ML073550278: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML073550278
| number = ML073550278
| issue date = 01/07/2008
| issue date = 01/07/2008
| title = 12/12/2007 Summary of Meeting to Discuss Upcoming License Amendment Request (LAR) for Digital Upgrade to the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) for Oconee, Units 1, 2, and 3
| title = Summary of Meeting to Discuss Upcoming License Amendment Request (LAR) for Digital Upgrade to the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) for Oconee, Units 1, 2, and 3
| author name = Olshan L N
| author name = Olshan L
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 7, 2008LICENSEE:DUKE POWER COMPANY LLC (DUKE)
{{#Wiki_filter:January 7, 2008 LICENSEE:       DUKE POWER COMPANY LLC (DUKE)
FACILITY:OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
FACILITY:       OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF DECEMBER 12, 2007, MEETING TO DISCUSS UPCOMINGLICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)On December 12, 2007, the U.S. Nuclear Regulatory (NRC) met with Duke (the licensee) todiscuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML073470813. Enclosed is a list of the meeting attendees.The licensee is planning to submit the LAR by January 31, 2008. The licensee proposed tohave the supporting technical documents available to the NRC staff, but not submit these documents on the docket. The NRC staff stated that it would provide to the licensee a list of the technical documents, based on the ongoing Digital Instrumentation and Control Steering Committee efforts, that should be submitted on the docket along with the LAR.The licensee requested that the amendments be issued by January 31, 2009. The NRC staffstated that this type of review would be expected to take about 12 to 15 months, but the NRC staff will attempt to complete its review and issue the amendments on the schedule requested by the licensee./RA by RJervey/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287
OF DECEMBER 12, 2007, MEETING TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)
On December 12, 2007, the U.S. Nuclear Regulatory (NRC) met with Duke (the licensee) to discuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML073470813. Enclosed is a list of the meeting attendees.
The licensee is planning to submit the LAR by January 31, 2008. The licensee proposed to have the supporting technical documents available to the NRC staff, but not submit these documents on the docket. The NRC staff stated that it would provide to the licensee a list of the technical documents, based on the ongoing Digital Instrumentation and Control Steering Committee efforts, that should be submitted on the docket along with the LAR.
The licensee requested that the amendments be issued by January 31, 2009. The NRC staff stated that this type of review would be expected to take about 12 to 15 months, but the NRC staff will attempt to complete its review and issue the amendments on the schedule requested by the licensee.
                                                              /RA by RJervey/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287


==Enclosure:==
==Enclosure:==
List of Attendeescc w/encl: See next page January 7, 2008LICENSEE:DUKE POWER COMPANY LLC (DUKE)
 
FACILITY:OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
List of Attendees cc w/encl: See next page
 
January 7, 2008 LICENSEE:       DUKE POWER COMPANY LLC (DUKE)
FACILITY:       OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF DECEMBER 12, 2007, MEETING TO DISCUSS UPCOMINGLICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)On December 12, 2007, the U.S. Nuclear Regulatory (NRC) met with Duke (the licensee) todiscuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML073470813. Enclosed is a list of the meeting attendees.The licensee is planning to submit the LAR by January 31, 2008. The licensee proposed tohave the supporting technical documents available to the NRC staff, but not submit these documents on the docket. The NRC staff stated that it would provide to the licensee a list of the technical documents, based on the ongoing Digital Instrumentation and Control Steering Committee efforts, that should be submitted on the docket along with the LAR.The licensee requested that the amendments be issued by January 31, 2009. The NRC staffstated that this type of review would be expected to take about 12 to 15 months, but the NRC staff will attempt to complete its review and issue the amendments on the schedule requested by the licensee./RA by RJervey/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287
OF DECEMBER 12, 2007, MEETING TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)
On December 12, 2007, the U.S. Nuclear Regulatory (NRC) met with Duke (the licensee) to discuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML073470813. Enclosed is a list of the meeting attendees.
The licensee is planning to submit the LAR by January 31, 2008. The licensee proposed to have the supporting technical documents available to the NRC staff, but not submit these documents on the docket. The NRC staff stated that it would provide to the licensee a list of the technical documents, based on the ongoing Digital Instrumentation and Control Steering Committee efforts, that should be submitted on the docket along with the LAR.
The licensee requested that the amendments be issued by January 31, 2009. The NRC staff stated that this type of review would be expected to take about 12 to 15 months, but the NRC staff will attempt to complete its review and issue the amendments on the schedule requested by the licensee.
                                                                /RA by RJervey/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287


==Enclosure:==
==Enclosure:==
List of Attendeescc w/encl: See next pageDistribution
:PUBLICW. Kemper, NRORidsAcrsAcnwMailCenter LPL2-1 R/FRidsNrrDorl (TMcGinty)RidsRgn2MailCenter (JMoorman)
RidsNrrDorlLpl2-1 (EMarinos)I. Ahmed, NRRM. Waterman, NRRRidsNrrPMLOlshan (hard copy)P. Hiland, NRRT. Liu, NRR RidsNrrLAMO'Brien (hard copy)RidsNrrPMRMartin, NRRS.Campbell, EDO Rgn II RidsOgcRpRidsNrrPMSBailey, NRRAccession Number:  ML073550278OFFICENRR/LPL2-1/PMNRR/LPL3-1/LANRR/LPL2-1/LANRR/LPL2-1/A-BCNAMERJervey forLOlshan:ncBTullyMO'BrienJStangDATE    1/7/08      1/2/08    1/3/08    1/7/08 OFFICIAL RECORD COPY EnclosureMEETING ATTENDEESFROM DECEMBER 12, 2007, MEETING WITH DUKE POWER COMPANY LLC (DUKE)TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST FOR DIGITAL UPGRADE TOREACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVESYSTEM NRC DUKEW. KemperR. GillI. AhmedE. Burchfield P. HilandB. Geddes T. McGintyG. Davenport E. MarinosJ. Fisicaro R. MartinB. Shingleton S. BaileyM. Bailey M. Waterman L. OlshanOTHERM. Burzynski, AREVAJ. Riley, Nuclear Energy Institute Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. HamiltonVice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC  29672Ms. Lisa F. VaughnAssociate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina  28202Manager, LISNUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL  34619-1035Senior Resident InspectorU.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC  29672Mr. Henry Porter, DirectorDivision of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC  29201-1708Mr. Michael A. SchoppmanFramatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA  22209Mr. B. G. DavenportRegulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC  29672Mr. Leonard G. GreenAssistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC  27602Mr. R. L. Gill, Jr.Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC  28202Division of Radiation ProtectionNC Dept of Environment, Health, & Natural 


Resources 3825 Barrett Dr.
List of Attendees cc w/encl: See next page Distribution:
Raleigh, NC 27609-7721Mr. Peter R. Harden, IVVP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210Mr. Henry BarronGroup Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006Mr. Charles BrinkmanDirector, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852Ms. Kathryn B. NolanSenior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202}}
PUBLIC                          W. Kemper, NRO                  RidsAcrsAcnwMailCenter LPL2-1 R/F                      RidsNrrDorl (TMcGinty)          RidsRgn2MailCenter (JMoorman)
RidsNrrDorlLpl2-1 (EMarinos)    I. Ahmed, NRR                    M. Waterman, NRR RidsNrrPMLOlshan (hard copy)    P. Hiland, NRR                  T. Liu, NRR RidsNrrLAMOBrien (hard copy)  RidsNrrPMRMartin, NRR            S.Campbell, EDO Rgn II RidsOgcRp                      RidsNrrPMSBailey, NRR Accession Number: ML073550278 OFFICE      NRR/LPL2-1/PM NRR/LPL3-1/LA      NRR/LPL2-1/LA      NRR/LPL2-1/A-BC NAME        RJervey for    BTully            MOBrien            JStang LOlshan:nc DATE          1/7/08            1/2/08          1/3/08              1/7/08
 
OFFICIAL RECORD COPY MEETING ATTENDEES FROM DECEMBER 12, 2007, MEETING WITH DUKE POWER COMPANY LLC (DUKE)
TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST FOR DIGITAL UPGRADE TO REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM NRC                                      DUKE W. Kemper                                R. Gill I. Ahmed                                E. Burchfield P. Hiland                                B. Geddes T. McGinty                              G. Davenport E. Marinos                              J. Fisicaro R. Martin                                B. Shingleton S. Bailey                                M. Bailey M. Waterman L. Olshan OTHER M. Burzynski, AREVA J. Riley, Nuclear Energy Institute Enclosure
 
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton                    Mr. Leonard G. Green Vice President, Oconee Site              Assistant Attorney General Duke Power Company LLC                    NC Department of Justice 7800 Rochester Highway                    P.O. Box 629 Seneca, SC 29672                          Raleigh, NC 27602 Ms. Lisa F. Vaughn                        Mr. R. L. Gill, Jr.
Associate General Counsel and Managing    Manager - Nuclear Regulatory Attorney                                    Issues and Industry Affairs Duke Energy Carolinas, LLC                Duke Power Company LLC 526 South Church Street - EC07H          526 S. Church St.
Charlotte, North Carolina 28202          Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation                          Division of Radiation Protection 2650 McCormick Dr., 3rd Floor            NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035                  Resources 3825 Barrett Dr.
Senior Resident Inspector                Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway                  Mr. Peter R. Harden, IV Seneca, SC 29672                          VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director                6000 Fairview Road Division of Radioactive Waste Management  12th Floor Bureau of Land and Waste Management      Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St.                            Mr. Henry Barron Columbia, SC 29201-1708                  Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman                  P.O. Box 1006-EC07H Framatome ANP                            Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.
Suite 705                                Mr. Charles Brinkman Rosslyn, VA 22209                        Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport                      12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager            Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation                  Ms. Kathryn B. Nolan ON03RC                                    Senior Counsel 7800 Rochester Highway                    Duke Energy Carolinas, LLC Seneca, SC 29672                          526 South Church Street - EC07H Charlotte, NC 28202}}

Latest revision as of 09:49, 7 December 2019

Summary of Meeting to Discuss Upcoming License Amendment Request (LAR) for Digital Upgrade to the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) for Oconee, Units 1, 2, and 3
ML073550278
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/07/2008
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To:
Duke Power Co
Olshan L N, NRR/DORL, 415-1419
References
TAC MD2471, TAC MD2472, TAC MD2473
Download: ML073550278 (4)


Text

January 7, 2008 LICENSEE: DUKE POWER COMPANY LLC (DUKE)

FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

SUBJECT:

SUMMARY

OF DECEMBER 12, 2007, MEETING TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)

On December 12, 2007, the U.S. Nuclear Regulatory (NRC) met with Duke (the licensee) to discuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML073470813. Enclosed is a list of the meeting attendees.

The licensee is planning to submit the LAR by January 31, 2008. The licensee proposed to have the supporting technical documents available to the NRC staff, but not submit these documents on the docket. The NRC staff stated that it would provide to the licensee a list of the technical documents, based on the ongoing Digital Instrumentation and Control Steering Committee efforts, that should be submitted on the docket along with the LAR.

The licensee requested that the amendments be issued by January 31, 2009. The NRC staff stated that this type of review would be expected to take about 12 to 15 months, but the NRC staff will attempt to complete its review and issue the amendments on the schedule requested by the licensee.

/RA by RJervey/

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Attendees cc w/encl: See next page

January 7, 2008 LICENSEE: DUKE POWER COMPANY LLC (DUKE)

FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

SUBJECT:

SUMMARY

OF DECEMBER 12, 2007, MEETING TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO THE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)

On December 12, 2007, the U.S. Nuclear Regulatory (NRC) met with Duke (the licensee) to discuss the upcoming LAR for a digital upgrade to RPS/ESPS at Oconee. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML073470813. Enclosed is a list of the meeting attendees.

The licensee is planning to submit the LAR by January 31, 2008. The licensee proposed to have the supporting technical documents available to the NRC staff, but not submit these documents on the docket. The NRC staff stated that it would provide to the licensee a list of the technical documents, based on the ongoing Digital Instrumentation and Control Steering Committee efforts, that should be submitted on the docket along with the LAR.

The licensee requested that the amendments be issued by January 31, 2009. The NRC staff stated that this type of review would be expected to take about 12 to 15 months, but the NRC staff will attempt to complete its review and issue the amendments on the schedule requested by the licensee.

/RA by RJervey/

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Attendees cc w/encl: See next page Distribution:

PUBLIC W. Kemper, NRO RidsAcrsAcnwMailCenter LPL2-1 R/F RidsNrrDorl (TMcGinty) RidsRgn2MailCenter (JMoorman)

RidsNrrDorlLpl2-1 (EMarinos) I. Ahmed, NRR M. Waterman, NRR RidsNrrPMLOlshan (hard copy) P. Hiland, NRR T. Liu, NRR RidsNrrLAMOBrien (hard copy) RidsNrrPMRMartin, NRR S.Campbell, EDO Rgn II RidsOgcRp RidsNrrPMSBailey, NRR Accession Number: ML073550278 OFFICE NRR/LPL2-1/PM NRR/LPL3-1/LA NRR/LPL2-1/LA NRR/LPL2-1/A-BC NAME RJervey for BTully MOBrien JStang LOlshan:nc DATE 1/7/08 1/2/08 1/3/08 1/7/08

OFFICIAL RECORD COPY MEETING ATTENDEES FROM DECEMBER 12, 2007, MEETING WITH DUKE POWER COMPANY LLC (DUKE)

TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST FOR DIGITAL UPGRADE TO REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM NRC DUKE W. Kemper R. Gill I. Ahmed E. Burchfield P. Hiland B. Geddes T. McGinty G. Davenport E. Marinos J. Fisicaro R. Martin B. Shingleton S. Bailey M. Bailey M. Waterman L. Olshan OTHER M. Burzynski, AREVA J. Riley, Nuclear Energy Institute Enclosure

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. Hamilton Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.

Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St.

Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.

Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.

Suite 705 Mr. Charles Brinkman Rosslyn, VA 22209 Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport 12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation Ms. Kathryn B. Nolan ON03RC Senior Counsel 7800 Rochester Highway Duke Energy Carolinas, LLC Seneca, SC 29672 526 South Church Street - EC07H Charlotte, NC 28202