ML17341A797

From kanterella
Jump to navigation Jump to search
NRC Inspection Report No. 07201035/2017002, Duke Energy Florida, Inc., Crystal River Unit 3, Crystal River, Florida
ML17341A797
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/07/2017
From: Racquel Powell
Decommissioning Branch I
To: Hobbs T
Duke Energy Florida
References
IR 2017002
Download: ML17341A797 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., Suite 100 KING OF PRUSSIA, PA 19406-2713 December 7, 2017 Docket No. 07201035 License No. DPR-72 Mr. Terry Hobbs Decommissioning General Manager Duke Energy Florida, Inc.

Crystal River Unit 3 15760 W. Power Line Road Crystal River, FL 34428-6708

SUBJECT:

NRC INSPECTION REPORT NO. 07201035/2017002, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA

Dear Mr. Hobbs:

On November 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3)

Independent Spent Fuel Storage Installation (ISFSI) activities. The on-site inspection was performed on November 27-30, 2017. The purpose of the inspection was to determine whether ISFSI activities were conducted safely and in accordance with NRC requirements.

The inspection consisted of observations by the inspectors, interviews with personnel, and a review of procedures and records. The results of this inspection were discussed with you and other members of your staff on November 30, 2017, and are described in the enclosed report. No findings of safety significance were identified.

In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

T. Hobbs 2 No reply to this letter is required. Please contact Katherine Warner at 610-337-5389 if you have any questions regarding this matter.

Sincerely,

/RA/

Raymond J. Powell, Chief Decommissioning, ISFSI and Reactor Health Physics Branch Division of Nuclear Materials Safety Docket No: 07201035 License No: DPR-72

Enclosure:

Inspection Report 07201035/2017002 cc w/encl: Distribution via ListServ

T. Hobbs 2 No reply to this letter is required. Please contact Katherine Warner at 610-337-5389 if you have any questions regarding this matter.

Sincerely,

/RA/

Raymond J. Powell, Chief Decommissioning, ISFSI and Reactor Health Physics Branch Division of Nuclear Materials Safety Docket No: 07201035 License No: DPR-72

Enclosure:

Inspection Report 07201035/2017002 cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\WordDocs\D&TS_ISFSI_IRs\Memo ISFSI CR3_2017002.docx SUNSI Review Complete: KWarner ML17341A797 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: C = Copy w/o attach/encl E = Copy w/ attach/encl N = No copy OFFICE DNMS/RI N DNMS/RI NAME KWarner/kw RPowell/rp DATE 12/7/17 12/7/17 OFFICIAL RECORD COPY

U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket No: 072-01035 License No: DPR-72 Report No: 07201035/2017002 Licensee: Duke Energy Florida, Inc. (Duke Energy)

Facility: Crystal River Unit 3 (CR-3)

Location: 15760 W. Power Line Road Crystal River, FL 34428-6708 Dates: November 27 - 30, 2017 Exit Date: November 30, 2017 Inspectors: Stephen Hammann, Senior Health Physicist Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Nuclear Materials Safety, Region I Katherine Warner, Health Physicist Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Nuclear Materials Safety, Region 1 Approved by: Raymond Powell, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Nuclear Materials Safety, Region I Enclosure

EXECUTIVE

SUMMARY

Duke Energy Crystal River Nuclear Plant NRC Inspection Report No. 07201035/2017002 This report covered an on-site inspection of activities related to Crystal River Nuclear Plant Unit 3 (CR-3) dry cask storage of spent fuel during the inspection period from November 27 - 30, 2017. The inspection included a review and observation of the Independent Spent Fuel Storage Installation (ISFSI) operational loading activities. The inspection consisted of observations by the inspectors, interviews with Duke Energy personnel, and a review of procedures and records.

The NRCs program for overseeing the safe operation of dry storage of spent fuel at an ISFSI as described in Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations. Although inspections are usually performed every two to three years, due to the length of CR-3s campaign, an additional inspection of this campaign was determined to be appropriate by NRC management.

Based on the results of this inspection, no findings of safety significance were identified.

ii Enclosure

REPORT DETAILS Operation of an ISFSI at Operating Plants (IP 60855)

a. Inspection Scope On November 27 - 30, the inspectors observed and evaluated selected steps of the loading of Crystal River Unit 3s (CR-3s) sequence 32 and 33 Dry Shielded Canisters (DSCs). The inspectors verified compliance with the Certificate of Compliance (CoC),

Technical Specifications (TS), regulations, and station procedures.

The inspectors observed the downending of the thirty-second sequenced canister as well as transportation to the pad, and alignment and insertion into the Horizontal Storage Module (HSM). The inspectors also observed DSC processing operations including installation of the automated welding system and buffing of an inner top cover. The inspectors observed the inspection of the interior of the transfer cask (TC), the upending and lift of the TC to the decon pit, and the insertion of the thirty-third sequenced DSC into the TC. During performance of these activities, the inspectors verified that procedure use, communication, and coordination of Independent Spent Fuel Storage Installation (ISFSI) activities met established CR-3 standards and requirements.

The inspectors observed fuel assemblies being loaded into the thirty-third sequenced DSC and reviewed the fuel selection of the thirty-third sequenced DSC to verify that the licensee was loading fuel in accordance with the CoC, TS, and procedures.

The inspectors verified that transient combustibles were not being stored on the ISFSI pad or the vicinity of the HSMs. The inspectors also confirmed that transient combustible materials entry onto the ISFSI pad were controlled in accordance with procedures. The inspectors observed radiation protection technicians as they performed surveys and provided job coverage for the cask loading workers to verify that the technicians were performing in accordance with site procedures.

The inspectors reviewed corrective action reports and the associated follow-up actions that were generated since the last inspection to ensure that issues were entered into the corrective action program, prioritized, and evaluated commensurate with their safety significance.

b. Findings No findings of significance were identified.

Meetings, including exit

.1 Exit Meeting On November 30, 2017, the inspectors presented the inspection results to Mr. Terry Hobbs, Decommissioning Plant Manager, and other members of the Duke Energy staff who acknowledged the inspection results. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

1 Enclosure

SUPPLEMENTARY INFORMATION PARTIAL LIST OF PERSONS CONTACTED Michael Culver SNM Custodian

  • Phyllis Dixon Duke Manager of Technical Support SAFSTOR
  • Alan Fata Duke ISFSI Project Director
  • Terry Hobbs Decommissioning Plant Manager
  • Robert Marckese ISFSI Engineering Manager
  • Phil Rose Crystal River Licensing
  • Mark Vansicklen Crystal River Licensing Paul Worthington Engineering Supervisor Kenneth Young TN RP Lead
  • Denotes attendance at the ISFSI exit meeting held on November 30, 2017 ITEMS OPENED, CLOSED, AND DISCUSSED None LIST OF DOCUMENTS REVIEWED Procedures HTPT-DSC-AREVA, High Temperature Liquid Penetrant (PT) Examination Using the Color Contrast Solvent-Removable Method, AREVA TN-05 ISFS-210, ISFSI Fuel Selection, Revision 4 PTIP 11182-5.10.6, DSC Fuel Loading, Revision 7 PTIP 11182-5.10.7, DSC Processing, Revision 5 PTIP 11182-5.10.8, DSC Insertion into HSM, Revision 5 PTIP 31181-5.21.1, Rigging, Lifting, and Load Handling at CR3, Revision 1 Action Request 02083369 02160875 02165293 02166613 02166660 Miscellaneous Completed Fuel Selection Package for DCS Serial No: CR3-32PTH1-L-2C-W-31 Corrective Action Report 2017-407 CR3 ISFSI Pool to Pad Dose Projected - versus- Actual 1 Attachment

LIST OF ACRONYMS USED CoC Certificate of Compliance CR-3 Crystal River Unit 3 DSC Dry Shielded Canister HSM Horizontal Storage Module ISFSI Independent Spent Fuel Storage Installation NRC U.S. Nuclear Regulatory Commission TC Transfer Cask TS Technical Specifications 2 Attachment