MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML21012A4282021-01-13013 January 2021 Security Inspection Plan ML20017A2412020-01-15015 January 2020 Security Inspection Plan for Oyster Creek Generating Station - 2020 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 ML16235A0792016-08-31031 August 2016 Mid Cycle Assessment Letter 2016-005 IR 05000219/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Inspection Report 05000219/2015006) IR 05000219/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2015005) ML15239A4742015-08-28028 August 2015 54(p) Eval IR 05000219/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2014001) IR 05000219/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 IR 05000219/20130012014-03-0404 March 2014 ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan IR 05000219/20120012013-03-0404 March 2013 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001) IR 05000219/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Oyster Creek Nuclear Generating Station (Report 05000219/2012006) IR 05000219/20110012012-03-0505 March 2012 Annual Assessment Letter for Oyster Creek Generating Station (Report 05000219/2011001) ML1124401172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Oyster Creek Nuclear Generating Station IR 05000219/20100012011-03-0404 March 2011 Annual Assessment Letter for Oyster Creek Generating Station, EOC-11 (Report 05000219/2010001) ML1024406162010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek ML1006212562010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001) ML0914606122009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility Oyster Creek ML0914606132009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility: Oyster Creek, with Handwritten Notes ML0914703552009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914703562009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 IR 05000219/20090012009-03-0404 March 2009 Annual Assessment Letter - Oyster Creek Generating Station (05000219-09-001) ML0914606812008-10-23023 October 2008 E-mail from J. Richmond of USNRC to Various, Regarding Oc License Renewal Inspection Plan ML0915403162008-10-23023 October 2008 Inspection Cover Sheet, Facility: Oyster Creek, with Handwritten Notes ML0914606192008-10-22022 October 2008 E-mail from J. Richmond of USNRC to M. Modes of USNRC, Regarding Oc Lri Inspection Plan, Rev. 2 ML0824705692008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek IR 05000219/20080012008-03-0303 March 2008 (05000219-08-001), Annual Assessment Letter, EOC 2007 ROP8 ML0805900142008-02-27027 February 2008 Notification of Triennial Fire Protection Baseline Inspection ML0734706102007-12-13013 December 2007 ROP 8 - Oyster Creek - Change to Inspection Plan, 12/13/07 ML0724309392007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706105922007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Oyster Creek Station (05-219-07-001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0624401992006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Oyster Creek Nuclear Plant ML0606604692006-03-0606 March 2006 3/06/2006 - Oyster Creek Pre-Inspection Cover Sheet and Inspection Plan for License Renewal ML0606201302006-03-0202 March 2006 2006-001 Annual Assessment Letter - Oyster Creek Generating Station (Report 05-219/2006001) ML0524207272005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Oyster Creek Nuclear Power Plant ML0518801352005-07-0707 July 2005 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406308112004-03-0303 March 2004 2003-04 Annual Assessment Letter - Oyster Creek ML0713401642003-09-0505 September 2003 Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 ML0323906832003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek Nuclear Generating Station ML0713401622003-08-21021 August 2003 Post Strike Monitoring Activities - Updated 8/21/03 ML0713401562003-08-12012 August 2003 Post Strike (Reintegration) Inspection Plan, August 12, 2003 ML0713401532003-08-0707 August 2003 Post Strike (Reintegration) Inspection Plan Draft IR 05000219/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Oyster Creek Generating Station (Report 50-219/02-01) ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 2024-01-09
[Table view] Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
August 27, 2003 Mr. John L. Skolds Chairman and CEO AmerGen Energy Company, LLC 4300 Winfield Road 5th Floor Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
OYSTER CREEK NUCLEAR GENERATING STATION
Dear Mr. Skolds:
On July 29, 2003, the NRC staff completed its mid-cycle plant performance review of the Oyster Creek Nuclear Generating Station. The mid-cycle review for Oyster Creek involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2003 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 2004, with the exception of additional inspection ongoing to review your staff reintegration efforts following the recent strike of employees involving operations, maintenance, radiation protection, chemistry and clerical staff.
In our annual assessment letter dated March 4, 2003, we advised you of a substantive cross-cutting issue in the area of human performance. We note that you have initiated a focus plan for the station to improve human performance, especially in the area of procedure use and adequacy.
During the first half of the current assessment cycle, three Green inspection findings were identified in the mitigating systems, occupational radiation safety, and physical protection cornerstones, which involved human performance deficiencies. These findings, when considered along with similar findings in the latter half of 2002, support the previously identified cross-cutting issue noted in the annual assessment letter. We plan to monitor your progress to improve human performance at the plant during baseline inspection activities, especially during the period after reintegration of the staff following the strike.
Mr. John Skolds 2 The enclosed inspection plan details the inspections scheduled through September 30, 2004. In addition, the NRC has been reviewing your staff reintegration efforts following the conclusion of an eleven (11) week strike by bargaining unit employees. An inspection plan has been developed using guidance in Inspection Procedure (IP) 92712, Resumption of Normal Operations After a Strike, to verify that the measures planned will ensure public health and safety as bargaining unit employees return to the site organization. This inspection is not listed in the attached schedule since it is being conducted primarily by the resident inspectors. The enclosed inspection plan is provided to minimize the resource impact on your staff, and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Neil Perry of my staff at (610) 337-5225 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
A. Randolph Blough, Director Division of Reactor Projects Docket No. 05000219 License No. DPR-16
Enclosure:
Oyster Creek Inspection/Activity Plan
Mr. John Skolds 3 cc w/encl:
Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township K. Tosch - Chief, New Jersey Department of Environmental Protection R. Shadis, New England Coalition Staff BNE Manager, State of New Jersey N. Cohen, Coordinator - Unplug Salem Campaign E. Gbur, Coordinator - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Institute of Nuclear Power Operations (INPO)
Mr. John Skolds 4 Distribution w/encl:
H. Miller, RA J. Wiggins, DRA A. Blough, DRP W. Lanning, DRS B. Holian, DRP K. McConnell, DRP R. Crlenjak, DRS N. Perry, DRP R. Barkley, DRP R. Summers, DRP - Senior Resident Inspector N. Della Greca, DRS J. McFadden, DRS G. Smith, DRS N. McNamara, DRS J. Jolicoeur, OEDO R. Laufer, NRR P. Tam, PM, NRR Region I Docket Room (with concurrences)
DOCUMENT NAME: G:\Branch7 - Oyster Creek, Three Mile Island and Beaver Valley\Rop4 Mid-cycle Review\OC-ROP4-MidCycleLetter - Final.WPD After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME RBarkley/RSB NPerry/NSP ABlough/ARB DATE 08/27/03 08/27/03 08/27/03 OFFICIAL RECORD COPY
Page 1 of 2 Oyster Creek 08/27/2003 14:48:12 Inspection / Activity Plan Report 22 06/29/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/28/2003 08/01/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/28/2003 08/01/2003 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/28/2003 08/01/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/28/2003 08/01/2003 Baseline Inspections 4/19+EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01496 OYSTER CREEK INITIAL EXAM (7/21-26/03) 12/17/2003 12/17/2003 Not Applicable 1 U01496 OYSTER CREEK INITIAL EXAM (7/21-26/03) 03/28/2004 04/01/2004 Not Applicable 1 U01496 OYSTER CREEK INITIAL EXAM (7/21-26/03) 04/19/2004 04/30/2004 Not Applicable 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 09/08/2003 09/12/2003 Baseline Inspections 7111401 - EP EXERCISE 5 1 IP 7111401 Exercise Evaluation 09/08/2003 09/12/2003 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/08/2003 09/12/2003 Baseline Inspections 7111111B - L.O. REQUALIFICATION PROGRAM 6 1 IP 7111111B Licensed Operator Requalification 10/13/2003 10/25/2003 Baseline Inspections 7112201 - OCC RAD SAFETY - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/17/2003 11/21/2003 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/08/2003 12/12/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/08/2003 12/12/2003 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/08/2003 12/12/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/08/2003 12/12/2003 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/16/2004 02/20/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/16/2004 02/20/2004 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/16/2004 02/20/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 02/16/2004 02/20/2004 Baseline Inspections 7111117B - PERM PLANT MODS 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/29/2004 04/02/2004 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 03/29/2004 04/02/2004 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 04/26/2004 04/30/2004 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 05/10/2004 05/14/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Oyster Creek 08/27/2003 14:48:12 Inspection / Activity Plan Report 22 06/29/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/19/2004 04/23/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/19/2004 04/23/2004 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/19/2004 04/23/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/19/2004 04/23/2004 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/16/2004 08/20/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/16/2004 08/20/2004 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/16/2004 08/20/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/16/2004 08/20/2004 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program 08/21/2004 08/25/2004 Baseline Inspections 71114 - EP PROGRAM INSPECTION & PI VERIF. 1 1 IP 7111402 Alert and Notification System Testing 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/23/2004 08/27/2004 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/23/2004 08/27/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/23/2004 08/27/2004 Baseline Inspections 71151 - PI VERIFICATION - RETS/ODCM 1 1 IP 71151 Performance Indicator Verification 09/13/2004 09/14/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.