Summer Nuclear Station Annual Assessment Meeting 2009 Reactor Oversight Process Nuclear Regulatory Commission - Region II Enclosure 2

NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials Enclosure 2

NRC Annual Assessment Summary Summer SCE&G operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Summer was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2009.

Enclosure 2

NRC Inspection Activities Summer for 2009 3,782 hours0.00905 days <br />0.217 hours <br />0.00129 weeks <br />2.97551e-4 months <br /> of inspection and related activities Two resident inspectors on site - residents perform inspections on a daily basis and issue four quarterly inspection reports per year Five regional inspections One major team inspection Initial License Exam Enclosure 2

Summer PIs and Findings January 1 through December 31, 2009 All Green Performance Indicators Enclosure 2

Summer Inspection Findings January 1 through December 31, 2009 Enclosure 2

NRC Inspection Findings Summer Failure to follow procedure results in inadvertent loss of spent fuel pool inventory Failure to follow procedure and correct previously indentified deficiencies with the operator workaround program Failure to effectively monitor the performance of the emergency air handling system Enclosure 2

Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue Enclosure 2

NRC Plans for 2010 NRC plans baseline inspections at Summer for the remainder of 2010. This includes:

Triennial Fire Protection Inspection Problem Identification and Resolution Inspection Enclosure 2

End of Presentation Nuclear Regulatory Commission Region II Atlanta, Ga 4/28/2010 Enclosure 2