August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR OYSTER CREEK NUCLEAR
GENERATING STATION (REPORT 05000219/2017005)
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Oyster Creek Nuclear Generating Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The finding involved the failure of Exelon to follow electromatic relief valve reassembly instructions. The final safety significance was documented as White in NRCs letter dated April 13, 2017 (ML17101A422).1 Oyster Creek Nuclear Generating Station has notified Region I of their readiness for this inspection and the onsite inspection is currently planned to begin on September 11, 2017.
The NRC will be performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. In addition, the NRC will also be performing Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.
1 The designation in parentheses refers to the Agencywide Documents Access and Management System (ADAMS)
Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at 610-337-5046 with any questions you have regarding this letter.
Sincerely,
/RA/
Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.
50-219 License No.
Enclosure:
Oyster Creek Inspection Plan
cc: Distribution via ListServ
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
OFFICE RI/DRP RI/DRP
NAME CSafouri/CF SKennedy/SK
DATE 08/22/17 08/28/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oyster Creek Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/08/2017 15:51:39 71152
1 IP Problem Identification and Resolution 71152 08/07/2017 08/11/2017 EP
- EP EXERCISE EVALUATION
1 IP Exercise Evaluation 7111401 09/25/2017 09/29/2017
IP Performance Indicator Verification 71151 09/25/2017 09/29/2017 HEAT
- TRIENNIAL HEAT SINK
1 IP Heat Sink Performance 7111107T 10/16/2017 10/20/2017 71124
- 71151PIVERIFY71124.01RADEXP.03AIR.05RM
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/06/2017 11/09/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/06/2017 11/09/2017
IP Radiation Monitoring Instrumentation 71124.05 11/06/2017 11/09/2017
IP Occupational Exposure Control Effectiveness 71151-OR01 11/06/2017 11/09/2017
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/06/2017 11/09/2017 TI-191
- FUKUSHIMA LESSONS-LEARNED
1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 11/13/2017 11/17/2017 7111121N
- EQ PROGRAM
1 IP Design Bases Assurance Inspection (Programs)
7111121N 01/29/2018 02/02/2018
IP Design Bases Assurance Inspection (Programs)
7111121N 02/12/2018 02/16/2018 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/05/2018 02/09/2018 71124.01
- 01 EXPOSURE CONTROL
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/21/2018 05/24/2018 7111117T
- 50.59 PROCESS
1 IP Evaluations of Changes, Tests, and Experiments 7111117T 07/23/2018 07/27/2018 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 09/10/2018 09/14/2018
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/10/2018 09/14/2018
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/10/2018 09/14/2018
IP Performance Indicator Verification 71151 09/10/2018 09/14/2018 U1 ISI
- UNIT 1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 09/24/2018 09/28/2018 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 10/22/2018 10/26/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oyster Creek Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/08/2017 15:51:39 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 11/05/2018 11/09/2018 71124
- IP 71124.01.02.03.04 HP INSPEC
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2018 09/28/2018
IP Occupational ALARA Planning and Controls 71124.02 09/24/2018 09/28/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2018 09/28/2018
IP Occupational Dose Assessment 71124.04 09/24/2018 09/28/2018 71124
- IP 71151 PI VERIFY 71124.01.02.03.04
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2018 11/08/2018
IP Occupational ALARA Planning and Controls 71124.02 11/05/2018 11/08/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2018 11/08/2018
IP Occupational Dose Assessment 71124.04 11/05/2018 11/08/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 11/05/2018 11/08/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/05/2018 11/08/2018 71124
- RAD SAFETY 01,02,03,04
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/07/2019 01/11/2019
IP Occupational ALARA Planning and Controls 71124.02 01/07/2019 01/11/2019
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/07/2019 01/11/2019
IP Occupational Dose Assessment 71124.04 01/07/2019 01/11/2019 71124.06
- RAD SAFETY RETS
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/25/2019 03/01/2019
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/25/2019 03/01/2019 DBAI-T
- DESIGN BASES ASSURANCE INSP - TEAMS
1 IP Design Bases Assurance Inspection (Teams)
7111121M 03/04/2019 03/08/2019
IP Design Bases Assurance Inspection (Teams)
7111121M 03/18/2019 03/22/2019 71124.05
- RAD SAFETY INSTS
1 IP Radiation Monitoring Instrumentation 71124.05 04/08/2019 04/12/2019 REQUAL
- OYSTER CREEK REQUAL INSP W/ P/F RESULTS
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 06/10/2019 06/14/2019
IP Licensed Operator Requalification Program 7111111B 06/10/2019 06/14/2019 ISFSI
- ISFSI OPERATIONAL INSPECTION
1 IP Operation Of An ISFSI 60855 05/20/2019 05/24/2019
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/20/2019 05/24/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.