NRC Inspection Report No. 05000302/2017002, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida
ML17300A284
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/26/2017
From: Racquel Powell
Decommissioning Branch I
To: Hobbs T
Duke Energy Florida
References
IR 2017002
Download: ML17300A284 (10)


Text

October 26, 2017

SUBJECT:

NRC INSPECTION REPORT NO. 05000302/2017002, DUKE ENERGY FLORIDA, LLC, CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA

Dear Mr. Hobbs:

On October 2 - 5, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3). The inspectors examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspectors, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Ivan Wilson, Manager - Operations and Maintenance, and other members of the CR-3 staff on October 5, 2017, and are described in the enclosed report. No findings of safety significance were identified.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.

Sincerely,

/RA MRoberts for/

Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety

Docket No.

05000302 License No.

DPR-72

Enclosure:

Inspection Report 05000302/2017002

w/Attachment

cc w/encl:

Distribution via ListServ

EXECUTIVE SUMMARY

Duke Energy

Crystal River Nuclear Plant NRC Inspection Report No. 05000302/2017002

An announced CR-3 decommissioning on-site inspection was performed October 2 - 5, 2017.

The inspection included a review of organization and management oversight, design changes, audits and corrective action program, spent fuel pool (SFP) safety, maintenance and surveillance, and decommissioning status. The inspection consisted of observations by the inspectors, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561,

Decommissioning Power Reactor Inspection Program."

Based on the results of this inspection, no findings of safety significance were identified.

Inspection Report No. 05000302/2017002

REPORT DETAILS

1.0 Background

On February 20, 2013, Duke Energy sent a letter [Agency Documentation and Management System (ADAMS) Accession Number ML13056A005] to the NRC certifying the permanent cessation of activities and certifying that the fuel had been permanently removed from the reactor. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii). CR-3 is currently in the SAFSTOR phase of decommissioning as described in IMC 2561.

2.0 SAFSTOR Performance and Status Review

a. Inspection Scope

[Inspection Procedures (IPs) 36801, 37801, 40801, 60801, 62801,

71801]

The inspectors conducted document reviews, attended management and personnel

meetings, and interviewed plant personnel to verify regulatory requirements were

properly implemented with respect to the site organization, staffing and staff

qualifications, including certified fuel handler (CFH) and employee training programs.

The inspectors reviewed procedures and processes to evaluate Duke Energys ability to

resolve employee safety concerns, disseminate safety information and effectively

resolve identified problems. The inspectors reviewed Duke Energys decommissioning

activities to verify they were performed in a manner consistent with the Post Shutdown

Decommissioning Activities Report (PSDAR).

The inspectors conducted document reviews and interviews with plant personnel to

verify Duke Energy procedures and processes conform to the regulations and guidance

associated with 10 CFR 50.59 and changes made by Duke Energy under 10 CFR 50.59

did not require prior NRC approval. The inspectors reviewed the qualification and

training for 10 CFR 50.59 evaluators, directions for performing reviews of proposed

changes, and an evaluation performed of the modification to install a temporary air

conditioning unit in the fuel handling building.

The inspectors reviewed documents and interviewed CR-3 personnel to verify Duke

Energy management performed audits and self-assessments, and ensured issues were

identified and corrected in accordance with the sites corrective action program (CAP).

The inspectors reviewed a representative selection of CAP documents to determine if a

sufficiently low threshold for problem identification existed, follow-up evaluations were of

sufficient quality, and Duke Energy assigned timely and appropriate prioritization for

issue resolution commensurate with the significance of the issue. The inspectors also

reviewed the project oversight plan for the dry fuel storage project.

The inspectors reviewed Duke Energys programs for the safe wet storage of spent fuel.

The inspectors performed a walk-down of the SFP and associated support systems to

assess material condition, configuration control, and system operation. The inspectors

toured the control room and interviewed certified fuel handlers to verify SFP system

instrumentation, alarms and leakage detection monitoring is adequate to assure the safe Inspection Report No. 05000302/2017002

storage of spent fuel. The inspectors interviewed employees and reviewed a

representative selection of SFP chemistry sample analysis that Duke Energy had

performed in the past year in order to verify SFP chemistry parameters were within the

limits of Duke Energys license commitments. The inspectors also reviewed data from

the spent fuel pumps to verify that the system was operating within the expected

parameters with no negative trends.

The inspectors accompanied plant personnel on a walk-down of key safety systems,

structures and components (SSCs) important to the defueled condition of the plant.

During the walk-down, the inspectors evaluated housekeeping and the material condition

of the SSCs and assessed area radiological conditions and radiological access controls,

including posting and labeling. The inspectors also met with CR-3 maintenance

supervisors and discussed staffing levels, how routine maintenance and emergent work

is requested, prioritized, and scheduled, and the current maintenance workload. The

inspectors reviewed the backlog of maintenance work to assess the age and

prioritization of the items. The inspectors reviewed the maintenance rule program

and procedures, as well as the performance criteria and monitoring procedures of

systems and components.

b. Observations and Findings

The inspectors verified that management oversight was adequate for the SAFSTOR

phase of decommissioning and that no significant changes had been made to the CR-3

SAFSTOR organization since the previous inspection. The inspectors determined that

training programs were being appropriately implemented, workers are able to check their training qualifications via computerized system, and notifications are automatically

emailed to workers and their supervisors when training is due. The inspectors

determined safety issues are reported to management and the site has monthly safety

meetings and weekly safety implementation meetings. The inspectors noted that Duke

Energy has not made any changes to their PSDAR in the past year.

The inspectors determined that 10 CFR 50.59 screenings and evaluations are being

performed and that Duke Energy has trained and qualified individuals to perform the

evaluations. The inspectors determined that changes under 10 CFR 50.59 did not

require prior NRC approval and safety reviews were performed for design changes and

modifications.

The inspectors determined that issues were being identified and entered into the CAP

and evaluated commensurate with their safety significance. The inspectors verified

audits were being performed by qualified individuals independent of the organization

being audited and quality assurance oversight of major activities was being performed.

The inspectors determined that Duke Energy was safely storing spent fuel in wet

storage. The inspectors verified spent fuel pool chemistry and cleanliness controls were

being adequately implemented. The inspectors verified surveillance requirements for

water level and temperature of the SFP were adequate and procedures provided

guidance to restore SFP water level if required. The inspectors also verified the CFH Inspection Report No. 05000302/2017002

rounds were adequate to satisfy the associated technical specification requirements for

the SFP.

The inspectors verified that all systems that supported spent fuel safety continued to be

appropriately scoped in to the maintenance rule and that the performance criteria

established were acceptable. The inspectors verified that the maintenance and

surveillance program for systems and components had been conducted in accordance

with the technical specifications requirements and established procedures. The

inspectors noted during the plant walk-down that housekeeping and plant material

condition standards were being maintained. The inspectors determined that workers

followed work plans, surveillance procedures and industrial safety protocols and were

aware of job controls specified in work instructions. The inspectors determined that the

maintenance backlog is reviewed by site management on a regular basis.

3.0

Exit Meeting Summary

On, October 5, 2017, the inspectors presented the inspection results to Ivan Wilson,

Manager - Operations and Maintenance, and other members of Duke Energys staff.

The inspectors confirmed that proprietary information was not removed from the site.

Inspection Report No. 05000302/2017002

PARTIAL LIST OF PERSONS CONTACTED

B. Akins, Radiation Protection and Chemistry Manager P. Dixon, Manager - Technical Support Manager A. Doruff, Supervisor Nuclear Shift Operations B. Ferguson, Supervisor Nuclear Shift Operations C. Gavin, Nuclear Performance Specialist J. Lane, Engineering C. Langford, Supervisor Nuclear Maintenance P. Rose, Licensing M. Van Sicklen, Licensing I. Wilson, Ops/Maintenance Manager H. Wojtasinski, Supervisor Nuclear Maintenance

ITEMS OPEN, CLOSED, AND DISCUSSED

None

LIST OF

DOCUMENTS REVIEWED

Audits and Reports

2017-CR3-CONSQA-01, NUCLEAR OVERSIGHT - AUDIT, Crystal River Consolidated QA,

Technical Specification, Operating License, Fuels and ISFSI Audit

NPOP 2014-002, NOS Nuclear Project Oversight Plan for Crystal River 3 Dry Fuel Storage

Project, Rev. 3

CRs

2091396, 02139529, 02109956, 02114073, 02137042, 02137061

Diagrams

Control Complex Chilled Water, FD-302-786

Spent Fuel Chilled Water System, FD-302-785

Spent Fuel System Flow Diagram, FD-302-621

Miscellaneous

50.59 Evaluation for EC 407307

50.59 Screenings, July 2016 - August 2017

Basic Cause Evaluations Since August 2016

CR3 Maintenance Backlog

Crystal River (CR3) Audit List

Maintenance Rule Scoping and Performance Criteria

Model Work Order Number 10221448-01, Quarterly test run of SFP-1A

Model Work Order Number 10221449-01, Quarterly test run of SFP-1B

Inspection Report No. 05000302/2017002

Procedures

AAG-005, Contingencies for Loss of SF Pool Level, Rev. 4

ADM-0101, Maintenance Rule Program, Rev. 1

AI-1000, Housekeeping/Material Condition Program, Rev. 48

AI-1806, CR-3 Safety Committee, Rev. 25

AD-NO-ALL-0102, Audit System Design, Rev. 1

AD-NO-ALL-0305, Integrated Scheduling of Audits and Assessments, Rev. 4

AD-NO-ALL-1001, Conduct of Audit, Rev. 4

AI-2205, Administration of CR-3 Fire Brigade Organization and Duties of the Fire Brigade,

Rev. 28

AI-301, Plant Nuclear Safety Committee Charter, Rev. 21

AI-4002, Site Specific Actions and Oversight Expectations, Rev. 9

AI-9003, System Evaluation, Categorization, and Abandonment, Rev. 7

CAP-0200, Conduct of Performance Improvement, Rev. 4

CH-513A, Spent Fuel Coolant Sampling (SFP), Rev. 4

EM-220D, Violent Weather (Permanently Defueled), Rev. 6

ISFS-320, ISFSI HSM Initial or Post Accident Monitoring, Rev. 3

MNT 1000, Conduct of Maintenance, Rev. 1

NOS-1000, CR3 Nuclear Oversight - Conduct of Operation, Rev. 1

OP-406, Spent Fuel Cooling System, Rev. 102

REG-0010, 10 CFR 50.59 and Selected Regulatory Reviews, Rev. 6

SAF-2172, Industrial Safety, Rev. 2

SP-300D, Defueled Daily Surveillance Log, Rev. 11

SP-318, Spent Fuel Pool Boron Concentration Verification, Rev. 6

TAP-408, Development and Conduct of Job Performance Measures, Rev. 11

TPP-0900, Maintenance Personnel Training Program, Rev. 1

TPP-901, Certified Fuel Handler Training and Retraining Program, Rev. 1

TRN-1000, DTO - Performance Based Training, Rev. 2

LIST OF ACRONYMS USED

ADAMS

Agency Documentation and Management System

CAP

Corrective Action Program

CFH

Certified Fuel Handler

CFR

Code of Federal Regulations

CR-3

Crystal River Unit 3

Duke Energy

Duke Energy Florida, Inc.

IMC

Inspection Manual Chapter

IP

Inspection Procedure

NRC

U.S. Nuclear Regulatory Commission

PSDAR

Post Shutdown Activities Report

SFP

Spent Fuel Pool

SSC

Systems, Structures, and Components