A SCANA COMPANY v.c. Summer Nuclear Station Combined Emergency Plan Review (Units 1, 2, & 3)
March 26, 2013
Agenda
~ Team Introductions
~ Current EP-Plan Overviews
~ Proposed Changes
~ New Technical Support Center
~ Emergency Response
~ Public Health and Safety
~ NRC Prior Approvals 2
~-------""
~SCE&G A SCANA COMPANY
Team Introductions
- Bob Williamson, Manager - Emergency Planning
~ Tim Bonnette, Supervisor - Emergency Services
~ Nuclear Licensing lI> Bruce Thompson, Manager John Garza, Supervisor
~ Amy Monroe, Engineer
~ Beth Quattlebaum, Engineer Tom Collins, Specialist
~SCE&G 3
A SCANA COMPANY
Current EP-Plans
~ VCSNS Unit 1 Radiation Emergency Plan, EP-l00 SER Received on Revision 5 (dated 10/81), NUREG-717 SUppa 3, NRC Safety Evaluation Report Dated 01/82 Current Revision is 62 Unit 1 guidance Up to date through new EP Rule Making to 10 CFR 50.47 (b) and 10 CFR 50 Appendix E (November, 2011, ML102510626)
~ VCSNS Units 2 & 3 Radiation Emergency Plan SER Received on Revision 4 for Units 2 & 3, ML110410366, 02/11 Contains guidance for VCSNS Unit 1 up to and including EP-100 Revision 57 Contains guidance for VCSNS Units 2 & 3, prior to rule making
~SCE&G 4
A SCANA COMPANY
Proposed Changes - Unit 1 Plan
~ Combine plans Single Emergency Response Organization structure Incorporate the new Technical Support Center Change the activation criteria for the Emergency Response Organization
~ Change the activation times for the Emergency Response Facilities
~ Expand Emergency Planning Zone in Lexington, SC
~ Relocate the Joint Information Services (Joint Information Center)
~.SCE&G A SCANA COMPANY 5
Proposed Changes - Units 2 & 3 Plan
~ Update based on EP Rule Making Elements
~ 10 CFR 50.54 (q) Process
~ Evacuation Time Estimates
~ Alert and Notification System Design Report Alternate Facility
~ Combine plans
~ Single Emergency Response Organization structure
~ Changes to responsibilities for Risk Significant Planning Standards "SCF&G A SCANA COMPANY 6
Proposed Changes - Units 2 & 3 Plan Continued:
~ Expand the Emergency Planning Zone in Lexington, SC
~ Relocate the Joint Information Services (Joint Information Center)
"SCE&G 7
A SCANA COMPANY
Site Layout
.-~-~~
Nuclear Operations Building
\\~
\\
\\.
, ~~I ~
[ \\
I I
""~,---, ""~.
('/
Ce><"Iy """oJ,,'\\,
/ \\....... ----.-"
I Legend N
Water
~ ~ -..' Slle Boundary/Exclusion Area Boundary (EAB)
--- Road
-- Stale Route
+
"-~ Railroad I0 025 05 0.75 1
I
~
1.... le.
~.SCE&G 8
A SCANA COMPANY
z c n-CD Q.)... o
-c CD iiJ...._.
o
- s tn III c_.-c._.
- s cc
~
n:::r
~-n Q)-en c
-a
-a 0
- l 0
0 CD
~
r+
CD..,
- I o
- T
~_.
o S>>-en c:
-c
-c o
- +
o CD
~
r+
CD..,
Technical Support Center (TSC)
~ The new TSC is located outside and between the Unit 1 Protected Area and the Units 2 & 3 Protected Area
~ Basement of the new Nuclear Operations Building
~ "'7,000 square feet of working space, including Command Area, Engineering Area, NRC Area, Executive Video Conference Room, two support areas, Back-up Operational Support Center, bathrooms, storage, etc.
~SCE&G 12 A SCANA COMPANY
Technical Support Center (TSC)
Continued:
- Positive pressure facility with HEPA and Charcoal Filtration System in emergency mode
- Uninterruptable Power Supply with Back-up Emergency Diesel Generator Power
- Computers (network and plant data display), telephones, radios, and satellite phones
- Response capability for any combination of single or multi-unit emergencies
~SCEF&G A SCANA COMPANY 13
Emergency Response
~ Single Emergency Response Organization Structure
~ EOF for corporate and offsite command and control
~ TSC for onsite command and control All primary Engineering functions moved to the TSC t 3 - Operational Support Centers (one per Unit)
~ 3 - Control Rooms (one per Unit) 14 4(.SCE&G A SCANA COMPANY
Emergency Response
~ Activation of Emergency Response Facilities Current Proposed TSC and OSC activated at ALERT
. ALL facilities activated at an ALERT EOF activated at SITE AREA EMERGENCY
~ Activation of the Emergency Response Organization Current Proposed ERO response required within about ERO response required within 75 60 minutes minutes
~SCE&G A SCANA COMPANY 15
Public Health and Safety
~ Expand the Emergency Planning Zone
~ Lexington County, South Carolina near Chapin, SC
~ Lexington has requested Federal Emergency Management Agency review
~ 2012 Evacuation Time Estimate has been completed
~ Additional Early Warning Sirens sites have been identified in the expanded area
-e.SCE&G A SCANA COMPANY 16
Emergency Planning Zone
\\',
"lr..
"' 'f~j~
I.
@;iIIii~.. _
...;r _
Green: Current I
EPZ Boundary
~
I for Zone D-2
.......; r-~
~*SCE&G 17 A SCANA COMPANY
Public Health and Safety Continued:
~ Relocation of Joint Information Services (JIS)
>> State of South Carolina Emergency Management Division no longer desires to support utility Joint Information Centers
~ The SC Emergency Operations Center (SEOC) will be used as the primary JIS location SCE&G/SCANA will send staff to SEOC JIS as the Company Spokesperson EOF staff will support the Company Spokesperson
~ SCE&G will maintain the capabilities to operate its current facility
~SCE&G 18 A SCANA COMPANY
NRC Prior Approval
~ Relocation of the Technical Support Center for Unit 1
~ Outside the guidance of NUREG-0696
~ Reassignment of the Risk Significant Planning Standards for Units 2 & 3 Classification responsibility assigned to TSC
~ Activation of Emergency Response Facilities
~ Emergency Response Organization Structure
~ Add and eliminate positions and reassign responsibilities
~SC:E&G A SCANA COMPANY 19
NRC Prior Approval Expand the Emergency Planning Zone Increases the number of evacuees and vehicle on the roadways
~ Relocation of the Joint Information Services (JIS)
Primary JIS location is no longer at SCE&G facility or controlled by licensee
~ Cumulative affect of all changes t2SCE&G A SCANA COMPANY 20
License Amendment Request
~ License Amendment Request will be submitted for Unit 1, Unit 2, and Unit 3
~ Expected to be submitted in second quarter, 2013
~ Expected Implementation in second quarter, 2014