March 3, 2010
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
ANNUAL PERFORMANCE REVIEW AND INSPECTION PLAN
OYSTER CREEK NUCLEAR GENERATING STATION
Dear Mr. Pardee:
On February 12,2010, the NRC staff completed its performance review of Oyster Creek. Our
technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection
results for the period from January 1 through December 31, 2009. The purpose of this letter is
to inform you of our assessment of your safety performance during this period and our plans for
future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only - Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, Oyster Creek operated in a manner that preserved public health and safety and fully
met all cornerstone objectives. Plant performance for the most recent quarter was within the
Regulatory Response column of the NRC's Action Matrix, based on the PI for "Unplanned
Scrams per 7000 Critical Hours" being White (lOW to moderate safety significance). This plant
performance was reviewed as part of the quarterly performance assessment of Oyster Creek
and documented in an assessment follow-up letter (ML093020034) 1.
On January 4, 2010, we were notified by your staff of your readiness for the NRC to conduct
a supplemental inspection to review the actions taken to address the PI for "Unplanned Scrams
per 7000 Critical Hours." Therefore, in addition to the planned reactor oversight process (RaP)
baseline inspections, we conducted a supplemental inspection using Inspection Procedure
95001, "Inspection for One or Two Inputs in a Strategic Performance Area," from February 16
through February 18, 2010. The supplemental inspection was conducted to provide assurance
that the root and contributing causes for the finding are understood, the extent of condition and
extent of cause are identified, and to provide assurance that the corrective actions are sufficient
to prevent recurrence. The results of this inspection will be provided to you via separate
correspondence.
Designation in parenthesis refers to an AOAMS accession number. Documents referenced in this letter are publicly available
using the accession number in ADAMS.
C. Pardee
2
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through June 30,2011. In addition to baseline inspections, we plan on conducting
the Post-Approval Site Inspection for License Renewal (IP 71003) in November, 2010. The
inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel
availability issues well in advance of inspector arrival onsite. Routine resident inspections are
not listed due to their ongoing and continuous nature. The inspections in the last nine months
of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200
with any questions you may have regarding this letter.
Sincerely.
mft'L
David C. Lew, Director
Division of Reactor Projects
Region I
Docket Nos.: 50-219
License Nos: DPR-16
co w/encls: Distribution via ListServ
Oyster Creek Inspectionl Activity Plan
C. Pardee
3
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through June 30, 2011. In addition to baseline inspections, we plan on conducting
the Post-Approval Site Inspection for License Renewal (IP 71003) in November, 2010. The
inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel
availability issues well in advance of inspector arrival onsite. Routine resident inspections are
not listed due to their ongoing and continuous nature. The inspections in the last nine months
of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please Gontact Dr. Ronald Be"amy at 610-337-5200
with any questions you may have regarding this letter.
Sincerely,
IRA!
David C. Lew, Director
Division of Reactor Projects
Region I
Distribution w/encl:
S. Collins, ORA
R. Bellamy, DRP
M. Dapas, ORA
G. Barber, DRP
D. Lew, DRP
C. Newport, DRP
J. Clifford, DRP
J. Greives, DRP
DRS Directors
l. Trocine, RI OEDO
DRS Branch Chiefs (6)
N. McNamara, SLO
J. Ambrosini, DRP, RI
D. Tifft, SLO
J. DeVries, DRP, Resident OA
D. Serenci, PAO
RidsNrrPMOysterCreek Resource
N. Sheehan, PAO
RidsNrrDirslpabResource@nrc.gov
ROPreportsResources@nrc.gov
SUNSI Review Complete: RRB
(Reviewer'S Initials)
DOCUMENT NAME: S:\\ROP-10 EOC Review\\8ranch 6\\OC\\OC ROP10 EOC Letter.Doc
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive acopy ofthis document, Indicate in the box: 'C' =Copywi!houtatlachmentlenclosul'El 'E' " Copy witll attachment/enclosure 'N' '" No copy
OFFICE
RIJDRP
I
RIIDRP
I
RIIDRP
I
RIIDRP
I
NAME
JKulpl RRB for
SBarberl GS8
RBellamyIRRB
DLew/DCL
DATE
02124/10
02/20/101
02/24/10
03/02/10
OFFICIAL RECORD COPY
Page 1 ofl
Oyster Creek
02124/2010
11:18:45
Inspection I Activity Plan
Report 22
01101/2010 - 06130/2011
Planned Dates
Start
f"!!St'<'kW
'"
End
6""k
04/19/2010
05/1712010
04/2312010
0512812010
02116/2010
02/1912010
04/12/2010
04/16/2010
05/10/2010
05/14/2010
06/1412010
06/2812010
06/1812010
07/0212010
07/12/2010
07/1212010
07/1212010
07/1612010
07/16/2010
07/16/2010
08l02/20iO
08/16/2010
OBi06/2010
0812712010
OSI30f2010
08/30/2010
08/30/2010
0813012010
0813012010
08130/2010
08130/2010
09/03/2010
09/0312010
09/03/2010
09/03/2010
09/0312010
0910312010
09/03/2010
10/0412010
10/0412010
10/04(2010
10/04/2010
10/04/2010
10108/2010
10/08/2010
10/0812010
10/08/2010
10/08/2010
11/0812010
11/12/2010
Title
5/17EXAM
- OPERATOR UCENSING INITIAL EXAMS
UOl771
FY10 - OYSTER CREEK INITIAL OPERATOR LICENSING EXAM
U01771
FY10 - OYSTER CREEK INITiAL OPERATOR LICENSING EXAM
95001
Supplemental Inspection For One Or Two White Inputs In A StrategiC Peliormance Area
71124
- HP-RAD WASTE
Radioactive Solid Waste Processing and Radioactive Material Handling. Storage. and Transportation
- OPERATION OF AN ISFSI
Operation Of An ISFSI
711528
- Pl&R
IP 71152B
Identification and Resolution of Problems
I P 71152B
Identification and Resolution of Problems
HP-71124
- INSTRUMENTS I RTS IISFSI
Operation Of An ISFSI
Radiation Monitoring Instrumentation
Radioactive Gaseous and Liquid Effluent Treatment
7111121
- COMPONENT DESIGN BASES INSPECTION
Com ponent Design Bases Inspection
Component Design Bases inspection
EP PROGR * EP PROGRAM INSPECTION
lP 7111402
Radiological Environmental Monitoring Program
Emergency Response Organization Augmentation Testing
Emergency Action Level and Emergency Plan Changes
Correction of Emergency Preparedness Weaknesses and Deficlencles
IP 71151-EP01
Drill/Exerclse Performance
IP 71151-EP02
ERO Drill Particlpation
IP 71151-EP03
Alert & Notification System
HP-71124
- ACCESSJALARAfAIRlDOSElINSTRUMENTS
Radiological Hazard Assessment and Exposure Controls
Occupational ALARA Planning and Controls
In-Plant Airborne Radioactivity Control and Mitigation
Occupational Dose Assessment .
Radiation Monitoring Instrumentation
7111108G
-INSERVICE INSPECTION
IP 7111108G
ins6IVice Inspection Activities BWR
is report does not include INPO and OUTAGE aCtivities.
This report shows only on-site and announced inspection procedures.
5
2
1
2
4
7
1
1
Page 2of2
"j\\',:': .
Oyster Creek
0212412010
11;18:45 ,i'
Inspection I Activity Plan
Report 22
01/0112010 - 06/3012011
Planned Dates
Start
End
Ii.,. 95Wi!tfee
I ,nspectiilp,.,A;tivity .I!
Title
ffi@Hfiiif
MM
f I' '
HP-71124
- ACCESS/ALARAIAIRIDOSEIINSTRUMENTS
S'iJiWWiffi
un.
J IHeiMM*,
1
11/0812010
1111212010
Radiological Hazard Assessment and Exposure Controls
11/08/2010
11/12/2010
Occupational ALARA Planning and Controls
11/0812010
1111212010
In-Plant Airborne Radioactivity Control and Mitigation
11/08/2010
11/1212010
Occupational Dose Assessment
11/0812010
11/12/2010
Radiation Monitoring Instrumentation
LR 71003
- POE COMMITMENT FOLLOW UP
2
11/01/2010
11/26/2010
Post-Approval Site Inspection for License Renewal
HP-71124
- ACCESSJALARAfAIRlDOSE/INSTRUMENTS/PI
1210612010
1211012010
Radiological Hazard Assessment and Exposure Controls
1210612010
12/10/2010
Occupational ALARA Planning and Controls
12106/2010
12110/2010
In-Plant Airborne Radioactivity Control and Mitigation
12/0612010
12/10/2010
Occupational Dose Assessment
1210612010
12110/2010
Radiation Monitoring Instrumentation
1210612010
12110/2010
IP 71151*0R01
Occupational Exposure Control Effectiveness
1210612010
12/1012010
IP 71151-PR01
RETS/ODCM Radiological Effluent
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION
3
i
03/1412011
03/1812011
IP 7111105T
Fire Protection [Trienniaij
03/28/2011
04/01/2011
IP 7111105T
Fire Protection [Triennial]
HP-71124
- ACCESS/ALARAlAIRlDOSEJINSTRUMENTS
03/1412011
03/1812011
Radiological Hazard Assessment and Exposure Controls
03/14/2011
03/1812011
Occupational ALARA Planning and Controls
03/14/2011
03/18/2011
In-Plant Airborne Radioactivity Control and Mitigation
03/14/2011
03118/2011
Occupational Dose Assessment
03/14/2011
03/18/2011
Radiation Monitoring Instrumentation
711111B
- OC REQUAL INSP WI P/F RESULTS
3
05/2312011
05/27/2011
IP 7111111B
Licensed Operator Requalificalion Program
rfhis rePQrt does not include I Npo and OUTAGE activities.