ML20091G723 V.C. Summer Unit 1 Annual Assessment Meeting 2019 Reactor Oversight Process (ROP)

U.S. Nuclear Regulatory Commission Region 2 / Division of Reactor Projects

Agenda Introductions - Summer Resident Inspectors and Regional Staff Responsible for Summer Oversight Strategic Plan Goals Annual Assessment Summary Findings Performance Indicators NRC Plans for 2020 COVID-19 Response

Introductions

Resident Inspectors Jacob Dolecki - Senior Resident Inspector Carey (Mac) Read - Senior Resident Inspector Eliza Hilton - Resident Inspector Regional Personnel Randy Musser - Branch Chief Lundy Pressley - Senior Project Engineer Adam Wilson - Project Engineer

The NRCs Resident Inspectors NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection of the secure use and management of radioactive materials

NRC Annual Assessment Summary V.C. Summer Dominion Energy (Licensee)/V.C. Summer operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

V.C. Summer was in the licensee response Column (Column 1 of IMC 0305) of the NRCs ROP Action Matrix for the last quarter of 2019.

NRC Inspection Activities V.C. Summer for 2019 Approximately 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> of inspection and related activities 2 resident inspectors onsite for full-time inspection coverage throughout the year 10 regional inspections

NRC Inspection Activities V.C. Summer for 2019 - cont.

4 major team inspections Problem Identification and Resolution Inspection Emergency Preparedness Exercise Inspection Modifications (50.59) Inspection Triennial Fire Protection Inspection

V.C. Summer PIs and Findings January 1 through December 31, 2019 All Green Performance Indicators Five Green / Severity Level IV inspection findings

NRC Plans for 2020 NRC plans baseline inspections at V.C.

Summer for the remainder of 2020. This includes:

Force-on-Force Exercise Inspection Inservice Inspection (ISI)

Radiation Safety during Refueling Outage Design Basis Assurance Inspection Material Control and Accounting Inspection

NRC Response to Mission Critical Functions Monitoring plant activities remotely through inspections and oversight Maintaining emergency response capabilities with Regional IRCs and HQ Limiting and risk-informing on-site inspections by residents and region-based inspectors

NRC Response to Additional Actions Expanded use of telework Ongoing Review of Continuity of Operations Plan Coordinating actions with industry to minimize inspection impacts while protecting inspectors and plant staff

V.C. Summer Plant Response The V.C. Summer priority is maintaining the health and safety of its employees.

The site is engaged in social distancing by conducting virtual meetings and having employees telework when possible.

Work on site will be focused on a narrow set of responsibilities to ensure customer needs are met.

Getting in Touch with the NRC Website - www.nrc.gov Questions/Information -

OPA2.Resource@nrc.gov or 404-997-4417 Allegations 800-695-7403 Employment - 301-415-7400 or www.usajobs.gov

NRC Social Media

  • GovDelivery:

https://service.govdelivery.com/accounts/USNRC/subscriber/new

End of Presentation Nuclear Regulatory Commission Region 2 Please submit questions or feedback regarding the meeting by emailing Randy.Musser@nrc.gov Roger.Hannah@nrc.gov