Category:Map
MONTHYEARML24221A2172024-09-23023 September 2024 V.C. Summer Area of Potential Effect Topographic Map ML22194A2212022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 2.4-1, Plot Plan - Service Water Pond: North, South and East Dams: Calculating Water Discharge Canal and Jetty ML19255F4152019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.1-26 ML19255F4212019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-10 ML19255F4232019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-13 ML19255F4252019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-25 ML19255F4272019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-27 ML19255F4302019-05-31031 May 2019 Updated Final Safety Analysis Report, Figure 2.5-3 RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B'2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B' ML18221A1542018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map ML18221A1562018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation ML18221A1572018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map ML18221A1582018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A' RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A'2018-05-31031 May 2018 Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A' ML18221A1592018-05-31031 May 2018 Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B' ML1015400222010-06-0303 June 2010 Enclosure 1, Irradiated Reactor Fuel Summary (234), VC Summer Nuclear Power Station, Jenkinsville, Sc to Port of Savannah, Savannah, Ga, Page 1 of 2 ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0303101662003-02-28028 February 2003 Map, Transmission Line Land Cover 2024-09-23
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24311A1872024-11-0707 November 2024 V.C. Summer EDG SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24250A1072024-09-0505 September 2024 Pre-Submittal Meeting Slides for VCS COLR Relocation and WCAP-17661 LAR - 9-9-24 ML24102A0212024-04-10010 April 2024 V. C. Summer 2023 Annual Assessment Public Meeting Presentation Slides - April 22, 2024 ML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14106A4762014-04-16016 April 2014 End of Cycle 2013 Public Meeting Memo ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12157A0452012-06-0404 June 2012 5/24/2012 - Summary of Category 3 Public Meeting - Virgil C. Summer Nuclear Station Unit 1 Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML11350A0902011-12-20020 December 2011 Draft VC Summer Public Meeting 20 Dec 2011 ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1120707792011-07-26026 July 2011 Enclosure 3: Presentation Slides/Handouts ML1115204732011-06-0101 June 2011 Meeting Summary - V. C. Summer - Presentation Slides ML1016705202010-06-17017 June 2010 Fire Protection Screening Criteria - V.C. Summer Nuclear Station ML1012600092010-05-0505 May 2010 Meeting Posters ML1012600102010-05-0505 May 2010 Meeting Slides ML0911000692009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Virgil C. Summer Nuclear Station ML0835204162008-12-16016 December 2008 Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No. 05-395 ML0811405532008-04-23023 April 2008 V. C. Summer Nuclear Station, Slides - Refuel 17 Plans ML0723400122007-08-22022 August 2007 Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License Application ML0715806282007-05-31031 May 2007 Enclosure 8 - OBE Exceedance Issues ML0713500662007-05-0202 May 2007 Meeting Handout on RF16 Outage Review V.C. Summer ML0713501092007-05-0202 May 2007 Meeting Handout on Summary of HP Performance During RF16 ML0713501062007-05-0202 May 2007 Meeting Handout on CRDM Canopy Seal Clamp Installation ML0713501022007-05-0202 May 2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection ML0713500972007-05-0202 May 2007 Meeting Handout on Alternate Safety Power Source - Summer ML0706703232007-03-0101 March 2007 (Westinghouse AP1000) ML0629904782006-10-24024 October 2006 VC Summer, Enclosure to Meeting Summary, September 13, 2006, Meeting with South Carolina Electric & Gas, on Generic Letter 96-06 (TAC M96872) ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0609405532006-03-20020 March 2006 Meeting Summary - Enclosure 2. Handouts for Meeting with South Carolina Electric & Gas Company Re Results of Root Cause Evaluation for the High Failure Rate on the January 10, 2006, Operator Licensing Initial Written Examination ML0600304352005-12-30030 December 2005 Rii Presentation Revised - RF-15 Outage Information IR 05000395/20050072005-03-10010 March 2005 Final Significance Determination for a Green Finding (NRC IR 05000395/2005007 Virgil C. Summer Nuclear Station) ML0409805332004-03-11011 March 2004 RIC 2004 Presentation - T11 - Alexander Marion - Emergent Technical Topics ML0404902122004-01-28028 January 2004 Handouts from 01/28/04 Management Meeting ML0328101372003-10-0606 October 2003 Presentation Slides for Post-Refueling Outage Meeting 2024-09-05
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24311A1872024-11-0707 November 2024 V.C. Summer EDG SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 ML24250A1072024-09-0505 September 2024 Pre-Submittal Meeting Slides for VCS COLR Relocation and WCAP-17661 LAR - 9-9-24 ML24101A0642024-04-22022 April 2024 2023 Annual Public Assessment Meeting Presentation Slides ML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML23325A2452023-11-13013 November 2023 Enclosure 2 - Dominion Slides ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23312A0202023-11-0808 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application-Virtual Meeting Slides ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML18067A1212018-03-15015 March 2018 March 15, 2018, Public Meeting Presentation Regarding NFPA-805 Application ML17087A1542017-03-28028 March 2017 Response to Request for Additional Information on VC Summer Sfpli - Elevation View ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12157A0452012-06-0404 June 2012 5/24/2012 - Summary of Category 3 Public Meeting - Virgil C. Summer Nuclear Station Unit 1 Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML11350A0902011-12-20020 December 2011 Draft VC Summer Public Meeting 20 Dec 2011 ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1120707792011-07-26026 July 2011 Enclosure 3: Presentation Slides/Handouts ML1115204732011-06-0101 June 2011 Meeting Summary - V. C. Summer - Presentation Slides ML1016705202010-06-17017 June 2010 Fire Protection Screening Criteria - V.C. Summer Nuclear Station ML1012600102010-05-0505 May 2010 Meeting Slides ML1012600092010-05-0505 May 2010 Meeting Posters ML0835204162008-12-16016 December 2008 Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No. 05-395 ML11216A2292008-12-0202 December 2008 0523 - R504P - Westinghouse Advanced Technology - 07.2 VC Summer Inadvertent Criticality ML0811405532008-04-23023 April 2008 V. C. Summer Nuclear Station, Slides - Refuel 17 Plans ML0723400122007-08-22022 August 2007 Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License Application IR 05000395/20075022007-07-30030 July 2007 Summary of Public Meeting - Virgil C. Summer Nuclear Station, to Discuss Significance on Apparent Violation Documented in Inspection Report 50-395-07-502 ML0715806282007-05-31031 May 2007 Enclosure 8 - OBE Exceedance Issues ML0713500662007-05-0202 May 2007 Meeting Handout on RF16 Outage Review V.C. Summer ML0713500972007-05-0202 May 2007 Meeting Handout on Alternate Safety Power Source - Summer ML0713501022007-05-0202 May 2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection ML0713501062007-05-0202 May 2007 Meeting Handout on CRDM Canopy Seal Clamp Installation ML0713501092007-05-0202 May 2007 Meeting Handout on Summary of HP Performance During RF16 ML0706703232007-03-0101 March 2007 (Westinghouse AP1000) ML0627602452006-09-27027 September 2006 V. C. Summer Nuclear Station RF-16 Outage Information ML0618002632006-09-18018 September 2006 Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 2024-09-05
[Table view] |
Text
NRC GEOTECHNICAL VISIT VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
[Old] Nuclear Training Center (NTC) - SC Hwy 213 JUNE 22, 2006 TIME AGENDA ITEM LEAD 8:00 Welcome & Introductions SCE&G
- Nuclear Training Center (NTC) Logistics
- Safety Issues 8:15 NRC Entrance - Comments NRC
- Region II 8:30 Site Orientation Presentation SCE&G
- Project Schedule (Whorton)
- Site Location / Facility Layout
- Initial Project Evaluations 8:45 Local and Regional Geology / Seismic Sources WLA
- General Overview (Lindvall)
- Seismic Sources (Faults) 9:15 Geotechnical Investigation Program Bechtel
- Geotechnical Investigation Plan / Layout (Davie)
- Results to Date (Soils, Rock, Groundwater) [MACTEC]
" Rock & Soil Sample Identification 9:45 Inspection of Rock Cores & Soil Samples All
- NTC Library Display 10:00 BREAK 10:15 Site Field Visit All
- Power Block Area (Drill Rigs, Wells, CPTs, Downhole Geophysic Tests)
- Site Area Rock Outcrop 12:00 LUNCH at NTC 1:00 NRC Break-Out Sessions: All
- Technical Discussions and/or Additional Field Visits
" QA Programs / Procedures / Data Collection, etc.
" Response to Questions 3:00 NRC Caucus NRC 4:00 NRC Exit - Comments NRC
SCE&G VC Summer COL Subsurface Investigation Bechtel Corporation NRC Site Visit June 22, 2006
Subsurface Investigation
" Boreholes
- Soil and Rock Drilling (111 Total)
- Observation Wells (31 Total)
- Slug and Packer Tests 4'.
- Cone Penetrometer Tests (36 Total)
" Geophysical Testing
- Downhole Testing (8 Total): ON.k (P-S Suspension Logging, Gamma, Resistivity, Televiewer, Caliper, and Deviation)
- Seismic CPTs (7 Total) 13
- Electrical Resistivity (6 Total)
F Location Plan is .EP-1.-
Available!
-- 4. 3 L%
,Q; 4'_, , .
~rH F~3f I 3
R-4 (S)
,-326 B-303 8-.332 8-330
[OH)
B-331 CS) B-329 B-328
F3orings: HQ Size (26 total) 2 to 350 ft depth (1 completed) 2 to r(1 215 ft depth completed)
.8 to 175 ft depth (3 completed) 8 to 150 ft depth (2 completed)
ý6 to 115 ft depth (2 completed)
Borings: NQ Size (85 total)
- 4 to 175 ft-depth (1 completed)
, 27 to 115 ft depth (10 completed)
° 2 to 100 ft depth- (2 completed)
- 24 to 85 ft depth (11 completed)
- 2 to 80 ft depth (0 completed)
- 10 to 70 ft depth (10 completed) 1Ito 60 ft depth (1 completed)
S10 to 55 ft depth (4 completed)
- 5 to 40 ft depth (0 completed)
Observation Wells (31 total)
- 1-to 115 ft depth (1-completed)
- 4 to 100 ft depth (4 completed),
- 1 to 80 ft depth (0 completed)
- 12 to 70 ft depth (12 completed)
- 9 to 60 ft depth (9 completed)
- 1 to 55 ft depth (1 completed)
- 3 to 50 ft depth (3-completed)
CPTs (36 total)
SIto 80 ft depth
- 6 to 40 ft depth 7 of the 50 ft CPTs include seismic tests For 80 and 50 ft tests, advance to refusal even if deeper than specified depth.
L-
Laboratory Testing: Soil
- Sieve and hydrometer analysis (100)
- Grain size analysis w/no. 200 wash (100)
Chemical analyses (pH, chloride, sulfate) (30)
California bearing ratio (10)
Unconfined compression (20)
SUnconsolidated undrained triaxial compression (40)
Consolidated undrained triaxial compression (15)
Direct shear (20)
Torsional shear and resonant column (16)
Consolidation (15)
Laboratory Testing: Rock
- Unconfined compression (80)
- Unconfined compression wI stress-strain (40)
'Age cdating (standard radio carbon) (8)
- X-ray diffraction/mineralogy (8)
- Petrographic analysis (thin section) (20) w _ __-- _ _ _ _ - -
Subsurface Investigation:
SJ une 11, 2006 Status I Completed Boreholes: 49. (44%)
- Completed Observation Wells: 30 (97%)
S*Boreholes, CPTs, and Downhole Geophysics Estimated Completion Date is Late July
Subsurface Profile
- Residual Soil- reddish sandy silts with variable clay content 0 Saprolite - completely weathered rock but w/preserved relict rock structure
- Partially Weathered Rock (PWR) - decomposed rock matrix mixed w/semi-hard rock fragments-
- Moderately Weathered Rock (MWR) -- >50% by volume of sound rock interspersed w/decomposed zones
- Sound Rock - Hard fresh to slightly discolored rock (granodiorite, gneiss, schist)
S u bs u rface P rofi le l.
B-201 B-305 Residual-Soil 0-17 ft 0-33 ff Saprolite 17-37 ft 37-51 ft PWR 37-50 ft 51-57. ft MWR 5.50-62 ft 57-61 ft Sound Rock >62-ft >61 ft
III a ppppo,- - m
__C_ ___ A** o MY
INTRODUCTION
- Nuclear Training Center (NTC) Logistics
- Fire Exits
- Restrooms
- Refreshments & Lunch
- Locked Entrances
LJJ P,, *.7'%
I ."j, ftýol . 040 r>4:
ý-Vow
~5~~
A
-~
i*¸*4**,
L
NRC Field Visit
" Orange Vests Shall be Worn
" Safety Protective Devices - Not Required Outside Drill Rig Ribbon Barrier
" Inside Drill Rig Ribbon Barrier:
- Steel Toe Shoes & Gloves
- Hard Hat & Eye Protection
- Ear Protection
NRC ENTRANCE
VCSNS COL / Proj-ect Schedule Fall 2007 - Submit COL Application
- 2011 SCOL Approval (42 Months)
- 2011 - Initiate Safety Related Construction
p -T
-p 9
SCE&G NProject Organization (Geotechnical
(,, Contacts) otehnl1l itt
.4 rni--
4ý11 w
I
JL ~J
{ II
) If
- OPW,
N-Iw I.1 Wm
R I )
K.'~Me
-W""
VIRGLC.S SEMERGENCY Lis~n C:r orey-Sch.
T04EM HOMLDINGaa (MEONTICELLO RECREATION AREA)
PLAN EVACUATION
"*'**'*"'iilSt. Petes 205 SMonticello
"* St. Johns,
.e rilCh
-"7 J BrownsvleRF
" RENE A
FREESUT 3M.LES 6 D A M ...... L * .* _.. , _..
Ch* THEBAEIMRTITS MAP WARR PREPAEDVO F 1.1 *!i*ENHPORTIONS OF THENTIC LLOWRINGRVOUTHPCAROL 8 1 tula .:. STAT H IRGHWA DEPARTME NT GEER STA A ION EARIIQA*.
SOUEWR e SECURIT GATESTHlnsMl.
A MAP NWER CUT VCOUN FoArcIRFITEL 91 192,RVIE ITY EIE 90 P17
VCSNS Units 2 & 3
- Site Selection Study (Fall 2005)
- Virgil C. Summer Nuclear Station (VCSNS)
- Savannah River Site (SRS)
- Other Sites (SCE&G Service Territory)
- Preliminary Geotechnical Investigation (Late 2005)
- 10 Boreholes (Laydown Area L-50 & Borrow Area G)
- L-50: Rock @ 45'-65' depth, Groundwater - Rock
- Borrow.Area G: Rock @ 85' depth, Groundwater - 50'
a e 4'
Virgil C. Summer Nuclear Station COL Local and Regional Geology / Seismic Sources -
William Lettis & Associates., Inc.
Scott Lindvall NRC Geotechnical Visit V.C. Summer Nuclear Station, SC June 22, 2006
Sections 2.5.1, 2.5.2, and 2.5.3:
Currently in, the prw-ezz, oif Compilatim, and reqiewQýf,- I't rýa iI,,e, _ýt,,qrf ej Update/ geQlogiQ,,,, geýQphysic.qiýý,, an -,,is Oa ai b,,qse Field reconnaissance
" Preparation of maps (2QO,,,,, 25ý,ý 5-,,,,,, ano Q),.ý mil, Review of EPRJ and other, sej c,,, s. ijr'ý )Mo 'Q Q, Qeý -J-!s
" Any new seismic sources?;
4, Update EPRI source, model o Evaluate potential for surface,, dpformatiQný,
Potential Quaternary Tectonic Features I V4WOmi tS 11130 2 Beakirfaait 3 Pon Brarmi fAul 4 Ca.fwAu 5 ECFZ 6 Owulesom Equoadon fastures.
7 Btufbn Sueabclon feakwes 8 Ge stm kKudaion features 9 E. TN Seiasmic Zone to Cape heac INdwu Barks fault I1 12 Howe Crossroads ftmA 13 Stwieytaw - Wa Hefta btap 14 Penwa~ke fait 0 150 3D0Mlin Fronn Crone and Wheeler 0 1SO 3w IkomeI" (21'000) and Wheeler (20051) Explanation Gimis&Wl Vfelr Feebsu Cis" LAA A 1
.lC C - Ems Coast Fault Symwn
- C We-n.m Fal Lbnm N A h mReowr 40 TWOtXfw femu*dao Wv irw
Regional Tectonic Features Explenation 0 2W0MIed
- Mesozoic RiBft cfth NOOb Basins Pdrksmiu at M.,2003) 1990 miW Faubs
-~ - Poloozoic (KNi ad OAlMan. 1974)
- Meseomoi (ernon 1992)
- Carozoic PAOSOLOCOS) kmk*d PmO LAWd EeC=9 F-f Symn.
Extended Crust (Jolmutan at al 1994)
SIgWl Extended EUpm"huat Epicentera I'mI
- 4. -0494 0 3M.3.99
&WIS..
50 901 4M-04,70
. 605 $100 7.00 716 0 25 S 00 xkwai
t4 Regona Fault and Lnamet Fro FS I KEY:
SMMAFIC DIKE SWARIMS
' - TRIASIC DIABASE DIKEII
+-FAULTS FOLD AXIS ATIMCLINES-4.
S*CUNES STATUTE MILES -PHOTO LINEARS tO 0 S0 C I0 SOUTH CAROLINA ELECTRIC S SGAS CO.
VIRGIL C. SUMMER NUCLEAR STATION Regional ERTS Photo Linear Map Figure 2.5-10
Eastern Piedmont (Goat Rock) Fault System EPFS, defined as.ý, a, serie, ir-fte f ults
ýf; w4pýafa
.3o OjU3 exte n d in g from Al abama, to,, VI'! II rgj nciýa (HatGr eA.
al, 1977)
Goat Rock (AL, G'A)', TQwaJ:I,.,a)' rý'Aý7ý S
ý__' - ( i ý ýý Modoc (GA, SC), Jone, bo slý' . rQ) (Nr; Qn] fO),uilt assoc. with Mesozo.icý blasýin')',, A\ugusf,at (G-"A,-\ S---,\,Q))
Earl 1-cti-I-emy Ion it i-d,--p-
-L eýs of deformation Most faults in system do, not dii Zplace, Triassic.,
diabase dikes (pre-Triassic, age,),
gneiss nsbo Jid Wn compte2x Ic.
Local Geology N~otie
('ivgneft A a GEOLOGY OFTHE CHAPIN, LITTLE
- OUNIAIM. FOMARIA AND JENKINSVILLe OUADRANGLES.
SO1UIH CAROLINA KiOMETERS 0 2 4 a modMed after Secor et al. (1982)
Abbot 195)
Crtcos Coata Rans0 ,e Sý t,ýK/'r
- a S e al 2001)SS S S I Waee Creek falS'l -of Srs-5*l' "
- v--nG -a -- rhccntin-uat-an- e, f i Se orandnosIipsi e sooJc)0k emplacementS S Ducil shea zon at 0hrote a*~., -a ~i
mmw
.ww m Mrsaw www WID" IEPgW*N Regional Seismicity lI y 1~.
W*W
Updte fo ESeEPr Q, in c EPR infomation* 06 0 6SA Lee 2 process,*
- EGSV ldACi 1- OMMSM A
N 0 2 a
0.7 - V
- UCSS (this study) 0.6 USGS (Frankel et al,202) 0.5-m SCDOT (Chapman
'and TaWar, 20
- EPRI composhto 0_0.3 -a- m 0.2 .6-I ii 0.1 I El-a-rn I1 6 i rninm 6.5 6.6 6.7 6.8 6.9 7 I I I t I7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 aL 1
8 Magnibide (M)
Updte Chaleto Sesi Souc Logi Tree Porti mfl of Rec urrerce, Data Used. to PaIcoiuc~cir Irvta~rva
- CvnstraIn Mmax Record Used to (CoritinUDzS.
SO zro e!
cua r~r Recu~rrence Model RacurmrIwce dsrbt~
A Charloston (0.70)
--Q.=aO-ye .53 iVoP. (+/-0,245 year~s 6&.7 (0, 10) (mean & -548,years) 84 1 oxp W~i+/-.~) year~s (Mman cf 9JS8 years)