| | {{#Wiki_filter:Report ITAACAugust 16, 2012 Overview"Report" ITAAC rely on a technical report to satisfy the acceptance criteria of the ITAACExamples of Report ITAAC include: |
| | -Equipment QualificationEnvironmental QualificationFunctional QualificationSeismic Qualification |
| | -ASMEPiping/Component DesignPiping/Component As |
| | -BuiltWeld NDE/hydrostatic tests 2 |
| | ASME Report ITAAC 3Typically satisfied by the N |
| | -5 Code Data ReportN-5 Code Data Report can be defined as |
| | -A document that certifies that [materials, design, fabrication, examination, testing, and inspection] of an item are in accordance with the requirements of ASME Section IIIExample ITAAC from Appendix C of the VCS Unit 2 COL: |
| | Piping System Construction Process & Documentation[Note] -This is ASME "Construction" which is an all |
| | -inclusive term Initial Design |
| | -Design SpecificationMaterial Procurement |
| | -CMTRs/CofCsFabrication |
| | -Welding/Mechanical Data SheetsExamination |
| | -NDE ReportsTesting -Pressure Test ReportsInspection |
| | -ANI oversightAs-built reconciliation |
| | -Dimensional checksFinal Design Report |
| | -Design meets Design SpecificationCertification and Stamping |
| | -The Code Data Report N-5 Report AttributesRepresents an index to (as applicable): |
| | -Design Specification |
| | -CMTRs/CofCs-Welding/Mechanical Data Sheets |
| | -NDE Reports |
| | -Pressure Test Reports |
| | -ANI oversight |
| | -As-built reconciliation |
| | -Final Design Report |
| | -Certification and Stamping |
| | -The Code Data Report 5 |
| | ASME ITAAC CLOSUREBased on the contents and comprehensive nature of the Data Report process, the N |
| | -5 Data Report will serve as the basis for closure of these ASME |
| | -related ITAAC issues. |
| | The Final Product |
| | -Data Report N-5 Form -The Index The Final Product |
| | -Data ReportDrawings -Page 1 The Final Product |
| | -Data ReportDrawings -Page 2 The Final Product |
| | -Data ReportComponents The Final Product |
| | -Data ReportSubassemblies The Final Product |
| | -Data ReportSupports The Final Product |
| | -Data ReportMaterials The Final Product |
| | -Data ReportWelds The Final Product |
| | -Data ReportPressure Tests The Final Product |
| | -Data Report N-5 Data Reports for Shop Assembly The Final Product |
| | -Data ReportNameplate The Final Product |
| | -Data ReportPreserviceInspection EQUIPMENT QUALIFICATION19 EQ Report ITAACSatisfied by Equipment Qualification Data Package(s) (EQDP) and Equipment Qualification Summary Report(s)Appendix 3D |
| | -Attachment A of the AP1000 DCD contains a sample EQDPExample ITAAC from Appendix C of the VCS Unit 2 COL:20 EQDP & EQSREQ Data Package |
| | -Provides description of the overall qualification program for that component/commodity, and a summary of the type testing and analysis results.EQ Summary Report |
| | -Summarizes the details of the qualification work performedTogether, the EQDP and EQSR provide all of the information required by AP1000 DCD Appendix 3D.Together, the EQDP and EQSR for each component/commodity are the "report that exists and concludes" the equipment is qualified21 EQDP Contents 1.Specifications |
| | -Equipment identification and requirements 2.Qualification Program |
| | -Description of overall program 3.Qualification by Test |
| | -Test Plan and Summary of Results 4.Qualification by Analysis |
| | -Analysis Methods and Results 5.Qualification Program Conclusion22 EQSR Contents 1.Introduction 2.Equipment to be Qualified |
| | -Equipment description, identification, performance specifications, qualification requirements (Seismic, DBA, QME-1, etc.), qualification program 3.Type Testing Performed |
| | -General Description, Specific test names, descriptions, procedures, results and anomalies 4.Analyses Performed |
| | -General Discussion, specific name and description of each analysis, its scope, methodology, and results 5.Qualification Basis |
| | -Qualification Basis, statement of qualified lifetime/operating cycles 6.Installation Requirements and Maintenance, Surveillance, and Replacement Program |
| | -Limitations on installation, and maintenance/surveillance/replacement requirements 7.Summary and Conclusions23}} |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24311A1872024-11-0707 November 2024 V.C. Summer EDG SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24250A1072024-09-0505 September 2024 Pre-Submittal Meeting Slides for VCS COLR Relocation and WCAP-17661 LAR - 9-9-24 ML24101A0642024-04-22022 April 2024 2023 Annual Public Assessment Meeting Presentation Slides ML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML23325A2452023-11-13013 November 2023 Enclosure 2 - Dominion Slides ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23312A0202023-11-0808 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application-Virtual Meeting Slides ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML18067A1212018-03-15015 March 2018 March 15, 2018, Public Meeting Presentation Regarding NFPA-805 Application ML17087A1542017-03-28028 March 2017 Response to Request for Additional Information on VC Summer Sfpli - Elevation View ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12157A0452012-06-0404 June 2012 5/24/2012 - Summary of Category 3 Public Meeting - Virgil C. Summer Nuclear Station Unit 1 Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML11350A0902011-12-20020 December 2011 Draft VC Summer Public Meeting 20 Dec 2011 ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1120707792011-07-26026 July 2011 Enclosure 3: Presentation Slides/Handouts ML1115204732011-06-0101 June 2011 Meeting Summary - V. C. Summer - Presentation Slides ML1016705202010-06-17017 June 2010 Fire Protection Screening Criteria - V.C. Summer Nuclear Station ML1012600102010-05-0505 May 2010 Meeting Slides ML1012600092010-05-0505 May 2010 Meeting Posters ML0835204162008-12-16016 December 2008 Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No. 05-395 ML11216A2292008-12-0202 December 2008 0523 - R504P - Westinghouse Advanced Technology - 07.2 VC Summer Inadvertent Criticality ML0811405532008-04-23023 April 2008 V. C. Summer Nuclear Station, Slides - Refuel 17 Plans ML0723400122007-08-22022 August 2007 Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License Application IR 05000395/20075022007-07-30030 July 2007 Summary of Public Meeting - Virgil C. Summer Nuclear Station, to Discuss Significance on Apparent Violation Documented in Inspection Report 50-395-07-502 ML0715806282007-05-31031 May 2007 Enclosure 8 - OBE Exceedance Issues ML0713500662007-05-0202 May 2007 Meeting Handout on RF16 Outage Review V.C. Summer ML0713500972007-05-0202 May 2007 Meeting Handout on Alternate Safety Power Source - Summer ML0713501022007-05-0202 May 2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection ML0713501062007-05-0202 May 2007 Meeting Handout on CRDM Canopy Seal Clamp Installation ML0713501092007-05-0202 May 2007 Meeting Handout on Summary of HP Performance During RF16 ML0706703232007-03-0101 March 2007 (Westinghouse AP1000) ML0627602452006-09-27027 September 2006 V. C. Summer Nuclear Station RF-16 Outage Information ML0618002632006-09-18018 September 2006 Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 2024-09-05
[Table view] Category:Inspections
[Table view] Category:Tests
[Table view] Category:Analyses
[Table view] Category:and Acceptance Criteria (ITAAC)
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24311A1872024-11-0707 November 2024 V.C. Summer EDG SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24250A1072024-09-0505 September 2024 Pre-Submittal Meeting Slides for VCS COLR Relocation and WCAP-17661 LAR - 9-9-24 ML24102A0212024-04-10010 April 2024 V. C. Summer 2023 Annual Assessment Public Meeting Presentation Slides - April 22, 2024 ML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14106A4762014-04-16016 April 2014 End of Cycle 2013 Public Meeting Memo ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12157A0452012-06-0404 June 2012 5/24/2012 - Summary of Category 3 Public Meeting - Virgil C. Summer Nuclear Station Unit 1 Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML11350A0902011-12-20020 December 2011 Draft VC Summer Public Meeting 20 Dec 2011 ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1120707792011-07-26026 July 2011 Enclosure 3: Presentation Slides/Handouts ML1115204732011-06-0101 June 2011 Meeting Summary - V. C. Summer - Presentation Slides ML1016705202010-06-17017 June 2010 Fire Protection Screening Criteria - V.C. Summer Nuclear Station ML1012600092010-05-0505 May 2010 Meeting Posters ML1012600102010-05-0505 May 2010 Meeting Slides ML0911000692009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Virgil C. Summer Nuclear Station ML0835204162008-12-16016 December 2008 Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No. 05-395 ML0811405532008-04-23023 April 2008 V. C. Summer Nuclear Station, Slides - Refuel 17 Plans ML0723400122007-08-22022 August 2007 Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License Application ML0715806282007-05-31031 May 2007 Enclosure 8 - OBE Exceedance Issues ML0713500662007-05-0202 May 2007 Meeting Handout on RF16 Outage Review V.C. Summer ML0713501092007-05-0202 May 2007 Meeting Handout on Summary of HP Performance During RF16 ML0713501062007-05-0202 May 2007 Meeting Handout on CRDM Canopy Seal Clamp Installation ML0713501022007-05-0202 May 2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection ML0713500972007-05-0202 May 2007 Meeting Handout on Alternate Safety Power Source - Summer ML0706703232007-03-0101 March 2007 (Westinghouse AP1000) ML0629904782006-10-24024 October 2006 VC Summer, Enclosure to Meeting Summary, September 13, 2006, Meeting with South Carolina Electric & Gas, on Generic Letter 96-06 (TAC M96872) ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0609405532006-03-20020 March 2006 Meeting Summary - Enclosure 2. Handouts for Meeting with South Carolina Electric & Gas Company Re Results of Root Cause Evaluation for the High Failure Rate on the January 10, 2006, Operator Licensing Initial Written Examination ML0600304352005-12-30030 December 2005 Rii Presentation Revised - RF-15 Outage Information IR 05000395/20050072005-03-10010 March 2005 Final Significance Determination for a Green Finding (NRC IR 05000395/2005007 Virgil C. Summer Nuclear Station) ML0409805332004-03-11011 March 2004 RIC 2004 Presentation - T11 - Alexander Marion - Emergent Technical Topics ML0404902122004-01-28028 January 2004 Handouts from 01/28/04 Management Meeting ML0328101372003-10-0606 October 2003 Presentation Slides for Post-Refueling Outage Meeting 2024-09-05
[Table view] |
Text
Report ITAACAugust 16, 2012 Overview"Report" ITAAC rely on a technical report to satisfy the acceptance criteria of the ITAACExamples of Report ITAAC include:
-Equipment QualificationEnvironmental QualificationFunctional QualificationSeismic Qualification
-ASMEPiping/Component DesignPiping/Component As
-BuiltWeld NDE/hydrostatic tests 2
ASME Report ITAAC 3Typically satisfied by the N
-5 Code Data ReportN-5 Code Data Report can be defined as
-A document that certifies that [materials, design, fabrication, examination, testing, and inspection] of an item are in accordance with the requirements of ASME Section IIIExample ITAAC from Appendix C of the VCS Unit 2 COL:
Piping System Construction Process & Documentation[Note] -This is ASME "Construction" which is an all
-inclusive term Initial Design
-Design SpecificationMaterial Procurement
-CMTRs/CofCsFabrication
-Welding/Mechanical Data SheetsExamination
-NDE ReportsTesting -Pressure Test ReportsInspection
-ANI oversightAs-built reconciliation
-Dimensional checksFinal Design Report
-Design meets Design SpecificationCertification and Stamping
-The Code Data Report N-5 Report AttributesRepresents an index to (as applicable):
-Design Specification
-CMTRs/CofCs-Welding/Mechanical Data Sheets
-NDE Reports
-Pressure Test Reports
-ANI oversight
-As-built reconciliation
-Final Design Report
-Certification and Stamping
-The Code Data Report 5
ASME ITAAC CLOSUREBased on the contents and comprehensive nature of the Data Report process, the N
-5 Data Report will serve as the basis for closure of these ASME
-related ITAAC issues.
The Final Product
-Data Report N-5 Form -The Index The Final Product
-Data ReportDrawings -Page 1 The Final Product
-Data ReportDrawings -Page 2 The Final Product
-Data ReportComponents The Final Product
-Data ReportSubassemblies The Final Product
-Data ReportSupports The Final Product
-Data ReportMaterials The Final Product
-Data ReportWelds The Final Product
-Data ReportPressure Tests The Final Product
-Data Report N-5 Data Reports for Shop Assembly The Final Product
-Data ReportNameplate The Final Product
-Data ReportPreserviceInspection EQUIPMENT QUALIFICATION19 EQ Report ITAACSatisfied by Equipment Qualification Data Package(s) (EQDP) and Equipment Qualification Summary Report(s)Appendix 3D
-Attachment A of the AP1000 DCD contains a sample EQDPExample ITAAC from Appendix C of the VCS Unit 2 COL:20 EQDP & EQSREQ Data Package
-Provides description of the overall qualification program for that component/commodity, and a summary of the type testing and analysis results.EQ Summary Report
-Summarizes the details of the qualification work performedTogether, the EQDP and EQSR provide all of the information required by AP1000 DCD Appendix 3D.Together, the EQDP and EQSR for each component/commodity are the "report that exists and concludes" the equipment is qualified21 EQDP Contents 1.Specifications
-Equipment identification and requirements 2.Qualification Program
-Description of overall program 3.Qualification by Test
-Test Plan and Summary of Results 4.Qualification by Analysis
-Analysis Methods and Results 5.Qualification Program Conclusion22 EQSR Contents 1.Introduction 2.Equipment to be Qualified
-Equipment description, identification, performance specifications, qualification requirements (Seismic, DBA, QME-1, etc.), qualification program 3.Type Testing Performed
-General Description, Specific test names, descriptions, procedures, results and anomalies 4.Analyses Performed
-General Discussion, specific name and description of each analysis, its scope, methodology, and results 5.Qualification Basis
-Qualification Basis, statement of qualified lifetime/operating cycles 6.Installation Requirements and Maintenance, Surveillance, and Replacement Program