ML120650197

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Crystal River Nuclear Plant Unit 3 2011007
ML120650197
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/05/2012
From: Croteau R
Division Reactor Projects II
To: Franke J
Progress Energy Florida
Shared Package
ML120650169 List:
References
IR-11-007
Download: ML120650197 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 5, 2012 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA1B)

Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CRYSTAL RIVER NUCLEAR PLANT UNIT 3 (NRC INSPECTION REPORT 05000302/2011007)

Dear Mr. Franke:

On February 15, 2012, the NRC staff completed its performance review of the Crystal River Nuclear Plant. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Crystal River Unit 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Crystal River Unit 3 to be in the Regulatory Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix beginning the third quarter of 2011 due to one White Emergency Preparedness finding.

On February 7, 2012, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issue.

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, beginning April 30, 2012. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

In order to implement the ROP at Crystal River Unit 3, the NRC implemented Inspection Manual Chapter (IMC) 0351, Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Other Than Significant Performance Problems.

The inspection plan prepared in accordance with IMC 0351 addresses accomplishment of the ROP baseline inspection procedures and also includes observations of the planned structural repairs to the containment building. Inspections will verify acceptable performance of major testing activities including tests associated with steam generator replacement, the containment

FPC 2 building structural integrity test, and the containment integrated leak rate test. The inspection plan describes the current status of performance indicators and inspections planned to address invalid performance indicators. As plant repairs and testing near completion, the inspection plan will be amended to focus on readiness for restart, including an Operational Readiness Assessment Inspection. The approved inspection plan is electronically available from the Publicly Available Record (PARS) component of the NRCs document system (ADAMS) under ML112590546.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Daniel Rich at (404) 997-4721 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosure:

Crystal River Nuclear Plant Inspection/Activity Plan (03/01/12 - 06/30/13)

_PKG: ML120650169________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE DWR1 for MGD1 TXM1 DWR1 NAME GWilson MDonithan TMorrissey DRich DATE 03/05/2012 03/01/2012 03/01/2012 03/05/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPC 3 cc w/encl: William A. Passetti, Chief Kelvin Henderson, General Manager Florida Bureau of Radiation Control Nuclear Fleet Operations Department of Health Progress Energy Electronic Mail Distribution Electronic Mail Distribution Daniel R. Westcott, Supervisor Robert J. Duncan II, Vice President Licensing & Regulatory Programs Nuclear Operations Crystal River Nuclear Plant (NA1B)

Progress Energy Electronic Mail Distribution Electronic Mail Distribution Joseph W. Donahue, Vice President Brian C. McCabe Nuclear Oversight Manager, Nuclear Oversight Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution Jack E. Huegel, Manager, Nuclear Oversight (Acting) Plant General Manager Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution 15760 W. Power Line Street Crystal River, FL 34428-6708 David T. Conley, Senior Counsel Legal Department Stephen J. Cahill Progress Energy Director - Engineering Nuclear Electronic Mail Distribution Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear R. Alexander Glenn, General Counsel Crystal River Nuclear Plant (NA2C)

Progress Energy Electronic Mail Distribution Electronic Mail Distribution Attorney General Jeffrey R. Swartz Department of Legal Affairs Director Site Operations The Capitol PL-01 Crystal River Nuclear Plant Tallahassee, FL 32399-1050 Electronic Mail Distribution Bryan Koon, Director Donna B. Alexander Florida Division of Emergency Management Manager, Nuclear Regulatory Affairs Electronic Mail Distribution (interim)

Progress Energy Chairman Electronic Mail Distribution Board of County Commissioners Citrus County Thomas Sapporito, Consulting Associate 110 N. Apopka Avenue (Public Correspondence Only) Inverness, FL 36250 Post Office Box 8413 Jupiter, FL 33468

FPC 4 Letter to Jon A. Franke from Daniel W. Rich dated March 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CRYSTAL RIVER NUCLEAR PLANT UNIT 3 (NRC INSPECTION REPORT 05000302/2011007)

Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource ROP Reports Institute of Nuclear Power Operations (INPO)