Fire Protection Screening Criteria - V.C. Summer Nuclear Station
ML101670520
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/17/2010
From:
SCANA Corp, South Carolina Electric & Gas Co
To:
NRC/NRR/DIRS/IRIB
Jeremy Bowen, 415-3471
Shared Package
ML101670555 List:
References
Download: ML101670520 (21)


Text

Enclosure 6 V.C. Summer Nuclear Station Presentation Meeting Summary of the 6/8/2010 Meeting with NRC/SNC/FPL/SCE&G Dated June 17, 2010

co c::

C L.. 0>

0 Q) 0 c

~

I

  • CI)

I *.-

I

  • L..

t)

Q) 10",

()

cu Q)

Q)

CI> -

(,)

I

  • O>~

0

~

L..

C 10",

a...-

t)

CI> E E

Q)

..c L..

J CI) lJ;;;

a..

(.) s

~

i:

j$

II)

It

~

(/)

CJ

+-'

i c

Q)

!5 E

E i

a c

i 0

a II)

C)

(/)

cj c

(/)

~

C

J CO U

Q)

(/)

"'C c...-

c 0

0 a

s::

(/)

ro

+-'

+-'

CD "0.-

(/) c c

Q)

C)

Q) c ro

+-'

ro E

(/)

.... E c 0 I-a C) L(") a 0

+-'

C 0

U ex)

C)

J C

"0 Q) << c.-

a Q)

Il...

(/)

a

+-'

u LL c

C/) Z 0

Screening Criteria Identified for VCSNS

  • SISBO mitigation strategy

. Issues

____________________ v.c. SUMMER NUCLEAR STATION

SISBO Mitigation Strategy

  • VSCNS utilizes a SISBO Appendix R fire mitigation strategy
  • SISBO ensures one train of equipment free from fire damage
  • But it reduces:

- mitigation equipment availability

- requires local manual operator actions

____________________ v.c. SUMMER NUCLEAR STATION

Number of IPEEE Operator Actions

  • 66 detailed modeling HEPs
  • Both Inside and Outside of the Control Room
  • Most zones use -20 HEP's to get to stable conditions
  • 8 Risk significant HEP's (RAW> 2)

____________________ v.c. SUMMER NUCLEAR STATION

Complexity of IPEEE Operator Actions

  • OMAs typically consist of only a few steps
  • Many of the steps are used in normal operation and for routine equipment LOTO for maintenance
  • Critical actions have been determined to be Feasible and Reliable through Engineering analysis and Operator walkdowns

____________________ v.c. SUMMER NUCLEAR STATION

Mitigation of Operator Action Complexity

  • Any special equipment is pre-staged
  • Added battery lighting
  • Component marking was improved.
  • Procedures are continuous use and require place-keeping

____________________ v.c. SUMMER NUCLEAR STATION

IPEEE Insights

  • The Fire Emergency Procedures (FEPs) are sound and workable.

- Several improvements were identified and incorporated

  • Today the FEPs are routinely trained on and improvements are identified and incorporated

____________________ v.c. SUMMER NUCLEAR STATION

IPEEE Insights Used to Reduce Fire Risk

  • Train operators on IPEEE risk insights
  • Train Fire Brigade Members on IPEEE risk insights

____________________ v.c. SUMMER NUCLEAR STATION

c:

Q)

E

a.

c:

(1)

E

a.

c: g 1$

II)

It:

~

(.)

i

~

Q) l5

~

l

'to-II) t:

u Q)

"'C -...,

t:

Q)

E

a.
l C'"

W

Screening Criteria Applicable to V.C. Summer

  • One screening criterion applies:

- SISBO mitigation strategy

  • Two screening criteria do not apply:

- A relatively large number of manual operator actions

- Operator manual actions that are complex

____________________ lI.c. SUMMER NUCLEAR STATION

Summary of Current Program

  • VCSNS is aware of the risk level associated with the SISBO fire mitigation strategy

- quantified during the IPEEE

- actions taken to minimize that risk

  • The station is transitioning to NFPA-805 to further minimize the risk

____________________ v.c. SUMMER NUCLEAR STATION

Transitioning to NFPA 805

- Full compliance with NFPA805

- Eliminate SISBO

- Address Multiple Spurious Operations

- Reduce or eliminate Operator Manual Actions

- Clear and concise Configuration Management Documents

____________________ v.c. SUMMER NUCLEAR STATION

NFPA 805 Project Status

  • Revised Shutdown Strategy
  • Nuclear Safety Compliance Assessment
  • Fire PRA (Peer Review Aug 2010)
  • Current Benefits (Insights)

____________________ v.c. SUMMER NUCLEAR STATION

NFPA 805 Project Status

  • Preliminary Results

- Fire Outside Main Control Room: No OMA (Recovery Actions)

- LAR Submittal: Early Finish, 4th Qtr 2010

____________________ v.c. SUMMER NUCLEAR STATION

NFPA805 Compensatory Actions

  • Compensatory Measures initiated

- NFPA805 Modifications

- Fire Modeling Solutions

  • Engineering Analysis

- Assess insights against Current Licensing Basis (CLB)

- Determine appropriate Compensatory Measures

____________________ v.c. SUMMER NUCLEAR STATION

NFPA805 Compensatory Actions

- Review NFPA805 insights outside CLB

- Conduct risk assessment

____________________ v.c. SUMMER NUCLEAR STATION

~

r::::

(1)

E E

o o

en r::::.-

t/) o -o