|
---|
Category:Inspection Plan
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML21012A4282021-01-13013 January 2021 Security Inspection Plan ML20017A2412020-01-15015 January 2020 Security Inspection Plan for Oyster Creek Generating Station - 2020 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 ML16235A0792016-08-31031 August 2016 Mid Cycle Assessment Letter 2016-005 IR 05000219/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Inspection Report 05000219/2015006) IR 05000219/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2015005) ML15239A4742015-08-28028 August 2015 54(p) Eval IR 05000219/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2014001) IR 05000219/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 IR 05000219/20130012014-03-0404 March 2014 ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan IR 05000219/20120012013-03-0404 March 2013 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001) IR 05000219/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Oyster Creek Nuclear Generating Station (Report 05000219/2012006) IR 05000219/20110012012-03-0505 March 2012 Annual Assessment Letter for Oyster Creek Generating Station (Report 05000219/2011001) ML1124401172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Oyster Creek Nuclear Generating Station IR 05000219/20100012011-03-0404 March 2011 Annual Assessment Letter for Oyster Creek Generating Station, EOC-11 (Report 05000219/2010001) ML1024406162010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek ML1006212562010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001) ML0914606122009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility Oyster Creek ML0914606132009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility: Oyster Creek, with Handwritten Notes ML0914703552009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914703562009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 IR 05000219/20090012009-03-0404 March 2009 Annual Assessment Letter - Oyster Creek Generating Station (05000219-09-001) ML0914606812008-10-23023 October 2008 E-mail from J. Richmond of USNRC to Various, Regarding Oc License Renewal Inspection Plan ML0915403162008-10-23023 October 2008 Inspection Cover Sheet, Facility: Oyster Creek, with Handwritten Notes ML0914606192008-10-22022 October 2008 E-mail from J. Richmond of USNRC to M. Modes of USNRC, Regarding Oc Lri Inspection Plan, Rev. 2 ML0824705692008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek IR 05000219/20080012008-03-0303 March 2008 (05000219-08-001), Annual Assessment Letter, EOC 2007 ROP8 ML0805900142008-02-27027 February 2008 Notification of Triennial Fire Protection Baseline Inspection ML0734706102007-12-13013 December 2007 ROP 8 - Oyster Creek - Change to Inspection Plan, 12/13/07 ML0724309392007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706105922007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Oyster Creek Station (05-219-07-001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0624401992006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Oyster Creek Nuclear Plant ML0606604692006-03-0606 March 2006 3/06/2006 - Oyster Creek Pre-Inspection Cover Sheet and Inspection Plan for License Renewal ML0606201302006-03-0202 March 2006 2006-001 Annual Assessment Letter - Oyster Creek Generating Station (Report 05-219/2006001) ML0524207272005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Oyster Creek Nuclear Power Plant ML0518801352005-07-0707 July 2005 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406308112004-03-0303 March 2004 2003-04 Annual Assessment Letter - Oyster Creek ML0713401642003-09-0505 September 2003 Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 ML0323906832003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek Nuclear Generating Station ML0713401622003-08-21021 August 2003 Post Strike Monitoring Activities - Updated 8/21/03 ML0713401562003-08-12012 August 2003 Post Strike (Reintegration) Inspection Plan, August 12, 2003 ML0713401532003-08-0707 August 2003 Post Strike (Reintegration) Inspection Plan Draft IR 05000219/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Oyster Creek Generating Station (Report 50-219/02-01) ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 2024-01-09
[Table view] Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ber 4, 2012
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2012006)
Dear Mr. Pacilio:
On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Oyster Creek during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near Term Task Force Recommendation 2.3 Seismic Walkdowns. Additionally, inspections will be performed for the operation of your Independent Spent Fuel Storage Installation and a follow up inspection for three or more severity level IV traditional enforcement violations in the same area in a 12 month period. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room.
Please contact me at 610-337-5046 with any questions you have regarding this letter.
Sincerely,
/RA/
Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DPR-16 Enclosure: Oyster Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML12240A357 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ADugandzic/ AD GHunegs/ GKH DATE 08/23 /12 08/27/12
Page 1 of 2 Oyster Creek 08/27/2012 08:55:50 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD MONT INSTRUMENTION & TI 2515/185 GW 1 1 08/06/2012 08/09/2012 IP 2515/185 Follow-up on the Industry's Ground Water Protection Initiative 1 08/06/2012 08/09/2012 IP 71124.05 Radiation Monitoring Instrumentation 71152B - PI&R 4 1 08/13/2012 08/17/2012 IP 71152B Problem Identification and Resolution 1 08/27/2012 08/31/2012 IP 71152B Problem Identification and Resolution 2515/187 - FLOODING WALKDOWNS 2 1 08/16/2012 09/06/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/188 - SEISMIC WALKDOWNS 3 1 08/20/2012 08/24/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 71124 - RAD HAZARD ALARA AIRBORNE & DOSE ASSESSM 1 1 08/20/2012 08/24/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/20/2012 08/24/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 08/20/2012 08/24/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/20/2012 08/24/2012 IP 71124.04 Occupational Dose Assessment 60855 - ISFSI OPERATIONAL INSPECTION 1 1 10/03/2012 10/03/2012 IP 60855 Operation Of An ISFSI 1 10/03/2012 10/03/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - HP INSPECTION 01 02 03 04 1 1 10/22/2012 10/26/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/22/2012 10/26/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 10/22/2012 10/26/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/22/2012 10/26/2012 IP 71124.04 Occupational Dose Assessment EP PROGR - EP PROGRAM INSPECTION 1 1 10/29/2012 11/09/2012 IP 7111402 Alert and Notification System Testing 1 10/29/2012 11/09/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 10/29/2012 11/09/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 7111108G - INSERVICE INSPECTION 1 1 10/29/2012 11/02/2012 IP 7111108G Inservice Inspection Activities - BWR 71124 - 71124.06 RAD EFFLUENT MONT TREATMENT 1 1 01/28/2013 02/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 60855 - ISFSI LOADING INSPECTION 1 1 03/01/2013 05/24/2013 IP 60855 Operation Of An ISFSI 1 03/01/2013 05/24/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Oyster Creek 08/27/2012 08:55:50 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111111B - OYSTER CREEK REQL INSP WITH P/F RESULTS 2 1 05/27/2013 05/31/2013 IP 7111111Q Licensed Operator Requalification Program 71124 - OC IP 71124.07 REMP 1 1 06/10/2013 06/14/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111121 - CDBI 6 1 09/09/2013 09/13/2013 IP 7111121 Component Design Bases Inspection 1 09/23/2013 09/27/2013 IP 7111121 Component Design Bases Inspection 1 10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection EP EX - EP EXERCISE EVALUATION 5 1 10/07/2013 10/11/2013 IP 7111401 Exercise Evaluation 1 10/07/2013 10/11/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 10/28/2013 11/01/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.