March 16, 2007 LICENSEE:
DUKE POWER COMPANY LLC (DUKE)
FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
SUBJECT:
SUMMARY
OF FEBRUARY 27, 2007, MEETING TO DISCUSS TECHNICAL SPECIFICATIONS (TSs) AND LICENSING PLAN FOR FUTURE LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (RPS/ESPS) (TAC NOS. MD2471, MD2472, AND MD2473)
On February 27, 2007, the Nuclear Regulatory Commission (NRC) met with Duke (the licensee) to discuss the TSs and the licensing plan for a future LAR for a digital upgrade to RPS/ESPS.
Enclosed is a list of the attendees. The handouts provided by the licensee during the meeting are available in the Agencywide Documents Access and Management System under accession number ML070590252.
The licensee stated that it intends to retain separate TSs for RPS and ESPS and that it intends to retain one set of TSs that apply to all three units. However, since the implementation of the digital upgrade to RPS/ESPS will occur at different times for the three units, the TS changes will include a note that states that these changes apply after the digital upgrade has been implemented. The NRC staff did not state any objections to this approach.
The licensee also stated that it intends to request some TS changes, and provide the justification for these changes, in the future LAR. These changes include extending the Required Action Completion Times, eliminating the 12-hour channel check, and extending the functional test frequency.
The licensee is currently planning to submit the LAR by November 30, 2007, and presented a schedule that allowed only 1 year for the NRC staff to issue its safety evaluation (SE). The NRC staff indicated that issuing its SE within 1 year of receipt of the LAR would be a significant challenge.
On slide 13 of the handout entitled, Oconee Digital LAR Licensing Plan, the licensee listed the documents that will not be provided before the NRC staff completes its SE. The NRC staff stated that the licensee had previously indicated that some of these documents would be submitted prior to the completion of the NRC staffs SE. The NRC staff stated that some of these delayed documents would be important for the successful completion of the NRC staffs review and that further discussion and consideration regarding the submission of these documents is needed.
Duke The licensee is planning to implement the digital upgrade to RPS/ESPS on Oconee Unit 1 during its fall 2009 refueling outage.
The licensee and the NRC staff agreed to have additional meetings and discussions prior to submission of the LAR. The licensee and the NRC staff agreed to meet in the near future to discuss cyber security and the quality management plan.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page
Duke March 16, 2007 The licensee is planning to implement the digital upgrade to RPS/ESPS on Oconee Unit 1 during its fall 2009 refueling outage.
The licensee and the NRC staff agreed to have additional meetings and discussions prior to submission of the LAR. The licensee and the NRC staff agreed to meet in the near future to discuss cyber security and the quality management plan.
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsOgcRp A. Howe LPL2-1 R/F RidsAcrsAcnwMailCenter C. Schulten RidsNrrDorlLpl2-1 (EMarinos)
T. McGinty MWaterman RidsNrrPMLOlshan (hard copy)
E. Eagle, Jr.
A. Zografos RidsNrrLAMOBrien (hard copy)
W. Kemper C. Doutt P. Rebstock G. Singh C. Ogle S. Campbell, EDO Rgn II RidsRgn2MailCenter (MErnstes)
RidsNrrOd (TLiu)
Accession Number: ML070650496 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan:nc MOBrien EMarinos DATE 3 /16 /07 3/15 /07 3/16/07 OFFICIAL RECORD COPY
Enclosure MEETING ATTENDEES FROM FEBRUARY 27, 2007, MEETING WITH DUKE POWER COMPANY LLC (DUKE)
TO DISCUSS TECHNICAL SPECIFICATIONS AND LICENSING PLAN FOR FUTURE LICENSE AMENDMENT REQUEST FOR DIGITAL UPGRADE TO REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM NRC DUKE E. Marinos M. Bailey W. Kemper L. Nicholson M. Waterman R. Gill P. Rebstock B. Shingleton G. Singh D. Coyle A. Howe M. Miller C. Schulten L. Olshan OTHER T. McGinty J. Weil, McGraw-Hill E. Eagle, Jr.
D. Raleigh, Scientech A. Zografos J. Voss, Excel Services C. Doutt C. Brinkman, Westinghouse C. Ogle (by phone)
Oconee Nuclear Station, Units 1, 2, and 3
cc:
Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202