{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 October 22, 2014 Mr. David Heacock President and Chief Nuclear Officer | ||
Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | |||
SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. | SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. | ||
Line 36: | Line 35: | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 | |||
ML14295A280 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr RMcKinley ADimitriadis DATE 10/21/14 10/20/14 10/22/14 2 | ML14295A280 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr RMcKinley ADimitriadis DATE 10/21/14 10/20/14 10/22/14 | ||
2 | |||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Inspection Report Nos. 05000336/2014502 and 05000423/2014502 | NRC Inspection Report Nos | ||
. 05000336/2014502 and 05000423/2014502 | |||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplementary Information | Supplementary Information | ||
cc w/encl: Distribution via ListServ S. Coleman, RAC Chair, FEMA Region I E. Larson 3 Distribution w/encl: (via E-mail) D. Lew, RA (R1ORAMAIL Resource) V. Ordaz, DRA (R1ORAMAIL Resource) H. Nieh, DRP (R1DRPMAIL Resource) M. Scott, DRP (R1DRPMAIL Resource) R. Lorson, DRS (R1DRSMAIL Resource) J. Trapp, DRS (R1DRSMAIL Resource) R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI L. McKown, DRP, RI J. Jandovitz, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPreports Resource A. Dimitriadis, DRS S. Barr, DRS | cc w/encl: Distribution via ListServ S. Coleman, RAC Chair, FEMA Region I | ||
E. Larson 3 | |||
Distribution w/encl: (via E-mail) D. Lew, RA (R1ORAMAIL Resource) | |||
V. Ordaz, DRA (R1ORAMAIL Resource) | |||
H. Nieh, DRP (R1DRPMAIL Resource) M. Scott, DRP (R1DRPMAIL Resource) | |||
R. Lorson, DRS (R1DRSMAIL Resource) | |||
J. Trapp, DRS (R1DRSMAIL Resource) R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI L. McKown, DRP, RI J. Jandovitz, RI OEDO RidsNrrPMMillstone Resource | |||
RidsNrrDorlLpl1-1 Resource ROPreports Resource A. Dimitriadis, DRS S. Barr, DRS | |||
i | R. Kahler, NSIR/EPD | ||
S. LaVie, NSIR/EPD | |||
i Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket Nos.: 50-336, 50-423 | |||
License Nos.: DPR-65, NPF-49 Report No.: 05000336/2014502 and 05000423/2014502 | |||
Licensee: Dominion Nuclear Connecticut, Inc. (Dominion) | |||
Facility: Millstone Power Station, Units 2 and 3 | Facility: Millstone Power Station, Units 2 and 3 | ||
Location: P.O. Box 128 Waterford, CT 06385 Dates: September 8-12, 2014 | Location: P.O. Box 128 Waterford, CT 06385 | ||
Dates: September 8-12, 2014 | |||
Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead) B. Fuller, Senior Operations Inspector, DRS, Region I N. Day, Project Engineer, Division of Reactor Projects, Region I J. Ambrosini, Senior Resident Inspector, Millstone B. Haagensen, Resident Inspector, Millstone L. McKown, Resident Inspector, Millstone S. LaVie, Senior Emergency Preparedness Specialist, NSIR | Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead) B. Fuller, Senior Operations Inspector, DRS, Region I N. Day, Project Engineer, Division of Reactor Projects, Region I J. Ambrosini, Senior Resident Inspector, Millstone B. Haagensen, Resident Inspector, Millstone L. McKown, Resident Inspector, Millstone S. LaVie, Senior Emergency Preparedness Specialist, NSIR | ||
Line 67: | Line 89: | ||
===Cornerstone: Emergency Preparedness=== | ===Cornerstone: Emergency Preparedness=== | ||
No findings were identified. | No findings were identified. | ||
Line 74: | Line 97: | ||
===Cornerstone:=== | ===Cornerstone:=== | ||
Emergency Preparedness (EP)1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample) | Emergency Preparedness (EP) | ||
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Dominion designed the September 9, 2014, Millstone EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory Commission (NRC) inspected the Millstone HA event exercise to assess Dominion's ability to effectively implement the Millstone Emergency Plan during a HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The exercise evaluation consisted of the following review and assessment: | Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight | ||
calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Dominion designed the September 9, 2014, Millstone EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory | |||
Commission (NRC) inspected the Millstone HA event exercise to assess Dominion's ability to effectively implement the Millstone Emergency Plan during a HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle. | |||
The exercise evaluation consisted of the following review and assessment: | |||
The adequacy of the Dominion Millstone ERO's performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively. | |||
The overall adequacy of Dominion's emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were: the Control Room Simulator; the Alternative Facility (AF); the Central Alarm Station (CAS); the onsite Incident Command Post (ICP); the local law enforcement Unified Command Post (UCP); and the Alternative Emergency Operations Facility (AEOF). | The overall adequacy of Dominion's emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were: the Control Room Simulator; the Alternative Facility (AF); the Central Alarm Station (CAS); the onsite Incident Command Post (ICP); the local law enforcement Unified Command Post (UCP); and the Alternative Emergency Operations Facility (AEOF). | ||
Line 85: | Line 117: | ||
A review of past performance issues from the last NRC Millstone exercise inspection report and recent Dominion Millstone EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 9, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14). | A review of past performance issues from the last NRC Millstone exercise inspection report and recent Dominion Millstone EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 9, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14). | ||
The licensee's post-exercise critiques, to evaluate Dominion's self-assessment of its Millstone ERO performance during the September 9, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. The inspectors reviewed the documents listed in the attachment to this report. | The licensee's post-exercise critiques, to evaluate Dominion's self-assessment of its Millstone ERO performance during the September 9, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. | ||
The inspectors reviewed the documents listed in the attachment to this report. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. 1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample) | No findings were identified. | ||
1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Prior to the September 9, 2014, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Dominion had submitted to the NRC, to determine if the exercise would test major elements of the Millstone Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The inspectors reviewed the documents listed in the attachment to this report. | Prior to the September 9, 2014, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Dominion had submitted to the NRC, to determine if the exercise would test major elements of the Millstone Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. | ||
The inspectors reviewed the documents listed in the attachment to this report. | |||
====b. Findings==== | ====b. Findings==== | ||
Line 101: | Line 139: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors reviewed data for the Millstone EP Performance Indicators (PI), which are: (1) Drill and Exercise Performance (DEP) (EP01); (2) ERO Drill Participation (EP02); and (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Millstone was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the second calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 7. | The inspectors reviewed data for the Millstone EP Performance Indicators (PI), which are: (1) Drill and Exercise Performance (DEP) (EP01); (2) ERO Drill Participation (EP02); and (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Millstone was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the second calendar quarter of 2014, to verify | ||
the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," | |||
Revision 7. | |||
This inspection activity represented the completion of three samples. | This inspection activity represented the completion of three samples. | ||
Line 110: | Line 151: | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Meetings, including Exit== | ==4OA6 Meetings, including Exit== | ||
On September 12, 2014, the inspectors presented the results of this inspection to Mr. S. Scace, Site Vice President, and other members of the Dominion staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | On September 12, 2014, the inspectors presented the results of this inspection to Mr. S. Scace, Site Vice President, and other members of the Dominion staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | ||
ATTACHMENT | ATTACHMENT | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
Line 123: | Line 165: | ||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
None. | None. | ||
Line 129: | Line 172: | ||
===Procedures=== | ===Procedures=== | ||
: Millstone Power Station Emergency Plan Implementing Procedures Millstone Power Station Emergency Plan Administrative Procedures | : Millstone Power Station Emergency Plan Implementing Procedures Millstone Power Station Emergency Plan Administrative Procedures | ||
===Miscellaneous=== | ===Miscellaneous=== | ||
: Millstone September 9, 2014, Emergency Exercise Scenario Package, MSEP14BE Millstone Power Station Emergency Plan, Revision 46 | : Millstone September 9, 2014, Emergency Exercise Scenario Package, MSEP14BE Millstone Power Station Emergency Plan, Revision 46 | ||
Line 149: | Line 192: | ||
: DEP PI data, October 2013 - June 2014 | : DEP PI data, October 2013 - June 2014 | ||
: ERO Drill Participation PI data, October 2013 - June 2014 | : ERO Drill Participation PI data, October 2013 - June 2014 | ||
: ANS Reliability PI data, October 2013 - June 2014 | : ANS Reliability PI data, October 2013 - June 2014 | ||
: Attachment | : Attachment | ||
==LIST OF ACRONYMS== | ==LIST OF ACRONYMS== |
Revision as of 08:35, 1 July 2018
ML14295A280 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 10/22/2014 |
From: | Anthony Dimitriadis Plant Support Branch 1 |
To: | Heacock D A Dominion Resources |
References | |
IR 2014502 | |
Download: ML14295A280 (11) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 October 22, 2014 Mr. David Heacock President and Chief Nuclear Officer
Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS.
05000336/2014502 AND 05000423/2014502
Dear Mr. Heacock:
On September 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 9, 2014, evaluated emergency preparedness exercise at your Millstone Power Station, Units 2 and 3 (Millstone). The enclosed inspection report documents the inspection results, which were discussed on September 12, 2014, with Mr. S. Scace, Site Vice President, and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49
ML14295A280 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr RMcKinley ADimitriadis DATE 10/21/14 10/20/14 10/22/14
2
Enclosure:
NRC Inspection Report Nos
. 05000336/2014502 and 05000423/2014502
w/Attachment:
Supplementary Information
cc w/encl: Distribution via ListServ S. Coleman, RAC Chair, FEMA Region I
E. Larson 3
Distribution w/encl: (via E-mail) D. Lew, RA (R1ORAMAIL Resource)
V. Ordaz, DRA (R1ORAMAIL Resource)
H. Nieh, DRP (R1DRPMAIL Resource) M. Scott, DRP (R1DRPMAIL Resource)
R. Lorson, DRS (R1DRSMAIL Resource)
J. Trapp, DRS (R1DRSMAIL Resource) R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI L. McKown, DRP, RI J. Jandovitz, RI OEDO RidsNrrPMMillstone Resource
RidsNrrDorlLpl1-1 Resource ROPreports Resource A. Dimitriadis, DRS S. Barr, DRS
R. Kahler, NSIR/EPD
S. LaVie, NSIR/EPD
i Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket Nos.: 50-336, 50-423
License Nos.: DPR-65, NPF-49 Report No.: 05000336/2014502 and 05000423/2014502
Licensee: Dominion Nuclear Connecticut, Inc. (Dominion)
Facility: Millstone Power Station, Units 2 and 3
Location: P.O. Box 128 Waterford, CT 06385
Dates: September 8-12, 2014
Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead) B. Fuller, Senior Operations Inspector, DRS, Region I N. Day, Project Engineer, Division of Reactor Projects, Region I J. Ambrosini, Senior Resident Inspector, Millstone B. Haagensen, Resident Inspector, Millstone L. McKown, Resident Inspector, Millstone S. LaVie, Senior Emergency Preparedness Specialist, NSIR
Approved By: Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety
ii Enclosure
SUMMARY OF FINDINGS
IR 05000336/2014502, 05000423/2014502; 09/08/2014 - 09/12/2014; Millstone Power Station Units 2 and 3 (Millstone); Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation - Scenario Review; Performance Indicator Verification.
This report covers an announced inspection conducted by four Region I-based inspectors, one senior EP specialist from the Office of Nuclear Security and Incident Response, and three resident inspectors. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5, dated February 2014.
Cornerstone: Emergency Preparedness
No findings were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone:
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)
a. Inspection Scope
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight
calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Dominion designed the September 9, 2014, Millstone EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory
Commission (NRC) inspected the Millstone HA event exercise to assess Dominion's ability to effectively implement the Millstone Emergency Plan during a HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The exercise evaluation consisted of the following review and assessment:
The adequacy of the Dominion Millstone ERO's performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
The overall adequacy of Dominion's emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were: the Control Room Simulator; the Alternative Facility (AF); the Central Alarm Station (CAS); the onsite Incident Command Post (ICP); the local law enforcement Unified Command Post (UCP); and the Alternative Emergency Operations Facility (AEOF).
A review of other performance areas, such as the Dominion Millstone ERO's: recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Millstone Emergency Plan and their implementing procedures.
A review of past performance issues from the last NRC Millstone exercise inspection report and recent Dominion Millstone EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 9, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
The licensee's post-exercise critiques, to evaluate Dominion's self-assessment of its Millstone ERO performance during the September 9, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)
a. Inspection Scope
Prior to the September 9, 2014, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Dominion had submitted to the NRC, to determine if the exercise would test major elements of the Millstone Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Millstone EP Performance Indicators (PI), which are: (1) Drill and Exercise Performance (DEP) (EP01); (2) ERO Drill Participation (EP02); and (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Millstone was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the second calendar quarter of 2014, to verify
the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines,"
Revision 7.
This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On September 12, 2014, the inspectors presented the results of this inspection to Mr. S. Scace, Site Vice President, and other members of the Dominion staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- S. Scace, Site Vice President
- D. Smith, Emergency Preparedness Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
Section 1EP7: Exercise Evaluation - Hostile Action (HA) Event
Procedures
- Millstone Power Station Emergency Plan Implementing Procedures Millstone Power Station Emergency Plan Administrative Procedures
Miscellaneous
- Millstone September 9, 2014, Emergency Exercise Scenario Package, MSEP14BE Millstone Power Station Emergency Plan, Revision 46
- Millstone Emergency Response Drill Reports, January 2013 - August 2014
Section 1EP8: Exercise Evaluation - Scenario Review
Procedure
- EP-AA-400, Attachment 3, Drill/Exercise Objectives, Revision 6
Miscellaneous
- Millstone September 9, 2014, Emergency Exercise Scenario Package, MSEP14BE Millstone Power Station Emergency Plan, Revision 46
Section 4OA1: Performance Indicator (PI) Verification
Procedures
- EP-AA-103, Emergency Preparedness Performance Indicators, Revision 3
Miscellaneous
- Attachment