Category:Inspection Plan
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML21012A4282021-01-13013 January 2021 Security Inspection Plan ML20017A2412020-01-15015 January 2020 Security Inspection Plan for Oyster Creek Generating Station - 2020 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 ML16235A0792016-08-31031 August 2016 Mid Cycle Assessment Letter 2016-005 IR 05000219/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Inspection Report 05000219/2015006) IR 05000219/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2015005) ML15239A4742015-08-28028 August 2015 54(p) Eval IR 05000219/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2014001) IR 05000219/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 IR 05000219/20130012014-03-0404 March 2014 ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan IR 05000219/20120012013-03-0404 March 2013 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001) IR 05000219/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Oyster Creek Nuclear Generating Station (Report 05000219/2012006) IR 05000219/20110012012-03-0505 March 2012 Annual Assessment Letter for Oyster Creek Generating Station (Report 05000219/2011001) ML1124401172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Oyster Creek Nuclear Generating Station IR 05000219/20100012011-03-0404 March 2011 Annual Assessment Letter for Oyster Creek Generating Station, EOC-11 (Report 05000219/2010001) ML1024406162010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek ML1006212562010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001) ML0914606122009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility Oyster Creek ML0914606132009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility: Oyster Creek, with Handwritten Notes ML0914703552009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914703562009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 IR 05000219/20090012009-03-0404 March 2009 Annual Assessment Letter - Oyster Creek Generating Station (05000219-09-001) ML0914606812008-10-23023 October 2008 E-mail from J. Richmond of USNRC to Various, Regarding Oc License Renewal Inspection Plan ML0915403162008-10-23023 October 2008 Inspection Cover Sheet, Facility: Oyster Creek, with Handwritten Notes ML0914606192008-10-22022 October 2008 E-mail from J. Richmond of USNRC to M. Modes of USNRC, Regarding Oc Lri Inspection Plan, Rev. 2 ML0824705692008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek IR 05000219/20080012008-03-0303 March 2008 (05000219-08-001), Annual Assessment Letter, EOC 2007 ROP8 ML0805900142008-02-27027 February 2008 Notification of Triennial Fire Protection Baseline Inspection ML0734706102007-12-13013 December 2007 ROP 8 - Oyster Creek - Change to Inspection Plan, 12/13/07 ML0724309392007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706105922007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Oyster Creek Station (05-219-07-001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0624401992006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Oyster Creek Nuclear Plant ML0606604692006-03-0606 March 2006 3/06/2006 - Oyster Creek Pre-Inspection Cover Sheet and Inspection Plan for License Renewal ML0606201302006-03-0202 March 2006 2006-001 Annual Assessment Letter - Oyster Creek Generating Station (Report 05-219/2006001) ML0524207272005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Oyster Creek Nuclear Power Plant ML0518801352005-07-0707 July 2005 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406308112004-03-0303 March 2004 2003-04 Annual Assessment Letter - Oyster Creek ML0713401642003-09-0505 September 2003 Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 ML0323906832003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek Nuclear Generating Station ML0713401622003-08-21021 August 2003 Post Strike Monitoring Activities - Updated 8/21/03 ML0713401562003-08-12012 August 2003 Post Strike (Reintegration) Inspection Plan, August 12, 2003 ML0713401532003-08-0707 August 2003 Post Strike (Reintegration) Inspection Plan Draft IR 05000219/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Oyster Creek Generating Station (Report 50-219/02-01) ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 2024-01-09
[Table view] Category:Report
MONTHYEARML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- ML13098A2092013-04-0505 April 2013 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12355A1422012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12359A0082012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4 ML12359A0062012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4 ML12359A0052012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4 RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel2012-10-10010 October 2012 Core Spray/Auto Depress'N System Relay Logic Panel RA-13-022, D Area Walk-By Checklists (Awcs)2012-10-10010 October 2012 D Area Walk-By Checklists (Awcs) ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. 2023-10-13
[Table view] Category:Miscellaneous
MONTHYEARML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML13098A2092013-04-0505 April 2013 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. ML12166A5042012-07-0505 July 2012 Operating Station Review of Committment Submittal for License Renewal Regarding Thermal Aging Irradiation Embrittlement of Cast Austenitic Stainless Steel ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants RA-11-031, Oyster Creek - Submittal of Commitment Change Summary Report - 20102011-08-12012 August 2011 Oyster Creek - Submittal of Commitment Change Summary Report - 2010 NEI 99-04, Oyster Creek - Submittal of Commitment Change Summary Report - 20102011-08-12012 August 2011 Oyster Creek - Submittal of Commitment Change Summary Report - 2010 RA-11-005, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2009 Though December 31, 20102011-06-24024 June 2011 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2009 Though December 31, 2010 RA-10-023, Submittal of Commitment Change Summary Report - 20092010-08-0606 August 2010 Submittal of Commitment Change Summary Report - 2009 NEI 99-04, Oyster Creek, Submittal of Commitment Change Summary Report - 20092010-08-0606 August 2010 Oyster Creek, Submittal of Commitment Change Summary Report - 2009 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1007402512009-08-0707 August 2009 AR 00916938 Report ML0934208122009-06-29029 June 2009 Root Cause Evaluation Report: Tritium Identified in Emergency Service Water (ESW) Vault ML1020203712009-06-25025 June 2009 Assignment Report #00907846 ML1007402602009-06-24024 June 2009 Issue - Statement of Confirmation ML1007402612009-06-24024 June 2009 AR 00934636 Report ML1020203682009-06-23023 June 2009 Assignment Report #009128267 ML1007402592009-06-21021 June 2009 Stable Standard-Fixed Target Hot Lab ML1007402192009-06-14014 June 2009 AR 00931098 Report ML1007402562009-06-0505 June 2009 AR 00928211 Report ML1020203672009-06-0404 June 2009 Assignment Report #00928211 ML1020203662009-06-0303 June 2009 Assignment Report #00927310 ML1007402572009-06-0101 June 2009 AR 00926251 Report ML1020203652009-05-26026 May 2009 Assignment Report #00907846 ML1007402162009-05-22022 May 2009 AR 00922841 Report ML1007402552009-05-22022 May 2009 AR 00922841 Report ML1020203302009-05-14014 May 2009 Assignment Report #00919392 2023-01-24
[Table view] |
Text
Post Strike Briefing 09/05/03 Current Overall Assessment The inspectors have noted no issues while the staff have been re-integrated. The inspectors observed several shift turnovers/briefs for the returning licensed & non-licensed operators and held discussions with key managers in Rad Pro and Maintenance to assess re-integration activities.
The inspectors observed supervisors' "re-entry" issues meeting and held several discussions with "mentor/shadow" supervisors to assess whether re-entry problems are being identified and resolved with appropriate management involvement. The inspectors have noted that shadow supervisors are being used for the near-term in ops, maintenance, and rad pro/chem departments to assist and assess the performance of supervisors in re-integration activities.
Also, Exelon Oversight has been implementing an audit process to independently assess the re-integration activities.
Several issues have been identified by the line management during the re-integration that demonstrate the sensitivity they have toward safe operation. Increased numbers of supervisors are present onsite on backshift periods to better monitor work activities. Also, a recent CAP identified a configuration problem in a resin transfer system. Management has implemented their "tampering" process to determine whether the mis-positioned valve was an intentional event. In addition, a non-licensed operator (who had crossed the picket line during the strike) conducting an entry into a potentially high rad area had been briefed prior to the entry by a rad pro tech. The NLO wound up in the wrong area. No excessive dose was incurred. However, the licensee is reviewing this event to ensure that the briefing was accurate and did not intentionally mislead the NLO.
The inspectors' assessment is that the licensee's reintegration plan is being appropriately implemented. Minor changes made to the plan as reintegration continues have also been reviewed by the inspectors and found to be appropriate. Based upon inspector interviews with returning workers, morale seems to be generally good with some complaints from operations and rad pro concerning the new 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift schedule. The status of the inspection plan is noted below.
Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 Inspection Dates:**
August 6, 2003 thru September 27, 2003
- End date may change based upon issues revealed during inspection Inspectors:**
Bob Summers - OC SRI Steve Dennis - OC RI Gil Johnson (or alternate) - DRS Alan Blarney - DRS Tom Hipschman - DRS
- Other inspectors TBD as needed Inspection Guidance:
IP 92711 - Continued Implementation of Strike Plans During an Extended Strike IP 92712 - Resumption of Normal Operations After a Strike RI 1080.2 - NRC Preparations for Pending Licensee Strike Background/Purpose:
On May 22, 2003, IBEW Local 1289, representing over 200 workers at Oyster Creek, went on strike after talks broke down during contract negotiations with AmerGen. NRC Inspectors and senior managers have monitored plant operation since the strike began to ensure the licensee's strike contingency efforts were effective in maintaining public health and safety. On August 5, 2003, following weeks of negotiations, the union bargaining group agreed to present AmerGen's latest contract offer to the union members for a vote. On August 7, 2003, the union members approved the contract and will begin to return to Oyster Creek on August 11, 2003.
Due to the lengthy strike (over 11 weeks), additional inspection focus is needed to ensure a safe transition to normal plant operations. The inspection effort will determine the efficacy of the licensee's implementation of their reintegration plan and evaluate the resumption of normal plant operations. Additionally, the inspection will also focus on human performance, which is a substantive cross-cutting issue at OC in the area of procedure adherence inadequacies.
3 Inspection Objectives: (IP 92712, IP 92711, RI 1080.2)
- 1. Review Licensee Reintegration Plan (Summers, Dennis, DRP, DRS)
- Verify an orderly turnover plan has been developed for all affected departments.
- Verify the plan addresses training and qualification issues.
- Verify the plan addresses employee concern issues which may arise during the reintegration.
- Verify the plan addresses any backlog issues in the engineering department.
- Verify that deviations to the plan are documented and addressed lAW licensee corrective action program.
- Verify May 30, 2003, and June 26, 2003, exemption request commitments are being met.
- Verify that plans are in place for Licensed Operators to complete all missed training/testing required for maintaining an active license lAW 10CFR55.
- Verify the plan includes adequate measures to prevent tampering with plant equipment or data as well as to promptly detect and react to tampering that might occur.
- Verify the plan provides for appropriate decision making as to whether or not individuals or groups are ready to return to in plant work.
Status - Complete
- 2. Review Licensee's Operations Organization (Summers, Dennis, DRS)
- Review requalification training evaluations to verify that operators are proficient. Use guidance from 71111.11 B & Q.
- Verify that operations shift crews are staffed in lAW with Tech Spec requirements.
Status - Complete
- 3. Training and Qualification (Summers, Dennis, DRP)
- Review and verify a sample of training and qualification records for returning personnel in the maintenance, I&C, Rad Pro, Fire Protection, and Chemistry organizations to verify the records are current and personnel have up-to-date proficiency. Interview personnel as appropriate.
Status - In progress
- 4. Emergency Preparedness (DRS - during week of graded exercise on September 9, 2003)
- Verify through a sample of training records review that records are current and returning personnel are cognizant of their roles and responsibilities in the EP organization. Interview personnel as appropriate.
Status - Week of 9/8
- 5. Security (Summers, Dennis)
- Verify that security management and security officers have addressed and are prepared to deal with emergent issues onsite, including tampering, and during plant entry and exit.
Status - Complete
- 6. Plant Conditions/Crew Turnovers (Summers, Dennis, DRS, DRP)
4
- Observe control room crew turnovers to ensure issues and duties are communicated and deficiencies are understood.
- Observe job briefings, in all departments, for normal surveillance activities and emergent issues, to ensure personnel communication, procedure adherence, and job knowledge are adequate.
- Accompany operators on building rounds and observe other department personnel during performance of maintenance activities to verify adequate job knowledge and procedure adherence.
Status - In progress
- 7. Engineering (Hipschman)
- Review and assess engineering corrective action backlog to determine if any risk significant issues have been deferred and if so, how they are being addressed and how do they affect plant operation.
Status - Complete
- 8. Maintenance (Summers, Dennis, DRP)
- Continue to track work scheduling backlog in PMs, STs, Corrective and Elective Maintenance.
Status - In progress Inspection Schedule:
Weekend and round the clock site coverage is not recommended at this time. Once operations department proficiency watches begin (August 18) - 2 shift coverage is recommended. (NOTE:
due to the response to the grid event on August 14, the resident staff did not begin 2-shift coverage on August 18. Additional control room observations of turnover involving the proficiency watch-standers began on August 20. Extended shift coverage will continue during the next week.) Once other department staffing and normal work week scheduling returns to normal (September 1) - weekend coverage should be considered. These recommendations can be adiusted and are contingent on plant operational issues.
August 6 - 15
- Review reintegration plan Inspection Effort:
1 inspector, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> August 11 - 15
- 50 people per day will return to work, for two days only, during the first week. Each group of 50 will receive one day of training on the backsite consisting of GET, FFD, and senior management discussion of worker expectations, core values, employee conduct, and other "soft" issues affecting worker relationships with supervision and peers. Day two will consist of a plant tour and general housekeeping duties. The remaining three days of the week for each group will be vacation days off, with the exception of the operators, who will report to training.
Inspection Effort:
5 2 or 3 inspectors, in plant, 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> each, per week - day shift 1 DRS inspector to observe operator training on August 15 - 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> August 18 - September 27
- Operations will begin on shift proficiency watches for ROs, around the clock
- Maintenance, I&C, and Rad Pro will begin 2 weeks of offsite training and requalification.
- Maintenance, I&C, and Rad Pro return to the plant the week of 9/1/03 Inspection Effort:
2 or 3 inspectors - 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> per week/2 overlapping shifts - observe Ops turnovers & RO proficiency watches.
1 DRS Inspector as necessary, August 18 & 19 - to observe RO reintegration training.
DRS requal inspection to be scheduled this fall - Date TBD Additional Inspection effort information:
Conduct of Inspection MC 0612 will be the guidance utilized for determining the thresholds of findings such as greater than minor. In addition, findings which are considered to be potentially greater than minor should be evaluated consistent with MC 0609, "Significance Determination Process (SDP),"
dated 4/30/2002. Observations, findings, or potential violations will be discussed daily with the SRI/RI. Also, f indings of potential risk significance should be discussed with the SRI/RI at the time of identification or as soon as possible. SRI/RI will brief Branch Chief as needed.
Documentation and Information Requests Documents and information requested during the course of the inspection will be listed, tracked, and documented by the individual inspectors and provided to the SRI/RI when submitting inspection documentation.
Inspection Report Documentation Format The outline of Manual Chapter 0612 is to be followed. Any documentation for the inspection report must be provided to the SRI/RI by October 1, 2003.
STARFIRE Information:
Inspection time charges to STARFIRE = Feeder to Inspection Report 50-219/2003-004 Preparation Time = GIP, 50-219/2003-004 Inspection Time = OA, IP 92712, 50-219/2003-004 Documentation Time = GID, 50-423/2003-004 Estimated insp. hrs for this inspection procedure = approx. 250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> and includes all DRS/DRP efforts**
- estimate is based upon 40-50 hours per for 4 to 6 weeks
- some of the inspection effort will be counted toward other ROP baseline inspection requirements
6 Site Contacts Licensee Dave Slear, Licensing (609) 971-4112 Bill Stewart, Reg Affairs (609) 971-4775 NRC Bob Summers or RI Office - (609) 693-0702/0717 Steve Dennis Resident Cell Ph. - 484-868-1476