| SUBJECT: ANNUAL ASSESSMENT LETTTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORTS 05000219/2017006, 05000219/2017402 and 05000219/2017501) DATED 2018 Distribution: (e-mail) DCollins, RA DLew, DRA MGray, DRP DPelton, DRP BWelling, DRS JYerokun, DRS MYoung, BC SShaffer, DRP CSafouri, DRP APatel, SRI EAndrews, DRP, RI KMcKenzie, DRP JBowen, RI, OEDO RidsNrrPMOysterCreek Resource RidsNrrDorlLpl1 Resource ROPreports Resource RMcKinley, DRS GDentel, DRS SPindale, DRS DJackson, DRS DTifft, RI, SLO JGreives, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME: S:\ROP Assessment Meetings\ROP-18 EOC Review\Branch 6\OC\OC 2018 Annual Assessment Letter.docx ADAMS Accession Pkg.No. ML18046A521 ADAMS Accession No. ML18058A069 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer DPelton DATE 2/28/18 8 OFFICIAL RECORD COPY Oyster Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count EQ PROGRAM 3
| | ML18058A069 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer DPelton DATE 2/28/18 8 Oyster Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count EQ PROGRAM 3 |
| 1 01/29/2018 02/02/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) | | 1 01/29/2018 02/02/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) |
| 1 02/12/2018 02/16/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) | | 1 02/12/2018 02/16/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) |
|
---|
Category:Inspection Plan
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML21012A4282021-01-13013 January 2021 Security Inspection Plan ML20017A2412020-01-15015 January 2020 Security Inspection Plan for Oyster Creek Generating Station - 2020 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 ML16235A0792016-08-31031 August 2016 Mid Cycle Assessment Letter 2016-005 IR 05000219/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Inspection Report 05000219/2015006) IR 05000219/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2015005) ML15239A4742015-08-28028 August 2015 54(p) Eval IR 05000219/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2014001) IR 05000219/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 IR 05000219/20130012014-03-0404 March 2014 ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan IR 05000219/20120012013-03-0404 March 2013 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001) IR 05000219/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Oyster Creek Nuclear Generating Station (Report 05000219/2012006) IR 05000219/20110012012-03-0505 March 2012 Annual Assessment Letter for Oyster Creek Generating Station (Report 05000219/2011001) ML1124401172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Oyster Creek Nuclear Generating Station IR 05000219/20100012011-03-0404 March 2011 Annual Assessment Letter for Oyster Creek Generating Station, EOC-11 (Report 05000219/2010001) ML1024406162010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek ML1006212562010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001) ML0914606122009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility Oyster Creek ML0914606132009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility: Oyster Creek, with Handwritten Notes ML0914703552009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914703562009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 IR 05000219/20090012009-03-0404 March 2009 Annual Assessment Letter - Oyster Creek Generating Station (05000219-09-001) ML0914606812008-10-23023 October 2008 E-mail from J. Richmond of USNRC to Various, Regarding Oc License Renewal Inspection Plan ML0915403162008-10-23023 October 2008 Inspection Cover Sheet, Facility: Oyster Creek, with Handwritten Notes ML0914606192008-10-22022 October 2008 E-mail from J. Richmond of USNRC to M. Modes of USNRC, Regarding Oc Lri Inspection Plan, Rev. 2 ML0824705692008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek IR 05000219/20080012008-03-0303 March 2008 (05000219-08-001), Annual Assessment Letter, EOC 2007 ROP8 ML0805900142008-02-27027 February 2008 Notification of Triennial Fire Protection Baseline Inspection ML0734706102007-12-13013 December 2007 ROP 8 - Oyster Creek - Change to Inspection Plan, 12/13/07 ML0724309392007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706105922007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Oyster Creek Station (05-219-07-001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0624401992006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Oyster Creek Nuclear Plant ML0606604692006-03-0606 March 2006 3/06/2006 - Oyster Creek Pre-Inspection Cover Sheet and Inspection Plan for License Renewal ML0606201302006-03-0202 March 2006 2006-001 Annual Assessment Letter - Oyster Creek Generating Station (Report 05-219/2006001) ML0524207272005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Oyster Creek Nuclear Power Plant ML0518801352005-07-0707 July 2005 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406308112004-03-0303 March 2004 2003-04 Annual Assessment Letter - Oyster Creek ML0713401642003-09-0505 September 2003 Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 ML0323906832003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek Nuclear Generating Station ML0713401622003-08-21021 August 2003 Post Strike Monitoring Activities - Updated 8/21/03 ML0713401562003-08-12012 August 2003 Post Strike (Reintegration) Inspection Plan, August 12, 2003 ML0713401532003-08-0707 August 2003 Post Strike (Reintegration) Inspection Plan Draft IR 05000219/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Oyster Creek Generating Station (Report 50-219/02-01) ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 2024-01-09
[Table view] Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
[Type here] 2018 Mr. Bryan Hanson Senior Vice President Exelon Generation Co., LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT: ANNUAL ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORTS 05000219/2017006 05000219/2017402 AND 05000219/2017501)
Dear Mr. Hanson:
The NRC has completed its end-of-cycle performance assessment of Oyster Creek Nuclear Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Note that Oyster Creek Nuclear Generating Station transitioned from the Regulatory Response Column to the Licensee Response Column on October 1, 2017, following the successful completion of Inspection Procedure 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs," which was initiated due to one White finding in the Mitigating System cornerstone associated with the inoperability of the 'E' electromatic relief valve (ADAMS Accession No. ML17291A306).1 The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. In a letter (ML18045A084) dated February 14, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Oyster Creek Nuclear Generating Station no later than October 31, 2018. Therefore, the inspection schedule is tentative and may be revised. Once you formally notify the NRC in accordance with 10 CFR 50.82(a)(1)(ii) that Oyster Creek Nuclear Generating Station is permanently shutdown, and that all the nuclear fuel has been removed from the reactor vessel, then Oyster Creek Nuclear Generating Station will transition from NRC IMC 0305, "Operating Reactor Assessment Program," and IMC 2515, "Light-Water Reactor Inspection Program - Operations Phase," to IMC 2561, "Decommissioning Power Reactor Inspection Program." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The NRC will also be performing Inspection Procedure 60855.1, "Operation of an ISFSI at Operating Plants," in the second quarter of 2018. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Mr. Matthew Young at 610-337-5205 with any questions you may have regarding this letter.
Sincerely,/RA/ David L. Pelton, Acting Director Division of Reactor Projects Docket No. 50-219 License No. DPR-16
Enclosure:
Inspection/Plan Activity
ML18058A069 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer DPelton DATE 2/28/18 8 Oyster Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count EQ PROGRAM 3
1 01/29/2018 02/02/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
1 02/12/2018 02/16/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
RADWASTE 1
1 02/05/2018 02/09/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ACCESS CONTROL, EQUIP PERF, TRAINING 3
1 04/09/2018 04/13/2018 IP 71130.02 000734 Access Control 1
04/09/2018 04/13/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1
04/09/2018 04/13/2018 IP 71130.07 000739 Security Training 1
04/09/2018 04/13/2018 IP 71151 001338 Performance Indicator Verification ISFSI OPERATIONAL INSPECTION 2
1 04/23/2018 04/27/2018 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RAD HAZARD, EXPOSURE CONTROL 01 1
1 05/21/2018 05/25/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls PI&R BIENNIAL 4
1 06/11/2018 06/15/2018 IP 71152B 000747 Problem Identification and Resolution 50.59 PROCESS 3
1 07/23/2018 07/27/2018 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments EP PROGRAM INSPECTION 1
1 09/10/2018 09/14/2018 IP 71114.02 000717 Alert and Notification System Testing 1
09/10/2018 09/14/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1
09/10/2018 09/14/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1
09/10/2018 09/14/2018 IP 71151 001397 Performance Indicator Verification UNIT 1 INSERVICE INSPECTION 1
1 09/24/2018 09/28/2018 IP 71111.08G 000701 Inservice Inspection Activities - BWR RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04 1
1 09/24/2018 09/28/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2/21/2018 2:19:59 PM Page 1
of 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Oyster Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04 1
1 09/24/2018 09/28/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1
09/24/2018 09/28/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1
09/24/2018 09/28/2018 IP 71124.04 000728 Occupational Dose Assessment RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS, PI's 01, 02, 03, 04, OR01, PR01 1
1 11/05/2018 11/09/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1
11/05/2018 11/09/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1
11/05/2018 11/09/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1
11/05/2018 11/09/2018 IP 71124.04 000728 Occupational Dose Assessment 1
11/05/2018 11/09/2018 IP 71151 000746 Performance Indicator Verification FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7
1 11/26/2018 11/30/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1
12/17/2018 12/21/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 1
1 01/14/2019 01/18/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1
01/14/2019 01/18/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1
01/14/2019 01/18/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1
01/14/2019 01/18/2019 IP 71124.04 000729 Occupational Dose Assessment ACCESS AUTH & CONTROL, SGI CONTROL, FFD 3
1 01/28/2019 02/01/2019 IP 71130.01 000733 Access Authorization 1
01/28/2019 02/01/2019 IP 71130.02 000734 Access Control 1
01/28/2019 02/01/2019 IP 71130.06 000738 Protection of Safeguards Information 1
01/28/2019 02/01/2019 IP 71130.08 000740 Fitness For Duty Program 1
01/28/2019 02/01/2019 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Team 6
1 03/04/2019 03/08/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1 03/18/2019 03/22/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
OYSTER CREEK REQUAL INSP W/ P/F RESULTS 2
1 06/10/2019 06/14/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual 2/21/2018 2:19:59 PM Page 2
of 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Oyster Creek 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count OYSTER CREEK REQUAL INSP W/ P/F RESULTS 2
1 06/10/2019 06/14/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06 1
1 06/17/2019 06/21/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment RP REMP 07 1
1 07/15/2019 07/19/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program MC&A 1
1 07/22/2019 07/26/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)
EP EXERCISE INSPECTION 2
1 10/07/2019 10/11/2019 IP 71114.01 000716 Exercise Evaluation 1
10/07/2019 10/11/2019 IP 71151 001397 Performance Indicator Verification RAD HAZARD, DOSE ASSESS, PI's 01, 04, PR01, OR01 1
1 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1
10/21/2019 10/25/2019 IP 71124.04 000729 Occupational Dose Assessment 1
10/21/2019 10/25/2019 IP 71151 000746 Performance Indicator Verification RAD INSTRUMENTATION 05 1
1 11/18/2019 11/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 2/21/2018 2:19:59 PM Page 3
of 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report