IR 05000302/2012502

From kanterella
Jump to navigation Jump to search
IR 05000302-12-502; 11/12/2012 - 11/16/2012; Crystal River Unit 3; Baseline Inspection
ML12342A374
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/07/2012
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Franke J
Florida Power Corp, Progress Energy Florida
References
IR-12-502
Download: ML12342A374 (10)


Text

December 7, 2012

SUBJECT:

CRYSTAL RIVER UNIT 3 - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000302/2012502

Dear Mr. Franke:

On November 16, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Crystal River Unit 3. The enclosed inspection report documents the inspection results, which were discussed on November 16, 2012, with you and other members of plant staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-302 License No. DPR-72

Enclosure:

IR 05000302/2012502 w/Attachment: (OUO SRI)

REGION II==

Docket Nos.: 05000302 License Nos.: DPR-72 Report No.: 05000302/2012502 Licensee: Progress Energy (Florida Power Corporation)

Facility: Crystal River Unit 3 Location: Crystal River, FL Dates: November 12, 2012, through November 16, 2012 Inspectors: M. Speck, Senior Emergency Preparedness Inspector D. Berkshire, Emergency Preparedness Inspector N. Childs, Resident Inspector Approved by: Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS

IR 05000302/2012502; 11/12/2012 - 11/16/2012; Crystal River Unit 3; Baseline Inspection

The report covered an announced inspection by two emergency preparedness inspectors and one resident inspector. No findings were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4.

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

Prior to the arrival onsite, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensees performance in the biennial exercise, conducted on November 14, 2012, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and
(10) which address emergency classification, offsite notification, radiological assessment and protective action recommendations respectively.
  • Other performance areas, such as: the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on November 15, 2012, to evaluate the licensees self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.

The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the Performance Indicators (PIs)listed below for the period April 1, 2011, through September 30, 2012. To verify the accuracy of the PI data reported during that period PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Emergency Response Organization Drill/Exercise Performance (DEP)
  • Emergency Response Organization Readiness (ERO)
  • Alert and Notification System Reliability (ANS)

For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. Licensee procedures, records and other documents reviewed within this inspection area are listed in the Attachment.

The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three

(3) Emergency Preparedness PIs, i.e., DEP, ERO, and ANS, on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On November 16, 2012, the lead inspector presented the inspection results to Mr. J.

Franke and other members of the plant staff. The inspectors confirmed that proprietary information was not provided during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

M. Austin, Fleet Emergency Preparedness Manager
C. Bergstrom, Supervisor, Emergency Preparedness
S. Cahill, Manager, Engineering
S. Crocker, Maintenance Coordinator
J. Franke, Vice President, Crystal River Nuclear Plant
D. Herrin, Lead Licensing Engineer
T. Hobbs, Plant General Manager
J. Huegel, Manager, Maintenance
M. Rigsby, Organizational Effectiveness Manager
J. Stephenson, Manager, Fleet Emergency Preparedness
B. Wunderly, Manager, Engineering

LIST OF DOCUMENTS REVIEWED