ML062210252

From kanterella
Jump to navigation Jump to search

Notice of Forthcoming Meeting with Duke Power Company LLC, Oconee, Units 1, 2, and 3, Diverse High-pressure Actuation System Upgrade
ML062210252
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/15/2006
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Marinos E
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
TAC MD2471, TAC MD2472, TAC MD2473
Download: ML062210252 (5)


Text

August 15, 2006 MEMORANDUM TO: Evangelos C. Marinos, Branch Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing FROM:

Leonard N. Olshan, Project Manager

/RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC DATE & TIME:

Wednesday, August 30, 2006 11:00 a.m. - 12:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-1F22 Rockville, Maryland PURPOSE:

To discuss the diverse high-pressure actuation system that will be provided for the digital upgrade to the reactor protective system and engineered safeguards protective system (TAC Nos. MD2471, MD2472, and MD2473)

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACTS:

Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

E. Marinos

- 2 -

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC/NRR DUKE M. Mayfield L. Nicholson T. McGinty R. Gill E. Marinos B. Shingleton A. Howe B. Thomas M. Waterman M. Miller P. Rebstock M. Bailey N. Carte L. Olshan Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Meeting Agenda cc w/encl: See next page

E. Marinos

- 2 -

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC/NRR DUKE M. Mayfield L. Nicholson T. McGinty R. Gill E. Marinos B. Shingleton A. Howe B. Thomas M. Waterman M. Miller P. Rebstock M. Bailey N. Carte L. Olshan Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Meeting Agenda cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDorl LPL2-1 R/F PMNS RidsNrrPMLOlshan (hard copy)

S. Lee, EDO Region II RidsNrrLAM'OBrien (hard copy)

K. Clark OPA Region II Receptionist (OWFN and TWFN) (hard copy)

N. Carter, NRR RidsNrrAdro R. Jasinski, NRR RidsNrrOpaMailCenter M. Mayfield, NRR RidsAcrs AcnwMailCenter T. McGinty, NRR RidsNrrDorlLpl2-1 (Emarinos)

A. Howe, NRR RidsOgcMailCenter M. Waterman, NRR RidsRgn2MailCenter (MErnstes)

R. Rebstock, NRR Accession Number: ML062210252 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan MOBrein EMarinos DATE 08/14/2006 08/14/2006 08/15/2006 OFFICIAL RECORD COPY

U.S. NUCLEAR REGULATORY COMMISSION AND DUKE POWER COMPANY LLC DIVERSE HIGH-PRESSURE INJECTION ACTUATION SYSTEM AUGUST 30, 2006 MEETING AGENDA 11:00 a.m. - 11:05 a.m.

Introductions and opening remarks 11:05 a.m. - 11:20 a.m.

Background

11:20 a.m. - 11:50 a.m.

Design process 11:50 a.m. - 12:20 p.m.

Diverse high-pressure injection design requirements 12:20 p.m. - 12:30 p.m.

Closing remarks

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Ms. Lisa F. Vaughn Duke Energy Corporation 526 South Church Street P. O. Box 1006 Mail Code = EC07H Charlotte, North Carolina 28201-1006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672