Docket No. 05000302License No. DPR-72 Terry Hobbs Decommissioning General Manager Duke Energy Florida, Inc. Crystal River Unit 3 15760 W. Power Line Road Crystal River, FL 34428-6708
Docket No.


SUBJECT: NRC INSPECTION REPORT NO. 05000302/2015009, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA
05000302License No.
 
DPR-72 Terry Hobbs Decommissioning General Manager Duke Energy Florida, Inc.
 
Crystal River Unit 3 15760 W. Power Line Road
 
Crystal River, FL 34428
-6708
 
SUBJECT: NRC INSPECTION REPORT NO. 05000302/201500 9, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA


==Dear Mr. Hobbs:==
==Dear Mr. Hobbs:==
On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, "Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3). On-site inspections were performed on August 25-27, 2015. In-office reviews of information supplied by Duke Energy Florida, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Phyllis Dixon, Decommissioning Technical Support Manager, and other members of the CR-3 staff on October 5, 2015, and are described in the enclosed report. No findings of safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.
On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, "Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR
-3). On-site inspections were performed on August 25
-27, 2015. In
-office reviews of information supplied by Duke Energy Florida, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Phyllis Dixon, Decommissioning Technical Support Manager, and other members of the CR
-3 staff on October 5, 2015, and are described in the enclosed report.
 
No findings of safety significance were identified.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading
-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
 
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also
 
obtain these documents by contacting the Government Printing Office (GPO) toll
-free at 1
-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
-2713 No reply to this letter is required. Please contact Steve Hammann, at 610
-337-5399, if you have any questions regarding this matter.


Sincerely,/RA/ Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety  
Sincerely,/RA/ Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety  


===Enclosure:===
===Enclosure:===
Inspection Report 05000302/2015009 cc w/encl: Distribution via ListServ
Inspection Report 05000302/201500 9 cc w/encl:
Distribution via ListServ
}}
}}

Revision as of 19:56, 30 June 2018

Duke Energy Florida, Inc., Crystal River Unit 3, NRC Inspection Report 05000302/2015009
ML15294A180
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/21/2015
From: Racquel Powell
Division of Nuclear Materials Safety I
To: Hobbs T
Duke Energy Florida
References
IR 2015009
Download: ML15294A180 (9)


Text

October 21, 2015

Docket No.

05000302License No.

DPR-72 Terry Hobbs Decommissioning General Manager Duke Energy Florida, Inc.

Crystal River Unit 3 15760 W. Power Line Road

Crystal River, FL 34428

-6708

SUBJECT: NRC INSPECTION REPORT NO. 05000302/201500 9, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA

Dear Mr. Hobbs:

On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, "Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR

-3). On-site inspections were performed on August 25

-27, 2015. In

-office reviews of information supplied by Duke Energy Florida, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Phyllis Dixon, Decommissioning Technical Support Manager, and other members of the CR

-3 staff on October 5, 2015, and are described in the enclosed report.

No findings of safety significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading

-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also

obtain these documents by contacting the Government Printing Office (GPO) toll

-free at 1

-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406

-2713 No reply to this letter is required. Please contact Steve Hammann, at 610

-337-5399, if you have any questions regarding this matter.

Sincerely,/RA/ Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety

Enclosure:

Inspection Report 05000302/201500 9 cc w/encl:

Distribution via ListServ