| issue date = 06/30/2011 | | issue date = 06/30/2011 | ||
| title = Notification of Inspection (NRC Inspection Report 05000445/2011004, 05000446/2011004) and Request for Information | | title = Notification of Inspection (NRC Inspection Report 05000445/2011004, 05000446/2011004) and Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Flores R | | addressee name = Flores R | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000445/2011004]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY | {{#Wiki_filter:UNITED STATES | ||
COMMISSION | NUCLEAR REGULATORY COMMISSION | ||
REGION IV Rafael Flores, Senior Vice President | REGION IV | ||
and Chief Nuclear Officer Luminant Generation | 612 EAST LAMAR BLVD, SUITE 400 | ||
Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 | ARLINGTON, TEXAS 76011-4125 | ||
June 30, 2011 | |||
OF INSPECTION (NRC INSPECTION | Rafael Flores, Senior Vice President | ||
and Chief Nuclear Officer | |||
05000446/2011004) | Luminant Generation Company LLC | ||
AND REQUEST FOR INFORMATION | Comanche Peak Nuclear Power Plant | ||
Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory | P.O. Box 1002 | ||
Commission (NRC) will begin the onsite portion of the Gas Accumulation | Glen Rose, TX 76043 | ||
Management | SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - | ||
in Emergency | NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT | ||
Core Cooling, Decay Heat Removal, and Containment | 05000445/2011004; 05000446/2011004) AND REQUEST FOR INFORMATION | ||
Spray Systems Temporary | Dear Mr. Flores: | ||
Instruction | On August 15, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite | ||
at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection | portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat | ||
will be performed | Removal, and Containment Spray Systems Temporary Instruction at your Comanche Peak | ||
in accordance | Nuclear Power Plant, Units 1 and 2. This inspection will be performed in accordance with NRC | ||
with NRC Temporary | Temporary Instruction (TI) 2515/177. | ||
Instruction (TI) 2515/177. | Experience has shown that this inspection is resource intensive both for the NRC inspectors | ||
Experience | and your staff. In order to minimize the impact to your onsite resources and to ensure a | ||
has shown that this inspection | productive inspection, we have enclosed a request for documents needed for this inspection. | ||
is resource intensive | The documents have been divided into two groups. | ||
both for the NRC inspectors | * The first group lists information necessary for our initial inspection scoping and in-office | ||
and your staff. In order to minimize the impact to your onsite resources | preparation activities. This information should be separated by information request number, | ||
and to ensure a productive | especially if provided electronically (e.g., folder with the information request number). This | ||
inspection, we have enclosed a request for documents | information should be available to the inspector no later than August 1, 2011. Upon review of | ||
needed for this inspection. | these documents, the inspectors will select additional documentation for review upon arrival. | ||
The documents | By August 10, 2011, the inspector will communicate the initial selected samples. | ||
have been divided into two groups. * The first group lists information | * The second group of documents requested is needed to support our onsite inspection | ||
necessary | activities. This set of documents should be available to the inspector on August 15, 2011. It | ||
for our initial inspection | is also requested that corrective action documents and responses to questions developed | ||
scoping and in-office | during the inspection be provided to the inspector as the documents are generated. | ||
preparation | We have discussed the schedule for these inspection activities with your staff and understand | ||
activities. | that our regulatory contact for this inspection will be Gary Merka of your licensing organization. | ||
This information | If there are any questions about this inspection or the materia! requested, please contact the | ||
should be separated | inspector, Matt Young, at 817-276-6545 or by email at '-'-==:.J:-==~=~=' | ||
by information | |||
request number, especially | -2- | ||
if provided electronically (e.g., folder with the information | This letter does not contain new or amended information collection requirements subject to the | ||
request number). This information | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | ||
should be available | requirements were approved by the Office of Management and Budget, control number | ||
to the inspector | 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, | ||
no later than August 1, 2011. Upon review of these documents, the inspectors | a request for information or an information collection requirement unless the requesting | ||
will select additional | document displays a currently valid Office of Management and Budget control number. | ||
documentation | In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of | ||
for review upon arrival. By August 10, 2011, the inspector | Practice, a copy of this letter and its enclosure will be available electronically for public | ||
will communicate | inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) | ||
the initial selected samples. * The second group of documents | component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web | ||
requested | site at (the Public Electronic Reading Room). | ||
is needed to support our onsite inspection | Thomas R. Farnholtz, Chief | ||
activities. | Engineering Branch 1 | ||
This set of documents | Division of Reactor Safety | ||
should be available | Dockets: 50-445; 50-446 | ||
to the inspector | Licenses: NPF-87; NPF-89 | ||
on August 15, 2011. It is also requested | Enclosure: Management of Gas Accumulation in Emergency Core Cooling, Decay Heat | ||
that corrective | Removal, and Containment Spray Systems Temporary Instruction Document Request | ||
action documents | cc w/encl: | ||
and responses | Distribution via ListServ for Comanche Peak | ||
to questions | |||
developed | MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY | ||
during the inspection | HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSTRUCTION | ||
be provided to the inspector | DOCUMENT REQUEST | ||
as the documents | inspection Report: 05000445/2011004; 05000446/2011004 | ||
are generated. | On-site Inspection Dates: August 15-19, 2011 | ||
We have discussed | Inspection Procedure: TI 2515/177, "Management of Gas Accumulation in | ||
the schedule for these inspection | Emergency Core Cooling, Decay Heat Removal, and | ||
activities | Containment Spray Systems" | ||
with your staff and understand | Lead InspectorlTeam Leader: Matt Young | ||
that our regulatory | 817 -276-6545 | ||
contact for this inspection | Matt.young@nrc.gov | ||
will be Gary Merka of your licensing | The following information should be sent to the Region IV office in hard copy or electronic | ||
organization. | format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the | ||
If there are any questions | selection of specific items that will be reviewed during the onsite inspection week. The | ||
about this inspection | inspector will select specific items from the information requested below and then request from | ||
or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545 | your staff additional documents needed during the onsite inspection weeks. Also, we request | ||
or by email at | that you categorize the documents in your response with the numbered list below. Please | ||
-2 -This letter does not contain new or amended information | provide requested documentation electronically if possible. If requested documents are large | ||
collection | and only hard copy formats are available, please inform the inspector(s), and provide subject | ||
requirements | documentation during the first day of the onsite inspection. If you have any questions regarding | ||
subject to the Paperwork | this information request, please call the inspector as soon as possible. | ||
Reduction | I. Information Requested By August 1, 2011 | ||
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | 1. List of corrective action program documents (with a short description) associated with | ||
collection | Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous | ||
requirements | three years. | ||
were approved by the Office of Management | 2. List of changes (with a short description and tracking number) to the final safety analysis | ||
and Budget, control number 3150-0011. | report (FSAR), technical specifications, technical specification bases, and technical | ||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information | requirements manual associated with the resolution of GL 2008-01. | ||
or an information | 3. List of calculations associated with GL 2008-01, including calculations that have been | ||
collection | changed or created in response to GL 2008-01 (with a short description of the | ||
requirement | calculation and the change). | ||
unless the requesting | 4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the | ||
document displays a currently | affected system locations (e.g. identify the source, conditions, and expected void | ||
valid Office of Management | locations). | ||
and Budget control number. In accordance | 5. List of the suction piping sections identified as susceptible to gas accumulation (the list | ||
with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure | should identify the corresponding system). | ||
will be available | - 1- Enclosure | ||
electronically | |||
for public inspection | 6. List of the discharge piping sections identified as susceptible to gas accumulation (the | ||
in the NRC Public Document Room or from the Publicly Available | list should identify the corresponding system). | ||
Records (PARS) component | 7. Copies of isometric drawings of the emergency core cooling, residual heat removal, and | ||
of NRC's document system (ADAMS). ADAMS is accessible | containment spray systems (hard-copies are preferred). | ||
from the NRC Web site at (the Public Electronic | 8. Copies of piping and instrumentation diagrams (P&IDs) of the emergency core cooling, | ||
Reading Room). | residual heat removal, and containment spray systems (hard-copies are preferred). | ||
NPF-87; NPF-89 | 9. Copies of program documents and procedures developed to implement the resolution of | ||
GL 2008-01. | |||
Management | 10. List of actions that were completed in response to GL 2008-01. | ||
of Gas Accumulation | 11. Copies of the modification packages for hardware modifications as part of the resolution | ||
in Emergency | of GL 2008-01. | ||
Core Cooling, Decay Heat Removal, and Containment | 12. Design basis documents of the emergency core cooling, residual heat removal, and | ||
Spray Systems Temporary | containment spray systems. | ||
Instruction | 13. Design basis documents of keep-full systems of the emergency core cooling, residual | ||
Document Request cc w/encl: Distribution | heat removal, and containment spray systems. | ||
via ListServ for Comanche Peak | 14. System walkdown reports associated with the resolution of GL 2008-01. | ||
MANAGEMENT | 15. If applicable, provide a list of inaccessible locations where plant walkdowns of the | ||
OF GAS ACCUMULATION | emergency core cooling, residual heat removal, and containment spray systems have | ||
IN EMERGENCY | not been completed. Include an explanation of why each area is considered | ||
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT | inaccessible. | ||
SPRAY SYSTEMS TEMPORARY | 16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the | ||
INSTRUCTION | results of the last two surveillances for the emergency core cooling, residual heat | ||
DOCUMENT REQUEST inspection | removal, and containment spray systems. | ||
Report: | 17. Copies of procedures used for detecting and determining void volumes. | ||
18. Copies of procedures used for filling and venting. | |||
19. Copies of trends of periodic venting results. | |||
20. Copies of the engineering evaluations performed for all identified voids in the past three | |||
years. | |||
05000446/2011004 | 21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the | ||
August 15-19, 2011 TI 2515/177, "Management | justification for any deviation from the void acceptance criteria established by the Office | ||
of Gas Accumulation | of Nuclear Reactor Regulation (NRR). | ||
22. Copy of any void transport analyses. | |||
Core Cooling, Decay Heat Removal, and Containment | -2- Enclosure | ||
Spray Systems" Matt Young 817 -276-6545 | |||
Matt.young@nrc.gov | 23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01. | ||
The following | 24. Copies of self-assessments associated with the implementation of the GL 2008-01 | ||
information | program. | ||
should be sent to the Region IV office in hard copy or electronic | II. Information Requested By August 15,2011 | ||
format (ims.certrec.com | 25. Copies of the selected corrective action program documents. | ||
or compact disc, preferred), in care of Matt Young, to facilitate | 26. Copies of the selected licensing and design basis document changes. | ||
27. Copies of the selected calculations. | |||
of specific items that will be reviewed during the onsite inspection | 28. Copies of training documents that ensure that personnel are aware of gas-related | ||
week. The inspector | concerns. | ||
will select specific items from the information | 29. Copies of corrective action program implementing procedures. | ||
requested | 30. Electronic copies of the current technical specifications, technical specification bases, | ||
below and then request from your staff additional | final safety analysis report, and technical requirements manual. | ||
documents | -3- Enclosure | ||
needed during the onsite inspection | |||
weeks. Also, we request that you categorize | |||
the documents | |||
in your response with the numbered list below. Please provide requested | |||
documentation | |||
electronically | |||
if possible. | |||
If requested | |||
documents | |||
are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation | |||
during the first day of the onsite inspection. | |||
If you have any questions | |||
regarding | |||
this information | |||
request, please call the inspector | |||
as soon as possible. | |||
I. Information | |||
Requested | |||
By August 1, 2011 1. List of corrective | |||
action program documents (with a short description) | |||
associated | |||
for the previous three years. 2. List of changes (with a short description | |||
and tracking number) to the final safety analysis report (FSAR), technical | |||
specifications, technical | |||
specification | |||
bases, and technical | |||
requirements | |||
manual associated | |||
with the resolution | |||
of GL 2008-01. 3. List of calculations | |||
associated | |||
with GL 2008-01, including | |||
calculations | |||
that have been changed or created in response to GL 2008-01 (with a short description | |||
of the calculation | |||
and the change). 4. List (with a short description) | |||
of gas intrusion | |||
mechanisms | |||
that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations). | |||
5. List of the suction piping sections identified | |||
as susceptible | |||
to gas accumulation (the list should identify the corresponding | |||
system). -1 -Enclosure | |||
6. List of the discharge | |||
piping sections identified | |||
as susceptible | |||
to gas accumulation (the list should identify the corresponding | |||
system). 7. Copies of isometric | |||
drawings of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems (hard-copies | |||
are preferred). | |||
8. Copies of piping and instrumentation | |||
diagrams (P&IDs) of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems (hard-copies | |||
are preferred). | |||
9. Copies of program documents | |||
and procedures | |||
developed | |||
to implement | |||
the resolution | |||
in response to GL 2008-01. 11. Copies of the modification | |||
packages for hardware modifications | |||
as part of the resolution | |||
of GL 2008-01. 12. Design basis documents | |||
of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems. 13. Design basis documents | |||
of keep-full | |||
systems of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems. 14. System walkdown reports associated | |||
with the resolution | |||
of GL 2008-01. 15. If applicable, provide a list of inaccessible | |||
locations | |||
where plant walkdowns | |||
of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems have not been completed. | |||
Include an explanation | |||
of why each area is considered | |||
inaccessible. | |||
16. Copies of surveillance | |||
procedures | |||
associated | |||
with the resolution | |||
of GL 2008-01 and the results of the last two surveillances | |||
for the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems. 17. Copies of procedures | |||
used for detecting | |||
and determining | |||
void volumes. 18. Copies of procedures | |||
used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering | |||
evaluations | |||
performed | |||
for all identified | |||
voids in the past three years. 21. Basis for the void acceptance | |||
criteria (e.g. calculation). | |||
If applicable, provide the justification | |||
for any deviation | |||
from the void acceptance | |||
criteria established | |||
by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport | |||
analyses. -2 -Enclosure | |||
23. Copy of vortexing | |||
calculations | |||
associated | |||
with systems under the scope of GL 2008-01. 24. Copies of self-assessments | |||
associated | |||
with the implementation | |||
of the GL 2008-01 program. II. Information | |||
Requested | |||
By August 15,2011 25. Copies of the selected corrective | |||
action program documents. | |||
26. Copies of the selected licensing | |||
and design basis document changes. 27. Copies of the selected calculations. | |||
28. Copies of training documents | |||
that ensure that personnel | |||
are aware of gas-related | |||
concerns. | |||
29. Copies of corrective | |||
action program implementing | |||
procedures. | |||
30. Electronic copies | |||
of the current technical | |||
specifications, technical | |||
specification | |||
bases, final safety analysis report, and technical | |||
requirements | |||
manual. -3 -Enclosure | |||
}} | }} |
Latest revision as of 17:59, 12 November 2019
ML11181A076 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 06/30/2011 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Flores R Luminant Generation Co |
References | |
IR-11-004 | |
Download: ML11181A076 (5) | |
See also: IR 05000445/2011004
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
June 30, 2011
Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Luminant Generation Company LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT
05000445/2011004; 05000446/2011004) AND REQUEST FOR INFORMATION
Dear Mr. Flores:
On August 15, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite
portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat
Removal, and Containment Spray Systems Temporary Instruction at your Comanche Peak
Nuclear Power Plant, Units 1 and 2. This inspection will be performed in accordance with NRC
Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
The documents have been divided into two groups.
- The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than August 1, 2011. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival.
By August 10, 2011, the inspector will communicate the initial selected samples.
- The second group of documents requested is needed to support our onsite inspection
activities. This set of documents should be available to the inspector on August 15, 2011. It
is also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Gary Merka of your licensing organization.
If there are any questions about this inspection or the materia! requested, please contact the
inspector, Matt Young, at 817-276-6545 or by email at '-'-==:.J:-==~=~='
-2-
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at (the Public Electronic Reading Room).
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-445; 50-446
Enclosure: Management of Gas Accumulation in Emergency Core Cooling, Decay Heat
Removal, and Containment Spray Systems Temporary Instruction Document Request
cc w/encl:
Distribution via ListServ for Comanche Peak
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSTRUCTION
DOCUMENT REQUEST
inspection Report: 05000445/2011004; 05000446/2011004
On-site Inspection Dates: August 15-19, 2011
Inspection Procedure: TI 2515/177, "Management of Gas Accumulation in
Emergency Core Cooling, Decay Heat Removal, and
Containment Spray Systems"
Lead InspectorlTeam Leader: Matt Young
817 -276-6545
Matt.young@nrc.gov
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By August 1, 2011
1. List of corrective action program documents (with a short description) associated with
Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous
three years.
2. List of changes (with a short description and tracking number) to the final safety analysis
report (FSAR), technical specifications, technical specification bases, and technical
requirements manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g. identify the source, conditions, and expected void
locations).
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
- 1- Enclosure
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the emergency core cooling, residual heat removal, and
containment spray systems (hard-copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the emergency core cooling,
residual heat removal, and containment spray systems (hard-copies are preferred).
9. Copies of program documents and procedures developed to implement the resolution of
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the emergency core cooling, residual heat removal, and
containment spray systems.
13. Design basis documents of keep-full systems of the emergency core cooling, residual
heat removal, and containment spray systems.
14. System walkdown reports associated with the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the
emergency core cooling, residual heat removal, and containment spray systems have
not been completed. Include an explanation of why each area is considered
inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the emergency core cooling, residual heat
removal, and containment spray systems.
17. Copies of procedures used for detecting and determining void volumes.
18. Copies of procedures used for filling and venting.
19. Copies of trends of periodic venting results.
20. Copies of the engineering evaluations performed for all identified voids in the past three
years.
21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the Office
of Nuclear Reactor Regulation (NRR).
22. Copy of any void transport analyses.
-2- Enclosure
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
24. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By August 15,2011
25. Copies of the selected corrective action program documents.
26. Copies of the selected licensing and design basis document changes.
27. Copies of the selected calculations.
28. Copies of training documents that ensure that personnel are aware of gas-related
concerns.
29. Copies of corrective action program implementing procedures.
30. Electronic copies of the current technical specifications, technical specification bases,
final safety analysis report, and technical requirements manual.