UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 2, 2008 Mr. Charles G. Pardee Chief Nuclear Officer (CNO) and Senior Vice President Exelon Generation Company, LLC Chief Nuclear Officer (CNO)
AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
MID CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
OYSTER CREEK
Dear Mr. Pardee:
On August 11, 2008, the NRC staff completed its performance review of the Oyster Creek Nuclear Generating Station (Oyster Creek) for the first half of calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security Information will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter of 2008 at Oyster Creek was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and license renewal commitments inspections. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
C. Pardee 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Raymond J. Powell Acting for/
Ronald R. Bellamy, Ph.D., Chief Division of Reactor Projects Projects Branch 6 Docket No.
50-219 License No.
Enclosure:
Oyster Creek Inspection/ Activity Plan cc w/encl:
C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer, Exelon T. Rausch, Site Vice President, Oyster Creek Nuclear Generating Station J. Randich, Plant Manager, Oyster Creek Generating Station J. Kandasamy, Regulatory Assurance Manager, Oyster Creek R. DeGregorio, Senior Vice President, Mid-Atlantic Operations K. Jury,Vice President, Licensing and Regulatory Affairs P. Cowan, Director, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk, AmerGen Mayor of Lacey Township P. Mulligan, Chief, NJ Dept of Environmental Protection R. Shadis, New England Coalition Staff W. Constanzo, Technical Advisor, Jersey Shore Nuclear Watch E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance P. Baldauf, Assistant Director, NJ Radiation Protection Programs
Oyster Creek Inspection / Activity Plan 07/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/29/2008 16:07:54 Report 22 2
RETAKE
- RETAKE OL OP TEST Not Applicable FY-08 OYSTER CREEK OPERATOR LICENSING RETAKE EXAMS 08/18/2008 08/22/2008 1
U01775 Not Applicable FY-08 OYSTER CREEK OPERATOR LICENSING RETAKE EXAMS 08/18/2008 08/22/2008 1
U01775 5
- PI&R Baseline Inspections Identification and Resolution of Problems 07/21/2008 07/25/2008 1
71152B IP Baseline Inspections Identification and Resolution of Problems 08/03/2008 08/08/2008 1
71152B IP 1
71121
- OCC RADIATION PROTECTION Baseline Inspections Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 1
7112101 IP Baseline Inspections ALARA Planning and Controls 09/08/2008 09/12/2008 1
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 1
7112103 IP 1
TI 176
- TI 176 Generic Safety Inspectio Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 09/15/2008 09/19/2008 1
2515/176 IP 1
- EP PROGRAM INSPECTION EP Baseline Inspection Alert and Notification System Testing 10/06/2008 10/10/2008 1
7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 10/06/2008 10/10/2008 1
7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/06/2008 10/10/2008 1
7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 10/06/2008 10/10/2008 1
7111405 IP Baseline Inspections Drill/Exercise Performance 10/06/2008 10/10/2008 1
71151-EP01 IP Baseline Inspections ERO Drill Participation 10/06/2008 10/10/2008 1
71151-EP02 IP Baseline Inspections Alert & Notification System 10/06/2008 10/10/2008 1
71151-EP03 IP 4
71003
- LR COMMITMENTS INSP - OUTAGE License Renewal Inspec Post-Approval Site Inspection for License Renewal 10/27/2008 10/31/2008 1
71003 IP License Renewal Inspec Post-Approval Site Inspection for License Renewal 10/28/2008 10/29/2008 1
71003 IP 1
7111108G
- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 10/27/2008 10/31/2008 1
7111108G IP 1
71121
- OCC RADIATION PROTECTION Baseline Inspections Access Control to Radiologically Significant Areas 10/27/2008 10/31/2008 1
7112101 IP Baseline Inspections ALARA Planning and Controls 10/27/2008 10/31/2008 1
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 10/27/2008 10/31/2008 1
7112103 IP 1
71121
- OCC RADIATION PROTECTION Other Routine Operation Of An ISFSI 12/08/2008 12/12/2008 1
60855 IP Baseline Inspections Access Control to Radiologically Significant Areas 12/08/2008 12/12/2008 1
7112101 IP Baseline Inspections ALARA Planning and Controls 12/08/2008 12/12/2008 1
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/08/2008 12/12/2008 1
7112103 IP Baseline Inspections Occupational Exposure Control Effectiveness 12/08/2008 12/12/2008 1
71151-OR01 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Oyster Creek Inspection / Activity Plan 07/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/29/2008 16:07:54 Report 22 1
71121
- OCC RADIATION PROTECTION Baseline Inspections RETS/ODCM Radiological Effluent 12/08/2008 12/12/2008 1
71151-PR01 IP 3
TI 171
- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 12/08/2008 12/12/2008 1
2515/171 IP 5
5/04 EXM
- INITIAL OPERATOR LICENSING EXAMS Not Applicable FY-09 OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 04/06/2009 04/10/2009 1
U01761 Not Applicable FY-09 OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 05/04/2009 05/08/2009 1
U01761 Not Applicable FY-09 OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 05/11/2009 05/15/2009 1
U01761 5
71003
- LR COMMITMENTS INSP - NON-OUTAGE License Renewal Inspec Post-Approval Site Inspection for License Renewal 03/09/2009 03/13/2009 1
71003 IP License Renewal Inspec Post-Approval Site Inspection for License Renewal 03/23/2009 03/27/2009 1
71003 IP 1
71121
- OCC RAD Baseline Inspections Access Control to Radiologically Significant Areas 03/23/2009 03/27/2009 1
7112101 IP Baseline Inspections ALARA Planning and Controls 03/23/2009 03/27/2009 1
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 03/23/2009 03/27/2009 1
7112103 IP 1
- ANNUAL SAMPLE - ISFSI INSPECTION Other Routine Operation Of An ISFSI 04/01/2009 06/30/2009 1
60855 IP 3
7111111B
- BIENNIAL REQUAL INSPECT WITH P/F RESULTS Baseline Inspections Licensed Operator Requalification Program 06/15/2009 06/19/2009 1
7111111B IP 2
MODS
- PERMANENT PLANT MODIFICATIONS Baseline Inspections Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 04/27/2009 05/01/2009 1
7111117T IP Baseline Inspections Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 05/11/2009 05/15/2009 1
7111117T IP 1
7111107T
- HEAT SINK INSP Baseline Inspections Heat Sink Performance 06/15/2009 06/19/2009 1
7111107T IP 1
71122
- REMP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/17/2009 08/21/2009 1
7112203 IP 2
EP EXER
- EP EXERCISE INSPECTION EP Baseline Inspection Exercise Evaluation 10/04/2009 10/10/2009 1
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/04/2009 10/10/2009 1
7111404 IP Baseline Inspections Drill/Exercise Performance 10/04/2009 10/10/2009 1
71151-EP01 IP Baseline Inspections ERO Drill Participation 10/04/2009 10/10/2009 1
71151-EP02 IP Baseline Inspections Alert & Notification System 10/04/2009 10/10/2009 1
71151-EP03 IP 1
71121
- OCC RAD SAFETY Other Routine Operation Of An ISFSI 10/05/2009 10/09/2009 1
60855 IP Baseline Inspections Access Control to Radiologically Significant Areas 10/05/2009 10/09/2009 1
7112101 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Oyster Creek Inspection / Activity Plan 07/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/29/2008 16:07:54 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections Performance Indicator Verification 10/05/2009 10/09/2009 1
71151 IP 1
7112201
- PUB RAD SAFETY Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 10/05/2009 10/09/2009 1
7112201 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.