Station ML17082A4462017-03-28028 March 2017 PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3 ML17027A2842017-01-27027 January 2017 Charter for the NRC Special Inspection Team at Palo Verde Nuclear Generating Station-Review of Licensee Actions Related to the Failure of the Unit 3 Train B Emergency Diesel Generator ML17018A1232017-01-17017 January 2017 Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure ML17003A0832017-01-0303 January 2017 Safety Evaluation Input Regarding Changes to Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML17004A2092017-01-0303 January 2017 Safety Evaluation Input for Palo Verde Nuclear Generating Station, Unit 3, Llcense Amendment Request for a One-Time Extension of the 3B Emergency Diesel Generator Completion Time ML17003A3892017-01-0303 January 2017 Safety Evaluation Input Regarding the Palo Verde Nuclear Generating Station Unit 3 Emergency Request to Extend Diesel Generator 3B Completion Time ML16358A4152016-12-23023 December 2016 Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15205A3602015-07-24024 July 2015 Assessment of Cyber Security Program Draft Temporary Instruction (Ti) Performed at Palo Verde Nuclear Generating Station ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13238A0352014-04-22022 April 2014 Memo from P. Lee to M. Markley Palo Verde RAI Memorandum ML13330A5732013-12-0505 December 2013 Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13324A4942013-11-19019 November 2013 Deferral of Baseline Inspection Activities ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13154A4832013-06-0404 June 2013 Rai'S Following Ifib Analysis of Ap'S 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13105A0182013-05-16016 May 2013 Request for Additional Information Regarding APS Overall Integrated Plan in Response to Order EA-12-049 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1104604622011-02-15015 February 2011 Minutes Meeting of Palo Verde Nuclear Generating Station Units 1, 2, and 3 License Renewal Subcommittee, September 8, 2010, in Rockville, Maryland ML1030105232010-11-16016 November 2010 Summary of Teleconference Held on Between the U.S. NRC and Arizona Public Service Company, Concerning Draft Follow-Up Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, LRA ML1029905302010-11-16016 November 2010 Summary of Telephone Conference Call Held on October 22, 2010, Btw the USNRC and Arizona Public Service Company, Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, LRA ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1020305002010-10-15015 October 2010 Summary of Tele Conf Call Held on 7/21/10, Btw the USNRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal App ML1019401422010-10-15015 October 2010 July 8, 2010, Summary of Telephone Conference Call Held Between USNRC and Arizona Public Service Company Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application ML1027801622010-10-13013 October 2010 9/15/10 Summary of Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for Palo Verde Nuclear Generating Station ML1028003402010-10-13013 October 2010 Final Response to Task Interface Agreement - Requirements for Degraded Voltage Relay Setpoints at Palo Verde Nuclear Generating Station (TIA 2010-005 ML1024303382010-10-0505 October 2010 Letter Summary of Telephone Conference Call Held on 8/31/10 Btw the USNRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Lr ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1021606502010-08-0909 August 2010 Transmittal Letter Advisory Committee on Reactor Safeguards Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application - Safety Evaluation Report ML1017600272010-07-19019 July 2010 Summary of Telecon Calls Held on May 5, May 19, and June 16, 2010 Between the USNRC and Arizona Public Service Company, Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application ML1013407042010-06-0202 June 2010 License Renewal, May 14, 2010 Conference Call Summary ML1013302522010-06-0202 June 2010 4-13-2010, Telecon Summary Re Draft Request for Additional Information Pertaining to the License Renewal Application ML1013302862010-06-0202 June 2010 04/23/10 Summary of Telepone Conference Call Held Between NRC and Arizona Public Service Co., Concerning Palo Verde, Units 1, 2 & 3 License Renewal Application ML1013406662010-06-0202 June 2010 Summary of Tele Conf Call Held on 4/12/10, Btw the USNRC and APS, Concerning the PVNGS, Units 1, 2, and 3, License Renewal Application ML1013407882010-06-0202 June 2010 Summary of Tele Conf Call Held on 4/14/10, Btw USNRC and APS, Concerning D-RAI Pertaining to the PVNGS, Units 1,2 and 3, License Renewal Application ML1010606402010-04-27027 April 2010 Summary of Tele Conference Call Held on 4/9/10, Btw the USNRC and Arizona Public Service Company, Concerning Draft Requests for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1,2, and 3, License Renewa 2024-10-30
[Table view] |
Text
June 2, 2010 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on April 14, 2010, to discuss and clarify the staffs draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs draft RAI. provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant, including a brief description on the status of the item.
The applicant had an opportunity to comment on this summary.
/RA/
Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530
Enclosures:
As stated cc w/encls: See next page
ML101340788 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IKing LRegner DWrona LRegner DATE 05/24/10 05/24/10 05/26/10 06/02/10
Memorandum to Arizona Public Service Company from L. Regner dated June 2, 2010
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource
L. Regner D. Drucker R. Hall B. Mizuno, OGC R. Treadway, RIV G. Pick, RIV
TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 14, 2010 PARTICIPANTS AFFILIATIONS Lisa Regner U.S. Nuclear Regulatory Commission (NRC)
James Gavula NRC Angela Krainik Arizona Public Service Company (APS)
Glenn Michael APS Eric Blocher Strategic Teaming and Resource Sharing (STARS) Alliance ENCLOSURE 1
DRAFT REQUESTS FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (PVNGS)
LICENSE RENEWAL APPLICATION APRIL 14, 2010 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on April 14, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application (LRA).
DRAFT RAI B2.1.6-1 Flow-Accelerated Corrosion
Background
In its discussion of aging effects for cavitation erosion for treated water, EPRI 1010639, Non-Class 1 Mechanical Implementation Guideline and Mechanical Tools, Revision 4, Appendix A, Section 3.1.6, Erosion and Flow Accelerated Corrosion, states, in part, that cavitation erosion is considered a design deficiency, which will be detected and corrected during current operation, and therefore, is not an applicable aging effect for the period of extended operation. However, in the same appendix, Section 4.1, Assumptions, No. 9 states, in part, that the above statement is an assumption, and notes an exception when the cavitation occurs in infrequently operated systems, and states in these cases, plant specific consideration may need to be addressed in the aging management review.
In addition, the Generic Aging Lessons Learned (GALL) Report, Table IX.E, Aging Effects notes that loss of material may be due to several causes and erosion is specifically included. The GALL Report, Table IX.F, Significant Aging Mechanisms, defines both cavitation, and erosion; however, the GALL Report does not include any specific items that address loss of material due to cavitation erosion. Since the GALL Report also does not include an aging management program to manage this specific aging effect, a plant-specific program would be needed to manage loss of material due to cavitation erosion.
Issue During a review of operating experience at PVNGS, the NRC identified CRDR 2932507, which documents a through-wall leak in piping immediately downstream of a valve in the high pressure safety injection recirculation line due to erosion by damaging cavitation. Within this document, CRAI 2964170 indicated that the Flow-Accelerated Corrosion (FAC) Program was to inspect, using UT, those components potentially susceptible to cavitation erosion as identified in the apparent cause evaluation. In addition, the FAC program was to be revised to include examination of portions of all three units HPSI train B recirculation piping every 18 months in order to assess cavitation erosion. Based on PVNGS operating experience, the exception noted above in EPRI 1010639, regarding infrequently operated systems, appears to apply. As such, the EPRI document indicates that a plant-specific consideration needs to be addressed in the aging management review. As described in CRDR 2932507, a monitoring program has been implemented to manage the identified aging effect.
ENCLOSURE 2
Request
- 1) Provide the aging effect evaluation, as described in NEI 95-10, Industry Guidelines for License Renewal Rule, Figure 4.2-1, which considered the operating experience documented in CRDR 2932507.
- 2) Provide the aging management review performed for any components determined to be susceptible to the aging effect caused by cavitation erosion as identified in CRDR 2932507.
Provide the technical evaluation that was performed, which included or excluded components for further consideration.
- 3) Provide a description of the aging management program, that will be used to manage the effects of aging associated with cause(s) identified in CRDR 2932507, and address the ten elements of the program as indicated in the SRP-LR, Appendix A.1, Aging Management Review.
Discussion: Following discussion with the applicant, the staff determined that the cavitation erosion identified in the draft RAI was a design issue and not an aging effect requiring aging management for this system. The applicant is monitoring the condition under the existing FAC program. The question is out of the scope of license renewal and will not be issued formally.
Palo Verde Nuclear Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Mr. John C. Taylor, Director, Nuclear Arizona Corporation Commission Generation 1200 W. Washington Street El Paso Electric Company Phoenix, AZ 85007 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter, Senior Counsel Southern California Edison Company Mr. James Ray Law Department, Generation Resources Public Service Company of New Mexico P.O. Box 800 2401 Aztec NE, MS Z110 Rosemead, CA 91770 Albuquerque, NM 87107-4224 Senior Resident Inspector Mr. Geoffrey M. Cook U.S. Nuclear Regulatory Commission Southern California Edison Company P.O. Box 40 5000 Pacific Coast Highway, Bldg. D21 Buckeye, AZ 85326 San Clemente, CA 92672 Regional Administrator, Region IV Mr. Robert Henry U.S. Nuclear Regulatory Commission Salt River Project 612 E. Lamar Blvd., Suite 400 6504 E. Thomas Road Arlington, TX 76011-4125 Scottsdale, AZ 85251 Chairman Mr. Jeffrey T. Weikert Maricopa County Board of Supervisors Assistant General Counsel 301 W. Jefferson, 10th Floor El Paso Electric Company Phoenix, AZ 85003 Mail Location 167 123 W. Mills Mr. Aubrey V. Godwin, Director El Paso, TX 79901 Arizona Radiation Regulatory Agency 4814 S. 40th Street Mr. Eric Tharp Phoenix, AZ 85040 Los Angeles Department of Water & Power Southern California Public Power Authority Mr. Ron Barnes, Director P.O. Box 51111, Room 1255-C Regulatory Affairs Los Angeles, CA 90051-0100 Palo Verde Nuclear Generating Station Mail Station 7636 Mr. Brian Almon P.O. Box 52034 Public Utility Commission Phoenix, AZ 85072-2034 William B. Travis Building P.O. Box 13326 Mr. Dwight C. Mims, Vice President 1701 N. Congress Avenue Regulatory Affairs and Plant Improvement Austin, TX 78701-3326 Palo Verde Nuclear Generating Station Mail Station 7605 Mr. Randall K. Edington P.O. Box 52034 Executive Vice President Phoenix, AZ 85072-2034 Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Station 7602 Phoenix, AZ 85072-2034