ML100621256

From kanterella
Jump to navigation Jump to search
Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001)
ML100621256
Person / Time
Site: Oyster Creek
Issue date: 03/03/2010
From: David Lew
Division Reactor Projects I
To: Pardee C
Exelon Generation Co, Exelon Nuclear
BELLAMY RR
References
IR-10-001
Download: ML100621256 (5)


See also: IR 05000219/2010001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PENNSYl.VANIA 19406*1415

March 3, 2010

Mr. Charles G. Pardee

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT: ANNUAL PERFORMANCE REVIEW AND INSPECTION PLAN

OYSTER CREEK NUCLEAR GENERATING STATION

(05000219/2010001 )

Dear Mr. Pardee:

On February 12,2010, the NRC staff completed its performance review of Oyster Creek. Our

technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection

results for the period from January 1 through December 31, 2009. The purpose of this letter is

to inform you of our assessment of your safety performance during this period and our plans for

future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only - Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, Oyster Creek operated in a manner that preserved public health and safety and fully

met all cornerstone objectives. Plant performance for the most recent quarter was within the

Regulatory Response column of the NRC's Action Matrix, based on the PI for "Unplanned

Scrams per 7000 Critical Hours" being White (lOW to moderate safety significance). This plant

performance was reviewed as part of the quarterly performance assessment of Oyster Creek

and documented in an assessment follow-up letter (ML093020034) 1.

On January 4, 2010, we were notified by your staff of your readiness for the NRC to conduct

a supplemental inspection to review the actions taken to address the PI for "Unplanned Scrams

per 7000 Critical Hours." Therefore, in addition to the planned reactor oversight process (RaP)

baseline inspections, we conducted a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two Inputs in a Strategic Performance Area," from February 16

through February 18, 2010. The supplemental inspection was conducted to provide assurance

that the root and contributing causes for the finding are understood, the extent of condition and

extent of cause are identified, and to provide assurance that the corrective actions are sufficient

to prevent recurrence. The results of this inspection will be provided to you via separate

correspondence.

Designation in parenthesis refers to an AOAMS accession number. Documents referenced in this letter are publicly available

using the accession number in ADAMS.

C. Pardee 2

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30,2011. In addition to baseline inspections, we plan on conducting

the Post-Approval Site Inspection for License Renewal (IP 71003) in November, 2010. The

inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel

availability issues well in advance of inspector arrival onsite. Routine resident inspections are

not listed due to their ongoing and continuous nature. The inspections in the last nine months

of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact Dr. Ronald Bellamy at 610-337-5200

with any questions you may have regarding this letter.

Sincerely.

mft'L

David C. Lew, Director

Division of Reactor Projects

Region I

Docket Nos.: 50-219

License Nos: DPR-16

co w/encls: Distribution via ListServ

Oyster Creek Inspectionl Activity Plan

C. Pardee 3

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2011. In addition to baseline inspections, we plan on conducting

the Post-Approval Site Inspection for License Renewal (IP 71003) in November, 2010. The

inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel

availability issues well in advance of inspector arrival onsite. Routine resident inspections are

not listed due to their ongoing and continuous nature. The inspections in the last nine months

of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please Gontact Dr. Ronald Be"amy at 610-337-5200

with any questions you may have regarding this letter.

Sincerely,

IRA!

David C. Lew, Director

Division of Reactor Projects

Region I

Distribution w/encl:

S. Collins, ORA R. Bellamy, DRP

M. Dapas, ORA G. Barber, DRP

D. Lew, DRP C. Newport, DRP

J. Clifford, DRP J. Greives, DRP

DRS Directors l. Trocine, RI OEDO

DRS Branch Chiefs (6) J. Kulp, DRP, DRP, SRI

N. McNamara, SLO J. Ambrosini, DRP, RI

D. Tifft, SLO J. DeVries, DRP, Resident OA

D. Serenci, PAO RidsNrrPMOysterCreek Resource

N. Sheehan, PAO RidsNrrDirslpabResource@nrc.gov

John Thompson, NRR ROPreportsResources@nrc.gov

SUNSI Review Complete: RRB (Reviewer'S Initials) ML100621256

DOCUMENT NAME: S:\ROP-10 EOC Review\8ranch 6\OC\OC ROP10 EOC Letter.Doc

After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy ofthis document, Indicate in the box: 'C' = Copywi!houtatlachmentlenclosul'El 'E' " Copy witll attachment/enclosure 'N' '" No copy

OFFICE RIJDRP I RIIDRP I RIIDRP I RIIDRP I

NAME JKulpl RRB for SBarberl GS8 RBellamyIRRB DLew/DCL

DATE 02124/10 02/20/101 02/24/10 03/02/10

OFFICIAL RECORD COPY

Page 1 ofl Oyster Creek

02124/2010 11:18:45 Inspection I Activity Plan

Report 22

01101/2010 - 06130/2011

Planned Dates

Start End Title

f"!!St'<'kW

'" 6 ""k 5/17EXAM * OPERATOR UCENSING INITIAL EXAMS 5

04/19/2010 04/2312010 UOl771 FY10 - OYSTER CREEK INITIAL OPERATOR LICENSING EXAM

05/1712010 0512812010 U01771 FY10 - OYSTER CREEK INITiAL OPERATOR LICENSING EXAM

95001 * SUPP INSP - UNPlANNED SCRAM PI 2

02116/2010 02/1912010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A StrategiC Peliormance Area

71124 * HP-RAD WASTE 1

04/12/2010 04/16/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage. and Transportation

ISFSI * OPERATION OF AN ISFSI 2

05/10/2010 05/14/2010 IP 60855 Operation Of An ISFSI

711528 * Pl&R 4

06/1412010 06/1812010 IP 71152B Identification and Resolution of Problems

06/2812010 07/0212010 IP 71152B Identification and Resolution of Problems

HP-71124 * INSTRUMENTS I RTS IISFSI

07/12/2010 07/1612010 IP 60855 Operation Of An ISFSI

07/1212010 07/16/2010 IP 71124.05 Radiation Monitoring Instrumentation

07/1212010 07/16/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

7111121 - COMPONENT DESIGN BASES INSPECTION 7

08l02/20iO OBi06/2010 IP 7111121 Com ponent Design Bases Inspection

08/16/2010 0812712010 IP 7111121 Component Design Bases inspection

EP PROGR * EP PROGRAM INSPECTION 1

OSI30f2010 09/03/2010 lP 7111402 Radiological Environmental Monitoring Program

08/30/2010 09/0312010 IP 7111403 Emergency Response Organization Augmentation Testing

08/30/2010 09/03/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes

0813012010 09/03/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficlencles

0813012010 09/0312010 IP 71151-EP01 Drill/Exerclse Performance

08130/2010 0910312010 IP 71151-EP02 ERO Drill Particlpation

08130/2010 09/03/2010 IP 71151-EP03 Alert & Notification System

HP-71124 - ACCESSJALARAfAIRlDOSElINSTRUMENTS

10/0412010 10108/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

10/0412010 10/08/2010 IP 71124.02 Occupational ALARA Planning and Controls

10/04(2010 10/0812010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

10/04/2010 10/08/2010 IP 71124.04 Occupational Dose Assessment .

10/04/2010 10/08/2010 IP 71124.05 Radiation Monitoring Instrumentation

7111108G -INSERVICE INSPECTION 1

11/0812010 11/12/2010 IP 7111108G ins6IVice Inspection Activities BWR

is report does not include INPO and OUTAGE aCtivities.

This report shows only on-site and announced inspection procedures.

Page 2of2 "j\',:': . Oyster Creek

0212412010 11;18:45 ,i'

Inspection I Activity Plan

Report 22

01/0112010 - 06/3012011

Planned Dates

Start

Ii.,. 95Wi!tfee

End I ,nspectiilp,.,A;tivity .I!

ffi@Hfiiif

MM

Title

f I' ' S'iJiWWiffi un. J IHeiMM*,

HP-71124 * ACCESS/ALARAIAIRIDOSEIINSTRUMENTS 1

11/0812010 1111212010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

11/08/2010 11/12/2010 IP 71124.02 Occupational ALARA Planning and Controls

11/0812010 1111212010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

11/08/2010 11/1212010 IP 71124.04 Occupational Dose Assessment

11/0812010 11/12/2010 IP 71124.05 Radiation Monitoring Instrumentation

LR 71003 * POE COMMITMENT FOLLOW UP 2

11/01/2010 11/26/2010 IP 71003 Post-Approval Site Inspection for License Renewal

HP-71124 - ACCESSJALARAfAIRlDOSE/INSTRUMENTS/PI

1210612010 1211012010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1210612010 12/10/2010 IP 71124.02 Occupational ALARA Planning and Controls

12106/2010 12110/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

12/0612010 12/10/2010 IP 71124.04 Occupational Dose Assessment

1210612010 12110/2010 IP 71124.05 Radiation Monitoring Instrumentation

1210612010 12110/2010 IP 71151*0R01 Occupational Exposure Control Effectiveness

1210612010 12/1012010 IP 71151-PR01 RETS/ODCM Radiological Effluent

TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3

i 03/1412011 03/1812011 IP 7111105T Fire Protection [Trienniaij

03/28/2011 04/01/2011 IP 7111105T Fire Protection [Triennial]

HP-71124 - ACCESS/ALARAlAIRlDOSEJINSTRUMENTS

03/1412011 03/1812011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

03/14/2011 03/1812011 IP 71124.02 Occupational ALARA Planning and Controls

03/14/2011 03/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

03/14/2011 03118/2011 IP 71124.04 Occupational Dose Assessment

03/14/2011 03/18/2011 IP 71124.05 Radiation Monitoring Instrumentation

711111B * OC REQUAL INSP WI P/F RESULTS 3

05/2312011 05/27/2011 IP 7111111B Licensed Operator Requalificalion Program

rfhis rePQrt does not include I Npo and OUTAGE activities.