Category:Meeting Agenda
MONTHYEARPMNS20231408, Notice of Meeting with Dominion Energy South Carolina (Desc) to Discuss Virgil C. Summer Nuclear Station'S Seismic Risk Analysis2024-01-10010 January 2024 Notice of Meeting with Dominion Energy South Carolina (Desc) to Discuss Virgil C. Summer Nuclear Station'S Seismic Risk Analysis PMNS20231234, Regulatory Conference with Dominion Energy - Virgil C. Summer Nuclear Station2023-11-0202 November 2023 Regulatory Conference with Dominion Energy - Virgil C. Summer Nuclear Station PMNS20231215, Environmental Scoping Meeting Related to the V.C. Summer Subsequent License Renewal Application2023-10-30030 October 2023 Environmental Scoping Meeting Related to the V.C. Summer Subsequent License Renewal Application PMNS20231214, Environmental Scoping Meeting Related to the V.C. Summer Nuclear Station Subsequent License Renewal Application2023-10-27027 October 2023 Environmental Scoping Meeting Related to the V.C. Summer Nuclear Station Subsequent License Renewal Application PMNS20231149, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for VC Summer to Extend the Required Completion Time for Technical Specification 3/4.8.3, Action C2023-10-0606 October 2023 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for VC Summer to Extend the Required Completion Time for Technical Specification 3/4.8.3, Action C PMNS20230620, 2022 Annual Assessment Meeting2023-05-12012 May 2023 2022 Annual Assessment Meeting PMNS20230047, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station2023-01-26026 January 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station PMNS20220829, Public Meeting with Dominion Energy to Discuss a Planned Request for Approval of a Modification to the Reactor Vessel Surveillance Capsule Removal Schedule for VC Summer Nuclear Generating Station2022-08-31031 August 2022 Public Meeting with Dominion Energy to Discuss a Planned Request for Approval of a Modification to the Reactor Vessel Surveillance Capsule Removal Schedule for VC Summer Nuclear Generating Station PMNS20220449, V.C. Summer Nuclear Station 2021 Annual Assessment Meeting2022-04-26026 April 2022 V.C. Summer Nuclear Station 2021 Annual Assessment Meeting PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML14076A1132014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Public Forum to Discuss the Annual Assessment of the Virgil C. Summer Nuclear Station, Unit 1 ML14065A5602014-03-0606 March 2014 March 27, 2014 Notice of Public Meeting/Open House Regarding the Virgil C. Summer, Unit 1, to Discuss the Annual Assessment ML14063A5462014-03-0404 March 2014 Notice of Category 3 Public Meeting/Open House with South Carolina Electric & Gas Company to Discuss Annual Assessment ML13178A2522013-06-25025 June 2013 Ltr. to Luke Scorsone Participate in a Public Commission Meeting on Nrc'S Construction Activities, on August 27, 2013 ML13178A2552013-06-25025 June 2013 Ltr to Jeffrey Archie Re Participation in Public Commission Meeting on Nrc'S Construction Activities, on August 27, 2013 ML13178A2572013-06-25025 June 2013 Ltr. to Joseph A. Miller Participating in a Public Commission Meeting on Nrc'S Construction Sctivities, on August 27, 2013 ML13142A1572013-05-29029 May 2013 Update for 06/20/13 Meeting Notice with South Carolina Electric & Gas Company Regarding Voluntary Fire Protection Risk Initiative Self Assessment ML13122A1782013-05-13013 May 2013 Notice of Forthcoming Meeting with South Carolina Electric & Gas Company Regarding Voluntary Fire Protection Risk Initiative Self Assessment ML13067A2592013-03-11011 March 2013 Forthcoming Meeting with South Carolina Electric & Gas Company Regarding Proposed Emergency Plan Change for Virgil C. Summer Nuclear Station, Unit No. 1 ML12129A3832012-05-0808 May 2012 Public Meeting/Open House Regarding Virgil C. Summer Nuclear Station, Unit 1, Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML1120707482011-07-26026 July 2011 July 20, 2011, Meeting Summary Pre-Application Meeting with South Carolina Electric and Gas Regarding General License Independent Spent Fuel Storage Installation Plans (TAC No. L24544) ML1106800552011-03-0909 March 2011 Notice of Forthcoming Meeting with South Carolina Electric & Gas Company, (Sce&G), to Discuss NFPA 805 License Amendment for Virgil C. Summer Nuclear Station, Unit 1 ML0924606222009-09-0303 September 2009 Forthcoming Conference Call with South Carolina Electric & Gas, to Discuss the Licensee'S Planned Response to the Nrc'S Request for Additional Information Pertaining to Generic Letter 2004-02, Potential Impact of Debris ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co ML0623303432006-08-29029 August 2006 Forthcoming Meeting with South Carolina Electric & Gas Company to Discuss the NRC Staff'S Evaluation Report of August 22, 2006 on Generic Letter 96-06 for V.C. Summer ML0615302842006-06-0505 June 2006 Notice of Meeting with South Carolina Electric & Gas Company Online Monitoring of Instrument Channel Performance at V. C. Summer ML0609405532006-03-20020 March 2006 Meeting Summary - Enclosure 2. Handouts for Meeting with South Carolina Electric & Gas Company Re Results of Root Cause Evaluation for the High Failure Rate on the January 10, 2006, Operator Licensing Initial Written Examination ML0331404862003-11-0606 November 2003 ,Summary of Public Meetings to Discuss the Draft Supplement 15 of the Generic Environmental Impact Statement for the Renewal of the V. C. Summer Nuclear Station Operating License 2024-01-10
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14106A4762014-04-16016 April 2014 End of Cycle 2013 Public Meeting Memo ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12157A0452012-06-0404 June 2012 5/24/2012 - Summary of Category 3 Public Meeting - Virgil C. Summer Nuclear Station Unit 1 Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML11350A0902011-12-20020 December 2011 Draft VC Summer Public Meeting 20 Dec 2011 ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1120707792011-07-26026 July 2011 Enclosure 3: Presentation Slides/Handouts ML1115204732011-06-0101 June 2011 Meeting Summary - V. C. Summer - Presentation Slides ML1016705202010-06-17017 June 2010 Fire Protection Screening Criteria - V.C. Summer Nuclear Station ML1012600102010-05-0505 May 2010 Meeting Slides ML1012600092010-05-0505 May 2010 Meeting Posters ML0911000692009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Virgil C. Summer Nuclear Station ML0835204162008-12-16016 December 2008 Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No. 05-395 ML0811405532008-04-23023 April 2008 V. C. Summer Nuclear Station, Slides - Refuel 17 Plans ML0723400122007-08-22022 August 2007 Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License Application ML0715806282007-05-31031 May 2007 Enclosure 8 - OBE Exceedance Issues ML0713501062007-05-0202 May 2007 Meeting Handout on CRDM Canopy Seal Clamp Installation ML0713501092007-05-0202 May 2007 Meeting Handout on Summary of HP Performance During RF16 ML0713501022007-05-0202 May 2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection ML0713500972007-05-0202 May 2007 Meeting Handout on Alternate Safety Power Source - Summer ML0713500662007-05-0202 May 2007 Meeting Handout on RF16 Outage Review V.C. Summer ML0706703232007-03-0101 March 2007 (Westinghouse AP1000) ML0629904782006-10-24024 October 2006 VC Summer, Enclosure to Meeting Summary, September 13, 2006, Meeting with South Carolina Electric & Gas, on Generic Letter 96-06 (TAC M96872) ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0609405532006-03-20020 March 2006 Meeting Summary - Enclosure 2. Handouts for Meeting with South Carolina Electric & Gas Company Re Results of Root Cause Evaluation for the High Failure Rate on the January 10, 2006, Operator Licensing Initial Written Examination ML0600304352005-12-30030 December 2005 Rii Presentation Revised - RF-15 Outage Information IR 05000395/20050072005-03-10010 March 2005 Final Significance Determination for a Green Finding (NRC IR 05000395/2005007 Virgil C. Summer Nuclear Station) ML0409805332004-03-11011 March 2004 RIC 2004 Presentation - T11 - Alexander Marion - Emergent Technical Topics ML0404902122004-01-28028 January 2004 Handouts from 01/28/04 Management Meeting ML0328101372003-10-0606 October 2003 Presentation Slides for Post-Refueling Outage Meeting ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0309805902003-03-31031 March 2003 Annual Assessment Meeting for Virgil C. Summer Nuclear Station. NRC Presentation Slides 2024-01-25
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24008A2182024-01-25025 January 2024 Seismic Data to Support Public Meeting with Dominion Regarding NRC Staff Evaluation of Seismic Risk at V.C. Summer Generating Station - January 25, 2024 (Tables) ML23325A2452023-11-13013 November 2023 Enclosure 2 - Dominion Slides ML23313A1292023-11-0909 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application - November 14 Meeting Slides ML23312A0202023-11-0808 November 2023 Environmental Scoping Meeting for V.C. Summer Subsequent License Renewal Application-Virtual Meeting Slides ML23131A4182023-05-25025 May 2023 V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx ML22115A0502022-04-21021 April 2022 VC Summer, 2021 Annual Assessment Meeting ML20091G7232020-03-31031 March 2020 V.C. Summer 2019 Assessment Meeting Presentation ML18144A1482018-05-24024 May 2018 Public Meeting Summary - Virgil C. Summer Nuclear Station Docket No. 50-395 ML18067A1212018-03-15015 March 2018 March 15, 2018, Public Meeting Presentation Regarding NFPA-805 Application ML17087A1542017-03-28028 March 2017 Response to Request for Additional Information on VC Summer Sfpli - Elevation View ML14323A4522014-11-19019 November 2014 V.C. Summer Construction Update ML14266A3912014-09-23023 September 2014 September 23, 2014, Category 1 Public Meeting with V. C. Summer - Presentation Slides ML14232A5372014-08-21021 August 2014 8-21-14 CIP Mtg Slides - FFD and ITAAC ML14219A4762014-08-0707 August 2014 Operating Experience on Initial Test Program ML14057A4202014-02-27027 February 2014 Public Meeting 2/27/2014 VCS Construction Update ML14028A4272014-01-23023 January 2014 Vendor Inspection Finding & ITAAC (Pdf) ML13309A8592013-11-0505 November 2013 V. C. Summer Construction Status and Lesson Learned AD Torres ML13170A1192013-06-18018 June 2013 Public Slide - Control Room Evacuation Due to Fire, Based on NFPA 805 ML13170A1302013-06-18018 June 2013 Public Slide - NFPA 805 Transient Combustible Controls ML13123A1472013-05-0303 May 2013 Summary of Category 1 Public Meeting with South Carolina Electric and Gas,Virgil C. Summer Nuclear Station, Units 2 and 3, Annual Assessment ML13098A8042013-03-26026 March 2013 Combined Emergency Plan Review ML12228A6292012-08-16016 August 2012 Report ITAAC Presentation ML12157A0452012-06-0404 June 2012 5/24/2012 - Summary of Category 3 Public Meeting - Virgil C. Summer Nuclear Station Unit 1 Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML11350A0902011-12-20020 December 2011 Draft VC Summer Public Meeting 20 Dec 2011 ML11242A0502011-08-30030 August 2011 Slides - Licensee Perspective on ITAAC Completion Process NRC Commission Briefing ML1120707792011-07-26026 July 2011 Enclosure 3: Presentation Slides/Handouts ML1115204732011-06-0101 June 2011 Meeting Summary - V. C. Summer - Presentation Slides ML1016705202010-06-17017 June 2010 Fire Protection Screening Criteria - V.C. Summer Nuclear Station ML1012600092010-05-0505 May 2010 Meeting Posters ML1012600102010-05-0505 May 2010 Meeting Slides ML0835204162008-12-16016 December 2008 Public Meeting Summary, Virgil C. Summer Nuclear Station, Docket No. 05-395 ML11216A2292008-12-0202 December 2008 0523 - R504P - Westinghouse Advanced Technology - 07.2 VC Summer Inadvertent Criticality ML0811405532008-04-23023 April 2008 V. C. Summer Nuclear Station, Slides - Refuel 17 Plans ML0723400122007-08-22022 August 2007 Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License Application IR 05000395/20075022007-07-30030 July 2007 Summary of Public Meeting - Virgil C. Summer Nuclear Station, to Discuss Significance on Apparent Violation Documented in Inspection Report 50-395-07-502 ML0715806282007-05-31031 May 2007 Enclosure 8 - OBE Exceedance Issues ML0713501062007-05-0202 May 2007 Meeting Handout on CRDM Canopy Seal Clamp Installation ML0713501022007-05-0202 May 2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection ML0713500972007-05-0202 May 2007 Meeting Handout on Alternate Safety Power Source - Summer ML0713500662007-05-0202 May 2007 Meeting Handout on RF16 Outage Review V.C. Summer ML0713501092007-05-0202 May 2007 Meeting Handout on Summary of HP Performance During RF16 ML0706703232007-03-0101 March 2007 (Westinghouse AP1000) ML0627602452006-09-27027 September 2006 V. C. Summer Nuclear Station RF-16 Outage Information ML0618002632006-09-18018 September 2006 Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants ML0707202262006-06-22022 June 2006 Sce&G VC Summer Site - Site Characterization Visit (Handouts) ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0609702982006-03-31031 March 2006 NRC Cy 2005 Annual Assessment Meeting, Virgil C. Summer Nuclear Station ML0609405532006-03-20020 March 2006 Meeting Summary - Enclosure 2. Handouts for Meeting with South Carolina Electric & Gas Company Re Results of Root Cause Evaluation for the High Failure Rate on the January 10, 2006, Operator Licensing Initial Written Examination ML0600304352005-12-30030 December 2005 Rii Presentation Revised - RF-15 Outage Information 2024-01-25
[Table view] |
Text
ML20091G723 V.C. Summer Unit 1 Annual Assessment Meeting 2019 Reactor Oversight Process (ROP)
U.S. Nuclear Regulatory Commission Region 2 / Division of Reactor Projects
Agenda Introductions - Summer Resident Inspectors and Regional Staff Responsible for Summer Oversight Strategic Plan Goals Annual Assessment Summary Findings Performance Indicators NRC Plans for 2020 COVID-19 Response
Introductions
Resident Inspectors Jacob Dolecki - Senior Resident Inspector Carey (Mac) Read - Senior Resident Inspector Eliza Hilton - Resident Inspector Regional Personnel Randy Musser - Branch Chief Lundy Pressley - Senior Project Engineer Adam Wilson - Project Engineer
The NRCs Resident Inspectors NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection of the secure use and management of radioactive materials
NRC Annual Assessment Summary V.C. Summer Dominion Energy (Licensee)/V.C. Summer operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
V.C. Summer was in the licensee response Column (Column 1 of IMC 0305) of the NRCs ROP Action Matrix for the last quarter of 2019.
NRC Inspection Activities V.C. Summer for 2019 Approximately 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> of inspection and related activities 2 resident inspectors onsite for full-time inspection coverage throughout the year 10 regional inspections
NRC Inspection Activities V.C. Summer for 2019 - cont.
4 major team inspections Problem Identification and Resolution Inspection Emergency Preparedness Exercise Inspection Modifications (50.59) Inspection Triennial Fire Protection Inspection
V.C. Summer PIs and Findings January 1 through December 31, 2019 All Green Performance Indicators Five Green / Severity Level IV inspection findings
NRC Plans for 2020 NRC plans baseline inspections at V.C.
Summer for the remainder of 2020. This includes:
Force-on-Force Exercise Inspection Inservice Inspection (ISI)
Radiation Safety during Refueling Outage Design Basis Assurance Inspection Material Control and Accounting Inspection
NRC Response to Mission Critical Functions Monitoring plant activities remotely through inspections and oversight Maintaining emergency response capabilities with Regional IRCs and HQ Limiting and risk-informing on-site inspections by residents and region-based inspectors
NRC Response to Additional Actions Expanded use of telework Ongoing Review of Continuity of Operations Plan Coordinating actions with industry to minimize inspection impacts while protecting inspectors and plant staff
V.C. Summer Plant Response The V.C. Summer priority is maintaining the health and safety of its employees.
The site is engaged in social distancing by conducting virtual meetings and having employees telework when possible.
Work on site will be focused on a narrow set of responsibilities to ensure customer needs are met.
Getting in Touch with the NRC Website - www.nrc.gov Questions/Information -
OPA2.Resource@nrc.gov or 404-997-4417 Allegations 800-695-7403 Employment - 301-415-7400 or www.usajobs.gov
NRC Social Media
https://service.govdelivery.com/accounts/USNRC/subscriber/new
End of Presentation Nuclear Regulatory Commission Region 2 Please submit questions or feedback regarding the meeting by emailing Randy.Musser@nrc.gov Roger.Hannah@nrc.gov