ML102440616

From kanterella
Jump to navigation Jump to search
Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek
ML102440616
Person / Time
Site: Oyster Creek
Issue date: 09/01/2010
From: Clifford J
Division Reactor Projects I
To: Pacilio M
Exelon Nuclear
bellamy rr
References
Download: ML102440616 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

MID CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN OYSTER CREEK

Dear Mr. Pacilio:

On August 11, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of the Oyster Creek Nuclear Generating Station. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30,2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as 'Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2010 at Oyster Creek was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Additionally, in the second quarter of 2010, Oyster Creek performance transitioned from the Regulatory Response column to the Licensee Response column based on the resolution of a White PI associated with Reactor Scrams per 7000 critical hours. On February 18, 2010, the NRC staff completed a supplemental inspection in accordance with Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." The inspectors concluded that your overall performance in the areas of problem identification, evaluation, and corrective actions with regards to the White PI was acceptable. Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. In addition to the baseline inspections, we plan to conduct Inspection Procedure 71003, "Post-Approval Site Inspection for License Renewal" during the fall 2010 refueling outage. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

M. Pacilio 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic R~ading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Ron Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Si~.p4I~

James W. Clifford, Acting Director Division of Reactor Projects Docket Nos.: 50-219 License Nos: DPR-16

Enclosure:

Oyster Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ I

M. Pacilio 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Ron Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely.

/RA!

James W. Clifford, Acting Director Division of Reactor Projects Docket Nos.: 50-219 License Nos: DPR-16

Enclosure:

Oyster Creek Inspection/Activity Plan ccw/encl: Distribution via ListServ Distribution w/encl:

M. Dapas, A.cting RA DRS Deputy Director D. Lew, Acting ORA DRS Branch Chiefs (6)

J. Clifford, ORP N. McNamara, SLO D. Collins, DRP O.Tifft.SLO R. Bellamy, DRP D. Screnci, PAO G. Barber, DRP N. Sheehan, PAO C. Newport. ORP R. Barkley, ORA L. Trocine, RI OEDO A. Klett, NRR J. Kulp, SRI. DRP RidsNrrDirsrpab@nrc.gov J. Ambrosini, RI, DRP RidsNrrPMOysterCreek Resource J. DeVries, OA. DRP RidsNrrDorlLpf1-2Resource DRS Director ROPreportsResources@nrc.gov SUNSI Review Complete: RRB (Reviewer's Initials) ML102440616 DOCUMENT NAME: S:\ROP-11 Mid~Cycle Review\Branch 6\OC\OC ROP-11 MC Cover Ltr.Docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a cOPJI of this document, indicate in the box, "c" ~ Copy with",,' attachmenllenclosure "E" ~ Copy with attachment/enclosure "N"; No copy OFFICE RIJDRP RIIDRP RIIDRP NAME SBarberJ RRB for DATE 08/27/10 OFFICIAL RECORD COPY

Page 1 of3 Oyster Creek 08/30[2010 14:43:22 Inspection 1Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 9

71152B - PI&R 4 06/28/2010 07/02/2010 IP 71152B Identification and Resolution of Problems HP-71124 - INSTRUMENTS I RTS IISFSI 1 07/12/2010 07/16/2010 IP 60855 Operation Of An ISFSI 07/12/2010 07/16/2010 IP 71124.05 Radiation Monitoring Instrumentation 07/1212010 07/16/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111121

  • COMPONENT DESIGN BASES INSPECTION 7 08/02/2010 08/06/2010 IP 7111121 Component Design Bases Inspection 08/16/2010 08/27/2010 IP 7111121 Component Design Bases Inspection EP PROGR - EP PROGRAM INSPECTION 08/30/2010 09/03/2010 IP 7111402 Alert and Notification System Testing 08/3012010 09/03/2010 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 08/30/2010 09/03/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/30/2010 09/03/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/30/2010 09/03/2010 IP 71151-EP01 DrililExercise Performance 08/30/2010 09/03/2010 IP 71151-EP02 ERO Drill Participation 08/30/2010 09/03/2010 IP 71151-EP03 Alert & Notification System HP-71124 - ACCESS/ALARAlAIRlDOSEIINSTRUMENTS 1 10/04/2010 10/08/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/04/2010 10/08/2010 IP 71124.02 Occupational ALARA Planning and Controls 10/04/2010 10/08/2010 IP 71124.03 In*Plant Airbome Radioactivity Control and Mitigation 10/04/2010 10108/2010 IP 71124.04 Occupational Dose Assessment 10104/2010 10/08/2010 IP 71124.05 Radiation Monitoring Instrumentation LR 71003 - POE COMMITMENT FOLLOW UP 2 11/01/2010 11/26/2010 IP 71003 Post-Approval Site Inspection for License Renewal 7111108G - INSERVICE INSPECTION 11/08/2010 11/1212010 IP 7111108G Inservice Inspection Activities - BWR HP*71124 - ACCESS/ALARAlAIRlDOSE/INSTRUMENTS 11/0812010 11/1212010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 11/08/2010 11/12/2010 IP 71124.02 Occupational ALARA Planning and Controls 11/08/2010 11/12/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 11/08/2010 11/1212010 IP 71124.04 Occupational Dose Assessment 11/08/2010 11/12/2010 IP 71124.05 Radiation Monitoring Instrumentation Hp*71124 - ACCESS/ALARAlAIRlDOSEIINSTRUMENTS/PI 1 12106/2010 12/10/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of3 Oyster Creek 08130/2010 14:43:22 Inspection 1Activity Plan Report 22 07/01/2010

  • 12/31/2011 Planned Dates Start End Title HP*71124
  • ACCESS/ALARAIAIR/OOSE/INSTRUMENTS/PI 12/06/2010 12/1012010 IP 71124.02 Occupational ALARA Planning and Controls 1210612010 12/10/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 12f06f2010 12/10/2010 IP 71124.04 Occupational Dose Assessment 12106/2010 12/1012010 IP 71124.05 Radiation Monitoring Instrumentation 12/06/2010 12/10/2010 IP 71151*0R01 Occupational Exposure Control Effectiveness 1210612010 12/10/2010 IP 71151*PR01 RETS/ODCM Radiological Effluent 07/11EXM - OPERATOR LICENSING INITIAL EXAMS 5 06113/2011 06/1712011 U01831 FY11- OYSTER CREEK. INITIAL Ol EXAM 07/11/2011 07/20/2011 U01831 FY11* OYSTER CREEK. INITIAL Ol EXAM TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 5 03/14/2011 03/1812011 IP 7111105T Fire Protection [rriennial) 03/2812011 04/01/2011 IP 7111105T Fire Protection [rriennial)

HP*71124

  • ACCESS/ALARAlAIRIDOSEflNSTRUMENTS 1 03/1412011 03/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/1412011 03/1812011 IP 71124.02 Occupational ALARA Planning and Controls 03/14/2011 03118/2011 IP 71124.03 In*Plant Airborne Radioactivity Control and Mitigation 03/14/2011 03/1812011 IP 71124.04 Occupational Dose Assessment 03/1412011 03/18/2011 IP 71124.05 Radiation Monitoring Instrumentation 711111 B - OC REQUAL INSP WI P/F RESULTS 3 05/23/2011 OS/27/2011 IP 71111118 Licensed Operator Requalification Program HP-71124
  • INSTRUMENTS I REMP I ISFSI 1 07111/2011 07115/2011 IP 60855 Operation Of An ISFSI 07/11/2011 07/15/2011 IP 71124.05 Radiation Monitoring Instrumentation 07/11/2011 07/15/2011 IP 71124.07 Radiological Environmental Monitoring Program TI-177 - MANAGING GAS ACCUMULATION IN ECCS 2 09112/2011 09/16/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System EP EX - EP EXERCISE EVALUATION 4 09/2612011 09/30/2011 IP 7111401 Exercise Evaluation 09126/2011 09/30/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/26/2011 09/30/2011 IP 71151-EP01 Drill/Exercise Performance 09/2612011 09/30/2011 IP 71151-EP02 ERO Drill PartiCipation 09/26/2011 09/30/2011 IP 71151*EP03 Alert & Notification System HP-71124 - ACCESS/ALARAfAIR/DOSEIINSTRUMENTS/PI 1 10/31/2011 11/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of3 Oyster Creek 08/30/2010 14:43:22 Inspection 1 Activity Plan Report 22 07101/2010

  • 12/3112011 Planned Dates Start End Ii I Jnspection ACtiVity II Title II Hp*71124
  • ACCESSlALARAlAIRJDOSE/INSTRUMENTSIPI 1 1 10/31/2011 11/0412011 IP 71124.02 Occupational ALARA Planning and Controls 1 10/31/2011 11/0412011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/31/2011 11/0412011 IP 71124.04 Occupational Dose Assessment 10/31/2011 11/0412011 IP 71124.05 Radiation Monitoring Instrumentation 10/31/2011 11/04/2011 IP 71151-0R01 Occupational Exposure Control Effectiveness 1 10/3112011 11/0412011 IP 71151-PR01 RETS/ODCM Radiological Effluent report does not include INPO and OUTAGE activities.

report shoVilS only on-site and announced inspection procedures.