ML070670323

From kanterella
Jump to navigation Jump to search
(Westinghouse AP1000)
ML070670323
Person / Time
Site: Summer, Bellefonte, 05200006, PROJ0740  South Carolina Electric & Gas Company icon.png
Issue date: 03/01/2007
From:
South Carolina Electric & Gas Co
To:
Office of New Reactors
References
+reviewedjms3, AP1000
Download: ML070670323 (13)


Text

Virgil C. Summer Nuclear Station Units 2 & 3 (Westinghouse AP1000)

LEE VOGTLE SUMMER

Aerial Photo

  • Shortcut to 8991G-OVERVIEW-D-8x11.jpg N

VCSNS UNITS 2&3 MONTICELLO RESERVOIR VCSNS UNIT 1 PARR RESERVOIR (BROAD RIVER)

PARR FAIRFIELD PUMPED STORAGE FACILITY NEW NUCLEAR DEPLOYMENT OFFICE PARR SHOALS DAM

Geotechnical Boring Layout

Geotechnical Boring Layout

Geotechnical Investigation Summary 8

Suspension Velocity Logging 4

Test Pits 36 Cone Penetrometer Tests 31 Observation Wells 111 Soil & Rock Borings

Existing Subsurface Profile (Typical) 20 - 40 Saprolite - Completely Weathered Rock Degraded to a Soil Consistency; Soil retains relict rock structure 45 - 65 Competent Rock 40 - 45 Partially Weathered Rock -

Transition Zone from Residual Soil /

Saprolite to Rock 0 - 20 Residual Soils - Reddish Soils, Typically Sandy Silts (ML) and Silty Sands (SM) with Variable Clay Content

Sound Rock Surface View B-201(DH)

B-202 B-203 B-204 B-205 B-206(DH)

B-207(DH)

B-208A B-209 B-210 B-211(DH)

B-212A B-213 B-214 B-215 B-216 B-217 B-218 B-219 B-220 B-221A B-222 B-223 B-224 B-225 B-226 B-228 B-229 B-230 B-231 B-232 B-233 B-235 B-236A B-301(DH)

B-301A B-302 B-303 B-304 B-305 B-306(DH)

B-307(DH)

B-308 B-309 B-310 B-311(DH)

B-312 B-313 B-314 B-315 B-316 B-317 B-318 B-319 B-320 B-321 B-322 B-323 B-324 B-325 B-326 B-328 B-329 B-330 B-331 B-332 B-333 B 334 B-335 B-336 Northing Easting N

N 380 360 340 320 Northing Easting 3-D View of Sound Rock Surface 295 300 305 310 315 320 325 330 335 340 345 350 355 360 365 370 375 380 SCEG COL Project Unit 3 Unit 2 Unit 2 Unit 3 Elevation (ft)

Elevation (ft)

Note: All coordinates are in South Carolina State Plane NAD83 and elevations use NAVD 88.

1903000 1902400 1903000 1902400 892000 893000 892000 893000

Rock Shear Wave Velocity Unit 3 Power Block 0

50 100 150 200 250 300 350 400 450 0

2000 4000 6000 8000 10000 12000 14000 Shear Wave Velocity (ft/sec)

Elevation (ft)

B-301 B-306 B-307 B-311

Rock Shear Wave Velocity Unit 2 Power Block 0

50 100 150 200 250 300 350 400 450 0

2000 4000 6000 8000 10000 12000 14000 Shear Wave Velocity (ft/sec)

Elevation (ft)

B-201 B-206 B-207 B-211

Average Rock Shear Wave Velocity Unit 2 V.C. Summer Proposed Unit 2 50 100 150 200 250 300 350 400 450 0

2000 4000 6000 8000 10000 12000 14000 Shear Wave Velocity (ft/sec)

Elevation (ft)

Unit 2 Boreholes Mean + 1 Sigma 5-foot Average Mean - 1 Sigma 9,200 ft/s SSE Horizon

Borings B-201 and B-206

Construction / Backfill Plans

  • Establish Plant Grade at Elevation ~ 400
  • Excavate Power Block to Competent Rock at Elevation ~ 360
  • Nuclear Island: Place Fill Concrete Leveling Mat
  • Other Structures: Install Engineered Backfill to Structure Foundation Level