Summer Nuclear Station Annual Assessment Meeting 2009 Reactor Oversight Process Nuclear Regulatory Commission - Region II
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials
NRC Annual Assessment Summary SCE&G operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
Summer was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2009.
Summer
NRC Inspection Activities 3,782 hours0.00905 days <br />0.217 hours <br />0.00129 weeks <br />2.97551e-4 months <br /> of inspection and related activities Two resident inspectors on site - residents perform inspections on a daily basis and issue four quarterly inspection reports per year Five regional inspections One major team inspection Initial License Exam Summer for 2009
Summer PIs and Findings All Green Performance Indicators January 1 through December 31, 2009
Summer Inspection Findings January 1 through December 31, 2009
NRC Inspection Findings Failure to follow procedure results in inadvertent loss of spent fuel pool inventory Failure to follow procedure and correct previously indentified deficiencies with the operator workaround program Failure to effectively monitor the performance of the emergency air handling system Summer
Significance Threshold Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Performance Indicators Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue
NRC Plans for 2010 NRC plans baseline inspections at Summer for the remainder of 2010. This includes:
Triennial Fire Protection Inspection Problem Identification and Resolution Inspection
End of Presentation Nuclear Regulatory Commission Region II Atlanta, Ga 4/28/2010