MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML21012A4282021-01-13013 January 2021 Security Inspection Plan ML20017A2412020-01-15015 January 2020 Security Inspection Plan for Oyster Creek Generating Station - 2020 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 ML16235A0792016-08-31031 August 2016 Mid Cycle Assessment Letter 2016-005 IR 05000219/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Inspection Report 05000219/2015006) IR 05000219/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2015005) ML15239A4742015-08-28028 August 2015 54(p) Eval IR 05000219/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2014001) IR 05000219/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 IR 05000219/20130012014-03-0404 March 2014 ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan IR 05000219/20120012013-03-0404 March 2013 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001) IR 05000219/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Oyster Creek Nuclear Generating Station (Report 05000219/2012006) IR 05000219/20110012012-03-0505 March 2012 Annual Assessment Letter for Oyster Creek Generating Station (Report 05000219/2011001) ML1124401172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Oyster Creek Nuclear Generating Station IR 05000219/20100012011-03-0404 March 2011 Annual Assessment Letter for Oyster Creek Generating Station, EOC-11 (Report 05000219/2010001) ML1024406162010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek ML1006212562010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001) ML0914703562009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914703552009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914606132009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility: Oyster Creek, with Handwritten Notes ML0914606122009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility Oyster Creek IR 05000219/20090012009-03-0404 March 2009 Annual Assessment Letter - Oyster Creek Generating Station (05000219-09-001) ML0915403162008-10-23023 October 2008 Inspection Cover Sheet, Facility: Oyster Creek, with Handwritten Notes ML0914606812008-10-23023 October 2008 E-mail from J. Richmond of USNRC to Various, Regarding Oc License Renewal Inspection Plan ML0914606192008-10-22022 October 2008 E-mail from J. Richmond of USNRC to M. Modes of USNRC, Regarding Oc Lri Inspection Plan, Rev. 2 ML0824705692008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek IR 05000219/20080012008-03-0303 March 2008 (05000219-08-001), Annual Assessment Letter, EOC 2007 ROP8 ML0805900142008-02-27027 February 2008 Notification of Triennial Fire Protection Baseline Inspection ML0734706102007-12-13013 December 2007 ROP 8 - Oyster Creek - Change to Inspection Plan, 12/13/07 ML0724309392007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706105922007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Oyster Creek Station (05-219-07-001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0624401992006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Oyster Creek Nuclear Plant ML0606604692006-03-0606 March 2006 3/06/2006 - Oyster Creek Pre-Inspection Cover Sheet and Inspection Plan for License Renewal ML0606201302006-03-0202 March 2006 2006-001 Annual Assessment Letter - Oyster Creek Generating Station (Report 05-219/2006001) ML0524207272005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Oyster Creek Nuclear Power Plant ML0518801352005-07-0707 July 2005 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406308112004-03-0303 March 2004 2003-04 Annual Assessment Letter - Oyster Creek ML0713401642003-09-0505 September 2003 Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 ML0323906832003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek Nuclear Generating Station ML0713401622003-08-21021 August 2003 Post Strike Monitoring Activities - Updated 8/21/03 ML0713401562003-08-12012 August 2003 Post Strike (Reintegration) Inspection Plan, August 12, 2003 ML0713401532003-08-0707 August 2003 Post Strike (Reintegration) Inspection Plan Draft IR 05000219/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Oyster Creek Generating Station (Report 50-219/02-01) ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 2024-01-09
[Table view] |
Text
NSIR REVIEW - TAC D92704 10 CFR 50.54(p)(2) CHANGES TO SECURITY PLAN EXELON GENERATION CO, LLC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NOS. 50-219 LICENSE NO. DPR-16
1.0 INTRODUCTION
By letter dated June 30, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15190A354) Exelon, Docket No. 50-219, Renewed Facility Operating License No. DPR-16, submitted the Oyster Creek Nuclear Generating Station Physical Security Plan (PSP), which also included Training and Qualification Plan, (T&QP) and Safeguards Contingency Plan (SCP), Revision 13, to the Nuclear Regulatory Commission (NRC) under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Part 50 Domestic Licensing of Production and Utilization Facilities, Section 50.54 Conditions of License paragraph (p)(2). The enclosure to the application contains Safeguards Information, which is protected under 10 CFR 73.21 and is withheld from public access pursuant to the requirements of 10 CFR 9.17 (NS113213).
The June 30, 2015 submittal implements an approved alternative measure as indicated in the NRC letter dated March 30, 2015, Oyster Creek Nuclear Generating Station (OCNGS) with regard to controlling vital area access to certain portions of the reactor building that satisfied applicable requirements of 10 CFR 73.55 (Accession No. ML14329A625).
The staff review of the licensees PSP was conducted consistent with the applicable requirements of 10 CFR Part 73 as well as the guidance contained within the Office of Nuclear Security and Incident Response (NSIR) Procedure LIC 800 Security Review Procedure for 10 CFR 50.54(p)(2) and the U.S. Nuclear Regulatory Commission (NRC)-endorsed Nuclear Energy Institute (NEI) 03-12, Revision 7, template for Security Plans as appropriate.
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.54(p)(2): the licensee may make changes to the plans without prior Commission approval if the changes do not decrease the safeguards effectiveness of the security plans. The licensee must submit a report to the NRC containing the description of each change, within two months after changes are made.
The NRC staff review consisted of determining whether the licensee appropriately implemented NRC-approved alternative measure that meets the same performance
objectives specified in 10 CFR 73.55(b) and the implementation of these changes under 10 CFR 50.54(p) did not decrease the safeguards effectiveness of the Commission-approved PSP.
3.0 TECHNICAL EVALUATION
The staff evaluated these changes consistent with the regulatory and technical basis for alternative measure discussed in the NRC letter dated March 30, 2015. The staff compared the licensees proposed changes as indicated in the submittal to staffs evaluation of alternative actions.
The staff compared the changes made in the OCNGS PSP, Revision 13 against the previous Revision 12 and noted that OCNGS PSP, Revision 13 contained eleven changes for Oyster Creek as stated in the Table of Changes for Security Plan Change Submittal of the Security Plan.
The licensee implemented changes to the PSP Training & Qualification Plan and the Safeguards Contingency Plan. Specifically, the licensee made changes to (1) insider mitigation program; (2) security badges; (3) security measures related to the access of the Reactor Building (RB); (4) Owner Control Area (OCA) surveillance; (5) security tours in the RB; and (6)
T&QP: protocols and personnel training.
As part of the review, the staff identified additional areas to be considered for future security plan change per 10 CFR 50.54(p). These areas are clarifications and administrative in nature with regard to identification of security tasks and role and responsibility of operators and radiological protection staff to be included in the appropriate section of the PSP. These additional discussions do not impact the overall assessment of staffs finding of the proposed OCNGS PSP revision 13. On August 19, 2015, the staff conducted a discussion with the licensee pertaining to inclusion of the above areas in future PSP update.
Based on staff assessment of the licensees implementation of the NRCs approval of the alternative measure per the NRC letter dated March 30, 2015, the staff finds that these changes are consistent with staff findings to support regulatory positions as stated in the staff safety evaluation report (ADAMS Accession No.ML14329A625).
4.0 CONCLUSION
The staff determined that the licensee properly concluded that the reported changes did not result in a decrease in safeguards effectiveness and recommends no further regulatory actions.
The effectiveness of the implementation of this revision is subject to future NRC review and inspection.
5.0 REVIEWED BY: Meagan Parker July 30, 2015
ADAMS Accession Number: ML15239A474 OFFICE NSIR/DSP NSIR/DSP NSIR/DSP TITLE DSP Reviewer DSP Reviewer Branch Chief NAME Meagan Parker David Diec Doug Huyck DATE 7/30/2015 8/27/2015 08/28/2015 OFFICIAL RECORD COPY