ML16256A121: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = Final Safety Analysis Report (FSAR)
| document type = Final Safety Analysis Report (FSAR)
| page count = 298
| page count = 298
}}
=Text=
{{#Wiki_filter:WSES-FSAR-UNIT-3  1-i Revision 11-A (02/02) CHAPTER 1  INTRODUCTION AND GENERAL DESCRIPTION OF PLANT  TABLE OF CONTENTS Section      Title      Page 
==1.0  INTRODUCTION==
AND GENERAL DESCRIPTION OF PLANT  1.1-1 
==1.1  INTRODUCTION==
1.1-1 1.2  GENERAL PLANT DESCRIPTION      1.2-1 1.2.1    PRINCIPAL SITE CHARACTERISTICS    1.2-1 (DRN 01-758, R11-A) 1.2.2    CONCISE PLANT DESCRIPTION      1.2-2 (DRN 01-758, R11-A) 1.3  COMPARISONS        1.3-1  1.3.1    COMPARISONS WITH SIMILAR FACILITY DESIGNS  1.3-1 1.3.2    COMPARISON OF FINAL AND PRELIMINARY INFORMATION  1.3-1
1.4  IDENTIFICATION OF AGENTS AND CONTRACTORS  1.4-1 1.5  REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION  1.5-1  1.5.1    FRETTING AND VIBRATIONS TESTS OF FUEL ASSEMBLIES  1.5-1
1.5.2    DEPARTURE FROM NUCLEATE BOILING (DNB) TESTING  1.5-1
1.5.3    FUEL ASSEMBLY STRUCTURAL TESTS    1.5-1
1.5.4    FUEL ASSEMBLY FLOW MIXING TESTS    1.5-2
1.5.5    REACTOR FLOW MODEL TESTING AND EVALUATION  1.5-2
1.5.6    FUEL ASSEMBLY FLOW TESTS      1.5-3
1.5.7    CONTROL ELEMENT DRIVE MECHANISM (CEDM) TESTS  1.5-3 1.5.8    DNB IMPROVEMENT      1.5-4
==1.5  REFERENCES==
1.5-4 1.6  MATERIAL INCORPORATED BY REFERENCE    1.6-1 1.7  ELECTRICAL, INSTRUMENTATION, AND CONTROL DRAWINGS  1.7-1 WSES-FSAR-UNIT-3  1-ii  CHAPTER 1  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 1.8  COMPARISON OF WATERFORD 3 DESIGN WITH NRC REGULATORY 1.8-1    GUIDES  1.
==8.1    INTRODUCTION==
1.8-1
1.9  THREE MILE ISLAND - 2 (TMI-2) ACTION PLAN REQUIREMENTS  1.9-1    FOR APPLICANTS FOR AN OPERATING LICENSE 1.9.1  SHIFT TECHNICAL ADVISOR (I.A.1.1)    1.9-1 1.9.2  SHIFT SUPERVISOR ADMINISTRATIVE DUTIES (I.A.1.2)  1.9-1 1.9.3  SHIFT MANNING (I.A.1.3)      1.9-2
1.9.4  IMMEDIATE UPGRADING OF REACTOR OPERATOR AND SENIOR  1.9-2 REACTOR OPERATOR TRAINING AND QUALIFICATIONS (I.A.2.1) 1.9.5  ADMINISTRATION OF TRAINING PROGRAMS (I.A.2.3)  1.9-2 1.9.6  REVISE SCOPE AND CRITERIA FOR LICENSING EXAMINATIONS  1.9-3    (I.A.3.1)
1.9.7  INDEPENDENT SAFETY ENGINEERING GROUP (I.B.1.2)  1.9-3
1.9.8  SHORT-TERM ACCIDENT ANALYSIS AND PROCEDURE REVISION  1.9-4    (I.C.1)
1.9.9  SHIFT RELIEF AND TURNOVER PROCEDURES (I.C.2)  1.9-5 1.9.10  SHIFT SUPERVISOR RESPONSIBILITIES (I.C.3)    1.9-5 1.9.11  CONTROL ROOM ACCESS (I.C.4)      1.9-5
1.9.12  PROCEDURES FOR FEEDBACK OF OPERATING EXPERIENCE TO  1.9-6 PLANT STAFF (I.C.5)
1.9.13  GUIDANCE ON PROCEDURES FOR VERIFYING CORRECT PER-  1.9-7    FORMANCE OF OPERATING ACTIVITIES (I.C.6)
1.9.14  NSSS VENDOR REVIEW OF PROCEDURES (I.C.7)    1.9-7 1.9.15  CONTROL ROOM DESIGN REVIEWS (I.D.1)    1.9-8
1.9.16  PLANT SAFETY PARAMETER DISPLAY SYSTEM (I.D.2)  1.9-8
WSES-FSAR-UNIT-3  1-iii Revision 11-A (02/02) CHAPTER 1  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 1.9-17  TRAINING DURING LOW-POWER TESTING (I.G.1)    1.9-9 1.9.18  REACTOR COOLANT SYSTEM VENTS (II.B.1)    1.9-9
1.9.19  DESIGN REVIEW OF PLANT SHIELDING AND ENVIRONMENTAL  1.9-10    QUALIFICATION OF EQUIPMENT FOR SPACES/SYSTEMS WHICH MAY BE USED IN POST-ACCIDENT OPERATIONS (II.B.2)
1.9.20  POST-ACCIDENT SAMPLING CAPABILITY (II.B.3)    1.9-11
1.9.21  TRAINING FOR MITIGATING CORE DAMAGE (II.B.4)  1.9-11 1.9.22  PERFORMANCE TESTING OF BOILING-WATER REACTOR AND  1.9-12 PRESSURIZED-WATER REACTOR RELIEF AND SAFETY VALVES (II.D.1)
1.9.23  DIRECT INDICATION OF RELIEF-AND-SAFETY-VALVE POSITION  1.9-12    (II.D.3)
1.9.24  AUXILIARY FEEDWATER SYSTEM EVALUATION (II.E.1.1)  1.9-13
1.9.25  AUXILIARY FEEDWATER SYSTEM AUTOMATIC INITIATION AND  1.9-14 FLOW INDICATION (II.E.1.2)
1.9.26  EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS  1.9-15    (II.E.3.1)
1.9.27  DEDICATED HYDROGEN PENETRATIONS (II.E.4.1)  1.9-16
1.9.28  CONTAINMENT ISOLATION DEPENDABILITY (II.E.4.2)  1.9-17 1.9.29  ADDITIONAL ACCIDENT-MONITORING INSTRUMENTATION  1.9-19    (II.F.1)
1.9.30  INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE  1.9-28    COOLING (II.F.2)
1.9.31  EMERGENCY POWER FOR PRESSURIZER EQUIPMENT (II.G.1)  1.9-28 1.9.32  IE BULLETINS ON MEASURES TO MITIGATE SMALL-BREAK LOCAs  1.9-28 AND LOSS OF FEEDWATER ACCIDENTS (II.K.1) (DRN 01-758, R11-A) 1.9.33  ORDERS ON B&W PLANTS (II.K.2)    1.9-29 (DRN 01-758, R11-A) 1.9.34  FINAL RECOMMENDATIONS OF B&O TASK FORCE (II.K.3)  1.9-31 WSES-FSAR-UNIT-3  1-iv Revision 11-A (02/02) CHAPTER 1  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 1.9.35  EMERGENCY PREPAREDNESS - SHORT TERM (III.A.1.1)  1.9-35
1.9.36  UPGRADE EMERGENCY SUPPORT FACILITIES (III.A.1.2)  1.9-35
1.9.36a  IMPROVING LICENSEE EMERGENCY PREPAREDNESS - LONG  1.9-36    TERM (III.A.2)
1.9.37  INTEGRITY OF SYSTEMS OUTSIDE CONTAINMENT LIKELY TO  1.9-36    CONTAIN RADIOACTIVE MATERIAL FOR PRESSURIZED-WATER REACTORS AND BOILING-WATER REACTORS (III.D.1.1) 1.9.38  IMPROVED INPLANT IODINE INSTRUMENTATION UNDER    1.9-40 ACCIDENT CONDITIONS (III.D.3.3)
1.9.39  CONTROL-ROOM HABITABILITY REQUIREMENTS (III.D.3.4)  1.9-43 (DRN 01-758, R11-A) 1.9A  RESPONSE TO SECTION II.F.2 OF NUREG-0737    1.9A-1    INADEQUATE CORE COOLING INSTRUMENTATION (DRN 01-758, R11-A) 1.9A.1  INTRODUCTION        1.9A-1
1.9A.2  FUNCTIONAL DESCRIPTION OF ICCI    1.9A-2
1.9A.3  ICCI SENSOR DESIGN DESCRIPTION    1.9A-3
1.9A.4  SIGNAL PROCESSING AND DISPLAY    1.9A-7
1.9A.5  SYSTEM VERIFICATION TESTING    1.9A-12
1.9A.6  ICCI SYSTEM QUALIFICATION      1.9A-13
1.9A.7  OPERATING INSTRUCTIONS      1.9A-13
1.9A.8  COMPARISON OF DOCUMENTATION REQUIREMENTS WITH  1.9A-14 THIS REPORT
1.9A.9  SCHEDULE FOR ICCI IMPLEMENTATION    1.9A-14
1.9A  REFERENCES        1.9A-15 1A  FSAR ACRONYMS      1A-1 
WSES-FSAR-UNIT-3  1-v Revision 11-A (02/02) CHAPTER 1  INTRODUCTION AND GENERAL DESCRIPTION OF PLANT  LIST OF TABLES Table      Title (DRN 01-758, R11-A) 1.3-1  PLANT PARAMETER COMPARISON FOR WATERFORD 3 CYCLE 1 (DRN 01-758, R11-A) 1.7-1  ELECTRICAL, INSTRUMENTATION AND CONTROL DRAWINGS
1.9-1  TMI-RELATED REQUIREMENTS FOR NEW OPERATING LICENSES
1.9-2  TMI INFORMATION REQUIRED FOR CONTROL-ROOM HABITABILITY EVALUATION (TASK ACTION  PLAN ITEM III.D.3.4) 1.9-3  CONTAINMENT ISOLATION VALVES PROVIDED WITH CAPABILITY FOR MANUAL OVERRIDE
1.9-4  ADDITIONAL ACCIDENT MONITORING INSTRUMENTATION
1.9A-1  DEFINITION OF ICC EVENT PROGRESSION INTERVALS 1.9A-2  COMPARISON OF ICCI TO DOCUMENTATION REQUIREMENTS OF    ITEM II.F.2 OF NUREG-0737
1.9A-3  COMPARISON OF ICCI TO ATTACHMENT 1 OF II.F.2
1.9A-4  COMPARISON OF ICCI TO APPENDIX B OF NUREG-0737
WSES-FSAR-UNIT-3  1-vi Revision 11-A (02/02) CHAPTER 1  INTRODUCTION AND GENERAL DESCRIPTION OF PLANT  LIST OF FIGURES Figure      Title 1.2-1  PLOT PLAN
1.2-2  SITE PLAN
1.2-3  GENERAL ARRANGEMENT TURBINE BUILDING GROUND FLOOR  - PLAN
1.2-4  GENERAL ARRANGEMENT TURBINE BUILDING MEZZANINE FLOOR - PLAN
1.2-5  GENERAL ARRANGEMENT TURBINE BUILDING OPERATING FLOOR - PLAN
1.2-6  GENERAL ARRANGEMENT TURBINE BUILDING - SECTION
1.2-7  GENERAL ARRANGEMENT TURBINE BUILDING - SECTIONS
1.2-8  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL + 46.00' 1.2-9  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL + 21.00' 1.2-10  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL - 4.00' 1.2-11  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL - 35.00' 1.2-12  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - SECTION
1.2-13  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - SECTION (DRN 01-758, R11-A) 1.2-14  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - (SH. 3) (DRN 01-758, R11-A) 1.2-15  GENERAL ARRANGEMENT FUEL HANDLING BUILDING - PLANS
1.2-16  GENERAL ARRANGEMENT FUEL HANDLING BUILDING - SECTIONS
1.2-17  GENERAL ARRANGEMENT REACTOR BUILDING PLAN - EL + 46.00' (DRN 01-758, R11-A) 1.2-18  GENERAL ARRANGEMENT REACTOR BUILDING - PLAN - EL + 21.00' (DRN 01-758, R11-A) 1.2-19  GENERAL ARRANGEMENT REACTOR BUILDING - PLAN EL - 4.00' (DRN 01-758, R11-A) 1.2-20  GENERAL ARRANGEMENT REACTOR BUILDING - SECTION (SHEET 1)
1.2-21  GENERAL ARRANGEMENT REACTOR BUILDING - SECTION (SH 2) (DRN 01-758, R11-A) 1.2-22  GENERAL ARRANGEMENT REACTOR BUILDING - SECTIONS (DRN 01-758, R11-A) 1.2-23  GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - PLANS AND    SECTIONS - (SHEET 4) (DRN 01-758, R11-A)
WSES-FSAR-UNIT-3  1-vii  CHAPTER 1  LIST OF FIGURES (Cont'd)
Figure      Title 1.2-24  GENERAL ARRANGEMENT COOLING TOWERS - PLAN
1.2-25  GENERAL ARRANGEMENT COOLING TOWERS - SECTIONS
1.9-1  DELETED
1.9-2  DELETED
1.9-3  BLOCK DIAGRAM, WIDE-RANGE GAS MONITOR
1.9-4  DETECTOR RANGES, WIDE-RANGE GAS MONITOR
1.9A-1  DEFINITION OF INTERVALS IN EVENT PROGRESSION 1.9A-2  ICC INSTRUMENTATION SYSTEM
1.9A-3  HJTC SENSOR
1.9A-4  HJTC SPLIT PROBE DESIGN CONFIGURATION
1.9A-5  HJTC SENSOR AXIAL LOCATIONS
1.9A-6  INADEQUATE CORE COOLING REACTOR VESSEL LEVEL CABLE ROUTING 1.9A-7  CORE EXIT TEMPERATURE MEASUREMENT SCHEME
1.9A-8  CORE EXIT THERMOCOUPLE CORE LOCATIONS
1.9A-9  INADEQUATE CORE COOLING CORE EXIT THERMOCOUPLES CABLE ROUTING 1.9A-10  HJTC LEVEL LOGIC
1.9A-11  HEATER POWER CONTROL LOGIC
WSES-FSAR-UNIT-3  1-viii Revision 14 (12/05) UPDATE REFERENCE LIST  Chapter 1 Section    Cross References 
Revision 12-B None
Revision 12-C Page 1A-7  ER-W3-2003-0249-000/DRN 03-657 Page 1.9-4 Revision 13 Page 1.9A-6  ER-W3-2003-0681/DRN 03-1872
Revision 13-A Section 1.1  ER-W3-2000-1018-009/DRN 04-1302 
Revision 13-B Figure 1.2-3  ER-W3-2004-0500/DRN 04-1514
Section 1.7  ER-W3-2004-0502/DRN 04-1444 Table 1.7-1
Revision 14 Section 1.1  ER-W3-2001-1149-000/DRN 03-2054 Section 1.2.1.3 Section 1.2.2.1.1 Section 1.2.2.1.2 Section 1.2.2.9 Section 1.6 Section 1.8.1.46 Section 1.8.1.145 Section 1.9.28 Section 1.9A.1.1 Section 1.9A.2.3 Section 1.9A.3.1 Section 1.9A.3.3 Section 1.9A.4.1.1 Section 1.9A.4.1.2 Section 1.9A.4.1.3 Section 1.9A.6
Figure 1.2-4  ER-W3-2002-0602-001/DRN 03-1184 Figure 1.9A-5  ER-W3-2004-0137-000/DRN 04-1958
WSES-FSAR-UNIT-3  1-ix Revision 304 (06/10) UPDATE REFERENCE LIST  Chapter 1  Section    Cross References Revision 14 Cont'd Section 1.2.2.2  ER-W3-2004-0276-000/DRN 04-1619 Section 1.8.1.4 Section 1.8.1.24 Section 1.8.1.25 Section 1.8.1.77 Section 1.8.1.183 Section 1.9.28 Section 1.9.37 Section 1.9.39
Revision 14-A Section 1.9.37  ER-W3-2005-0378-000/DRN 05-1265 Revision 14-B Figure 1.2-7  ER-W3-2005-0442-000/DRN 06-278 Revision 15 Appendix 1A  ER-W3-2006-0210-000/DRN 06-623
Section 1.8.1.46  ER-W3-2006-0258-000/DRN 06-802 Section 1.2.2.1.1  ER-W3-2005-0447-004/DRN 06-1058 
Revision 301 Figure 1.2-18  EC-1396
Section 1.8.1.23  EC-1837
Section 1.8.1.45  EC-5000082437
Table 1.9-2 Sh. 1  EC-5000082445
Revision 302 Figure 1.9A-5  EC-6607
Revision 303 Figure 1.2-17  EC-8039
Revision 304 Figure 1.9A-5  EC-10453
Section 1.5.2  EC-13881 Section 1.6
Section 1.2.2.3.1  EC-15702 WSES-FSAR-UNIT-3  1-x Revision 308 (11/14) UPDATE REFERENCE LIST  Chapter 1  Section    Cross References Revision 304 Cont'd Section 1.2.2.6  EC-16212
Section 1.9A.3.3  EC-18688 Section 1.9A.4 Section 1.9A.4.1.3 Figure 1.9A-8
Revision 305 Figure 1.2-4  EC-8038
Section 1.6  EC-19087 Section 1.8.45
Section 1.8.1.133  EC-26965
Revision 306 Section 1.9.29  EC-12329 Section 1.9A.4 Section 1.9A.4.2 Table 1.9A-3 Table 1.9A-4 (Sheet 1)
Appendix 1A  EC-14275 Section 1.2.2.6
Figure 1.2-18  EC-17580
Revision 307 Section 1.2.2.1.2  EC-1020
Table 1.7-1  EC-2800 Section 1.8.1.31
Section 1.8.1.83  EC-8458
Figure 1.2-17  EC-27161 Figure 1.2-20
Section 1.2.2.1.1  EC-30663
Section 1.9.24  EC-33720
Section 1.8.1.40  EC-40281
Revision 308 Section 1.8.1.9  LBDRC 14-010
Section 1.8.1.143  EC 47424
WSES-FSAR-UNIT-3  1-xi Revision 309 (06/16) Chapter 1 
Section    Cross References Revision 308 Cont'd Section 1.9.2  LBDCR 13-015 Section 1.9.7 Section 1.9.10
Revision 308A Section 1.9  LBDCR 15-028
Revision 309 Section 1.9.13  LBDCR 15-027 Section 1.9.17  LBDCR 13-014
WSES-FSAR-UNIT-3  2-i Revision 307 (07/13) SITE CHARACTERISTICS  CHAPTER 2  TABLE OF CONTENTS Section      Title      Page
2.0  SITE CHARACTERISTICS      2.1-1 2.1  GEOGRAPHY AND DEMOGRAPHY    2.1-1 2.1.1    SITE LOCATION AND DESCRIPTION    2.1-1 2.1.2    EXCLUSION AREA AUTHORITY AND CONTROL  2.1-3 2.1.3    POPULATION DISTRIBUTION      2.1-5
==2.1  REFERENCES==
2.1-24
NEARBY INDUSTRIAL, TRANSPORTATION AND MILITARY  2.2-1    FACILITIES  2.2.1    LOCATIONS AND ROUTES      2.2-1
2.2.2    DESCRIPTIONS      2.2-1 (EC-39014, R307) 2.2.3    EVALUATION OF POTENTIAL ACCIDENTS    2.2-11 (EC-39014, R307)
==2.2  REFERENCES==
2.2-57 2.2A    EVALUATION OF ACTUAL HAZARDOUS CHEMICAL RELEASES 2.2A-1      POSTULATED TO OCCUR NEAR THE WATERFORD 3 SITE  2.2A.1      ANALYSIS OF THE POSSIBLE CONSEQUENCES OF THE  2.2A-1        LIVINGSTON, LOUISIANA DERAILMENT ACCIDENT ON THE WATERFORD 3 PLANT
2.2A.2      ANALYSIS OF THE POTENTIAL CONSEQUENCES OF THE 2.2A-7        DECEMBER 11, 1982 EXPLOSION AT THE UNION CARBIDE PLANT ON WSES-3
2.2A  REFERENCES        2.2A-10
2.3  METEOROLOGY      2.3-1 2.3.1    REGIONAL CLIMATOLOGY      2.3-1
2.3.2    LOCAL METEOROLOGY      2.3-6
2.3.3    ONSITE METEOROLOGICAL MEASUREMENTS PROGRAM  2.3-9 
WSES-FSAR-UNIT-3  2-ii  CHAPTER 2  TABLE OF CONTENTS (Cont'd)  Section      Title      Page
2.3.4    SHORT-TERM (ACCIDENT) DIFFUSION ESTIMATES  2.3-17 2.3.5    LONG TERM (ROUTINE) DIFFUSION ESTIMATES  2.3-20
==2.3  REFERENCES==
2.3-22
2.4  HYDROLOGIC ENGINEERING      2.4-1 2.4.1    HYDROLOGIC DESCRIPTION    2.4-1
2.4.2    FLOODS        2.4-5
2.4.3    PROBABLE MAXIMUM FLOOD (PMF) ON STREAMS AND  2.4-12 RIVERS
2.4.4    POTENTIAL DAM FAILURES, SEISMICALLY INDUCED  2.4-20 2.4.5    PROBABLE MAXIMUM SURGE AND SEICHE FLOODING  2.4-20
2.4.6    PROBABLE MAXIMUM TSUNAMI FLOODING    2.4-32
2.4.7    ICE EFFECTS        2.4-32
2.4.8    COOLING WATER CANALS AND RESERVOIRS  2.4-33 2.4.9    CHANNEL DIVERSIONS      2.4-33
2.4.10    FLOODING PROTECTION REQUIREMENTS    2.4-33 2.4.11    LOW WATER CONSIDERATION    2.4-34
2.4.12    DISPERSION, DILUTION, AND TRAVEL TIMES OF  2.4-36 ACCIDENTAL RELEASES OF LIQUID EFFLUENTS IN SURFACE WATERS
2.4.13    GROUNDWATER      2.4-37
2.4.14    TECHNICAL SPECIFICATIONS AND EMERGENCY OPERATION 2.5-51      REQUIREMENTS
==2.4  REFERENCES==
2.4-52
2.5  GEOLOGY AND SEISMOLOGY      2.5-1 2.5.1    BASIC GEOLOGIC AND SEISMIC INFORMATION  2.5-2
2.5.2    VIBRATORY GROUND MOTION    2.5-41
WSES-FSAR-UNIT-3  2-iii  CHAPTER 2  TABLE OF CONTENTS (Cont'd)
Section      Title      Page
2.5.3    SURFACE FAULTING      2.5-52
2.5.4    STABILITY OF SUBSURFACE MATERIALS    2.5-58
2.5.5    STABILITY OF SLOPES      2.5-103
2.5.6    EMBANKMENTS AND DAMS      2.5-103
==2.5  REFERENCES==
2.5-104
2.5  BIBLIOGRAPHY      2.5-111
2.5A  LABORATORY TESTING      2.5A-1 2.5A  GENERAL SAMPLE HANDLING    2.5A-1 2.5A.1    CLASSIFICATION TESTS      2.5A-1
2.5A.2    STRENGTH TESTS      2.5A-2
2.5A.3    CONSOLIDATION TESTS      2.5A-4
2.5A.4    ELASTIC PROPERTIES      2.5A-4
2.5A.5    LIQUEFACTION TESTS      2.5A-5
2.5A.6    SUMMARY OF TESTS RESULTS    2.5A-5
2.5B  BORING LOGS        2.5B-1 2.5C  PROCEDURE FOR SOILS CONTROL AND FILTER  2.5C-0    AND BACKFILL SPECIFICATION 
WSES-FSAR-UNIT-3  2-iv  CHAPTER 2  SITE CHARACTERISTICS  LIST OF TABLES Table      Title
2.1-1  Resident Population Within 50 Miles of Waterford 3
2.1-2  Towns With Over 1,000 Persons Within 10 Miles of Waterford 3
2.1-3  Cities, Towns, and Communities With Over 10,000 Persons Within    50 Miles of Waterford 3
2.1-4  Total Estimated Peak Daily And Seasonal Transient Population    1977 and 2030
2.1-5  Peak Daily and Seasonal Transient Population Within 10 Miles    Of Waterford 3
2.1-6  Estimated Average Sunday Participation In Recreational Activity    Within 10 Miles of Waterford 3
2.1-7  Combined Daily And Seasonal Recreational Transient Population    Within 10 Miles Of Waterford 3
2.1-8  Transportation Transient Population Within 10 Miles Of Waterford 3 (passengers per day)
2.1-9  Peak Daily Industrial Employment Within 10 Miles Of Waterford 3
2.1-10  Cumulative Population Density By Sectors Within 30 Miles Of Waterford Unit 3, 1981
2.1-11  Cumulative Population Density By Sectors Within 30 Miles of Waterford Unit 3, 2030
2.1-12  Major Transportation Facilities Within the LPZ
2.1-13  1977 Peak Daily Population Distribution Within The Low    Population Zone
2.1-14  Summary Comparison Of Demographic Methodologies
2.1-15  Correlation And Regression Of Growth Rates Versus Development Suitability Within Five Miles Of Waterford 3, 1973-1977
2.1-16  Probability Of Residential Development Within Different Levels Of Development Suitability
WSES-FSAR-UNIT-3  2-v Revision 307 (07/13) CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.2-1  Major Industries Within Five Miles Of Waterford 3
2.2-2  Truck Traffic Accidents In The Vicinity Of Waterford 3 (1974-1986) 2.2-3  Products Used, Produced, Stored, By Industries Within Five Miles    Of Waterford 3 (EC-5000082218, R301) 2.2-3a  Industrial Facilities Storing Significant Quantities of Toxic Materials Within Five    Miles of Waterford 3
2.2-3b  Hazardous Materials Stored or Processed in the Waterford 3 Vicinity 2.2-3c  Hazardous Materials Shipped on the Mississippi River by Industrial Facilities in    the Waterford 3 Vicinity (EC-39014, R307) 2.2-3d  Hazardous Materials Carried on Union Pacific Railroad in 2011 in the Vicinity of    Waterford 3
2.2-3e  Hazardous Materials Carried Through Good Hope, LA in 2011 on Canadian National Railway
2.2-3f  Hazardous Materials Carried on Kansas City Southern Railway Through St. Charles Parish in 2011 (EC-39014, R307) (EC-38835, R307) 2.2-3g Hazardous Materials Shipped by Truck on Louisiana Highway 18 in Waterford 3 Vicinity (EC-38835, R307) 2.2-4  Deleted 2.2-4a  Materials Transported New Waterford 3 Posing Potential Hazards
2.2-4b  Deleted (EC-39014, R307) 2.2-5  Hazardous Freight Transported on the Mississippi River Between River Miles    123 and 137 in 2010 (EC-39014, R307) 2.2-6  Major Pipelines Carrying Hazardous Materials Within Two Miles of Waterford 3 2.2-7  Oil And Gas Fields Within Five Miles Of Waterford 3 (EC-5000082218, R301) 2.2-8  Trips and Drafts Of Vessels On The Mississippi River, Between    Baton Rouge To, But Not Including, New Orleans, La., 1975
2.2-9  Commercial Vessel Casualties On The Mississippi River Between Mile 124 and 135 Reported In Fiscal Year 1976
2.2-10  Mississippi River Terminals, Docks, Mooring Locations And Warehouses In The Vicinity Of Waterford 3
2.2-11  Forecast Of Aircraft Operations For The St. John The Baptist Parish Airport WSES-FSAR-UNIT-3  2-vi Revision 307 (07/13) CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.2-12  Aircraft Operations For New Orleans International Airport 2.2-13  Aircraft Operations Forecasts For New Orleans International Airport
2.2-14  Aircraft Accidents Occurring On Or Within Five Miles Of New Orleans International Airport, 1966-1976
2.2-15  Vessel Casualties On The Mississippi River Between New Orleans And Baton Rouge Fiscal Years 1969-1971
2.2-16  Time and Drafts Of Vessels Mississippi River - Baton Rouge, La.,
But Not Including New Orleans, La., 1970
2.2-17  Rail, Truck And Barge Accident Probability
2.2-18  Centerline Concentrations For Methane Plume Of 67 LBM/Sec Source,    Stability Class F, Wind Speed 2.6 Ft./Sec Assuming No Buoyancy 2.2-19  Releases From Ruptured Pipelines
2.2-20  Dimension of Propane Plume Downwind of 325 Ft3/Sec Source    (6 In. LPG Line) Stability Category F, Wind Speed 2.6 Ft/Sec
2.2-21  Dimension of Propane Plume Downwind of 1000 Ft/Sec Source, (8 In. LPG Line) Stability Category F, Wind Speed 2.6 Ft/Sec
2.2-22  Blast And Seismic Parameters For Shock Waves From Propane Detonations (EC-38835, R307) 2.2-23  Dimension Of Methane Plume Downwind Of 2893 Ft3/Sec Source    Stability Category F, Wind Speed 2.6 Ft/Sec. No Buoyancy (EC-38835, R307) 2.2A-1  Toxic Chemicals Lost In Train Derailment 2.2A-2  Chemical Released In Derailment Posing Potential Hazards To Control Room Habitability
2.2A-3  Waterford Steam Electric Station Unit 3 Onsite Meteorological    Data:  1972-1978 Summary of Maximum Persistence Occurrences 2.2A-4  Calculational Assumptions Used in Acrolein Release Analysis 2.3-1  Recurrence Interval And Wind Speed (Fastest Mile) At New Orleans, Louisiana (At 30 Ft.)
2.3-2  Fastest Mile Wind Speed And Wind Direction New Orleans, Louisiana WSES-FSAR-UNIT-3  2-vii  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-2(a)  Ultimate Heat Sink Meteorological Design Parameters
2.3-3  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-4  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-5  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-6  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-7  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-8  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-9  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-10  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-11  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-12  New Orleans, La. Moisant International Airport Percentage    Frequencies Of Wind Direction And Speed
2.3-13  New Orleans, La. Moisant International Airport Percentage    Frequencies of Wind Direction and Speed
2.3-14  New Orleans, La. Moisant International Airport Percentage    Frequencies of Wind Direction and Speed
2.3-15  New Orleans, La. Moisant International Airport Percentage    Frequencies of Wind Direction and Speed
2.3-15a  New Orleans, La. Moisant International Airport Percentage    Frequencies of Wind Direction and Speed
2.3-16  [Wind Rose Data for January] 1973-1975 and 1978 at Waterford 3 Site 2734. Observations
WSES-FSAR-UNIT-3  2-viii  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-17  [Wind Rose Data for February] 1973-1975 and 1977-1978 at Waterford 3 Site 2585. Observations
2.3-18  [Wind Rose Data for March] 1973-1975 and 1977 at Waterford 3 Site 2706. Observations
2.3-19  [Wind Rose Data for April] 1973-1975 and 1977 at Waterford 3 Site 2751. Observations
2.3-20  [Wind Rose Data for May] 1973-1975 and 1977 at Waterford 3 Site 2790. Observations
2.3-21  [Wind Rose Data for June] 1973-1975 and 1977 at Waterford 3 Site 2716. Observations
2.3-22  [Wind Rose Data for July] 1972-1974 and 1977 at Waterford 3 Site 2886. Observations
2.3-23  [Wind Rose Data for August] 1972-1974 and 1977 at Waterford 3 Site 2746. Observations
2.3-24  [Wind Rose Data for September] 1972-1974 and 1977 at Waterford 3 Site 2616. Observations
2.3-25  [Wind Rose Data for October] 1972-1974 and 1977 at Waterford 3 Site 2647. Observations
2.3-26  [Wind Rose Data for November] 1972-1974 and 1977 at Waterford 3 Site 2731. Observations
2.3-27  [Wind Rose Data for December] 1972-1974 and 1977 at Waterford 3 Site 2843. Observations
2.3-28  Annual Wind Rose Data for July 1972-June 1975 and February 1977-February 1978 at Waterford 3 Site 32751. Observations
2.3-29  Average Monthly And Annual Temperature For Selected Stations In    The New Orleans Areas (1931-1960)
2.3-30  Mean Monthly And Annual Maximum, Minimum, Average Temperatures    Moisant International Airport (1931-1960)
2.3-31  Temperature Extremes, Moisant International Airport, New Orleans,    Louisiana
2.3-32  Average Monthly Occurrences Of Extreme Temperatures Moisant    International Airport, New Orleans, Louisiana (1947-1972)
WSES-FSAR-UNIT-3  2-ix  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-33  Mean Monthly And Annual Maximum, Minimum And Average Temperatures    Waterford Nuclear Unit 3 On Site Data (July 1972-June 1975 And February 1977-February 1978)
2.3-34  Mean Relative Humidity And Number Of Days With Heavy Fog Moisant    International Airport, New Orleans, Louisiana (1949-1972)
2.3-35  Average Monthly And Annual Precipitation For Selected Stations    In The New Orleans Areas (1931-1960)
2.3-36  Extreme Monthly And Daily Precipitation (Inches) (1947-1972)    And Mean Number Of Days With Rain (1947-1972) Moisant International Airport, New Orleans, Louisiana
2.3-37  Maximum Short Period Precipitation (Inches) Audubon Station,    New Orleans, Louisiana (1889-1969)
2.3-38  Number Of Precipitation Occurrences By Hour Of Day For    Moisant International Airport (1951-1960)
2.3-39  Annual And Seasonal Percentage Frequency Of Surface Wind    Direction During Precipitation Naval Air Station-New Orleans,    Louisiana, (1949-1965)
2.3-40  Percent Frequency Of Onsite Stability Classes July 1972 -
June 1975 And February 1977 - February 1978
2.3-41  Seasonal And Annual Average Morning And Afternoon Mixing    Heights Waterford Area
2.3-42  Wind Distribution By Stability Class At Waterford 3,    January Class A
2.3-43  Wind Distribution By Stability Class At Waterford 3,    January Class B
2.3-44  Wind Distribution By Stability Class At Waterford 3,    January Class C
2.3-45  Wind Distribution By Stability Class At Waterford 3,    January Class D
2.3-46  Wind Distribution By Stability Class At Waterford 3,    January Class E
2.3-47  Wind Distribution By Stability Class At Waterford 3,    January Class F WSES-FSAR-UNIT-3  2-x  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-48  Wind Distribution By Stability Class At Waterford 3,    January Class G
2.3-49  Wind Distribution By Stability Class At Waterford 3,    February Class A
2.3-50  Wind Distribution By Stability Class At Waterford 3,    February Class B
2.3-51  Wind Distribution By Stability Class At Waterford 3,    February Class C
2.3-52  Wind Distribution By Stability Class At Waterford 3,    February Class D
2.3-53  Wind Distribution By Stability Class At Waterford 3,    February Class E
2.3-54  Wind Distribution By Stability Class At Waterford 3,    February Class F
2.3-55  Wind Distribution By Stability Class At Waterford 3,    February Class G
2.3-56  Wind Distribution By Stability Class At Waterford 3,    March Class A
2.3-57  Wind Distribution By Stability Class At Waterford 3,    March Class B
2.3-58  Wind Distribution By Stability Class At Waterford 3,    March Class C
2.3-59  Wind Distribution By Stability Class At Waterford 3,    March Class D
2.3-60  Wind Distribution By Stability Class At Waterford 3,    March Class E
2.3-61  Wind Distribution By Stability Class At Waterford 3,    March Class F
2.3-62  Wind Distribution By Stability Class At Waterford 3,    March Class G
2.3-63  Wind Distribution By Stability Class At Waterford 3,    April Class A WSES-FSAR-UNIT-3  2-xi  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-64  Wind Distribution By Stability Class At Waterford 3,    April Class B
2.3-65  Wind Distribution By Stability Class At Waterford 3,    April Class C
2.3-66  Wind Distribution By Stability Class At Waterford 3,    April Class D
2.3-67  Wind Distribution By Stability Class At Waterford 3,    April Class E
2.3-68  Wind Distribution By Stability Class At Waterford 3,    April Class F
2.3-69  Wind Distribution By Stability Class At Waterford 3,    April Class G
2.3-70  Wind Distribution By Stability Class At Waterford 3,    May Class A
2.3-71  Wind Distribution By Stability Class At Waterford 3,    May Class B
2.3-72  Wind Distribution By Stability Class At Waterford 3,    May Class C
2.3-73  Wind Distribution By Stability Class At Waterford 3,    May Class D
2.3-74  Wind Distribution By Stability Class AT Waterford 3,    May Class E
2.3-75  Wind Distribution By Stability Class AT Waterford 3,    May Class F
2.3-76  Wind Distribution By Stability Class At Waterford 3,    May Class G
2.3-77  Wind Distribution By Stability Class At Waterford 3,    June Class A
2.3-78  Wind Distribution By Stability Class At Waterford 3,    June Class B
2.3-79  Wind Distribution By Stability Class At Waterford 3,    June Class C WSES-FSAR-UNIT-3  2-xii  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-80  Wind Distribution By Stability Class At Waterford 3,    June Class D
2.3-81  Wind Distribution By Stability Class At Waterford 3,    June Class E
2.3-82  Wind Distribution By Stability Class At Waterford 3,    June Class F
2.3-83  Wind Distribution By Stability Class At Waterford 3,    June Class G
2.3-84  Wind Distribution By Stability Class At Waterford 3,    July Class A
2.3-85  Wind Distribution By Stability Class At Waterford 3,    July Class B
2.3-86  Wind Distribution By Stability Class At Waterford 3,    July Class C
2.3-87  Wind Distribution By Stability Class At Waterford 3,    July Class D
2.3-88  Wind Distribution By Stability Class At Waterford 3,    July Class E
2.3-89  Wind Distribution By Stability Class At Waterford 3,    July Class F
2.3-90  Wind Distribution By Stability Class At Waterford 3,    July Class G
2.3-91  Wind Distribution By Stability Class At Waterford 3,    August Class A
2.3-92  Wind Distribution By Stability Class At Waterford 3,    August Class B
2.3-93  Wind Distribution By Stability Class At Waterford 3,    August Class C
2.3-94  Wind Distribution By Stability Class At Waterford 3,    August Class D
2.3-95  Wind Distribution By Stability Class At Waterford 3,    August Class E WSES-FSAR-UNIT-3  2-xiii  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-96  Wind Distribution By Stability Class At Waterford 3,    August Class F
2.3-97  Wind Distribution By Stability Class At Waterford 3,    August Class G
2.3-98  Wind Distribution By Stability Class At Waterford 3,    September Class A
2.3-99  Wind Distribution By Stability Class At Waterford 3,    September Class B
2.3-100  Wind Distribution By Stability Class At Waterford 3,    September Class C
2.3-101  Wind Distribution By Stability Class At Waterford 3,    September Class D
2.3-102  Wind Distribution By Stability Class At Waterford 3,    September Class E
2.3-103  Wind Distribution By Stability Class At Waterford 3,    September Class F
2.3-104  Wind Distribution By Stability Class At Waterford 3,    September Class G
2.3-105  Wind Distribution By Stability Class At Waterford 3,    October Class A
2.3-106  Wind Distribution By Stability Class AT Waterford 3,    October Class B
2.3-107  Wind Distribution By Stability Class At Waterford 3,    October Class C
2.3-108  Wind Distribution By Stability Class At Waterford 3,    October Class D
2.3-109  Wind Distribution By Stability Class At Waterford 3,    October Class E
2.3-110  Wind Distribution By Stability Class At Waterford 3,    October Class F
2.3-111  Wind Distribution By Stability Class At Waterford 3,    October Class G WSES-FSAR-UNIT-3  2-xiv  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-112  Wind Distribution By Stability Class At Waterford 3,    November Class A
2.3-113  Wind Distribution By Stability Class At Waterford 3,    November Class B
2.3-114  Wind Distribution By Stability Class At Waterford 3,    November Class C
2.3-115  Wind Distribution By Stability Class At Waterford 3,    November Class D
2.3-116  Wind Distribution By Stability Class At Waterford 3,    November Class E
2.3-117  Wind Distribution By Stability Class At Waterford 3,    November Class F
2.3-118  Wind Distribution By Stability Class At Waterford 3,    November Class G
2.3-119  Wind Distribution By Stability Class At Waterford 3,    December Class A
2.3-120  Wind Distribution By Stability Class At Waterford 3,    December Class B
2.3-121  Wind Distribution By Stability Class At Waterford 3,    December Class C
2.3-122  Wind Distribution By Stability Class At Waterford 3,    December Class D
2.3-123  Wind Distribution By Stability Class At Waterford 3,    December Class E
2.3-124  Wind Distribution By Stability Class At Waterford 3,    December Class F
2.3-125  Wind Distribution By Stability Class At Waterford 3,    December Class G
2.3-126  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class A
2.3-127  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class B WSES-FSAR-UNIT-3  2-xv Revision 14 (12/05) CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.3-128  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class C
2.3-129  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class D
2.3-130  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class E
2.3-131  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class F
2.3-132  Wind Distribution By Stability Class At Waterford 3,    Annual Total, Class G
2.3-133  Average Monthly Data Recovery, Waterford Onsite Meteorological Monitoring Program (July 1972-June 1975 and February 1977-February 1978)
2.3-134  Waterford SES-Unit 3 Annual Average Dilution Factors (July 1972-    June 1975 and February 1977-February 1978)
2.3-135  Waterford SES-Unit 3 Annual Average Dilution Factors At The Minimum Site Boundary (914m) (July 1972-June 1975 and February 1977-February 1978)
(DRN 03-2055, R14) 2.3-136  Waterford SES-Unit 3 Short-term (Accident) Dilution  Factors (Sec/m3) (1997-2001) (DRN 03-2055, R14) 2.3-137  Storms in Excess of 50 MPH Since 1963 2.3-138  Waterford Onsite Meteorological Monitoring System
2.3-139  Summary of Meteorological Monitoring Program Parameters Measured At Primary And Backup Systems (DRN 01-156, R11-A) 2.3-140  DELETED (DRN 01-156, R11-A) 2.3-141  Waterford Operational Meteorological Monitoring System    Accuracies
2.4-1  Municipal Water Intakes Downstream Of Waterford 3 Discharge (River Mile 129.6)
2.4-2  Flood-Crest Elevation Near The Waterford Site WSES-FSAR-UNIT-3  2-xvi Revision 11 (05/01) CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.4-3  Maximum Discharges for 1973 Flood
2.4-4  Original And Adjusted Project Design Flood Flow Lines
2.4-5  Streamflow In The Mississippi River 1900-1976 (DRN 99-2493) 2.4-6  DELETED 2.4-6a  DELETED
2.4-6b  DELETED
2.4-6c  DELETED (DRN 99-2493) 2.4-7  Hypothetical Flood Peaks On The Mississippi And    Atchafalaya Rivers
2.4-8  Computations Of Static And Dynamic Head Following Levee    Failure
2.4-9  Computations Of Static And Dynamic Head 2.4-10  Probable Maximum Hurricane Parameters Zone B - Mile 660 -
New Orleans, Louisiana
2.4-10a  Comparison Of Hurricane Surge Computations For South Pass    Approach
2.4-11  Continental Shelf Profiles For Open Coast Surge Computations 2.4-12  Frequency Analysis Of Mississippi River Discharge Charge At    Tarbert Landing
2.4-13  Water Well And Test Hole Data For St. Charles Parish
2.4-14  Local Detailed Well Survey
2.4-15  Groundwater Quality At Site
2.5-1  Approximate Periods Of Movements Along Growth Faults In Louisiana
2.5-2  Oil Well Logs Used In Structural Correlations
2.5-3  Tonal Anomalies And Linear Trends In The Site Area WSES-FSAR-UNIT-3  2-xvii  CHAPTER 2  LIST OF TABLES (Cont'd)
Table      Title
2.5-4  Utilized Southern Louisiana Salt Domes
2.5-5  Salt Domes Near Waterford Site
2.5-6  Listing Of Historic Earthquakes In Order Of Distance From    Waterford Site
2.5-7  Listing Of Historic Earthquakes In Order Of Decreasing    Intensity
2.5-8  Listing Of Historic Earthquakes In Chronological Order
2.5-9  Summary Of Intensity Data Concerning The New Madrid Series,    Donaldsonville Earthquake, Gulfport Earthquake, And Baton    Rouge Earthquake
2.5-10  Results From Parametric Study Of Seismic Wave Transmission Characteristics
2.5-11  Results From Parametric Study Of Seismic Wave Transmission Characteristics
2.5-12  Pleistocene Soil Strata Zones
2.5-13  Unified Soil Classifications
2.5-14  Properties Of Subsurface Materials Design Values
2.5-15  Compacted Class A Backfill Index Properties Test Results 2.5-16  Monitoring Point Locations
2.5A-1  Laboratory Test Summary Table
2.5A-2  Summary Of Laboratory Permeability Tests
2.5A-3  Coefficient Of Permeability Computed From Consolidation Data
2.5A-4  Summary Of Organic Content Data
2.5A  Notes On Tables
WSES-FSAR-UNIT-3  2-xviii  SITE CHARACTERISTICS  CHAPTER 2  LIST OF FIGURES Figure      Title
2.1-1  THE REGION WITHIN 50 MILES OF WATERFORD 3
2.1-2  THE AREA WITHIN 5 MILES OF WATERFORD 3
2.1-3  WATERFORD 3 SITE AND NEARBY STRUCTURES
2.1-4  EFFLUENT RELEASE POINTS AND RESTRICTED AREA BOUNDARY
2.1-4a  WATERFORD 3 SITE EXCLUSION ZONE AND PROPERTY BOUNDARY 2.1-5  1977 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-6  1980 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-7  1981 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-8  1990 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-9  2000 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-10  2010 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-11  2020 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-12  2030 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-13  THE REGION WITHIN 10 MILES OF WATERFORD 3
2.1-14  1977 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-15  1980 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-16  1981 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-17  1990 RESIDENT POPULATION WITHIN  50 MILES OF WATERFORD 3 2.1-18  2000 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-19  2010 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-20  2020 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-21  2030 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-22  1977 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 WSES-FSAR-UNIT-3  2-xix Revision 307 (07/13) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.1-23  1980 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-24  1981 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-25  1990 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-26  2000 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-27  2010 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-28  2020 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-29  2030 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-30  RECREATIONAL FACILITIES WITHIN 10 MILES OF WATERFORD 3 2.1-31  TRANSPORTATION NETWORK WITHIN 10 MILES OF WATERFORD 3
2.1-32  MAJOR INDUSTRIAL PROPERTIES WITHIN 10 MILES OF WATERFORD 3 2.1-33  LOW POPULATION ZONE CULTURAL FEATURES
2.1-34  LOW POPULATION ZONE 1977 PEAK POPULATION DISTRIBUTION 2.2-1  MAJOR INDUSTRIES AND OIL AND GAS FIELDS WITHIN 5 MILES OF    WATERFORD 3
2.2-2  TRANSPORTATION FACILITIES WITHIN 5 MILES OF WATERFORD 3 (EC-5000082218, R301) 2.2-3  DELETED (EC-39014, R307) 2.2-3A  PIPELINES OF ACADIAN & EVANGELINE IN VICINITY OF WATERFORD 3 2.2-3B  PIPELINES OF AIR PRODUCTS & NUSTAR IN WATERFORD 3 VICINITY 2.2-3C  PIPELINES OF CHEVRON & BRIDGELINE IN VICNITY OF WATERFORD 3 (EC-39014, R307) 2.2-3D  PIPELINES OF ENTERPRISE PRODUCTS OPERATING CO. IN VICINITY OF    WATERFORD 3  2.2-3E  PIPELINES OF GULF SOUTH PIPELINE IN VICINITY OF WATERFORD 3 (EC-5000082218, R301) (EC-39014, R307) 2.2-3F  PIPELINES OF SHELL OIL & DCP MIDSTREAM IN VICINITY OF WATERFORD 3  2.2-3G  PIPELINES OF UCAR IN VICINITY OF WATERFORD 3 (EC-39014, R307) 2.2-4  AIRPORTS AND LOW ALTITUDE FEDERAL AIRWAYS IN THE VICINITY OF    WATERFORD 3  2.2-5  FIGURE NUMBER NOT USED  2.2-5A  LANDING AND APPROACH PATHS, NEW ORLEANS INTERNATIONAL AIRPORT  2.2-5B  LANDING AND APPROACH PATHS, NEW ORLEANS INTERNATIONAL AIRPORT WSES-FSAR-UNIT-3  2-xx Revision 301 (09/07) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.2-6  AIR ALERT ZONE IN THE VICINITY OF WATERFORD 3  2.2-7  OVERPRESSURE VS. SCALED RANGE FOR SURFACE BURST  2.2-8  DETONABLE CLOUD FOR 6" TEXACO LPG LINE 2.2-9  DETONABLE CLOUD FOR 8" UNION CARBIDE LINE
2.2-10  BLAST WAVE PARAMETER VS. SCALED DISTANCE  2.2-11  ENTRAINMENT COEFFICIENT  VS. DENSIMETRIC FROUDE NO. (FROM    REFERENCE 20)
2.2-12  100 LB/SEC BREAK GRAVITY SLUMPING MODEL RESULTS 2.2-13  VOLUME DISTANCE OF 100 LB/SEC SOURCE OF WIDTH L GIVING 2.4%    CONCENTRATION 2.2-14  LATERAL DIFFUSION, Y, VS. DOWNWIND DISTANCE FROM SOURCE FOR    PASQUILL'S TURBULENCE TYPES (SOURCE:  REF. 71)
2.2-15  FAMILY OF HUGONIOT CURVES CORRESPONDING TO ZERO & 100 PERCENT REACTION OF STOICHIOMETRIC PROPANE AND AIR
2.2-16  OVERPRESSURES GENERATED BY DEFLAGRATIONS OF PROPANE AND    HYDROGEN OXYGEN AND AIR MIXTURES
2.2-17  QUADRATIC REGRESSION LINE MAXIMUM DEBRIS DISTANCE VS. EQUIVALENT YIELD
2.2A-1  TOPOGRAPHIC MAP OF SITE AND VICINITY
2.2A-2  PERSISTENCE OF CALMS
2.2A-3  CONDITIONAL PROBABILITY OF EXCEEDING DISTANCE FROM TRACK    FOLLOWING A FREIGHT TRAIN DERAILMENT
2.2A-4  PROBABILITY OF OCCURRENCE OF POOLS OR CLOUDS OF GIVEN    DIMENSION  - THAT MIGHT IGNITE AND CAUSE FIRES/EXPLOSIONS    (GIVEN A SPILL HAS OCCURRED)
2.2A-5  FLAME HEIGHT VS. SIZE OF FIRE
2.2A-6  PROBABILITY OF MISSILES REACHING A DISTANCE FROM ACCIDENT    LOCATION
2.2A-7  QUADRATIC REGRESSION LINE MAXIMUM DEBRIS DISTANCE VS. EQUIVALENT YIELD
2.2A-8  ACROLEIN CONCENTRATION VS. TIME 2.3-1  JANUARY WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA WSES-FSAR-UNIT-3  2-xxi Revision 301 (09/07) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.3-2  FEBRUARY WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA
2.3-3  MARCH WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS,    LOUISIANA
2.3-4  APRIL WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS,    LOUISIANA
2.3-5  MAY WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS,    LOUISIANA
2.3-6  JUNE WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS,    LOUISIANA
2.3-7  JULY WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS,    LOUISIANA
2.3-8  AUGUST WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA
2.3-9  SEPTEMBER WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA
2.3-10  OCTOBER WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA
2.3-11  NOVEMBER WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA  2.3-12  DECEMBER WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA  2.3-13  ANNUAL WIND ROSE MOISANT INTERNATIONAL AIRPORT,    NEW ORLEANS, LOUISIANA  2.3-14  ON-SITE WIND ROSE - JANUARY 1973-1975 & 1978  2.3-15  ON-SITE WIND ROSE - FEBRUARY 1973-1975 & 1977-1978  2.3-16  ON-SITE WIND ROSE - MARCH 1973-1975 & 1977  2.3-17  ON-SITE WIND ROSE - APRIL 1973-1975 & 1977
2.3-18  ON-SITE WIND ROSE - MAY 1973-1975 & 1977
2.3-19  ON-SITE WIND ROSE - JUNE 1973-1975 & 1977
2.3-20  ON-SITE WIND ROSE - JULY 1972-1974 & 1977 WSES-FSAR-UNIT-3  2-xxii  CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.3-21  ON-SITE WIND ROSE - AUGUST 1972-1974 & 1977
2.3-22  ON-SITE WIND ROSE - SEPTEMBER 1972-1974 & 1977
2.3-23  ON-SITE WIND ROSE - OCTOBER 1972-1974 & 1977
2.3-24  ON-SITE WIND ROSE - NOVEMBER 1972-1974 & 1977
2.3-25  ON-SITE WIND ROSE - DECEMBER 1972-1974 & 1977
2.3-26  ON-SITE WIND ROSE - ANNUAL 1972-1975 & 1977-78
2.3-27  FIGURE NUMBER NOT USED
2.3-27a  MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM    CENTERLINE OF PLANT (SHEET 1 OF 4)
2.3-27b  MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM    CENTERLINE OF PLANT (SHEET 2 OF 4)
2.3-27c  MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM    CENTERLINE OF PLANT (SHEET 3 OF 4)
2.3-27d  MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM    CENTERLINE OF PLANT (SHEET 4 OF 4)
2.3-28  TOPOGRAPHIC FEATURES WITHIN 5 MILES OF SITE 2.3-29  LOCATION OF METEOROLOGICAL TOWER
2.3-30  W1034 LOW THRESHOLD RECORDING WIND SYSTEM
2.3-31  W1034 LOW THRESHOLD RECORDING WIND SYSTEM
2.3-32  W1034 LOW THRESHOLD RECORDING WIND SYSTEM
2.3-33  SPECIFICATIONS FOR THE GILL ANEMOMETER BIVANE -    MODEL NO. 21001
2.3-34  PHOTOGRAPH OF THE GILL ANEMOMETER BIVANE - MODEL NO. 21002 2.3-35  SPECIFICATION OF THE W101-P SKYVANE I WIND SENSOR 2.3-36  PHOTOGRAPH OF THE W101-P SKYVANE I WIND SENSOR 2.3-37  SPECIFICATIONS OF THE M731 DIGITAL DATA LOGGER
2.3-38  PHOTOGRAPH OF THE M731 DIGITAL DATA LOGGER WSES-FSAR-UNIT-3  2-xxiii Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.3-39  HORIZONTAL DISPERSION COEFFICIENTS
2.3-40  VERTICAL DISPERSION COEFFICIENTS
2.3-41  DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF    X/Q AT THE MIN. SITE BOUNDARY - JULY 1972 - JUNE 1975 & FEB 1977-FEB 1978 - 1 HOUR PERIOD 
2.3-42  DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF    X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE - JULY 1972-JUNE 1975 & FEB 1977 - FEB 1978 - 8 HOUR PERIOD
2.3-43  DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF    X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE - JULY 1972-JUNE 1975 & FEB 1972 - FEB 1978 - 16 HOUR PERIOD
2.3-44  DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF    X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE - JULY 1972-JUNE 1975 & FEB 1972 - FEB 1978 - 3 DAY PERIOD
2.3-45  DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF    X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE JULY 1972-JUNE 1975 & FEB 1972 - FEB 1978 - 26 DAY PERIOD
2.3-46  DIAGRAM OF PRIMARY METEOROLOGICAL TOWER COMPOUND  2.3-47  LOCATIONS OF PRIMARY AND BACKUP METEOROLOGICAL    MONITORING SYSTEMS (DRN 03-2055, R14) 2.3-48  SOURCE AND RECEPTOR LOCATIONS FOR CONTROL ROOM  ATMOSPHERIC DISPERSION CALCULATIONS (DRN 03-2055, R14) 2.4-1  TOPOGRAPHIC MAP OF SITE AND VICINITY  2.4-2  REGIONAL HYDROGRAPHIC FEATURES 2.4-3  FLOOD CONTROL SCHEME IN THE LOWER MISSISSIPPI RIVER 2.4-4  COMPARISON BETWEEN 1973 FLOOD DISCHARGE & PDF DISCHARGE 2.4-5  SURFACE AND GROUNDWATER PUMPAGE TRENDS FOR ST. CHARLES PARISH
2.4-6  STAGE HYDROGRAPH AT RED RIVER LANDING, LA.
2.4-7  FLOOD FREQUENCY AT TARBERT LANDING AND BATON ROUGE, MISS. RIVER BY LOG-PEARSON TYPE III DISTRIBUTION  2.4-8  ROOF DRAINAGE 2.4-9  DETERMINATION OF MANNING ROUGHNESS COEFFICIENT WSES-FSAR-UNIT-3  2-xxiv Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.4-10  PROJECT DESIGN FLOOD FLOW LINE FROM VENICE TO NEW ORLEANS 2.4-11  BONNET CARRE' SPILLWAY OPERATION
2.4-12  PROJECT DESIGN FLOOD FLOW LINE AND LEVEE DESIGN GRADE 2.4-13  FLOOD STAGE - DISCHARGE CURVE AT WATERFORD SITE
2.4-14  COMPUTED RIVER PROFILE WITH FULL LEVEE DISCHARGE 2.4-15  DELETED
2.4-16  DELETED
2.4-17  DELETED
2.4-18  DELETED
2.4-19  DELETED
2.4-20  WATERFORD 3-SITE AREA
2.4-21  WATER PROFILE UNDER SUDDEN LEVEE FAILURE CONDITION 2.4-22  CRITICAL PMH PATHS
2.4-23  OPEN COAST SURGE HYDROGRAPH MOUTH OF MISSISSIPPI RIVER 2.4-24  EFFECT OF PMH SURGE ON RIVER STAGE PROFILE
2.4-25  OPEN COAST SURGE MAXIMUM FLOOD LEVELS
2.4-26  FLOW DURATION CURVE AT SITE
2.4-27  PEAK CONCENTRATION VS. DOWNSTREAM DISTANCE
2.4-28  LOCATION MAP OF GROUNDWATER REGION, SITE AREA, AND SITE 2.4-29  POINT BAR DEPOSITS OF MISSISSIPPI RIVER 2.4-30  CONFIGURATION OF THE TOP OF THE GRAMERCY AQUIFER
2.4-31  CONFIGURATION OF THE TOP OF THE NORCO AQUIFER
2.4-32  CONFIGURATION OF THE TOP OF THE GONZALES - NEW ORLEANS    AQUIFER
2.4-33  GENERALIZED CROSS-SECTION THROUGH WATERFORD SITE WSES-FSAR-UNIT-3  2-xxv Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.4-34  CONFIGURATION OF THE POTENTIOMETRIC SURFACE IN THE GRAMERCY    AQUIFER, FALL 1960
2.4-35  CONFIGURATION OF THE POTENTIOMETRIC SURFACE IN THE NORCO    AQUIFER, FALL 1965
2.4-36  WATER LEVEL AND PUMPAGE NORCO AQUIFER AT NORCO
2.4-37  CONFIGURATION OF THE POTENTIOMETRIC SURFACE IN THE GONZALES-  NEW ORLEANS AQUIFER, FALL 1965
2.4-38  WATER LEVELS IN GONZALES - NEW ORLEANS AQUIFER
2.4-39  WATER WELLS AND TEST HOLES IN SITE AREA
2.4-40  AREA OF DETAILED WELL SURVEY
2.4-41  AVERAGE MONTHLY GROUND WATER REQUIREMENTS FOR ST. JAMES, ST. CHARLES AND ST. JOHN THE BAPTIST PARISHES; 1970 - 2020
2.4-42  PIEZOMETRIC SURFACE IN E1 - 77 FT. SAND
2.4-43  ASSUMED PIEZOMETRIC SURFACE IN RECENT MATERIAL 2.5-1  SITE LOCATION MAP
2.5-2  REGIONAL PHYSIOGRAPHIC MAP (LAND)
2.5-3  REGIONAL PHYSIOGRAPHIC (SUBMARINE) 2.5-4  DELTAS OF THE MISSISSIPPI RIVER
2.5-5  GENERALIZED REGIONAL CROSS SECTIONS
2.5-6  REGIONAL STRATIGRAPHIC COLUMN
2.5-7  REGIONAL SURFICIAL GEOLOGY MAP GULF COASTAL PLAIN
2.5-8  SALT BASIN LOCATIONS (GENERALIZED)
2.5-9  GENERALIZED REGIONAL GROSS-SECTIONS 2.5-10  REGIONAL STRUCTURE MAP
2.5-11  REGIONAL BOUGUER GRAVITY ANOMALY MAP
2.5-12  VACHERIE FISSURE WSES-FSAR-UNIT-3  2-xxvi Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-13  FISK'S FEATURES OF THE DELTAIC PLAIN
2.5-14  WATERFORD SITE BOUNDARIES
2.5-15  TOPOGRAPHIC MAP OF SITE AND VICINITY
2.5-16  SURFACE GEOLOGY IN THE SITE AREA
2.5-17  EXAMPLE PETROLEUM TEST WELL ELECTRIC LOG SHOWING SITE    AREA STRATIGRAPHY AND MARKER HORIZONS
2.5-18  OIL AND GAS TEST WELLS USED IN SITE STRUCTURE STUDY
2.5-19  FAULT SURFACES IN THE SITE AREA
2.5-20  SITE STRUCTURE - HORIZON 1 FROM ELECTRIC LOG SIGNATURE
2.5-21  SITE STRUCTURE - HORIZON 2 FROM ELECTRIC LOG SIGNATURE
2.5-22  SITE STRUCTURE - HORIZON 3 FROM ELECTRIC LOG SIGNATURE (LOWEST DATUM WITHOUT FAULTING)
2.5-23  SITE STRUCTURE - HORIZON 4 FROM ELECTRIC LOG SIGNATURE (HIGHEST DATUM WHICH REFLECTS FAULTING PATTERN)
2.5-24  SITE STRUCTURE - HORIZON 5 FROM ELECTRIC LOG SIGNATURE (RIDGEFIELD SAND)
2.5-25  SITE STRUCTURAL CROSS SECTION A
2.5-26  SITE STRUCTURAL CROSS SECTION B
2.5-27  SITE STRUCTURAL CROSS SECTION C
2.5-27a  SITE STRUCTURAL CROSS-SECTION D
2.5-27b  SITE STRUCTURAL CROSS-SECTION E
2.5-28  GEOLOGIC SECTION X-X'
2.5-29  GEOLOGIC SECTION Y-Y'
2.5-30  GEOLOGIC MAP OF WATERFORD 3 EXCAVATION
2.5-30a  TOP OF PLEISTOCENE CONTOUR MAP
2.5-30b  TOP OF PLEISTOCENE STUDY SECTION 1-1
WSES-FSAR-UNIT-3  2-xxvii Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-30c  TOP OF PLEISTOCENE STUDY SECTION 2-2
2.5-30d  TOP OF PLEISTOCENE STUDY SECTION 3-3
2.5-30e  TOP OF PLEISTOCENE STUDY SECTION 4-4
2.5-30f  LOCATION MAP FOR CROSS-SECTION 5-5
2.5-30g  CROSS-SECTION 5-5
2.5-31  TONAL ANOMALIES & LINEAR TRENDS IN THE SITE AREA 2.5-31a  ELEVATION OF TOP OF PLEISTOCENE DEPOSITS 2.5-32  FIGURE NUMBER NOT USED (DRN 01-360) 2.5-32a  ELECTRIC LOG BORING TEST NO. B-3*
2.5-32b  ELECTRIC LOG COMPANY BORE TEST NO. B-5*
2.5-32c  ELECTRIC LOG COMPANY NO. B-7*
2.5-32d  ELECTRIC LOG BORING COMPANY NO. 41*
2.5-32e  ELECTRICAL LOG BORING NO. 42*
2.5-32f  ELECTRICAL LOG BORING NO. 26* (DRN 01-360) 2.5-33  SITE BORING PLAN 2.5-34  TIME - DISTANCE PLOT FOR FIGURE 27 SEISMIC TRAVERSE A-A'
2.5-35  SEISMIC TRAVERSE A-A'
2.5-36  SEISMIC TRAVERSE B-B'
2.5-37  SEISMIC TRAVERSE C-C'
2.5-38  SEISMIC TRAVERSE D-D' (DRN 01-360)
* Figures 2.5-32(a) through 2.5-32(f) are classified as historical pursuant to Waterford 3 Site  Procedure W4.504 and Nuclear Energy Institute (NEI) 98-03. The figures have been physically removed from the UFSAR. However, the figures are incorporated by reference, and thus they continue to be a part of the UFSAR. These figures are available for references and use in Document Control, and they may be found as record ER-W3-01-0268-00-00 / DRN 01-360. (DRN 01-360)
WSES-FSAR-UNIT-3  2-xxviii Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-39  OIL & GAS PRODUCTION IN THE SITE AREA
2.5-40  CHANGE IN BENCHMARK ELEVATIONS 1938-1964
2.5-41  BENCHMARK LOCATION MAP SHOWING OIL AND GAS PRODUCTION NEAR    MISSISSIPPI RIVER
2.5-42  HISTORIC EARTHQUAKE EPICENTERS WITH PROVINCES OF UNIQUE    CRUSTAL PATTERNS, GEOLOGIC HISTORY AND EARTHQUAKE HISTORY 2.5-42a  SEISMIC REFLECTION COVERAGE MAP
2.5-43  USC & GS ISOSEISMAL MAP OF DONALDSONVILLE EARTHQUAKE -
OCTOBER 19, 1930
2.5-44  WATERFORD SITE INTENSITY ACCELERATION RELATIONSHIP 2.5-45  SYNTHETIC EARTHQUAKE TIME - HISTORY 2.5-46  VACHERIE FISSURE DISPLACEMENT ACROSS FURROW
2.5-47  VACHERIE FISSURE SHAPE OF FISSURE
2.5-48  BORING PLOT PLAN
2.5-49  BORING PROFILE A-A'
2.5-50  BORING PROFILE B-B' & C-C'
2.5-51  BORING PROFILE D-D'
2.5-52  BORING PROFILE E-E' & F-F'
2.5-53  GRAIN SIZE DISTRIBUTION SUMMARY CURVE GRADE TO -40 FT. MSL 2.5-54  GRAIN SIZE DISTRIBUTION SUMMARY CURVE -40 FT. MSL TO -77 FT. MSL 2.5-55  GRAIN SIZE DISTRIBUTION SUMMARY CURVE -77 FT. MSL TO -92 FT. MSL 2.5-56  GRAIN SIZE DISTRIBUTION SUMMARY CURVE -92 FT. MSL TO -108 FT. MSL 2.5-57  GRAIN SIZE DISTRIBUTION SUMMARY CURVE -108 FT. MSL TO -116 FT. MSL 2.5-58  GRAIN SIZE DISTRIBUTION SUMMARY CURVE -127 FT. MSL TO -317 FT. MSL 2.5-59  GRAIN SIZE DISTRIBUTION SUMMARY CURVE -317 FT. MSL TO -500 FT. MSL WSES-FSAR-UNIT-3  2-xxix Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-60  LIQUID LIMIT VS. PLASTICITY INDEX GRADE TO -40 FT. MSL (RECENT    MATERIAL)
2.5-61  LIQUID LIMIT VS. PLASTICITY INDEX -40 FT. MSL TO -77 FT. MSL 2.5-62  LIQUID LIMIT VS. PLASTICITY INDEX -92 FT. MSL TO -108 FT. MSL 2.5-63  LIQUID LIMIT VS. PLASTICITY INDEX - 108 FT. MSL TO -116 FT. MSL 2.5-64  LIQUID LIMIT VS. PLASTICITY INDEX -116 FT. MSL TO -127 FT. MSL 2.5-65  LIQUID LIMIT VS. PLASTICITY INDEX -127 FT. MSL TO -317 FT. MSL 2.5-66  UNCONFINED COMPRESSIVE STRENGTH AND COHESION VS. DEPTH 2.5-67  UNCONSOLIDATED UNDRAINED SHEAR STRENGTH GRADE TO -40 FT. MSL    (RECENT MATERIAL)
2.5-68  UNCONSOLIDATED UNDRAINED SHEAR STRENGTH -40 FT. MSL TO -77    FT. MSL
2.5-69  UNCONSOLIDATED UNDRAINED SHEAR STRENGTH -127 FT MSL TO -317    FT MSL
2.5-70  CONSOLIDATED UNDRAINED SHEAR STRENGTH GRADE TO -40 FT. MSL    (RECENT MATERIAL)
2.5-71  CONSOLIDATED UNDRAINED SHEAR STRENGTH -108 FT. MSL TO -116 FT. MSL 2.5-72  DRAINED SHEAR STRENGTH GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5-73  DRAINED SHEAR STRENGTH -77 FT. MSL TO -92 FT. MSL 2.5-74  DRAINED SHEAR STRENGTH - PLEISTOCENE CLAYS 2.5-75  OVERCONSOLIDATION RATIO VS. DEPTH
2.5-76  SEISMIC WAVE VELOCITY & SHEAR MODULUS VS. DEPTH 2.5-77  SHEAR MODULUS & DAMPING VS. STRAIN-RECENT MATERIAL (GRADE    TO -40 FT. MSL)
2.5-78  SHEAR MODULUS & DAMPING VS. STRAIN-UPPER PLEISTOCENE (-40 FT. MSL TO -317 FT. MSL)
2.5-79  SHEAR MODULUS & DAMPING VS. STRAIN-LOWER PLEISTOCENE    (BELOW -317 FT. MSL)
WSES-FSAR-UNIT-3  2-xxx Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-80  GENERALIZED SITE CROSS SECTION
2.5-81  EXCAVATION PLAN
2.5-82  EXCAVATIONS SECTIONS
2.5-83  DEWATERING SYSTEM PLAN
2.5-84  COMPACTED BACKFILL - STATISTICAL STUDY
2.5-85  COMPACTED BACKFILL - DRY DENSITY VS. RELATIVE DENSITY 2.5-86  COMPACTED BACKFILL - COMPACTION CURVE & GRAIN SIZE DISTRIBUTION CURVE
2.5-87  COMPACTED BACKFILL - EARTH PRESSURE COEFFICIENT VS. RADIAL    STRAIN
2.5-88  COMPACTED BACKFILL - ACTIVE - PASSIVE MOHR'S CIRCLE PLOTS
2.5-89  SHEAR MODULUS & DAMPING VS. STRAIN-COMPACTED BACKFILL 2.5-90  CYCLIC SHEAR STRENGTH - COMPACTED BACKFILL
2.5-91  RESPONSE ANALYSIS MODEL
2.5-92  SHEAR STRESS AND ACCELERATION VS. DEPTH
2.5-93  FIGURE NUMBER NOT USED
2.5-93a  GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS
2.5-93b  GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS
2.5-93c  GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS
2.5-93d  GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS
2.5-93e  GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS
2.5-93f  GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS
2.5-94  COMPACTION CURVES FOR -55 FT. MSL MATERIALS
2.5-95  FIGURE NUMBER NOT USED
2.5-95a  GRAIN SIZE ANALYSES OF -77 FT. MSL MATERIALS
WSES-FSAR-UNIT-3  2-xxxi Revision 14 (12/05) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-95b  GRAIN SIZE ANALYSES OF -77 FT. MSL MATERIALS
2.5-95c  GRAIN SIZE ANALYSES OF -77 FT. MSL MATERIALS
2.5-96  CYCLIC SHEAR STRENGTH - IN SITU MATERIAL 2.5-97  LIQUEFACTION POTENTIAL FACTOR OF SAFETY PLOT
2.5-98  GRAIN SIZE AND VOID RATIO COMPARISONS WITH LEE AND FITTON 2.5-99  CYCLIC TEST COMPARISONS WITH LEE AND FITTON
2.5-100  STATIC PRESSURE DIAGRAM
2.5-101  DYNAMIC EARTH PRESSURE DIAGRAM
2.5-102  DESIGN CONCEPT OUTLINE
2.5-103  BEARING PRESSURE HISTORY AT -47 FT. MSL
2.5-104  CONSTRUCTION DIAGRAM - STAGE 1
2.5-105  CONSTRUCTION DIAGRAM - STAGE 2
2.5-106  CONSTRUCTION DIAGRAM - STAGE 3
2.5-107  CONSTRUCTION DIAGRAM - STAGE 4
2.5-108  CONSTRUCTION DIAGRAM - STAGE 5
2.5-109  CONSTRUCTION DIAGRAM - STAGE 6
2.5-110  CONSTRUCTION DIAGRAM - STAGE 7
2.5-111  CONSTRUCTION DIAGRAM - STAGE 8
2.5-112  INSTRUMENTATION PLOT PLAN
2.5-112a  SETTLEMENT MONITORING POINTS (1981-84)
2.5-112b  PRIMARY SETTLEMENT MONITORING POINT LOCATIONS (1985-1986) 2.5-112c  SECONDARY SETTLEMENT MONITORING POINT LOCATIONS (1985-1986) 2.5-112d  SETTLEMENT MONITORING POINT LOCATIONS
2.5-113  PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 1 OF 5 WSES-FSAR-UNIT-3  2-xxxii Revision 11 (05/01) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5-113  PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 2 OF 5 2.5-113  PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 3 OF 5 2.5-113  PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 4 OF 5 2.5-113  PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 5 OF 5 2.5-114  INCLINOMETER MOVEMENT NORTH-SOUTH DIRECTION
2.5-115  INCLINOMETER MOVEMENT EAST-WEST DIRECTION
2.5-116  SITE AREA SETTLEMENT SHEET 1 OF 2
2.5-116  SITE AREA SETTLEMENT SHEET 2 OF 2
2.5-117  COMPOSITE FOUNDATION MAT SETTLEMENT (SHEET 1 OF 3)
2.5-117  COMPOSITE FOUNDATION MAT SETTLEMENT (SHEET 2 OF 3)
2.5-117  COMPOSITE FOUNDATION MAT SETTLEMENT (SHEET 3 OF 3)
2.5-118  COMPOSITE FOUNDATION MAT DIFFERENTIAL SETTLEMENT CONTOURS 2.5A-1  GRAIN SIZE ANALYSES
2.5A-2  GRAIN SIZE ANALYSES
2.5A-3  GRAIN SIZE ANALYSES
2.5A-4  GRAIN SIZE ANALYSES
2.5A-5  GRAIN SIZE ANALYSES
2.5A-6  GRAIN SIZE ANALYSES
2.5A-7  GRAIN SIZE ANALYSES
2.5A-8  GRAIN SIZE ANALYSES
2.5A-9  GRAIN SIZE ANALYSES
2.5A-10  GRAIN SIZE ANALYSES
2.5A-11  GRAIN SIZE ANALYSES
2.5A-12  GRAIN SIZE ANALYSES
WSES-FSAR-UNIT-3  2-xxxiii Revision 11 (05/01) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-13  GRAIN SIZE ANALYSES
2.5A-14  GRAIN SIZE ANALYSES
2.5A-15  GRAIN SIZE ANALYSES
2.5A-16  GRAIN SIZE ANALYSES
2.5A-17  GRAIN SIZE ANALYSES
2.5A-18  GRAIN SIZE ANALYSES
2.5A-19  GRAIN SIZE ANALYSES
2.5A-20  GRAIN SIZE ANALYSES
2.5A-21  GRAIN SIZE ANALYSES
2.5A-22  GRAIN SIZE ANALYSES
2.5A-23  GRAIN SIZE ANALYSES
2.5A-24  GRAIN SIZE ANALYSES
2.5A-25  GRAIN SIZE ANALYSES
2.5A-26  GRAIN SIZE ANALYSES
2.5A-27  GRAIN SIZE ANALYSES
2.5A-28  GRAIN SIZE ANALYSES
2.5A-29  GRAIN SIZE ANALYSES
2.5A-30  GRAIN SIZE ANALYSES
2.5A-31  GRAIN SIZE ANALYSES
2.5A-32  GRAIN SIZE ANALYSES
2.5A-33  GRAIN SIZE ANALYSES
2.5A-34  GRAIN SIZE ANALYSES
2.5A-35  GRAIN SIZE ANALYSES
2.5A-36  GRAIN SIZE ANALYSES
WSES-FSAR-UNIT-3  2-xxxiv Revision 11 (05/01) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-37  GRAIN SIZE ANALYSES
2.5A-38  GRAIN SIZE ANALYSES
2.5A-39  GRAIN SIZE ANALYSES
2.5A-40  GRAIN SIZE ANALYSES
2.5A-41  GRAIN SIZE ANALYSES
2.5A-42  GRAIN SIZE ANALYSES
2.5A-43  GRAIN SIZE ANALYSES
2.5A-44  GRAIN SIZE ANALYSES
2.5A-45  GRAIN SIZE ANALYSES
2.5A-46  GRAIN SIZE ANALYSES
2.5A-47  GRAIN SIZE ANALYSES
2.5A-48  GRAIN SIZE ANALYSES
2.5A-49  GRAIN SIZE ANALYSES
2.5A-50  GRAIN SIZE ANALYSES
2.5A-51  GRAIN SIZE ANALYSES
2.5A-52  GRAIN SIZE ANALYSES
2.5A-53  GRAIN SIZE ANALYSES
2.5A-54  GRAIN SIZE ANALYSES
2.5A-55  GRAIN SIZE ANALYSES
2.5A-56  GRAIN SIZE ANALYSES
2.5A-57  GRAIN SIZE ANALYSES
2.5A-58  GRAIN SIZE ANALYSES
2.5A-59  GRAIN SIZE ANALYSES
2.5A-60  GRAIN SIZE ANALYSES
WSES-FSAR-UNIT-3  2-xxxv Revision 11 (05/01) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-61  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-62  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-63  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-64  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-65  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-66  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-67  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-68  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-69  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-70  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-71  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-72  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-73  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-74  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-75  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-76  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-77  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-78  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-79  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-80  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-81  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-82  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-83  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-84  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
WSES-FSAR-UNIT-3  2-xxxvi Revision 11 (05/01) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-85  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-86  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-87  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-88  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-89  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-90  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-91  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-92  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-93  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-94  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-95  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-96  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-97  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-98  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-99  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-100  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-101  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-102  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-103  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-104  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-105  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-106  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-107  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-108  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
WSES-FSAR-UNIT-3  2-xxxvii Revision 11 (05/01) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-109  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-110  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-111  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-112  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-113  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-114  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-115  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-116  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-117  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-118  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-119  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-120  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-121  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-122  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-123  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-124  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-125  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-126  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-127  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-128  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-129  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-130  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-131  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-132  UNCONSOLIDATED UNDRAINED STRENGTH TESTS WSES-FSAR-UNIT-3  2-xxxviii Revision 12-C (07/03) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-133  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-134  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-135  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-136  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-137  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-138  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-139  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-140  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-141  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-142  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-143  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-144  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-145  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-146  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-147  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-148  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-149  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-150  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-151  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-152  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-153  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-154  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-155  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-156  UNCONSOLIDATED UNDRAINED STRENGTH TESTS
WSES-FSAR-UNIT-3  2-xxxix Revision 12-C (07/03) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-157  CONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-158  CONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-159  CONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-160  CONSOLIDATED UNDRAINED STRENGTH TESTS
2.5A-161  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-162  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-163  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-164  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-165  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-166  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-167  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-168  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-169  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-170  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-171  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-172  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-173  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-174  CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-175  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-176  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-177  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-178  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-179  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-180  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
WSES-FSAR-UNIT-3  2-xl Revision 12-C (07/03) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-181  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-182  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-183  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-184  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-185  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-186  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-187  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-188  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-189  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-190  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-191  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-192  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-193  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-194  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-195  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-196  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-197  CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL
2.5A-198  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-199  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-200  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-201  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-202  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-203  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-204  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
WSES-FSAR-UNIT-3  2-xli Revision 12-C (07/03) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-205  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-206  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-207  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-208  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-209  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-210  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-211  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-212  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-213  CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL
2.5A-214  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-215  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-216  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-217  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-218  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-219  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-220  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-221  CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL
2.5A-222  CONSOLIDATION TESTS -116 FT. MSL TO -127 FT. MSL
2.5A-223  CONSOLIDATION TESTS -116 FT. MSL TO -127 FT. MSL
2.5A-224  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-225  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-226  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-227  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-228  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
WSES-FSAR-UNIT-3  2-xlii Revision 12-C (07/03) CHAPTER 2  LIST OF FIGURES (Cont'd)
Figure      Title
2.5A-229  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-230  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-231  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-232  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-233  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-234  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-235  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-236  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-237  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-238  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-239  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL  2.5A-240  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL  2.5A-241  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL  2.5A-242  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL  2.5A-243  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL  2.5A-244  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL  2.5A-245  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-246  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL
2.5A-247  CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL WSES-FSAR-UNIT-3  2-xliii Revision 15 (03/07) UPDATE REFERENCE LIST  Chapter 2  Section    Cross References Revision 12-C Table 2.2-4 Sheet 2  ER-W3-2000-0948-000/DRN 02-1834 Table 2.2-4 Sheet 3 Table 2.2-4 Sheet 4 Table 2.2-4 Sheet 6 Table 2.2-4 Sheet 7 Table 2.2-4 Sheet 8 Table 2.2-4 Sheet 10 Table 2.2-4 Sheet 11 Table 2.2-4A Table 2.2-4B Table 2.2-3d (all 16 sheets)
Table 2.2-5 (both pages)  Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2055 Section 2.1.1.3 Section 2.1.3.4.1 Section 2.2.3 Section 2.2.3.1 Section 2.2.3.1.4 Section 2.3.4 Section 2.4.3 References 2.3 Table 2.3-136 Figure 2.3-48 
Section 2.2.3 ER-W3-2004-0276-000/DRN 05-149 Section 2.2.3.1.4 Section 2.2.3.2 Section 2.2.3.3.6 
Section 2.2.3.3.6 ER-W3-2004-0276-002/DRN 05-845
Revision 15 Section 2.1.1.3 ER-W3-2006-0210-000/DRN 06-624
Section 2.2.3.1.3.2 ER-W3-2006-0281-000/DRN 06-869 Section 2.3.5.1 Section 2.4.3.7 
Section 2.5.4.13.4 ER-W3-2006-0223-000/DRN 06-877
Section 2.2.3.1.3.1 ER-W3-2006-0223-000/DRN 06-905 Section 2.2.3.1.3.2 Section 2.3.5.1 Section 2.5.4.5.3.2 
Section 2.2A.1.3 ER-W3-2006-0296-000/DRN 06-926 WSES-FSAR-UNIT-3  2-xliv Revision 302 (12/08) UPDATE REFERENCE LIST  Chapter 2  Section Cross References Revision 301 Section 2.3.2.1.5 EC-1837 Section 2.3.2.2 Section 2.3.3.1.5 Section 2.3.3.1.7 Section 2.3.3.2 Section 2.3:  References 
Section 2.4.2.3.4 EC-5000082442 EC-2097
Table of Contents EC-5000082218 Section 2.2.1 Section 2.2.2.1.2 Section 2.2.2.2 Section 2.2.2.3 Section 2.2.2.4 Section 2.2.2.6 Section 2.2.3 Section 2.2.3.1.3.1.1 Section 2.2.3.3 Section 2.2.3.3.1 Section 2.2.3.3.2 Section 2.2.3.3.4 Section 2.2.3.3.5 Section 2.2.3.3.6 Section 2.2.:  References Table 2.2-3A Table 2.2-3B Sh. 1 of 8 thru Sh. 8 of 8 Table 2.2-3C Table 2.2-3D Sh. 1 of 15 thru Sh. 15 of 15 Table 2-23E Sh. 1 of 11 thru Sh. 11 of 11 Table 2.2-3F Sh 1. of 4 thru Sh. 4 of 4 Table 2.2-3G Table 2.2-4 Table 2.2-4A Table 2.2-4B Table 2.2-5 Table 2.2-6 Sh. 1 of 2 thru Sh. 2 of 2 Table 2.2-7 Figure 2.2-1 Figure 2.2-2 Figure 2.2-3 Figure 2.2-3a Figure 2.2-3b Figure 2.2-3c Figure 2.2-3d Figure 2.2-3e 
Revision 302 Section 2.4.2.2 LBDCR 2008-001 WSES-FSAR-UNIT-3  2-xlv Revision 307 (07/13)  Section Cross References Revision 303 Section 2.4.11.5 EC-530 Section 2.4.11.6 
Section 2.3.3.1.2 EC-8688
Revision 305 Section 2.4.1.1 EC-29230
Section 2.4.3.7 EC-30923
Revision 306 Section 2.4.3.5.3 EC-32952
Revision 307 Table of Contents EC-38835
Table of Contents EC-39014 Section 2.2.1 Section 2.2.2.2 Section 2.2.2.3 Section 2.2.3.1.3.1.1 Section 2.2.3.1.3.2 Section 2.2:  REFERENCES Table 2.2-3A Table 2.2-3B Table 2.2-3D Table 2.2-3E Table 2.2-3F Table 2.2-3G Table 2.2-5 Table 2.2-6 Figure 2.2-1 Figure 2.2-3a Figure 2.2-3b Figure 2.2-3c Figure 2.2-3d Figure 2.2-3e Figure 2.2-3f Figure 2.2-3g 
Section 2.2.3.1 EC-40308
Section 2.2.3.3.5 EC-41671 Section 2.2.3.3.6 Table 2.2-4A 
Section 2.4-10 EC-42115
WSES-FSAR-UNIT-3  2-xlvi Revision 308 (11/14)  Revision 308 Section 2.1.1.1 LBDCR 14-023
Section 2.4.10 EC 45161 WSES-FSAR-UNIT-3  3-i  DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS  CHAPTER 3  TABLE OF CONTENTS Section      Title    Page 3.0  DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS  3.1-1  3.1  CONFORMANCE WITH NRC GENERAL DESIGN CRITERIA  3.1-1 3.1.1    CRITERION 1 - QUALITY STANDARDS AND RECORDS    3.1-1
3.1.2    CRITERION 2 - DESIGN BASES FOR PROTECTION AGAINST  3.1-2 NATURAL PHENOMENA
3.1.3    CRITERION 3 - FIRE PROTECTION      3.1-3
3.1.4    CRITERION 4 - ENVIRONMENTAL AND MISSILE DESIGN BASES  3.1-4
3.1.5    CRITERION 5 - SHARING OF STRUCTURES, SYSTEMS AND COMPONENTS 3.1-5
3.1.6    CRITERION 10 - REACTOR DESIGN      3.1-5
3.1.7    CRITERION 11 - REACTOR INHERENT PROTECTION    3.1-6
3.1.8    CRITERION 12 - SUPPRESSION OF REACTOR POWER OSCILLATIONS  3.1-6
3.1.9    CRITERION 13 - INSTRUMENTATION AND CONTROL    3.1-7
3.1.10    CRITERION 14 - REACTOR COOLANT PRESSURE BOUNDARY  3.1-8
3.1.11    CRITERION 15 - REACTOR COOLANT SYSTEM DESIGN    3.1-8
3.1.12    CRITERION 16 - CONTAINMENT DESIGN    3.1-9
3.1.13    CRITERION 17 - ELECTRIC POWER SYSTEMS    3.1-10
3.1.14    CRITERION 18 - INSPECTION AND TESTING OF ELECTRICAL  3.1-11 POWER SYSTEMS
3.1.15    CRITERION 19 - CONTROL ROOM      3.1-12
3.1.16    CRITERION 20 - PROTECTION SYSTEM FUNCTIONS    3.1-13
3.1.17    CRITERION 21 - PROTECTION SYSTEM RELIABILITY AND    3.1-14 TESTABILITY
3.1.18    CRITERION 22 - PROTECTION SYSTEM INDEPENDENCE  3.1-15
WSES-FSAR-UNIT-3  3-ii    CHAPTER 3  TABLE OF CONTENTS (Cont'd)
Section      Title    Page 3..1.19    CRITERION 23 - PROTECTION SYSTEM FAILURE MODES  3.1-15
3.1.20    CRITERION 24 - SEPARATION OF PROTECTION AND CONTROL  3.1-16 SYSTEMS
3.1.21    CRITERION 25 - PROTECTION SYSTEM REQUIREMENTS FOR  3.1-16 REACTIVITY CONTROL MALFUNCTIONS
3.1.22    CRITERION 26 - REACTIVITY CONTROL SYSTEM REDUNDANCY  3.1-17 AND CAPABILITY
3.1.23    CRITERION 27 - COMBINED REACTIVITY CONTROL SYSTEMS  3.1-18 CAPABILITY
3.1.24    CRITERION 28 - REACTIVITY LIMITS      3.1-18
3.1.25    CRITERION 29 - PROTECTION AGAINST ANTICIPATED OPERATIONAL  3.1-19 OCCURRENCES
3.1.26    CRITERION 30 - QUALITY OF REACTOR COOLANT PRESSURE  3.1-19 BOUNDARY
3.1.27    CRITERION 31 - FRACTURE PREVENTION OF REACTOR COOLANT  3.1-20 PRESSURE BOUNDARY
3.1.28    CRITERION 32 - INSPECTION OF REACTOR COOLANT PRESSURE  3.1-21 BOUNDARY
3.1.29    CRITERION 33 - REACTOR COOLANT MAKEUP    3.1-22
3.1.30    CRITERION 34 - RESIDUAL HEAT REMOVAL    3.1-23
3.1.31    CRITERION 35 - EMERGENCY CORE COOLING    3.1-23
3.1.32    CRITERION 36 - INSPECTION OF EMERGENCY CORE COOLING  3.1-24 SYSTEM
3.1.33    CRITERION 37 - TESTING OF EMERGENCY CORE COOLING  3.1-24 SYSTEM
3.1.34    CRITERION 38 - CONTAINMENT HEAT REMOVAL    3.1-25
3.1.35    CRITERION 39 - INSPECTION OF CONTAINMENT HEAT REMOVAL  3.1-26 SYSTEM
WSES-FSAR-UNIT-3  3-iii    CHAPTER 3  TABLE OF CONTENTS (Cont'd)
Section      Title    Page 3.1.36    CRITERION 40 - TESTING OF CONTAINMENT HEAT REMOVAL  3.1-27 SYSTEM
3.1.37    CRITERION 41 - CONTAINMENT ATMOSPHERE CLEANUP  3.1-27
3.1.38    CRITERION 42 - INSPECTION OF CONTAINMENT ATMOSPHERE  3.1-28 CLEANUP SYSTEMS
3.1.39    CRITERION 43 - TESTING OF ATMOSPHERE CLEANUP SYSTEMS  3.1-29
3.1.40    CRITERION 44 - COOLING WATER      3.1-30
3.1.41    CRITERION 45 - INSPECTION OF COOLING WATER SYSTEM  3.1-31
3.1.42    CRITERION 46 - TESTING OF COOLING WATER SYSTEM  3.1-31
3.1.43    CRITERION 50 - CONTAINMENT DESIGN BASIS    3.1-32
3.1.44    CRITERION 51 - FRACTURE PREVENTION OF CONTAINMENT    3.1-32 PRESSURE BOUNDARY
3.1.45    CRITERION 52 - CAPABILITY FOR CONTAINMENT LEAKAGE  3.1-33 RATE TESTING
3.1.46    CRITERION 53 - PROVISION FOR CONTAINMENT TESTING    3.1-34 AND INSPECTION
3.1.47    CRITERION 54 - PIPING SYSTEMS PENETRATING CONTAINMENT  3.1-34
3.1.48    CRITERION 55 - REACTOR COOLANT PRESSURE BOUNDARY    3.1-35 PENETRATION CONTAINMENT
3.1.49    CRITERION 56 - PRIMARY CONTAINMENT ISOLATION    3.1-36
3.1.50    CRITERION 57 - CLOSED SYSTEMS ISOLATION VALVES  3.1-37
3.1.51    CRITERION 60 - CONTROL OF RELEASES OF RADIOACTIVE  3.1-37 MATERIALS TO THE ENVIRONMENT
3.1.52    CRITERION 61 - FUEL STORAGE AND HANDLING AND    3.1-38 RADIOACTIVITY CONTROL
3.1.53    CRITERION 62 - PREVENTION OF CRITICALITY IN FUEL    3.1-39 STORAGE AND HANDLING
WSES-FSAR-UNIT-3  3-iv    CHAPTER 3  TABLE OF CONTENTS (Cont'd)
Section      Title    Page 3.1.54    CRITERION 63 - MONITORING FUEL AND WASTE STORAGE  3.1-39
3.1.55    CRITERION 64F - MONITORING RADIOACTIVITY RELEASES  3.1-40
3.2  CLASSIFICATION OF STRUCTURES, COMPONENTS AND SYSTEMS  3.2-1 3.2.1    SEISMIC CLASSIFICATION      3.2-1
3.2.2    SYSTEM SAFETY CLASSIFICATION      3.2-2
3.3  WIND AND TORNADO LOADINGS      3.3-1 3.3.1    WIND LOADINGS        3.3-1
3.3.2    TORNADO        3.3-3
==3.3  REFERENCES==
3.3-5
3.4  WATER LEVEL (FLOOD) DESIGN      3.4-1 3.4.1    FLOOD PROTECTION      3.4-1
3.4.2    ANALYSIS PROCEDURE      3.4-2
3.5  MISSILE PROTECTION      3.5-1 3.5.1    DESIGN BASES        3.5-1
3.5.2    SYSTEMS TO BE PROTECTED      3.5-15
3.5.3    BARRIER DESIGN PROCEDURES      3.5-15
==3.5  REFERENCES==
3.5-22
3.6  PROTECTION AGAINST DYNAMIC EFFECTS ASSOCIATED WITH  3.6-1  THE POSTULATED RUPTURE OF PIPING 3.6.1    POSTULATED PIPING FAILURES IN FLUID SYSTEMS    3.6-1 BOTH INSIDE AND OUTSIDE OF CONTAINMENT
3.6.2    DETERMINATION OF BREAK LOCATIONS AND DYNAMIC EFFECTS  3.6-9 ASSOCIATED WITH THE POSTULATED RUPTURE OF PIPING
==3.6  REFERENCES==
3.6-33
WSES-FSAR-UNIT-3  3-v    CHAPTER 3  TABLE OF CONTENTS (Cont'd)
Section      Title    Page
3.6A  PIPE RUPTURE ANALYSIS      3.6A-1
3.6A.1    HIGH ENERGY PIPE BREAK INSIDE CONTAINMENT    3.6A-1
3.6A.2    HIGH ENERGY PIPE BREAK OUTSIDE CONTAINMENT    3.6A-11
3.6A.3    SUB COMPARTMENT PRESSURE ANALYSIS    3.6-15
3.6A.4    MODERATE ENERGY PIPING FAILURES -    3.6-16 INSIDE CONTAINMENT
3.6A.5    MODERATE ENERGY PIPING FAILURES -    3.6A-16 OUTSIDE CONTAINMENT
3.6A.6    FLOODING ANALYSIS      3.6A-16
3.6A.7    MAIN CONTROL ROOM HABITABILITY    3.6A-23
3.6B    PIPE WHIP ANALYSIS      3.6B-1
3.6C    BEND FORCE CALCULATION IN A PIPING SYSTEM    3.6C-1 USING CALPLOTF2421
3.7  SEISMIC DESIGN        3.7-1
3.7.1    SEISMIC INPUT        3.7-1
3.7.2    SEISMIC SYSTEM ANALYSIS      3.7-4
3.7.3    SEISMIC SUBSYSTEM ANALYSIS      3.7-13
3.7.4    SEISMIC INSTRUMENTATION      3.7-37
==3.7  REFERENCES==
3.7-41
3.7A    SEISMIC DESIGN - PARAMETRIC STUDIES    3.7A-1
3.7A  REFERENCES        3.7A-4
3.8  DESIGN OF CATEGORY I STRUCTURES    3.8-1
3.8.1    CONCRETE CONTAINMENT      3.8-1
3.8.2    STEEL CONTAINMENT      3.8-1
WSES-FSAR-UNIT-3  3-vi Revision 9 (12/97)  CHAPTER 3  TABLE OF CONTENTS (Cont'd)  Section      Title    Page
3.8.3    CONCRETE AND STEEL INTERNAL STRUCTURES OF    3.8-36 STEEL CONTAINMENT
3.8.4    OTHER SEISMIC CATEGORY I STRUCTURES    3.8-64
3.8.5    FOUNDATIONS        3.8-78
==3.8  REFERENCES==
3.8-81
3.9  MECHANICAL SYSTEMS AND COMPONENTS    3.9-1
3.9.1    SPECIAL TOPICS FOR MECHANICAL COMPONENTS    3.9-1
3.9.2    DYNAMIC SYSTEM ANALYSIS AND TESTING    3.9-29
3.9.3    ASME CODE CLASS 1, 2 AND 3 COMPONENTS,    3.9-46 COMPONENT SUPPORTS AND CORE SUPPORT STRUCTURES 3.9.4    CONTROL ELEMENT DRIVE MECHANISMS    3.9-64
3.9.5    REACTOR PRESSURE VESSEL INTERNALS    3.9-72
3.9.6    IN-SERVICE TESTING OF PUMPS AND VALVES    3.9-79
==3.9  REFERENCES==
3.9-80
3.9A    SEISMIC CONSIDERATIONS FOR EQUIPMENT SPECIFICATIONS  3.9A-1
3.9B    DESCRIPTION OF SEISMIC ANALYSIS AND SUMMARY OF RESULTS  3.9B-1 FOR NON-NSSS SUPPLIED ACTIVE PUMPS AND THEIR SUPPORTS
3.9B.1      CHILLED WATER PUMPS      3.9B-1
3.9B.2      CONTAINMENT SPRAY PUMPS      3.9B-1
3.9B.3      DIESEL OIL TRANSFER PUMP      3.9B-3
3.9B.4      COMPONENT COOLING WATER PUMPS    3.9B-7
3.9B.5      AUXILIARY COMPONENT COOLING WATER PUMPS    3.9B-9
3.9B.6      EMERGENCY FEEDWATER PUMPS      3.9B-12
3.9B.7      COMPONENT COOLING WATER MAKE-UP PUMPS    3.9B-17
3.9B.8      DIESEL ENGINE DRIVEN LUBE OIL PUMP    3.9B-20
3.9B.9      DIESEL ENGINE DRIVEN JACKET WATER PUMP    3.9B-20 WSES-FSAR-UNIT-3  3-vii    CHAPTER 3  TABLE OF CONTENTS (Cont'd)
Section      Title    Page 3.9C  DESCRIPTION OF SEISMIC ANALYSIS AND SUMMARY    3.9C-1  OF RESULTS FOR NON-NSSS SUPPLIED ACTIVE VALVES 3.9D  NSSS COMPUTER CODE VERIFICATION    3.9D-1 3.9E  ASYMMETRIC LOADS      3.9E-1 3.10  SEISMIC QUALIFICATIONS OF SEISMIC CATEGORY I    3.10-1  INSTRUMENTATION AND ELECTRICAL EQUIPMENT 3.10.1    SEISMIC QUALIFICATION CRITERIA      3.10-1
3.10.2    METHODS AND PROCEDURES FOR QUALIFYING ELECTRICAL  3.10-1 EQUIPMENT AND INSTRUMENTATION
3.10.3    METHODS AND PROCEDURES OF ANALYSIS OR TESTING OF  3.10-2 SUPPORTS OF ELECTRICAL EQUIPMENT AND INSTRUMENTATION
3.10.4    OPERATING LICENSE REVIEW      3.10-3
3.10  REFERENCES        3.10-5
3.10A  CRITERIA FOR SEISMIC QUALIFICATION OF NON-NSSS SEISMIC  3.10A-1  CATEGORY I INSTRUMENT AND ELECTRICAL EQUIPMENT AND  THEIR SUPPORTS 3.11  ENVIRONMENTAL DESIGN OF MECHANICAL AND ELECTRICAL  3.11-1  EQUIPMENT 3.11.1    EQUIPMENT IDENTIFICATION AND ENVIRONMENTAL CONDITIONS  3.11-1
3.11.2    QUALIFICATION TESTS AND ANALYSES    3.11-1
3.11.3    QUALIFICATION TESTS AND ANALYSES RESULTS    3.11-2
3.11.4    LOSS OF VENTILATION      3.11-2
3.11.5    ESTIMATED CHEMICAL AND RADIATION ENVIRONMENT  3.11-3
3.11  REFERENCE        3.11-4
WSES-FSAR-UNIT-3  3-viii    DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS  CHAPTER 3  LIST OF TABLES Table      Title 3.2-1  CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS
3.2-2  EQUIPMENT CODE EXCEPTIONS TO REGULATORY GUIDE 1.26
3.3-1  WIND SPEEDS AND RESULTING STATIC PRESSURE LOADINGS
3.3-2  TORNADO WIND SPEEDS AND RESULTING STATIC PRESSURE LOADINGS
3.5-1  MISSILES OUTSIDE CONTAINMENT GENERATED BY HIGH ENERGY SYSTEMS
3.5-2  MISSILES OUTSIDE CONTAINMENT FROM FAILURE OF OVERSPEED PROTECTION
3.5-3  MISSILE PROTECTION - OUTSIDE CONTAINMENT TABULATION OF SAFETY RELATED STRUCTURES AND SYSTEMS
3.5-3a  TABLE OF PROTECTED SAFETY RELATED HVAC AIR INTAKES & EXHAUSTS 3.5-4  POTENTIAL MISSILES INSIDE CONTAINMENT
3.5-5  PARAMETERS OF LOW PRESSURE WHEEL FRAGMENTS
3.5-6  PARAMETERS OF LOW PRESSURE TURBINE CYLINDER FRAGMENTS
3.5-7  SAFETY RELATED COMPONENTS LOCATED INSIDE REACTOR BUILDING AND BARRIERS 3.5-8  SAFETY RELATED EQUIPMENT IN RAB WING AREA AND BARRIERS
3.5-9a  SAFETY RELATED EQUIPMENT LOCATED IN RAB AT FL. EL. +46 AND BARRIERS
3.5-9b  SAFETY RELATED EQUIPMENT IN RAB @ EL. +21 AND BARRIERS
3.5-9c  SAFETY RELATED EQUIPMENT IN RAB @ EL. -4.0' AND BARRIERS
3.5-9d  SAFETY RELATED EQUIPMENT IN RAB AT EL. -35.0'
3.5-9e  SAFETY RELATED EQUIPMENT IN RAB - CABLE TRAYS AND HVAC DUCTS 3.5-9f  SAFETY RELATED EQUIPMENT IN FUEL HANDLING BUILDING AND BARRIERS
3.5-9g  RESULTS OF PROBABILITY ANALYSIS FOR DESIGN OVERSPEED TURBINE FAILURE EVENT
3.5-9h  RESULTS OF PROBABILITY ANALYSIS FOR DESTRUCTIVE OVERSPEED FAILURE EVENT 
WSES-FSAR-UNIT-3  3-ix    CHAPTER 3  LIST OF TABLES (Cont'd)
Table      Title 3.5-10  POTENTIAL TORNADO MISSILES
3.5-11  TORNADO MISSILE CONCRETE BARRIER MINIMUM THICKNESS
3.5-12  ALLOWABLE DUCTILITY RATIOS FOR TORNADO IMPACT LOADS 3.5-13  STEEL BARRIERS
3.6-1  GUARD PIPE ASSEMBLY DESIGN CRITERIA
3.6-2  MATERIAL USED FOR PROCESS LINES WITHIN GUARD PIPE
3.6-3  TRUNNION WELDED ATTACHMENTS BETWEEN CONTAINMENT ISOLATION VALVES 3.6-4  SHEAR LUG WELDED ATTACHMENTS BETWEEN CONTAINMENT ISOLATION VALVES
3.6-5  CALCULATED STRESSES IHN ASME CODE CLASS 1 PIPING SYSTEMS
3.6A-1  STEAM GENERATOR BLOWDOWN SYSTEM - PIPE WHIP RESTRAINTS INSIDE CONTAINMENT
3.6A-2  REACTOR COOLANT SYSTEM DRAIN LINES - PIPE WHIP RESTRAINTS INSIDE CONTAINMENT
3.6A-3  SAFETY INJECTION SYSTEM - PIPE WHIP RESTRAINTS LOOP "2A" INSIDE  CONTAINMENT
3.6A-4  CHEMICAL AND VOLUME CONTROL (LETDOWN) - PIPE WHIP RESTRAINTS-INSIDE  CONTAINMENT
3.6A-5 CHEMICAL AND VOLUME CONTROL (CHARGING) - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT 3.6A-6  PRESSURIZER RELIEF SYSTEM - PIPE WHIP RESTRAINTS
3.6A-7  PRESSURIZER SPRAY SYSTEM - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT
3.6A-8  PRESSURIZER SURGE - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT
3.6A-9  SUMMARY OF DESIGN BASIS BREAKS
3.6A-10  SUMMARY OF DESIGN BASIS BREAKS
3.6A-11  SUMMARY OF DESIGN BASIS BREAKS
3.6A-12  SUMMARY OF DESIGN BASIS BREAKS
3.6A-13  MAIN STEAM - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT
WSES-FSAR-UNIT-3  3-x    CHAPTER 3  LIST OF TABLES (Cont'd)
Table      Title 3.6A-14  FEEDWATER - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT
3.6A-15  CVCS - CHARGING - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT 3.6A-16  CVCS LETDOWN - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT 3.6A-17  STEAM GENERATOR BLOWDOWN SYSTEM - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT
3.6A-18  PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES  OPERATING CONDITIONS
3.6A-19  PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES  PIPE RUPTURE CONDITION
3.6A-20  PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES  OPERATING CONDITIONS
3.6A-21  PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES    PIPE RUPTURE CONDITION
3.6A-22  SUMMARY OF DESIGN BASIS BREAKS
3.6A-23  SUMMARY OF DESIGN BASIS BREAKS
3.6A-24  SUMMARY OF DESIGN BASIS BREAKS
3.6A-25  SUMMARY OF DESIGN BASIS BREAKS
3.6A-26  MAINSTREAM - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT
3.6A-27  FEEDWATER - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT
3.7-1  DAMPING VALUES (PERCENT OF CRITICAL DAMPING)
3.7-2  SOIL SUPPORTED SEISMIC CATEGORY I STRUCTURES
3.7-3  INPUT DATA FOR SEISMIC ANALYSIS HORIZONTAL EXCITATIONS
3.7-4  INPUT DATA FOR SEISMIC ANALYSIS VERTICAL EXCITATIONS
3.7-5  NATURAL FREQUENCIES IN CYCLES PER SECOND (CPS)
3.7-6  COMPARISON OF STRUCTURAL RESPONSES FOR SEISMIC CATEGORY I STRUCTURES  USING RESPONSE SPECTRA AND TIME HISTORY METHODS
WSES-FSAR-UNIT-3  3-xi    CHAPTER 3  LIST OF TABLES (Cont'd)
Table      Title 3.7-7  COMPARISON OF STRUCTURAL RESPONSES FOR SEISMIC CATEGORY I STRUCTURES    USING RESPONSE SPECTRA AND TIME HISTORY METHODS
3.7-8  COMPARISON OF STRUCTURAL RESPONSES FOR SEISMIC CATEGORY I STRUCTURES    USING RESPONSE SPECTRA AND TIME HISTORY METHODS
3.7-9  COMPARISON OF ACCELERATION FOR SEISMIC CATEGORY I STRUCTURES USING  RESPONSE SPECTRA AND TIME HISTORY METHODS
3.7-10  COMPARISON OF ACCELERATION OF DYNAMIC ANALYSIS WITH AND WITHOUT  TORSIONAL DEGREE OF FREEDOM
3.7-11  MAXIMUM DAMPING RATIONS USED IN ANALYSIS OF NSSS CATEGORY I STRUCTURES, SYSTEMS AND COMPONENTS
3.7-12  REACTOR COOLANT SYSTEM NATURAL FREQUENCY AND DOMINANT DEGREES OF FREEDOM
3.7-13  COMPARISON OF SEISMIC LOADS
3.7-14  MAXIMUM STRESS COMPARISON
3.7-15  DELETED
3.7-16  REACTOR INTERNALS NON-LINEAR HORIZONTAL SEISMIC MODEL NODE LOCATIONS 3.7-17  SEISMIC MONITORING SYSTEM COMPONENTS
3.7-18  COMPARISON OF MAXIMUM RESPONSES
3.7-19  COMPARISON OF MAXIMUM RESPONSES
3.7-20  COMPARISON OF MAXIMUM RESPONSES
3.7-21  LINES ANALYZED BY CHART METHOD
3.7A-1  EFFECT OF SHEAR MODULUS ON STRUCTURE RESPONSE
3.8-1  CONTAINMENT VESSEL PENETRATIONS - LOAD COMBINATIONS AND STRESS LIMITS
3.8-2  CONTAINMENT VESSEL LOAD COMBINATIONS
3.8-3  CONTAINMENT SHELL STRESSES AT JUNCTION OF COLUMN AND KNUCKLE 3.8-4  CONTAINMENT VESSEL TEMPERATURE GRADIENT
3.8-5  PENETRATION ANALYSIS
WSES-FSAR-UNIT-3  3-xii  CHAPTER 3  LIST OF TABLES (Cont'd)
Table      Title 3.8-6  ALLOWABLE STRESS
3.8-7  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 1
3.8-8  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 2
3.8-9  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 3
3.8-10  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 4
3.8-11  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 5
3.8-12  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 6
3.8-13  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 7
3.8-14  SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 10
3.8-15  ALLOWABLE BUCKLING STRESSES FOR CONTAINMENT VESSEL ELLIPSOIDAL HEAD
3.8-16  ALLOWABLE BUCKLING STRESSES FOR CONTAINMENT VESSEL ELLIPSOIDAL HEAD AT POST WELD HEAT TREATMENT
3.8-17  SUMMARY OF SHELL STRESSES IN KNUCKLE BETWEEN COLUMNS 3.8-18  SUMMARY OF SHELL STRESSES IN KNUCKLE AT COLUMNS
3.8-19  PHYSICAL PROPERTIES FOR MATERIALS TO BE USED FOR PRESSURE PARTS OR ATTACHMENT TO PRESSURE PARTS
3.8-20  MAJOR EQUIPMENT LOADS FOR CONTAINMENT INTERNAL STRUCTURE 3.8-21  CONTAINMENT INTERNAL CONCRETE STRUCTURE LOAD COMBINATIONS 3.8-22  CONTAINMENT INTERNAL STEEL STRUCTURE LOAD COMBINATIONS 3.8-23  COMPARISON OF MAX. DISPLACEMENT FIXMAT 2037 AND STARDYNE PROGRAMS
3.8-24  COMPARISON OF MAX. FORCE FIXMAT 2037 AND STARDYNE PROGRAMS
3.8-25  COMPARISON OF MAX. SHEAR FIXMAT 2037 AND STARDYNE PROGRAMS
3.8-26  COMPARISON OF MAX. MOMENT FIXMAT 2037 AND STARDYNE PROGRAMS
3.8-27  COMPARISON OF NATURAL FREQUENCIES FIXMAT 2037 AND NASTRAN PROGRAMS 3.8-28  COMPARISON OF ACCELERATIONS FIXMAT 2037 AND NASTRAN PROGRAMS
WSES-FSAR-UNIT-3  3-xiii    CHAPTER 3  LIST OF TABLES (Cont'd)
Table      Title 3.8-29  COMPARISON OF SHEAR FORCES FIXMAT 2037 AND NASTRAN PROGRAMS 3.8-30  COMPARISON OF BENDING MOMENTS FIXMAT 2037 AND NASTRAN PROGRAMS 3.8-31  REACTOR COOLANT PIPE STOP (STOP A)
3.8-32  COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF STRUCTURAL  ELEMENTS OF CONCRETE INTERNAL STRUCTURE
3.8-33  COMPARISON OF MAXIMUM DESIGN AND ALLOWABLE STRESSES FOR REACTOR COOLANT PUMP SUPPORTS
3.8-34  COMPARISON OF MAXIMUM DESIGN AND ALLOWABLE STRESSES FOR UPPER STEAM GENERATOR SUPPORTS
3.8-35  STEAM GENERATOR SLIDING BASE SUPPORT STRESS COMPARISONS
3.8-36  REACTOR VESSEL SUPPORT
3.8-37  NSSS SUPPORT STEEL MATERIAL SUMMARY
3.8-38  SHIELD STRUCTURE LEAKAGE RATES
3.8-39  OTHER SEISMIC CATEGORY I STRUCTURES LOAD COMBINATIONS 3.8-40  COMPARISON OF CALCULATED DESIGNS LOADS AND ULTIMATE CAPACITY OF STRUCTURAL ELEMENTS OF SHIELD BUILDING
3.8-41  COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF STRUCTURAL  ELEMENTS OF REACTOR AUXILIARY BUILDING
3.8-42  COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF STRUCTURAL    ELEMENTS OF FUEL HANDLING BUILDING
3.8-43 COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF THE COMMON MAT UNDER THE FOLLOWING STRUCTURAL ELEMENTS OF THE BUILDING 3.9-1  TRANSIENTS USED IN STRESS ANALYSIS OF CODE CLASS 1 COMPONENTS
3.9-2  SAFETY CLASS 1 NON-NSSS PIPING
3.9-3  TRANSIENTS AND OPERATIVE CONDITIONS FOR CODE CLASS 1 NON-NSSS PIPING
3.9-4  COMPARISON OF STRUCTURAL AND HYDRAULIC DESIGN PARAMETERS
3.9-5  LOADING COMBINATIONS FOR ASME CODE CLASS 1 COMPONENTS OTHER THAN VALVES
WSES-FSAR-UNIT-3  3-xiv  CHAPTER 3  LIST OF TABLES (Cont'd)
Table      Title 3.9-6  STRESS LIMITS FOR ASME CODE CLASS 1 COMPONENTS OTHER THAN VALVES
3.9-7  DESIGN LOADING COMBINATIONS AND STRESS LIMITS FOR ASME CODE CLASS 2 AND 3 PIPING
3.9-8  NSSS SUPPLIED ACTIVE VALVES AND PUMPS
3.9-9  NON-NSSS SUPPLIED ACTIVE VALVES AND PUMPS
3.9-10  CODE CLASS 1 AND 2 SAFETY RELIEF VALVES
3.9-11  PIPE STRESSES DUE TO SAFETY RELIEF VALVE LOADS
3.9-12  STRESS LIMITS FOR CEDM PRESSURE HOUSINGS
3.9-13  STRESS LIMITS FOR REACTOR INTERNALS
3.9-14  NSSS TANKS AND HEAT EXCHANGERS
3.9-15  NSSS PUMPS
3.9-16  PIPE BREAK LOAD CONSIDERATIONS FOR ACTIVE VALVES LOCATED IN HIGH ENERGY SYSTEMS
3.9-17  MSLB FLOW CONDITIONS AS APPLICABLE TO THE MSIV's
3.9-18  STRESS LIMITS AND LOADING COMBINATIONS FOR PIPE SUPPORTS
3.9-19  VIBRATION TESTING MODES
3.9-20  INSTRUMENTATION REQUIREMENTS FOR LEVEL 2 TEST
3.9-21  CLASS 1 STRESS RANGE VALUES
3.9C-1  SEISMIC QUALIFICATION REPORTS FOR NON-NSSS SUPPLIED ACTIVE VALVE OTHER THAN    CHECK VALVES
3.9C-2  SEISMIC QUALIFICATION REPORTS FOR NON-NSSS SUPPLIED CLASS 1 CHECK VALVES 3.9C-3  SEISMIC QUALIFICATION REPORTS FOR NON-NSSS SUPPLIED ACTIVE CLASS 2 AND 3 CHECK VALVES
3.10-1  DELETED
3.11-1  ENVIRONMENTAL CONDITION SUMMARY
3.11-2  OPERABILITY REQUIREMENTS FOR EQUIPMENT REQUIRED TO FUNCTION DURING AND    SUBSEQUENT TO ANY DESIGN BASIS ACCIDENT
3.11-3  SAFETY RELATED EQUIPMENT DESIGNED FOR NON-SEISMIC VIBRATION
WSES-FSAR-UNIT-3  3-xv Revision 11 (05/01)  DESIGN OF STRUCTURES, COMPONENTS EQUIPMENT AND SYSTEMS  CHAPTER 3  LIST OF FIGURES Figure      Title 3.3-1  Wind Speeds and Resulting Static Pressures (Reactor Building - Dome)
3.3-2  Tornado Wind Speeds and Resulting Static Pressure Loadings - (Reactor    Building - Dome)
3.3-3  Wind Speeds and Resulting Static Pressures (Reactor Building - Wall)
3.3-4  Tornado Wind Speeds and Resulting Static Pressures (Reactor Building - Wall) 3.4-1  Waterproofing and Water Stop Details For Seismic Category I Structures
3.4-2  Typical Flood Door
3.5-1  Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-2  Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-3  Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-4  Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train  3.5-5  Properties of Low Pressure Turbine 90 Disc Quadrants 3.5-6  Arrangement and Identification of LP Turbine Discs
3.5-7  Typical LP Cylinder
3.5-8  Properties of Low Pressure Turbine Cylinder (Casing) Fragments
3.5-9  Display of Variables Used in the Turbine Missile Analysis 3.6-1  Pipe Whip Mathematical Model Main Steam Piping Inside Containment 3.6-2  Pipe Whip Mathematical Model Feedwater Lines Inside Containment 3.6-3  Pipe Whip Mathematical Model Main Steam Line A Outside Containment to    Column "G"
3.6-4  Pipe Whip Mathematical Model Main Steam Line B Outside Containment to    Column "G"
3.6-5  Pipe Whip Mathematical Model Feedwater Line A Outside Containment to  Column "G"
WSES-FSAR-UNIT-3  3-xvi Revision 11 (05/01)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.6-6  Pipe Whip Mathematical Model Feedwater Line B Outside Containment to    Column "G"
3.6-7  Piping Stress - Strain  Characteristics
3.6-8  Restraint Impact
3.6-9  U-Bar Restraint
3.6-10  Collar Restraint
3.6-11  Plate - Type Restraint
3.6-12  Jet Divergence for Wet Steam and Saturated Water
3.6-13  Circumferential Break - Limited Separation 3.6-14  Jet Divergence for Dry Steam and Nonflashing Water
3.6-15  Containment Piping Penetration Assemblies Type I Load Combinations 3.6-16  Containment Piping Penetration Assemblies Type II Load Combinations 3.6-17  Containment Piping Penetration Assemblies Type III Load Combinations 3.6-18  Containment Piping Penetration Assemblies Types IV & V  Load Combinations 3.6-19  Containment Piping Penetration Assemblies Type VI Load Combinations 3.6-20  Blowdown and Total Wave Forces
3.6-21  Friction Effect on Steady Blowdown Force
3.6A-1  Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints
3.6A-2  Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints
3.6A-3  Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints
3.6A-4  Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints
3.6A-5  Reactor Building Reactor Coolant Piping Breakpoints & Pipe Whip    Restraints
3.6A-6  Reactor Building Reactor Coolant Piping Breakpoints & Pipe Whip    Restraints
WSES-FSAR-UNIT-3  3-xvii Revision 11 (05/01)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.6A-7  Reactor Building Reactor Coolant Piping Breakpoints & Pipe Whip    Restraints
3.6A-8  Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints
3.6A-9  Reactor Building-Safety Injection Piping-Break Points & Pipe Whip    Restraints
3.6A-10  Reactor Building-Safety Injection Piping-Break Points & Pipe Whip    Restraints
3.6A-11  Reactor Building-Safety Injection Piping System-Break Points &    Pipe Whip Restraints
3.6A-12  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-13  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-14  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-15  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-16  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-17  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-18  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-19  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-20  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-21  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
3.6A-22  Reactor Building-Safety Injection System-Break Points & Pipe Whip  Restraints
WSES-FSAR-UNIT-3  3-xviii Revision 11 (05/01)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.6A-23  Reactor Building - Safety Injection System-Break Points & Pipe Whip Restraints 3.6A-24  Reactor Building - Safety Injection Piping-Break Points & Pipe Whip Restraints 3.6A-25  Reactor Building - Safety Injection Piping-Break Points & Pipe Whip Restraints 3.6A-26  Reactor Building - Safety Injection System-Break Points & Pipe Whip Restraints 3.6A-27  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-28  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-29  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-30  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-31  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-32  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-33  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-34  Reactor Building - Chemical and Volume Control Piping - Break Points    and Pipe Whip Restraints
3.6A-35  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-36  Reactor Building - Chemical and Volume Control Piping - Break Points  and Pipe Whip Restraints
3.6A-36a  Reactor Coolant System Design Basis Pipe Breaks Types and Locations 3.6A-36b  Reactor Coolant System Design Basis Pipe Breaks Types and Locations 3.6A-36c  Reactor Building Chemical & Volume Control Piping Breakpoints & Pipe  Whip Restraints
WSES-FSAR-UNIT-3  3-xix Revision 15 (03/07)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.6A-37  Reactor Building - Pressurizer Relief System - Break Points and Pipe Whip Restraints
3.6A-38  Reactor Building - Reactor Coolant Piping Pressurizer Spray Break Points  & Pipe Whip Restraints
3.6A-38a  Reactor Building - Reactor Coolant Piping Pressurizer Spray Break Points  & Pipe Whip Restraints
3.6A-38b  Reactor Building - Reactor Coolant Piping Pressurizer Spray Break Points  & Pipe Whip Restraints
3.6A-38c  Reactor Building Pressurizer Surge Piping Break Points & Pipe Whip Restraints 3.6A-38d  Main Steam & Feedwater Piping Systems Selection of Postulated Break Locations  Inside Containment
3.6A-38e  Postulated Break Locations - Main Steam Piping Inside Containment  (DRN 06-734, R15) 3.6A-38f  Postulated Break Locations - Feedwater Piping Inside Containment (DRN 06-734, R15)  3.6A-39  Auxiliary Building Chemical and Volume Control Piping (Charging) Break Points  and Pipe Whip Restraints
3.6A-40  Reactor Auxiliary Building Chemical and Volume Control Piping (Charging)  Break Points and Pipe Whip Restraints
3.6A-41  Reactor Auxiliary Building Chemical and Volume Control Piping (Charging)  Break Points and Pipe Whip Restraints
3.6A-41a  Reactor Auxiliary Building Chemical & Volume Control Piping (Charging)  Breakpoints & Pipe Whip Restraints
3.6A-42  Reactor Auxiliary Building Chemical and Volume Control Piping (Charging)  Break Points and Pipe Whip Restraints
3.6A-43  Reactor Auxiliary Building Chemical and Volume Control Piping (Charging)  Break Points and Pipe Whip Restraints
3.6A-43a  Reactor Auxiliary Building - CVCS Charging System - Break Points and    Pipe Whip Restraints
3.6A-43b  Reactor Auxiliary Building - CVCS Charging System - Break Points and    Pipe Whip Restraints
3.6A-44  Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown)
Break Points & Pipe Whip Restraints
WSES-FSAR-UNIT-3  3-xx    CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.6A-45  Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints
3.6A-46  Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints
3.6A-47  Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints
3.6A-48  Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints
3.6A-49  Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints
3.6A-50  Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints
3.6A-51  Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints
3.6A-52  Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints
3.6A-53  Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints
3.6A-54  Main Steam & Feedwater Piping Systems - Superpipe Region Combined Operating & Pipe Rupture Stresses Outside Containment
3.6A-54a  Reactor Auxiliary Building - Main Steam and Feedwater - Break Exclusion Region
3.6A-54b  Reactor Auxiliary Building - Main Steam and Feedwater - Break Exclusion Region
3.6A-55  Postulated Break Locations - Main Steam Break Outside Containment to    "G" Row
3.6A-56  Postulated Break Locations - Main Feedwater Piping Outside Containment to    "G" Row
3.6A-57  Main Steam & Feedwater Piping Systems Selection of Postulated Break Locations -  Isolation Valves to "G" Row - Outside Containment 3.6A-58  CVCS Letdown (RAB)
3.6A-59  Blowdown, RLB (Steam Generator No. 1)
WSES-FSAR-UNIT-3  3-xxi    CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure    Title 3.6A-60  Blowdown, RAB (Steam Generator No. 1)
3.6A-61  Blowdown, RAB (Steam Generator no. 2)
3.6A-62  CVCS Letdown (RCB)
3.6A-63  Blowdown, RLB (Steam Generator No. 2)
3.6A-64  CVCS Charging (RCB, Penetration to Regenerative Heat Exchanger) 3.6A-65  CVCS Charging (RAB)
3.6A-66  CVCS Charging (RAB, From Pump A)
3.6A-67  CVCS Charging (RAB, From Pumps B and A/B)
3.6C-1  Typical Piping Bend
3.6C-2  Typical Piping Bend With Adjacent Break
3.6C-3  Pipe Break Experimental System
3.6C-4  Relap Model of Experimental System
3.6C-5  Bend Force Comparisons With Test
3.6C-6  Typical Piping Straight Run With Control Volumes
3.6C-7  Typical Piping Straight Run With Break
3.6C-8  Cold Water Experimental Force Comparison
3.6C-9  Assumed Rupture Disk Opening
3.7-1  Horizontal Response Spectrum Design Basis Earthquake 2% Damping -  Top of Pleistocene
3.7-2  Horizontal Response Spectrum Design Basis Earthquake 5% Damping -  Top of Pleistocene
3.7-3  Horizontal Response Spectrum Operating Basis Earthquake 2% Damping -  Top of Pleistocene
3.7-4  Horizontal Response Spectrum Operating Basis Earthquake 5% Damping -  Top of Pleistocene
WSES-FSAR-UNIT-3  3-xxii    CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.7-5  Vertical Response Spectrum Design Basis Earthquake 2% Damping - Top  of Pleistocene
3.7-6  Vertical Response Spectrum Design Basis Earthquake 5% Damping - Top  of Pleistocene
3.7-7  Vertical Response Spectrum Operating Basis Earthquake 2% Damping -  Top of Pleistocene
3.7-8  Vertical Response Spectrum Operating Basis Earthquake 5% Damping -  Top of Pleistocene
3.7-9  Mathematical Model For Seismic Analysis (Horizontal Excitations) 3.7-10  Mathematical Model for Seismic Analysis (Vertical Excitation) 3.7-11  Floor Spectra E-W SSE 1% Containment Vessel Elev. + 88 Ft. MSL 3.7-12  Floor Spectra E-W SSE 1% Internal Structure Elev. + 46 Ft. MSL 3.7-13  Floor Spectra E-W SSE 1% Fuel Handling Bldg. Elev. + 21 Ft. MSL 3.7-14  Floor Spectra E-W SSE 1% Reactor Aux. Bldg. Elev. + 21 Ft. MSL 3.7-15  Floor Spectra E-W SSE 1% Foundation Mat Elev. - 35 Ft. MSL
3.7-16  Floor Spectra Vertical SSE 1% Containment Vessel Elev. + 88 Ft. MSL 3.7-17  Floor Spectra Vertical SSE 1% Internal Structure Elev. + 46 Ft. MSL 3.7-18  Floor Spectra Vertical SSE 1% Reactor Aux. Bldg. Elev. + 21 Ft. MSL 3.7-19  Floor Spectra Vertical SSE 1% Fuel Handling Bldg. Elev. + 21 Ft. MSL 3.7-20  Floor Spectra Vertical SSE 1% Foundation Mat Elev. - 35 Ft. MSL 3.7-21  Reactor Building Mathematical Torsion Model 3.7-22  Stability Against Overturning For Seismic Category I Structures
3.7-23  Reactor Coolant System Seismic Analysis Model
3.7-24  Pressurizer Seismic Analysis Model
3.7-25  Surge Line Seismic Analysis Model
3.7-26  Seismic Protection Analysis Sample Problem No. 1
WSES-FSAR-UNIT-3  3-xxiii    CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.7-27  Seismic Protection Analysis Sample Problem No. 2 (Sheet 1) 3.7-28  Seismic Protection Analysis Sample Problem No. 2 (Sheet 2) 3.7-29  Seismic Protection Analysis Sample Problem No. 3
3.7-30  Representative Node Locations Seismic Mathematical Model 3.7-31  Reactor Internals Linear Lateral Seismic Model
3.7-32  Reactor Internals Linear Vertical Seismic Model 3.7-33  Reactor Internals Nonlinear Lateral Seismic Model
3.7-34  Reactor Core Horizontal Nonlinear Seismic Model 3.7-35  Core - Support Barrel Upper Flange Finite - Element Model 3.7-36  Schematic Representation of the Theoretically Modeled 150 Inch CEDM 3.7A-1  Variation of Shear Modulus with Time (Level 19) 3.7A-2  Variation of Shear Modulus with Time (Level 13) 3.7A-3  Soil Shear Modulus Distribution During Safe Shutdown Earthquake 3.7A-4  Soil Shear Modulus During Safe Shutdown Earthquake
3.8-1  Seismic Category I Structural Layout
3.8-2  Reactor Building Containment Vessel
3.8-3  Reactor Containment Building Piping Penetrations 3.8-4  Reactor Containment Building Piping Penetrations 3.8-5  Reactor Containment Building Pipe Penetrations
3.8-6  Electrical Penetrations Penetration Outline Sheet 1 of 2 3.8-6  Electrical Penetrations Concrete Inserts Sheet 2 of 2 3.8-7  OBE Seismic Coefficients For Steel Containment Vessel 3.8-8  SSE Seismic Coefficients For Steel Containment Vessel
3.8-9  Combination of Latitudinal and Meridional Stresses For the Containment Vessel 
WSES-FSAR-UNIT-3  3-xxiv Revision 11 (05/01)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.8-10  Formulas For Calculating Containment Vessel Stresses Resulting From Vertical  Axial Forces
3.8-11  Formulas For Calculating Containment Vessel Stresses Resulting From Horizontal  Axial Forces
3.8-12  Dimensions and Plate Sizes For Containment Vessel Bottom Head
3.8-13  Schematic of Column to Containment Shell Junction
3.8-14  Schematic of Containment Vessel Knuckle Section
3.8-15  Containment Vessel Bottom Elliptical Head:  Computer Model
3.8-16  Load Development For Containment Vessel Personnel Lock
3.8-17  Model for CB&I Program 1027
3.8-18  Containment Penetration Model Used in CB&I Program 1036 M
3.8-19  Containment Penetration Model Used in CB&I Program 1392
3.8-20  Containment Penetration Model Used In CB&I Program 1392
3.8-21  Shell Model Showing Points of Stress Summary
3.8-22  Allowable Buckling Stresses For Unstiffened Hemispherical Head 3.8-23  Allowable Buckling Stresses For Cylindrical Vessel
3.8-24  Allowable Buckling Stress For SA-516 Grade 70 Material
3.8-25  Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 0 After a LOCA
3.8-26  Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 20 Min.
After a LOCA
3.8-27  Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 50 Min.
After a LOCA
3.8-28  Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 2 Hours After a LOCA
3.8-29  Post Weld Heat Treatment:  Thermocouple and Furnace Arrangement (Elevation) 3.8-30  Post Weld Heat Treatment:  Thermocouple and Furnace Arrangement (Plan) 
WSES-FSAR-UNIT-3  3-xxv Revision 9 (12/97)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.8-31  Reactor Building Structural Layout
3.8-32  Reactor Primary Shield and Refueling Canal Masonry Sheet 1 of 2
3.8-32  Reactor Primary Shield and Refueling Canal Masonry Sheet 2 of 2
3.8-33  Reactor Primary Shield and Refueling Canal - Reinforcement Sheet 1 of 2
3.8-33  Reactor Primary Shield and Refueling Canal - Reinforcement Sheet 2 of 2
3.8-34  Reactor Building Reactor Vessel Support
3.8-35  Reactor Building Equipment Supports
3.8-36  Reactor Building Steam Generator Sliding Base
3.8-37  Reactor Building Reactor Coolant System Support
3.8-38  Reactor Building Reactor Coolant System Supports and Stops 3.8-39  Reactor Building Reactor Coolant System Supports and Stops 3.8-40  Shield Building Dome - Masonry
3.8-41  Shield Building Dome - Reinforcement (Typical)
3.8-42  Reactor Auxiliary Building Structural Layout
3.8-43  Fuel Handling Building Structural Layout
3.8-44  Shield Building Cylinder Development
3.8-45  Common Foundation Mat - Masonry (Typical)
3.8-46  Common Foundation Mat - Reinforcement (Typical)
3.9-47  Unacceptable and Acceptable Fusion Conditions 3.9-1  ASHSD Finite Element Model of the CSB System
3.9-2  Full Power DE Outlet Break Radial Pressure Difference Across Core Support Barrel 3.9-3  Full Power DE Inlet Break Radial Pressure Difference Across Core Support Barrel 3.9-4  Sammsor/Dynasor Finite Element Model of Core Support Barrel 3.9-5  DELETED
WSES-FSAR-UNIT-3  3-xxvi Revision 9 (12/97)  CHAPTER 3  LIST OF FIGURES (Cont'd)
Figure      Title 3.9-6  Detailed Vertical Internals Model
3.9-7  Detailed Horizontal Internals Mode
3.9-8  Reduced Internals Model
3.9-9  Reactor Vertical Arrangement
3.9-10  Maine Yankee Reactor Vertical Arrangement
3.9-11  Fort Calhoun - Unit 1 Reactor Vertical Arrangement
3.9-12  Closed System Arrangement for Safety Relief Valves
3.9-13  Control Element Drive Mechanism (Magnetic Jack)
3.9-14  Pressure Vessel, Core Support Barrel Snubber Assembly
3.9-15  Core Shroud Assembly
3.9-16  Upper Guide Structure Assembly
3.9-17  In-Core Instrument Support Assembly
3.9-18  In-Core Instrument Nozzle
3.9-19  Intentionally Deleted
3.9-20  General Flow Chart for Piping Vibration Testing 
WSES-FSAR-UNIT-3  3-xxvii Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 3 Section    Cross References 
Revision 12-B Section 3.2.1  ER-W3-1999-9544-001/DRN 03-291 Table 3.2-1 Sht 23 Table 3.2-1 Sht 26 Table 3.9-9 Sht 13
Section 3.6.2.1.3  ER-W3-2000-0563-000/DRN 00-0958 Section 3.6A.6.4.2.1
Revision 12-C Table 3.2-1 Sht 24  ER-W3-2003-0227-000/DRN 03-633 Table 3.2-1 Sht 25
Revision 13 Section 3.9.1.2  ER-W3-2000-1073-000/DRN 02-1196 Table 3.9C-30
Section 3.6A.6.4.2.1  ER-W3-2003-0271-000/DRN 03-774
Table 3.2-1 Sht 5  ER-W3-2000-0106-002/DRN 03-759 Table 3.2-1 Sht 6
Section 3.3.2.3  ER-W3-2002-0510-000/DRN 03-1823
Figure 3.9-18  ER-W3-2003-0135-000/DRN 03-1921
Revision 13-A Table 3.9-1 Sht 9  ER-W3-99-0557-00-00/DRN 99-868
Revision 13-B Table 3.9-9 Sht 8  ER-W3-2004-0143-000/DRN DRN 04-515 Table 3.9-9 Sht. 10 Table 3.9-9 Sht. 18 Table 3.9-9 Sht. 24
Revision 14 Section, 3.1.4 ER-W3-2001-1149-000/DRN 03-2056 Section, 3.6.1.2 Section, 3.6.2.1.1 Section, 3.6.2.1.1.1 Section, 3.6.2.1.1.2 Section, 3.6.2.3.1 Section, 3.6.2.5.1 Section, 3.6.3 Section, 3.6A.1.1.5.2 Section, 3.6A.6.3 Section, 3.7.3.14.2.1 Section, 3.7.3.14.2.2 Section, 3.7.3.14.2.3 Section, 3.7.3.14.2.5 Section, 3.9.1.2 Section, 3.9.1.5 
WSES-FSAR-UNIT-3  3-xxviii Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 3 Revision 14 Cont'd Section 3.9.2.5.1 ER-W3-2001-1149-000/DRN 03-2056 Section 3.9.2.5.1.1 Section 3.9.2.5.1.5 Section 3.9.2.5.2 Section 3.9.2.5.3 Section 3.9.3.4 Section 3.9.4.3 Section 3.9.5.1.1 Section 3.9.5.1.1.1 Section 3.9.5.1.1.3 Section 3.9.5.1.2 Section 3.9.5.1.4 Section 3.9.5.3.2 Section 3.9.5.4.1 Section 3.11.3 Reference, 3.6 Reference, 3.9 Table 3.6A-18 Table 3.6A-19 Table 3.6A-20 Table 3.6A-21 Table 3.9-1 sh 1-2 Table 3.9-12 Table 3.9-13 Table 3.9-21 Figure 3.6A-38d Figure 3.6A-54 Figure 3.6A-57 Figure 3.6A-58 Figure 3.6A-59 Figure 3.6A-60 Figure 3.6A-61 Figure 3.6A-62 Figure 3.6A-63 Figure 3.6A-64 Figure 3.6A-65 Figure 3.6A-66 Figure 3.6A-67 Appendix 3.9E 
Section 3.6A.6.3 ER-W3-2001-1149-000/DRN 05-163 Section 3.11-3 
Section 3.1.16 ER-W3-2002-0110-001/DRN 04-1095
Figure 3.9-17 ER-W3-2004-0137-000/DRN 04-1959 Figure 3.9-18 
Figure 3.8.32 ER-W3-2004-0137-002/DRN 05-557
Section 3.2.1 ER-W3-2004-0276-001/DRN 05-127 Section 3.5.1 Section 3.5.1.4.1 Section 3.6.1.1 Table 3.11 sheets 1-8 
Table 3.9-9 sheet 11 ER-W3-2004-0618-000/DRN 05-40
Table 3.9-9 sheet 3 ER-W3-2005-0273-000/DRN 05-1063 Table 3.9-9 sheet 10 Table 3.9-9 sheet 14 WSES-FSAR-UNIT-3  3-xxix Revision 15 (03/07)  UPDATE REFERENCE LIST  Chapter 3 Revision 14 Cont'd Table 3.9-9 sheet 3 ER-W3-2005-0302-000/DRN 05-1133 Table 3.9-9 sheet 9 Table 3.9-9 sheet 16 Table 3.9-9 sheets 23-24 
Table 3.11-1 page 8 ER-W3-2005-0500-000/DRN 05-1549
Revision 14-A Table 3.2-1 sheet 8 ER-W3-2004-0523-000/DRN 05-1572
Section 3.2.2 ER-W3-1998-0840-001/DRN 05-1637
Section 3.6A.6.4.1 ER-W3-2005-0033-000/DRN 05-1388
Section 3.8.3.3.1 ER-W3-2004-0331-000/DRN 05-1534
Table 3.9-9 sheet 6 ER-W3-2004-0523-000/DRN 05-1572
Table 3.9-10 sheet 1 ER-W3-2004-0523-000/DRN 05-1572
Table 3.11-1 sheet 2 ER-W3-2000-0334-000/DRN 04-1197 Table 3.11-1 sheet 3 
Revision 14-B Section 3.6.1.2 ER-W3-2005-0442-000/DRN 06-291 Section 3.6A.6.4.2.2 
Table 3.2-1 sh 8 ER-W3-2006-0178-000/DRN 06-499 Table 3.9-9 sh 6 Table 3.9-10 sh 1 
Revision 15 Table 3.2-1 Sh. 8 ER-W3-2004-0523-000/DRN 05-1572 Table 3.9-9 Sh. 6 Table 3.9-10 Sh. 1 
Table 3.9-1 Sh. 1 ER-W3-2006-0190-000/DRN 06-555
Table of Contents ER-W3-2006-0109-000/DRN 06-734 Figure 3.6-2 Table 3.6A-14 Figure 3.6A-38f 
Section 3.5.1.3.7 ER-W3-2006-0164-000/DRN 06-758
==References:==
Section 3.5 Section 3.5.1.3.3 
Section 3.6 ER-W3-2006-0258-000/DRN 06-803 Section 3.6.2.1.1.2 Section 3.6.2.1.1.3 
Section 3.1.48 ER-W3-2006-0281-000/DRN 06-870 Table 3.2-1 Sh. 9 Table 3.2-1 Sh. 11 Table 3.2-1 Sh. 12 Table 3.2-1 Sh. 21 Table 3.2-1 Sh. 24 Table 3.2-1 Sh. 25 WSES-FSAR-UNIT-3  3-xxx Revision 304 (06/10)  UPDATE REFERENCE LIST  Chapter 3 Revision 15 Cont'd Table 3.9C-2 ER-W3-2006-0223-000/DRN 06-882
Table 3.6-5 Sh. 1 ER-W3-2006-0223-000/DRN 06-883 Table 3.6-5 Sh. 2 Table 3.6-5 Sh. 3 Table 3.6-5 Sh. 4 Table 3.6-5 Sh. 8 
Table 3.2-1 Sh. 1 ER-W3-2006-0223-000/DRN 06-903 Table 3.2-1 Sh. 2 Table 3.2-1 Sh. 3 Table 3.2-1 Sh. 4 Table 3.2-1 Sh. 8 Table 3.2-1 Sh. 25 
Section 3.6.2.3.4 ER-W3-2006-0223-000/DRN 06-913 Section 3.7.2.1.1.4 Section 3.7.3.1.1.2 Section 3.7.3.14.1.2 
Table 3.9-1 Sh. 1 ER-W3-2006-0245-000/DRN 06-1001 Table 3.9-3 
Table 3.9-9 Sh. 9 ER-W3-1999-0557-004/DRN 06-1183
Table 3.6A-3 Sh. 3 ER-W3-2007-0030-000/DRN 07-39 Figure 3.6A-16 
Revision 301 Section 3.1.37 EC-5000082443 Section 3.1.38 
Revision 302 Section 3.11.1 EC-658 Section 3.11.3 
Table 3.9-9 Sh. 22 EC-935 Section 3.9.1.1.1 Section 3.9.1.2.1.22 
Table 3.11-1 Sh. 3 EC-10297
Revision 304 Section 3.8.2.3 EC-706 EC-18219
Table 3.9-9 Sh. 22 EC-13981 Table 3.9C-2 Section 3.9.1.1.2 
Table 3.9-9 Sh. 16 EC-18248
Section 3.7.2.6 EC-18996 Section 3.7.3.1.1.2 
Table 3.9-9 Sh. 11 EC-19716 Table 3.9C-3 Sh. 1 WSES-FSAR-UNIT-3  3-xxxi Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 3 
Section    Cross References Revision 305 Table 3.2-1 Sheet 5 of 27 EC-4019
Section 3.6.1.2 EC-19087 Section 3.6.2.3.1 Section 3.6.2.5 Section 3.6.3 Section 3.6:  References Section 3.6A Table 3.6A-8 Figure 3.6A-36a Figure 3.6A-36b Figure 3.6A-38c 
Section 3.8.3.8 EC-26170 Section 3.8.4.8 
Table 3.9-8 Sheet 2 of 2 EC-26496
Table 3.9-9 Sheet 22 of 24 EC-14765 Table 3.9C-1 Sheet 12 of 12 
Section 3.4-1 EC-29230
Revision 306 Section 3.8.4.1.3 EC-14275
Section 3.6.2.3.4 EC-29816 Section 3.9.1.5.2 
Revision 307 Section 3.7.3.14.2.5 EC-1020 Section 3.7.4.1 Section 3.9.1.2.2.1.3 Section 3.9.1.2.2.1.4 Section 3.9.1.2.2.1.9 Section 3.9.1.2.2.2.3 Section 3.9.5.1.4 Figure 3.9-9 Figure 3.9-18 
Table 3.5-4 (Sh. 2 of 2) EC-2800 Section 3.7.3.14.2.2 Section 3.7.3.14.2.3 Section 3.7.3.14.2.5 Section 3.9.1.2.2.2.1 b Section 3.9.1.2.2.2.2 Section 3.9.1.2.2.2.3 Section 3.9.4.1.1.3 Section 3.9.4.2 Section 3.9.4.4.1.1 Section 3.9.4.4.1.2 Section 3.9.4.4.1.3 Section 3.9:  References Table 3.9-12 
Section 3.8.4.1.1 EC-8427 Figure 3.8-44 
WSES-FSAR-UNIT-3  3-xxxii Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 3 
Section    Cross References Revision 307 (continued)
Section 3.6.2.5.1 EC-8433 Figure 3.8-37 Figure 3.8-38 Figure 3.8-39 
Section 3.9.1.2.1.23 EC-8435 Section 3.9.1.2.2 Table 3.6A-1 Figure 3.6A-1 Figure 3.6A-3 
Section 3.8.3.1.5 EC-8438 Figure 3.8-35 Figure 3.8-36 
Table 3.6A-3 Sh. 1 of 5 EC-8439 Table 3.6A-3 Sh. 3 of 5 Table 3.6A-3 Sh. 4 of 5 Table 3.6A-3 Sh. 5 of 5 Table 3.6A-8 Figure 3.6A-8 Figure 3.6A-14 Figure 3.6A-21 Figure 3.6A-26 Figure 3.6A-38c Table 3.6-5 Sh. 5 of 10 Table 3.6-5 Sh. 7 of 10 Table 3.6-5 Sh. 8 of 10 Table 3.6-5 Sh. 9 of 10 
Section 3.7.3.1.2.1 EC-8458 Section 3.7.3.1.2.2 Section 3.7.3.1.2.3 Section 3.7.3.1.3 Section 3.7.3.1.4 Table 3.7-12 Table 3.7-13 Figure 3.7-23 Figure 3.7-25 Section 3.7.3.14.2.2 Section 3.7.3.14.2.5 Section 3.7.4.1 Section 3.7:  REFERENCES Section 3.9.1.1 Section 3.9.1.2.2.1.1 Section 3.9.1.2.2.1.2 Section 3.9.1.2.2.2.3 Section 3.9.1.2.2.2.4 Section 3.9.1.5.2 Section 3.9:  REFERENCES Table 3.9-1 Table 3.9-3 Appendix 3.9E Section 3.9.1.2.2.1.34 Section 3.9.1.2.2.1.35 
Section 3.9.1.2.2.3 EC-12610
Table 3.2-1 Sh. 2 of 27 EC-33471 Table 3.2-1 Sh. 26 of 27 WSES-FSAR-UNIT-3  3-xxxiii Revision 308 (11/14)  UPDATE REFERENCE LIST  Chapter 3 
Section    Cross References Revision 307 (continued)
Figure 3.6A-20 EC-38445
Section 3.4.1 EC-41046
Table 3.9-9 Sh. 1 of 24 EC-41355 Table 3.9-9 Sh. 4 of 24 Table 3.9-9 Sh. 5 of 24 Table 3.9-9 Sh. 6 of 24 Table 3.9-9 Sh. 11 of 24 Table 3.9-9 Sh. 17 of 24 
Table 3.8-37 Sh. 1 of 2 EC-41857
Table 3.2-1 Sh. 25 of 27 EC-44877
Revision 308 Section 3.5.3.2.1 EC 40242 Table 3.5-13 
Section 3.8.3.2.3 LBDCR 14-018 Section 3.8.6.13 Section 3.8.4.1.1 
Table 3.2-1 Sh. 13 of 27 LBDCR 13-016 Table 3.2-1 Sh. 23 of 27 LBDCR 13-016
Table 3.6a-26 EC 45581 Table 3.6a-27 
WSES-FSAR-UNIT-3  4-i Revision 308 (11/14)  REACTOR  CHAPTER 4  TABLE OF CONTENTS Section      Title      Page
4.0  REACTOR        4.1-1
4.1  SUMMARY DESCRIPTION      4.1-1
==4.1  REFERENCES==
4.1-3
4.2  FUEL SYSTEM DESIGN      4.2-1
4.2.1  DESIGN BASES        4.2-1
4.2.2  DESCRIPTION AND DESIGN DRAWINGS    4.2-33 4.2.3  DESIGN EVALUATION        4.2-39
4.2.4  TESTING AND INSPECTION PLAN      4.2-63
==4.2  REFERENCES==
4.2-71
4.3  NUCLEAR DESIGN        4.3-1
4.3.1  DESIGN BASES        4.3-1
4.3-2  DESCRIPTION        4.3-3
4.3.3  ANALYTICAL METHODS      4.3-20
4.3.4  CHANGES        4.3-34
==4.3  REFERENCES==
4.3-35 (DRN 02-1538, R12; 04-502, R13; 05-508, R14; EC-30663, R307, LBDCR 14-008, R308) 4.3A  FUEL CYCLE 20        4.3A-1 (DRN 02-1538, R12; 04-502, R13; 05-508, R14; EC-30663, R307, LBDCR 14-008, R308) 4.3A.1  GENERAL DESCRIPTION      4.3A-1 4.3A.2  FUEL SYSTEM DESIGN      4.3A-1
4.3A.3  NUCLEAR DESIGN        4.3A-5
4.3A.4  THERMAL - HYDRAULIC DESIGN      4.3A-7
4.3A.5  REACTOR PROTECTION AND MONITORING SYSTEM  4.3A-8
4.3A.6  REFERENCES TO APPENDIX 4.3A      4.3A-9 WSES-FSAR-UNIT-3  4-ii  CHAPTER 4  TABLE OF CONTENTS (Cont'd)
Section      Title      Page
4.4  THERMAL AND HYDRAULIC DESIGN      4.4-1
4.4.1  DESIGN BASES        4.4-1
4.4.2  DESCRIPTION OF THERMAL AND HYDRAULIC    4.4-2  DESIGN OF THE REACTOR CORE
4.4.3  DESCRIPTION OF THE THERMAL AND HYDRAULIC    4.4-14  DESIGN OF THE REACTOR COOLANT SYSTEM (RCS) 4.4.4  EVALUATION        4.4-16
4.4.5  TESTING AND VERIFICATION      4.4-30
4.4.6  INSTRUMENTATION REQUIREMENTS      4.4-30 
==4.4  REFERENCES==
4.4-34
4.5  REACTOR MATERIALS      4.5-1
4.5.1  CONTROL ELEMENT DRIVE STRUCTURAL MATERIALS  4.5-1
4.5.2  REACTOR INTERNALS MATERIALS      4.5-4
==4.5  REFERENCES==
4.5-12
4.6  FUNCTIONAL DESIGN OF REACTIVITY CONTROL SYSTEMS  4.6-1
4.6.1  INFORMATION FOR CONTROL ELEMENT ASSEMBLY DRIVE SYSTEM 4.6-1
4.6.2  EVALUATIONS OF THE CEADS      4.6-1
4.6.3  TESTING AND VERIFICATION OF THE CEADS    4.6-2
4.6.4      INFORMATION FOR COMBINED PERFORMANCE OF REACTIVITY SYSTEMS 4.6-2 4.6.5  EVALUATIONS OF COMBINED PERFORMANCE    4.6-2
==4.6  REFERENCES==
4.6-3 WSES-FSAR-UNIT-3  4-iii  CHAPTER 4  LIST OF TABLES Table    Title
4.1-1  ANALYSIS TECHNIQUES
4.2-1  MECHANICAL DESIGN PARAMETERS
4.2-2  TENSILE TEST RESULTS ON IRRADIATED SAXTON CORE III CLADDING 4.3-1  NUCLEAR DESIGN CHARACTERISTICS
4.3-2  INTENTIONALLY DELETED
4.3-3  COMPARISON OF CORE REACTIVITY COEFFICIENT WITH THOSE USED IN VARIOUS  SAFETY ANALYSES
4.3-4  REACTIVITY COEFFICIENTS
4.3-5  WORTHS OF CEA GROUPS
4.3-6  CEA REACTIVITY ALLOWANCES 4.3-7  CALCULATED CEA WORTHS AND ALLOWANCES ()
4.3-8  COMPARISON OF RODDED AND UNRODDED PEAKING FACTORS FOR VARIOUS    RODDED CONFIGURATIONS AT BOC AND EOC
4.3-9  CALCULATED VARIATION OF THE AXIAL STABILITY INDEX DURING THE FIRST    CYCLE(a)  4.3-10  MAXIMUM FAST FLUX GREATER THAN 1 MeV (n/cm2sec) 4.3-11  CONTROL ELEMENT ASSEMBLY SHADOWING FACTORS 4.3-12  FUEL ROD DESCRIPTION
4.3-13  RESULTS OF ANALYSIS OF CRITICAL UO2 SYSTEMS 4.3-14  RESULTS OF ANALYSIS OF PuO2 -UO2 FUELED LATTICES 4.3-15  REACTION RATES
4.3-16  BEGINNING OF CYCLE, ZERO POWER UNRODDED CHARACTERISTICS  4.3-17  CONTROL ROD WORTH, BEGINNING OF CYCLE () HOT - ZERO POWER  4.3-18  COMPARISONS OF CALCULATED AND MEASURED CEA WORTHS ()  4.3-19  AT-POWER ISOTHERMAL TEMPERATURE COEFFICIENTS WSES-FSAR-UNIT-3  4-iv Revision 308 (11/14) CHAPTER 4  LIST OF TABLES Table    Title
4.3-20  POWER DISTRIBUTIONS SUMMARY OF CALCULATION AND MEASUREMENT    UNCERTAINTIES
4.3-21  AXIAL XENON OSCILLATIONS
4.3-22  DENSIFICATION CHARACTERISTICS
4.3-23  RADIAL PIN POWER CENSUS (DRN 04-502, R13; 05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-1  CYCLE 20 CORE LOADING (DRN 04-502, R13; 05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-2  NOMINAL PHYSICS CHARACTERISTICS 4.3A-3  LIMITING VALUES OF REACTIVITY WORTHS AND ALLOWANCES    FOR HOT FULL POWER STEAM LINE BREAK,    END-OF-CYCLE (EOC)
4.3A-4  REACTIVITY WORTH OF CEA REGULATING GROUPS  AT HOT FULL POWER,  (DRN 04-502, R13; 05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-5  CYCLE 20 THERMAL HYDRAULIC PARAMETERS AT FULL POWER (DRN 04-502, R13; 05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308)  4.4-1  THERMAL AND HYDRAULIC PARAMETERS
4.4-2  COMPARISON OF THE DEPARTURE FROM NUCLEATE BOILING RATIOS    COMPUTED WITH DIFFERENT CORRELATIONS
4.4-3  REACTOR COOLANT FLOWS IN BYPASS CHANNELS
4.4-4  REACTOR VESSEL BEST ESTIMATE PRESSURE LOSSES AND COOLANT  TEMPERATURES
4.4-5  DESIGN STEADY STATE HYDRAULIC LOADS ON VESSEL INTERNALS  AND FUEL ASSEMBLIES (a)  4.4-6  RCS VALVES AND PIPE FITTINGS
4.4-7  RCS DESIGN MINIMUM FLOWS
4.4-8  REACTOR COOLANT SYSTEM GEOMETRY
4.4-9  SAFETY INJECTION LINES LENGTHS
4.4-10  REACTOR COOLANT SYSTEM COMPONENT THERMAL AND HYDRAULIC DATA (a) 4.6-1  POSTULATED EVENTS REQUIRING OPERATION OF TWO OR MORE REACTIVITY    CONTROL SYSTEMS WSES-FSAR-UNIT-3  4-v Revision 308 (11/14) CHAPTER 4  LIST OF FIGURES 
Figure    Title
4.1-1  REACTOR VERTICAL ARRANGEMENT
4.1-2  REACTOR CORE CROSS-SECTION
4.2-1  CIRCUMFERENTIAL STRAIN VS TEMPERATURE 4.2-2  DESIGN CURVE FOR CYCLIC STRAIN USAGE OF ZIRCALOY-4 AT 700F 4.2-3  FUEL ROD INTERNAL PRESSURE VARIATION WITH BURNUP AND POWER  LEVEL MINIMUM PRESSURE ROD
4.2-4  FUEL ROD INTERNAL PRESSURE VARIATION WITH BURNUP AND POWER  LEVEL MAXIMUM PRESSURE ROD (DRN 02-1477, R12) 4.2-5 CONTROL ELEMENT ASSEMBLY  (DRN 02-1477, R12) (DRN 01-1103, R12) 4.2-6 FIGURE INTENTIONALLY DELETED 4.2-7  FIGURE INTENTIONALLY DELETED (DRN 01-1103, R12) 4.2-8  FUEL ASSEMBLY 4.2-9  FUEL SPACER GRID
4.2-10  FUEL ROD (DRN 02-1538, R12) 4.2-10A  COMPARISON OF URANIA ROD ASSEMBLY FEATURES (DRN 02-1538, R12) (LBDCR 14-008, R308) 4.2-10B  COMPARISON OF URANIA ROD ASSEMBLY FEATURES (LBDCR 14-008, R308) 4.2-11  BURNABLE POISON ROD (DRN 02-1538, R12; 06-1059, R15) 4.2-11A  COMPARISON OF BURNABLE ABSORBER RODS (DRN 02-1538, R12; 06-1059, R15) (LBDCR 14-008, R308) 4.2-11B  COMPARISON OF BURNABLE ABSORBER RODS (LBDCR 14-008, R308) 4.2-12  CONTROL ELEMENT ASSEMBLY LOCATIONS 4.3-1  FUEL MANAGEMENT PATTERN
4.3-2  PLANAR AVERAGE POWER DISTRIBUTION BOC, UNRODDED, FULL  POWER, NO XENON
4.3-3  PLANAR AVERAGE POWER DISTRIBUTION BOC, UNRODDED FULL POWER, EQUILIBRIUM XENON
4.3-4  PLANAR AVERAGE POWER DISTRIBUTION EOC, FULL POWER, EQUILIBRIUM XENON 4.3-5  PLANAR AVERAGE POWER DISTRIBUTION BOC, BANK 6 FULL IN, FULL POWER,  NO XENON WSES-FSAR-UNIT-3  4-vi Revision 9 (12/97) CHAPTER 4  LIST OF FIGURES (Cont'd)
Figure    Title
4.3-6  PLANAR AVERAGE POWER DISTRIBUTION BOC, BANK 6 FULL IN, FULL    POWER EQUILIBRIUM XENON
4.3-7  PLANAR AVERAGE POWER DISTRIBUTION EOC, BANK 6 FULL IN,    FULL POWER EQUILIBRIUM XENON
4.3-8  PLANAR AVERAGE POWER DISTRIBUTION BOC, PART-LENGTH ROD  AS IF FULL LENGTH, FULL POWER, NO XENON
4.3-9  PLANAR AVERAGE POWER DISTRIBUTION BOC PART LENGTH ROD  AS IF FULL LENGTH, FULL POWER, EQUILIBRIUM XENON 4.3-10  PLANAR AVERAGE POWER DISTRIBUTION EOC PART LENGTH ROD  AS IF FULL LENGTH, FULL POWER, EQUILIBRIUM XENON 4.3-11  PLANAR AVERAGE POWER DISTRIBUTION BOC, PART LENGTH ROD  AS IF FULL LENGTH BANK 6 FULL IN, FULL POWER NO XENON 4.3-12  PLANAR AVERAGE POWER DISTRIBUTION EOC, PART LENGTH ROD AS IF  FULL LENGTH BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON  4.3-13  PLANAR AVERAGE POWER DISTRIBUTION EOC, PART-LENGTH ROD AS IF FULL  LENGTH BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON  4.3-14  AXIAL POWER DISTRIBUTION, BOC, UNRODDED 4.3-15  AXIAL POWER DISTRIBUTION, AT 3,000 MWD/MTU UNRODDED 4.3-16  AXIAL POWER DISTRIBUTION AT 6,000 MWD/MTU UNRODDED 4.3-17  AXIAL POWER DISTRIBUTION AT 9,000 MWD/MTU UNRODDED 4.3-18  AXIAL POWER DISTRIBUTION AT THE END OF THE FIRST CYCLE,  UNRODDED
4.3-19  DELETED
4.3-20  DELETED
4.3-21  DELETED
4.3-22  DELETED
4.3-23  DELETED WSES-FSAR-UNIT-3  4-vii  CHAPTER 4  LIST OF FIGURES (Cont'd)
Figure    Title
4.3-24  DELETED
4.3-25  DAILY REACTOR POWER MANEUVERING NEAR BEGINNING OF CYCLE  (100% TO 35% TO 100% POWER)
4.3-26  DAILY REACTOR POWER MANEUVERING NEAR END OF CYCLE (100% TO 35% TO    100% POWER)
4.3-27  DAILY REACTOR POWER MANEUVERING NEAR THE BEGINNING OF CYCLE    (100% TO 50% TO 100% POWER)
4.3-28  DAILY REACTOR POWER MANEUVERING NEAR THE END OF CYCLE  (100% TO 50% TO 100% POWER)
4.3-29  DAILY REACTOR POWER MANEUVERING NEAR THE BEGINNING OF  CYCLE (2-HOUR RAMPS)
4.3-30  DAILY REACTOR POWER MANEUVERING NEAR THE END OF CYCLE  (2-HOUR RAMPS) 4.3-31  FNQ VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 1 OF 3)  4.3-31  FNQ VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 2 OF 3)  4.3-31  FNQ VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 3 OF 3)  4.3-32  FNR VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 1 OF 3)  4.3-32  FNR VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 2 OF 3)  4.3-32  FNR VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 3 OF 3)  4.3-33  NORMALIZED POWER DISTRIBUTION WITHIN TYPICAL UNSHIMMED ASSEMBLY 4.3-34  FUEL TEMPERATURE COEFFICIENT VS EFFECTIVE FUEL TEMPERATURE 4.3-35  MODERATOR TEMPERATURE COEFFICIENT VS MODERATOR TEMPERATURE AT BOC 1 4.3-36  MODERATOR TEMPERATURE COEFFICIENT VS MODERATOR TEMPERATURE AT EOC 1 4.3-37  MODERATOR DENSITY COEFFICIENT VS DENSITY 4.3-38  FUEL TEMPERATURE CONTRIBUTION TO POWER COEFFICIENT AT EOC 4.3-39  CEA BANK IDENTIFICATION
4.3-40  TYPICAL POWER DEPENDENT CEA INSERTION LIMIT WSES-FSAR-UNIT-3  4-viii Revision 9 (12/97)  CHAPTER 4  LIST OF FIGURES (Cont'd)
Figure    Title
4.3-41  INTEGRAL WORTH VS WITHDRAWAL AT ZERO POWER, EOC CONDITIONS 4.3-42  INTEGRAL WORTH VS WITHDRAWAL AT FULL POWER EOC, EQUILIBRIUM  XENON CONDITIONS
4.3-43  REACTIVITY DIFFERENCE BETWEEN FUNDAMENTAL AND EXCITED  STATES OF A BARE CYLINDRICAL REACTOR
4.3-44  EXPECTED VARIATION OF THE AZIMUTHAL STABILITY INDEX  4.3-45  STABILITY INDEX  4.3-46  ROD SHADOWING EFFECT VS ROD POSITION FOR ROD INSERTION AND  WITHDRAWAL TRANSIENTS AT PALISADES
4.3-47  TYPICAL THREE SUB CHANNEL ANNEALING
4.3-48  GEOMETRY LAYOUTS
4.3-49  COMPARISON OF MEASURED AND CALCULATED SHAPE ANNEALING  CORRECTION FOR PALISADES
4.3-50  TYPICAL TEMPERATURE DEFECT VS REACTOR INLET TEMPERATURE 4.3-51  COMPARISON OF CALCULATED AND MEASURED PLUTONIUM TO URANIUM  MASS RATION IN THE ASYMPTOTIC NEUTRON SPECTRUM FOR YANKEE 4.3-52  PLUTONIUM ISOTOPIC COMPOSITION VS FUEL DEPLETION IN THE  ASYMPTOTIC SPECTRUM FOR YANKEE
4.3-53  CRITICAL BORON - REACTIVITY DEPLETION OF PALISADES
4.3-54  CRITICAL BORON FOR MAIN YANKEE
4.3-55  CRITICAL BORON FOR FORT CALHOUN  4.3-56  LIMITING INTEGRAL RADIAL PIN POWER DISTRIBUTION  4.3-57  A DIVERGENT AXIAL OSCILLATION IN AN EOC CORE WITH REDUCED POWER  FEEDBACK (//) = 0.96 X 10-4KWFT  4.3-58  DAMPING COEFFICIENT VS REACTIVITY DIFFERENCE BETWEEN FUNDAMENTAL  AND EXCITED STATE  4.3-59  LIMITING SINGLE GAP POWER PEAKING AND ASSOCIATED ROD LOCATION  RELATIVE TO THE GAP LOCATION
4.3-60  AUGMENTATION FACTOR WSES-FSAR-UNIT-3  4-ix Revision 308 (11/14) CHAPTER 4  LIST OF FIGURES (Cont'd)
Figure    Title (LBDCR 14-008, R308) 4.3A-1 WATERFORD 3 - INTEGRAL BURNABLE POISON SHIM AND ENRICHMENT ZONING PATTERNS (LBDCR 14-008, R308) 4.3A-1A WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-1B WATERFORD 3 - FIGURE INTENTIONALLY DELETED (DRN 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-2  WATERFORD 3 - CYCLE 20 FUEL MANAGEMENT SCHEME  (DRN 04-502, R13; 05-508, R14) 4.3A-3  WATERFORD 3 - CYCLE 20 ASSEMBLY AVERAGE BURNUP (DRN 04-502, R13; 05-508, R14; 06-1059, R15) 4.3A-3a  WATERFORD 3 - CYCLE 20 BEGINNING OF CYCLE FROM SHORT ENDPOINT OF    PREVIOUS CYCLE (BOCS) ASSEMBLY AVERAGE BURNUP
4.3A-3b  WATERFORD 3 - CYCLE 20 END OF CYCLE FROM LONG ENDPOINT OF    PREVIOUS CYCLE (EOCL) ASSEMBLY AVERAGE BURNUP (EC-30663, R307, LBDCR 14-008, R308) 4.3A-4  WATERFORD 3 - CEA BANK IDENTIFICATION 4.3A-5  WATERFORD 3 - IN-CORE INSTRUMENT ASSEMBLIES CORE LOCATIONS
4.3A-6  WATERFORD 3 - PDIL FOR REGULATING GROUPS (DRN 04-502, R13, LBDCR 14-008, R308) 4.3A-7  WATERFORD 3 - CEA GROUP P INSERTION LIMIT VS THERMAL POWER (DRN 05-508, R14; 06-1059, R15; EC-30663, R307) 4.3A-8  WATERFORD 3 - CYCLE 20 ASSEMBLY RELATIVE POWER DENSITY,  BOC HFP, EQUILIBRIUM XENON, ARO
4.3A-9  WATERFORD 3 - CYCLE 20 ASSEMBLY RELATIVE POWER DENSITY  MOC, HFP, EQUILIBRIUM XENON, ARO
4.3A-10  WATERFORD 3 - CYCLE 20 ASSEMBLY RELATIVE POWER DENSITY    EOC, HFP, EQUILIBRIUM XENON, ARO (DRN 04-502, R13; 05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308)  4.3A-11  WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-12  WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-13  WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-14  WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-15  WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-16  WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-17  FUEL ROD AND LOWER END FITTING CHANGES 4.3A-18  FUEL ROD DESIGNS WSES-FSAR-UNIT-3  4-x Revision 308 (11/14) CHAPTER 4  LIST OF FIGURES (Cont'd)
Figure    Title (DRN 02-1538, R12) 4.3A-18a COMPARISON OF URANIA ROD ASSEMBLY FEATURES (DRN 02-1538, R12) (LBDRC 14-008, R308) 4.3A-18b COMPARISON OF URANIA ROD ASSEMBLY FEATURES 4.3A-19  POISON ROD DESIGNS (DRN 02-1538, R12; 06-1059, R15) 4.3A-19b COMPARISON OF BURNABLE ABSORBER RODS (DRN 02-1538, R12; 06-1059, R15, LBDCR 14-008, R308) 4.4-1  CORE WIDE PLANAR POWER DISTRIBUTION FOR SAMPLE DNB ANALYSIS 4.4-2  ROD RADIAL POWER FACTORS IN HOT ASSEMBLY FOR SAMPLE DNB ANALYSIS
4.4-3  TYPICAL AXIAL POWER DISTRIBUTIONS
4.4-4  AVERAGE VOID FRACTIONS AND QUALITIES AT THE EXIT OF  DIFFERENT CORE REGIONS
4.4-5  AXIAL DISTRIBUTION OF VOID FRACTION AND QUALITY IN  THE SUB CHANNEL ADJACENT TO THE ROD WITH MINIMUM DNBR 4.4-6  REACTOR VERTICAL ARRANGEMENT SHOWING BYPASS FLOW PATHS 4.4-7  ISOMETRIC VIEW OF THE REACTOR COOLANT SYSTEM
4.4-8  SAFETY INJECTION SYSTEM (SHEET 1 OF 4)
4.4-8  SAFETY INJECTION SYSTEM (SHEET 2 OF 4) (DRN 01-416) 4.4-8  SAFETY INJECTION SYSTEM (SHEET 3 OF 4) (DRN 01-416) 4.4-8  SAFETY INJECTION SYSTEM (SHEET 4 OF 4) 4.4-9  PRESSURE DROP PREDICTIONS FOR A 21-ROD BUNDLE
4.4-10  SENSITIVITY OF MINIMUM DNBR TO SMALL CHANGES IN REACTOR COOLANT CONDITIONS
4.4-11  VIBRATION AND LOOSE PARTS MONITORING SYSTEM SCHEMATIC 4.6-1  REACTOR VESSEL CLOSURE HEAD PLAN VIEW CEPM LAYOUT WSES-FSAR-UNIT-3  4-xi Revision 14 (12/05) UPDATE REFERENCE LIST  Chapter 4 Section    Cross References Revision 12-B Section 4.3A.6  ER-W3-2000-1027/DRN 03-270
Revision 13 Section 4.2.1.2.1  ER-W3-2003-0678/DRN 03-1821
TOC Page 4-i  ER-W3-2003-0654/DRN 04-502 TOC Page 4-iv TOC Page 4-ix Section 4.2.4.2.3.2 Table 4.2-1 Sht 3 Section 4.3A.1 Section 4.3A.2 Section 4.3A.3 Table 4.3A-1 Table 4.3A-5 Sht 1 Table 4.3A-5 Sht 2 Figure 4.3A-2 Figure 4.3A-3 Figure 4.3A-7 Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10
Revision 13-A Section 4.4.6.1  ER-W3-2003-0418-000/DRN 03-1689
Revision 14 Section 4.2.1 ER-W3-2001-1149-000/DRN 03-2058 Section 4.2.1.2.2.1 Section 4.2.1.2.5 Section 4.2.1.3.3 Section 4.2.1.3.3.1 Section 4.2.1.3.3.3 Section 4.2.3.1.2.3 Section 4.2.3.1.3 Section 4.3A.4.1 Section 4.3A.4.2 Section 4.4.1.1 Section 4.4.2.6.3 Section 4.5.2.4.2.3 
Table 4.3A-5 Table 4.6-1 
WSES-FSAR-UNIT-3  4-xii Revision 15 (03/07) UPDATE REFERENCE LIST  Chapter 4 Section    Cross References Revision 14 Cont'd Section 4.2.1.2.4.4 ER-W3-2002-0110-001/DRN 04-1096 Section 4.2.1.2.7 Section 4.3.2.2.1 Section 4.4.1.3 Reference 4.4 
Section 4.4.6.1 ER-W3-2003-0418-001/DRN 04-1780
Table Of Contents ER-W3-2004-0116-003/DRN 05-508 Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.3 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 
Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 
Figure 4.3A-2 Figure 4.3A-3 Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 
Revision 15 Section 4.3.3.1.1 ER-W3-2006-0281-000/DRN 06-871 Section 4.4.4.2.1 Section 4.4.6.1 Section 4.6.5 
Section 4.2.1.1.5 ER-W3-2001-1023-000/DRN 06-895 Section 4.2.1.4.4 Section 4.2.4.1.2 Section 4.3.2.3.2 Section 4.3.3.1.2.1 Figure 4.3-57 Table 4.3-1 Sh. 1 
Section 4.3.2.7.2 ER-W3-2006-0223-000/DRN 06-914
WSES-FSAR-UNIT-3  4-xiii Revision 302 (12/08) UPDATE REFERENCE LIST  Chapter 4 Section    Cross References Revision 15 Cont'd Section 4.2.1.2.2.1 ER-W3-2004-0116-018/DRN 06-992 Table 4.2-1 Sh. 3 
Table of Contents ER-W3-2005-0447-004/DRN 06-1059 Section 4.2.1.1.2 Section 4.2.1.2.1 Section 4.2.1.2.2.1 Section 4.2.1.2.2.2 Section 4.2.1.2.5 Section 4.2.1.2.5.1 Section 4.2.1.2.8 Section 4.2.1.3 Section 4.2.2.2 Section 4.2.2.3 Section 4.2.3.1.3 Section 4.2.3.1.4 Section 4.2.3.3.1 Section 4.2:  References Table 4.2-1 Sh. 2 Figure 4.2-11A Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.1.2 Section 4.3A.2.3 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.3.3.3 Section 4.3:  References Table 4.3A-1 thru Table 4.3A-5 Figure 4.3A-1 thru Figure 4.3A-3 Figure 4.3A-8 thru Figure 4.3A-10 Figure 4.3A-19a 
Section 4.2.3.2.3 ER-W3-2004-0094-003/DRN 06-1141
Revision 302 Section 4.1 EC-9533 Figure 4.1.2a Section 4.2.1.1.2 Section 4.2.1.1.5 Section 4.2.1.1.7 
WSES-FSAR-UNIT-3  4-xiv Revision 302 (12/08) UPDATE REFERENCE LIST  Chapter 4 Section    Cross References Revision 302 Cont'd Section 4.2.1.1.8 Section 4.2.1.1.9 Section 4.2.1.2.1 Section 4.2.1.2.2.1 Section 4.2.1.2.2.2 Section 4.2.1.2.5 Section 4.2.1.2.6 Section 4.2.1.2.8 Section 4.2.2.1 Section 4.2.2.2 Section 4.2.2.3 Section 4.2.3.1.1 Section 4.2.3.1.3 Section 4.2.3.1.4 Section 4.2.3.2.3 Section 4.2.3.2.4.2 Section 4.2.3.2.7 Section 4.2.3.2.12 Section 4.2.4.1.1 Section 4.2.4.1.2 Section 4.2:  References Table 4.2-1 Sh. 1 Table 4.2-1 Sh. 2 Table 4.2-1 Sh. 3 Figure 4.2-8a Figure 4.2-10B Figure 4.2-11B Section 4.3:  References Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.1.2 Section 4.3A.2.3 Section 4.3A.2.4 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.3.3.1 Section 4.3A.3.3.2 Section 4.3A.3.3.3 Section 4.3A.4.1 Section 4.3A.4.2 Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 
WSES-FSAR-UNIT-3  4-xv Revision 304 (06/10) UPDATE REFERENCE LIST  Chapter 4 Section    Cross References Revision 302 Cont'd Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 Figure 4.3A-18b Figure 4.3A-19b Section 4.4.1.1 Section 4.4.2.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.9.4 Section 4.4.4.1 Section 4.4:  References 
Revision 304 Section 4.5.2.1 EC-10453
Section 4.2.2.2 EC-13881 Section 4.3.2.2.2 Section 4.3A Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 Figure 4.3A-19b Section 4.4.2.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.2.2.2 Section 4.4.2.4 Section 4.4.2.6.3 Section 4.4.2.8 WSES-FSAR-UNIT-3  4-xvi Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 4  Section    Cross References Revision 304 Cont'd Section 4.4.2.9.4 EC-13881 (Continued)
Section 4.4.4.1 Section 4.4.4.2.3 Section 4.4.4.5.2 Section 4.4:  References 
Figure 4.3A-5 EC-18688
Revision 305 Table 4.4-6 Sheet 2 of 3 EC-14765
Section 4.4.6.1 EC-26965
Revision 307 Section 4.1 EC-1020 Table 4.1-1 Sh. 1 of 3 
Section 4.1 EC-2800 Table 4.1-1 Sh. 1 of 3 Table 4.3-1 Sh. 1 of 2 Section 4.5.1.1 Section 4.5.1.3 Section 4.5.1.3.2 Section 4.5.1.3.3 Section 4.5.1.4 Section 4.5.2.4.2.2 Section 4.5.2.4.2.4 Section 4.5.2.4.3 Figure 4.6-1 
Table of Contents EC-30663 Section 4.2.1.1.7 Section 4.2.2.1 Section 4.3A Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Section 4.4.1.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.9.4 Section 4.4.4.1 WSES-FSAR-UNIT-3  4-xvii Revision 308 (11/14) UPDATE REFERENCE LIST  Chapter 4  Section    Cross References Revision 307 (Continued)
Figure 4.3A-1 EC-30663 (Continued)
Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 
Revision 308 Table of Contents  LBDRC 14-008 Section 4.3A Section 4.3A.1 Section 4.3A.2 Section 4.3A.2.3 Section 4.3A.2.4 Section 4.3A.2.5 Section 4.3A3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.6 Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 
WSES-FSAR-UNIT-3  5-i Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 TABLE OF CONTENTS Section      Title    Page5.0  REACTOR COOLANT SYSTEM AND CONNECTED  5.1-1    SYSTEMS5.1  SUMMARY DESCRIPTION    5.1-1 5.1.1    SCHEMATIC FLOW DIAGRAM    5.1-1 5.1.2    PIPING AND INSTRUMENT DIAGRAM  5.1-2 5.1.3    ELEVATION DRAWING    5.1-2 5.2  INTEGRITY OF REACTOR COOLANT PRESSURE    5.2-1    BOUNDARY5.2.1    COMPLIANCE WITH CODES AND CODE CASES  5.2-1 5.2.2    OVERPRESSURIZATION PROTECTION  5.2-4 5.2.3    REACTOR COOLANT PRESSURE BOUNDARY  5.2-6    MATERIALS 5.2.4    INSERVICE INSPECTION AND TESTING    5.2.15    OF REACTOR COOLANT PRESSURE BOUNDARY 5.2.5    DETECTION OF LEAKAGE THROUGH REACTOR  5.2-18    COOLANT PRESSURE BOUNDARY 5.
==2.5    REFERENCES==
5.2-27 (DRN 03-2059, R14) 5.2A  WATERFORD-3 OVERPRESSURE PROTECTION REPORT  5.2A-1 5.2A.1    DELETED 5.2A.2    DELETED 5.2A.3    DELETED 5.2A    DELETED (DRN 03-2059, R14)
WSES-FSAR-UNIT-3  5-ii  CHAPTER 5  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 5.2B  LOW TEMPERATURE OVERPRESSURE PROTECTION  5.2B-1    DURING HEATUP, COOLDOWN, AND COLD SHUTDOWN 5.2B.1    SYSTEM DESCRIPTION      5.2B-1
5.2B.2    DESIGN CRITERIA      5.2B-1
5.2B.3    DESIGN AND ANALYSIS      5.2B-2
5.3  REACTOR VESSEL      5.3-1
5.3.1    REACTOR VESSEL MATERIALS    5.3-1
5.3.2    PRESSURE TEMPERATURE LIMITS    5.3-13
5.3.3    REACTOR VESSEL INTEGRITY    5.3-16
==5.3  REFERENCES==
5.3-19
5.4  COMPONENT AND SUBSYSTEM DESIGN    5.4-1 5.4.1    REACTOR COOLANT PUMPS    5.4-1
5.4.2    STEAM GENERATORS      5.4-10
5.4.3    REACTOR COOLANT PIPING    5.4-15
5.4.4    MAIN STEAM LINE FLOW RESTRICTIONS    5.4-17
5.4.5    MAIN STEAM LINE ISOLATION SYSTEM    5.4-17
5.4.6    REACTOR CORE ISOLATION COOLING SYSTEM  5.4-18
5.4.7    RESIDUAL HEAT REMOVAL SYSTEM    5.4-18
5.4.8    REACTOR WATER CLEANUP SYSTEM    5.4-18
5.4.9    MAIN STEAM LINE AND FEEDWATER PIPING  5.4-18 5.4.10    PRESSURIZER      5.4-18
5.4.11    QUENCH TANK (PRESSURIZER RELIEF TANK)  5.4-22 
WSES-FSAR-UNIT-35-iiiCHAPTER 5TABLE OF CONTENTS (Cont'd)Section TitlePage5.4.12VALVES5.4-255.4.13SAFETY AND RELIEF VALVES5.4-265.4.14COMPONENTS SUPPORT5.4-275.4.15REACTOR COOLANT GAS VENTING SYSTEM5.4-30 5.4.16REFUELING WATER LEVEL INDICATING SYSTEM5.4-345.4.17REACTOR COOLANT SHUTDOWN LEVEL5.4-35MEASUREMENT SYSTEM (RCSLMS)5.4ADYNAMIC ANALYSIS FOR THE WATERFORD 3 REACTOR VESSEL5.4A-iSUPPORT LOADS UNDER LOCA CONDITIONS5.4A.1PURPOSE5.4A-15.4A.2CONCLUSION5.4A-15.4A.3BACKGROUND5.4A-15.4A.4MODELS5.4A-2 5.4A-5FORCING FUNCTIONS5.4A-3 5.4A-6RESULTS5.4A-35.4AREFERENCES WSES-FSAR-UNIT-3  5-iv Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 LIST OF TABLES Table      Title5.1-1  Process Data Point Tabulation (DRN 05-930, R14)5.1-2  Parameters of Reactor Coolant System (DRN 05-930, R14)5.1-3  Nominal Reactor Coolant System Volumes 5.2-1  Codes and Addenda Applied to the Reactor Coolant Pressure Boundary 5.2-2  Applicable Code Cases 5.2-3  Reactor Coolant System Materials 5.2-4  Weld Materials for Reactor Coolant Pressure Boundary Components 5.2-5  Chemical Analyses of Plate Material in Waterford Unit 3 Reactor Vessel Beltline 5.2-6  Waterford Unit 3 Reactor Vessel Fracture Toughness Data 5.2-7  Waterford Unit 3 Piping Materials Fracture Toughness Data 5.2-8  Waterford 3 Pressurizer Materials Fracture Toughness Data 5.2-9  Waterford Unit 3 Steam Generator Materials Fracture Toughness Data 5.2-10  Reactor Coolant Leak Detection Sensitivity 5.2-11  ISI for Valves which form the Pressure Boundary of the RCS (DRN 03-2059, R14) 5.2A-1  Deleted (DRN 03-2059, R14) 5.3-1  Data Points used to Establish C-ERTNDT Shift Vs. Fluence and Percent Cv Upper  Shelf Drop Vs. (Fluence) 1/2 Design Curves for A-533-B Reactor Vessel Materials 5.3-2  Literature References for Table 5.3-1 5.3-3  Summary of Surveillance Materials Testing 5.3-4  Total Quantity of Specimens 5.3-5  Type and Quantity of Specimens for Unirradiated Tests 5.3-6  Type and Quantity of Specimens for Irradiation Exposure and Irradiated Tests WSES-FSAR-UNIT-3  5-v Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 LIST OF TABLES (Cont'd) Table      Title5.3-7  Candidate Materials for Neutron Threshold Detectors 5.3-8  Composition and Melting Points of Candidate Materials for Temperature  Monitors 5.3-9  Type and Quantity of Specimens Contained in Each Irradiation Capsule  Assembly 5.3-10  Capsule Assembly Removal Schedule 5.3-11  Waterford Unit 3 Reactor Vessel Closure Studs Data 5.3-12  Waterford Unit 3 Reactor Vessel Nuts and Washers Data 5.3-13  Waterford Unit 3 Reactor Vessel Materials (DRN 03-2059, R14) 5.3-14  Calculation of the Waterford Unit 3 RTPTS Values for 32 EFPY (DRN 03-2059, R14) 5.4-1  Reactor Coolant Pump Parameters 5.4-2  Steam Generator Parameters 5.4-3  Steam Generator Fabrication Testing 5.4-4  Reactor Coolant Piping Parameters 5.4-5  Reactor Coolant Piping Tests 5.4-6  Pressurizer Parameters 5.4-7  Pressurizer Tests 5.4-8  Quench Tank Parameters 5.4-9  Primary Safety Valve Parameters 5.4A-1  Results of LOCA Analysis of Reactor Vessel Supports 5.4A-2  Reactor Coolant System Model 5.4A-3  Pipe Break Summary 5.4A-4  Expanded Reactor Coolant System Model 350 in2 RV Inlet Nozzle Break 5.4A-5  Expanded Reactor Coolant System Model 600 in2 S.G. Inlet Nozzle Break WSES-FSAR-UNIT-35-viREACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURESFigure Title5.1-1REACTOR COOLANT SYSTEM ARRANGEMENT PLAN5.1-2REACTOR COOLANT SYSTEM ARRANGEMENT ELEVATION5.1-3FLOW DIAGRAM REACTOR COOLANT SYSTEM5.1-4FLOW DIAGRAM REACTOR COOLANT PUMP SEALS 5.2-1SECONDARY SYSTEM PRESSURE RELIEF5.2-2CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-15.2-3CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-2 5.2-4CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-35.2-5CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-15.2-6CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-2 5.2-7CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-3 5.2-8CHARPY TEST RESULTS BOTTOM HEAD TORUS M-1007-15.2-9CHARPY TEST RESULTS BOTTOM HEAD DOME M-1008-15.2-10CHARPY TEST RESULTS CLOSURE HEAD TOURS M-1005-1 5.2-11CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-15.2-12CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-25.2-13CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-3 5.2-14CHARPY TEST RESULTS CLOSURE HEAD DOME M-1006-1 5.2-15CHARPY TEST RESULTS CLOSURE HEAD FLANGE M-603-15.2-16CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-15.2-17CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-2 5.2-18CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-35.2-19CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-4 WSES-FSAR-UNIT-3  5-vii Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 LIST OF FIGURES (Cont'd) Figure      Title5.2-20  CHARPY TEST RESULTS OUTLET NOZZLE SAFE END M-1012-1 5.2-21  CHARPY TEST RESULTS OUTLET NOZZLE SAFE END M-1012-2 5.2-22  CHARPY TEST RESULTS OUTLET NOZZLE FORGING M-1011-1 5.2-23  CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-1 5.2-24  CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-2 5.2-25  CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-3 5.2-26  CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-4 5.2-27  CHARPY TEST RESULTS OUTLET NOZZLE FORGING M-1011-2 5.2-28  CHARPY TEST RESULTS VESSEL FLANGE M-1001-1 5.2-29  CHARPY V-NOTCH TESTS ENERGY ABSORBED VS TEMPERATURE 5.2-30  CHARPY V-NOTCH TESTS LATERAL EXPANSION VS TEMPERATURE (DRN 03-2059, R14) 5.2A-1  DELETED 5.2A-2  DELETED 5.2A-3  DELETED 5.2A-4  DELETED 5.2B-1  DELETED 5.2B-2  DELETED 5.2B-3  DELETED (DRN 03-2059, R14) 5.3-1  C-ERTNDT SHIFT CURVE A533-B PLATE AND WELD MATERIAL DATA GROUP  (  0.10WT%CU )
WSES-FSAR-UNIT-35-viiiRevision 11 (05/01)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURES (Cont'd)Figure Title5.3-2CHARPY TEST RESULTS BASE METAL PLATE M-1004-2 (RW)5.3-3CHARPY TEST RESULTS WELD METAL PLATE M-1004-1/M-1004-35.3-4CHARPY TESTS RESULTS HEAT AFFECTED ZONE METAL PLATE M-1004-25.3-5TYPICAL CHARPY SURVEILLANCE CAPSULE ASSEMBLY 5.3-6TYPICAL CHARPY IMPACT COMPARTMENT ASSEMBLY5.3-7TYPICAL TENSILE - MONITOR COMPARTMENT DETAIL5.3-8LOCATIONS OF SURVEILLANCE CAPSULE ASSEMBLIES 5.3-9REACTOR VESSEL FASTENERS CHARPY IMPACT ABSORBED ENERGY VS TEMPERATURE5.3-10REACTOR VESSEL FASTENERS LATERAL EXPANSION VS TEMPERATURE5.3-11REACTOR VESSEL 5.4-1REACTOR COOLANT PUMP OUTLINE 5.4-2REACTOR COOLANT PUMP AND SEAL5.4-3REACTOR COOLANT PUMP PERFORMANCE5.4-4ANTI-REVERSE ROTATION DEVICE 5.4-5STEAM GENERATOR5.4-6PRESSURIZER5.4-7PRESSURIZER LIQUID VOLUME PROGRAM 5.4-8TEMPERATURE CONTROL PROGRAM 5.4-9CONTROL ACTIONS RESULTING FROM HIGH OR LOW LEVEL ERROR SIGNALS5.4-10QUENCH TANK5.4-11PRIMARY SAFETY VALVE 5.4-12REACTOR COOLANT SYSTEM ARRANGEMENT AND SUPPORT POINTS WSES-FSAR-UNIT-35-ixRevision 11 (05/01)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURES (Cont'd)Figure Title5.4-13REACTOR VESSEL SUPPORTS5.4-14STEAM GENERATOR SUPPORTS5.4-15REACTOR COOLANT PUMP SUPPORTS5.4-16PRESSURIZER SUPPORTS 5.4-17REACTOR COOLANT SYSTEM VENTING SYSTEM5.4-18REFUELING WATER LEVEL INDICATING SYSTEM5.4-19REACTOR COOLANT SHUTDOWN LEVEL MEASUREMENT SYSTEM 5.4A-1RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL ARRANGEMENT5.4A-2RV ASYMMETRIC LOADS ANALYSIS PRIMARY COOLANT PIPE BREAK AT REACTOR INLETNOZZLE5.4A-3RV ASYMMETRIC LOADS ANALYSIS ASYMMETRIC HYDRAULIC LOADS INTERNAL TO THEVESSEL5.4A-4RV ASYMMETRIC LOADS ANALYSIS REACTOR CAVITY PRESSURE LOADS5.4A-5RV ASYMMETRIC LOADS ANALYSIS PIPE THRUST LOAD 5.4A-6RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL FORCES FOLLOWING LOCA 5.4A-7RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR COOLANT SYSTEM MODEL5.4A-8RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR INTERNALS MODEL5.4A-9RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR COOLANT SYSTEM 5.4A-10RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR INTERNALS5.4A-11RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONSSIMPLIFIED INTERNALS AND VESSEL5.4A-12RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONSDETAILED INTERNALS, SIMPLIFIED VESSEL WSES-FSAR-UNIT-35-xRevision 11 (05/01)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURES (Cont'd)Figure Title5.4A-13RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL LOCA SUPPORTS5.4A-14RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT LOADS5.4A-15RV ASYMMETRIC LOADS ANALYSIS 350 SQ. IN. COLD LEG GUILLOTINEAT RV NOZZLE MAX. RV VERTICAL SUPPORT LOAD VS TIME (TYP)5.4A-16RV ASYMMETRIC LOADS ANALYSIS 350 SQ. IN. COLD LEG GUILLOTINEAT RV NOZZLE MAX. RV HORIZONTAL SUPPORT LOAD VS TIME WSES-FSAR-UNIT-3  5-xi Revision 14 (12/05) UPDATE REFERENCE LIST  Chapter 5 
Section    Cross References Revision 13 Figure 5.4-9  ER-W3-2003-0373-000/DRN 03-1006
Figure 5.1-3  ER-W3-1998-0617-000/DRN 03-1348
Table 5.2-3 Sht 4  ER-W3-2001-1211-000/DRN 03-1707
Section 5.4.3.2  ER-W3-2003-0404-000/DRN 03-1268
Section 5.4.3.2  ER-W3-2001-1211-002/DRN 04-292
Revision 13-A Table 5.3-9  ER-W3-2004-0376/DRN 04-1049 Table 5.3-10
Section 5.2.5.1.1  ER-W3-2004-0396-002/DRN 04-1221 Section 5.2.5.1.2 Section 5.2.5.2 Table 5.2-10 Sht 1
Revision 14 Table of Contents ER-W3-2001-1149-000/DRN 03-2059 Section 5.2.2.1 Section 5.2.2.2 Section 5.2.5.1.2 Section 5.2B.1 Section 5.2B.3 Section 5.3.1.4 Section 5.3.1.6 Section 5.3.2.1 Section 5.3.2.3 Section 5.4.1.3 Section 5.4.1.4.1.2 Section 5.4.1.4.2 Section 5.4.2.1 Section 5.4.2.2 Section 5.4.11.1 Section 5.4.14.1 Section 5.4.14.2.2 Section 5.4.14.2.3 Section 5.4.14.3 References 5.3 WSES-FSAR-UNIT-3  5-xii Revision 14-B (06/06)UPDATE REFERENCE LIST Chapter 5 Section  Cross ReferencesRevision 14 Cont'dAppendix 5.2A ER-W3-2001-1149-000/DRN 03-2059 Cont'd Appendix 5.4A Table  5.1-1 Table 5.1-2 Table 5.2A-1 Table 5.3-10 Table 5.3-14 Table 5.4-1 sh 1 Table 5.4-2 Table 5.4-4 Figure 5.2A-1 Figure 5.2A-2 Figure 5.2A-3 Figure 5.2A-4 Figure 5.2B-2 Figure 5.2B-3 Figure 5.4-8  Section 5.4.11.1 ER-W3-2001-1149-000/DRN 05-316 Table of Contents ER-W3-2001-1149-000/DRN 05-930 Section 5.4.2.2 ER-W3-2002-0288-000/DRN 03-130 Section 5.4.3.2 ER-W3-2004-0122-000/DRN 05-892 Table 5.2-3 Table 5.4-6 sh 1 Figure 5.4-6  Section 5.4.1.3 ER-W3-2004-0276-000/DRN 05-150 Revision 14-ATable 5.2-3 sheet 1 ER-W3-2005-0441-000/DRN 05-1400 Table 5.2-3 sheet 2 Table 5.2-3 sheet 3 Table 5.2-3 sheet 4  Table 5.2-4 sheet 1 ER-W3-2005-0441-000/DRN 05-1400 Table 5.2-4 sheet 2  Section 5.4.1.4.1.1 ER-W3-2005-0436-000/DRN 05-1392 Revision 14-BSection 5.2.5.1.1 ER-W3-2006-0069-000/DRN 06-250 Section 5.4.2.2 ER-W3-2005-0442-000/DRN 06-290 WSES-FSAR-UNIT-3  5-xiii Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 5 Section  Cross ReferencesRevision 15Section 5.4.3.1 ER-W3-2006-0190-000/DRN 06-546 Section 5.4.10.1  Table 5.2-2 Sh. 1 ER-W3-2006-0194-000/DRN 06-552 Table 5.2-2 Sh. 2 Table 5.2-2 Sh. 3  Table 5.2-3 Sh. 4 ER-W3-2006-0186-000/DRN 06-720 Section 5.3.2.1 ER-W3-2006-0223-000/DRN 06-842 Section 5.2.3.3.2.1 ER-W3-2006-0281-000/DRN 06-872 Section 5.2.4 Section 5.3.1.3 Table 5.4-9  Table 5.2-10 Sh. 1 ER-W3-2006-0282-000/DRN 06-885 Table 5.2-11 Sh. 1 ER-W3-2006-0223-000/DRN 06-897 Table 5.2-11 Sh. 2 Table 5.2-11 Sh. 4 Table 5.2-11 Sh. 5 Table 5.3-4 Table 5.3-5 Table 5.3-6  Table 5.4-6 Sh. 1 ER-W3-2006-0223-000/DRN 06-904 Table 5.4-6 Sh. 2  Section 5.2.3.4.1.1.1 ER-W3-2006-0223-000/DRN 06-911 Section 5.2.3.4.2.1 Table 5.2-3 Sh. 1 Table 5.2-3 Sh. 2 Section 5.3.1.3 Section 5.3.2.2  Section 5.2.2.4 ER-W3-2006-0245-000/DRN 06-1002 Section 5.4.2.1 ER-W3-2005-0447-004/DRN 06-1060 Table 5.4-2 Sh. 1 Table 5.4-2 Sh. 2  Figure 5.1-2 ER-W3-2007-0002-000/DRN 07-2 WSES-FSAR-UNIT-3  5-xiv Revision 305 (11/11) UPDATE REFERENCE LIST  Chapter 5  Section    Cross References Revision 301 Section 5.4.15.2.3 EC-5000080002
Section 5.2.4.2 EC-5000082400
Section 5.2.5 EC-5000082424 Section 5.2.5.6 
Revision 302 Table 5.2-11 Sh. 1 EC-935 Table 5.2-11 Sh. 4 
Table 5.2-4 Sh. 2 EC-1830
Section 5.4.1.2.1.3 EC-6256 Section 5.2.5.1.7 Figure 5.1-4 
Revision 303 Table 5.2-2 Sh. 2 EC-14300
Revision 304 Figure 5.1-4 EC-18520 Section 5.4.1.2.1.3 
Section 5.4.2.3.1.3 EC-18652
Revision 305 Table 5.2-11 Sheet 1 of 5 EC-14765 Table 5.2-11 Sheet 4 of 5 
Section 5.2.5 EC-19087 Section 5.2.5.1.1 Section 5.2.5.1.10 Section 5.2.5.4 Section 5.2.5.5 Section 5.2.5:  References Section 5.4.3.2 
Section 5.4.1.3 EC-30077
WSES-FSAR-UNIT-3  5-xv Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 5 Section    Cross References Revision 307 Section 5.2.1.1 EC-1020 Section 5.2.3.3.1 Section 5.2.3.3.2.1 Table 5.2-1 Sheet 1 of 2 Table 5.2.2 Sheet 1 of 3 Table 5.2.3 Sheet 1 of 4 Table 5.2.4 Sheet 2 of 2 Table 5.2-6 Sheet 1 of 2 Table 5.2.6 Sheet 2 of 2 Figure 5.2-10 Figure 5.2-14 Figure 5.2-15 Section 5.3.1.1 Section 5.3.1.5 Section 5.3.3 Section 5.3.3.3 Section 5.3.3.4 Section 5.3.3.5 Figure 5.3-11 
Section 5.2.3.3.1 EC-2800 Section 5.2.3.4.1.1.1 Section 5.2.3.4.2.1 Table 5.2-1 Sheet 2 of 2 Table 5.2-2 Sheet 2 of 3 Table 5.2.3 Sheet 1 of 4 Table 5.2-4 Sheet 1 of 2 Table 5.2-4 Sheet 2 of 2 
Section 5.4.14.2.2 EC-8438 Figure 5.4-12 Figure 5.4-14 
Section 5.1 EC-8458 Table 5.1-1 Table 5.1-2 Table 5.1-3 Section 5.2.1.1 Table 5.2-1 Sheet 1 of 2 Table 5.2-3 Sheet 1 of 4 Table 5.2-3 Sheet 2 of 4 Table 5.2-9 Appendix 5.2A Appendix 5.2B Section 5.4.1.2.1.4 Section 5.4.1.3 Section 5.4.2.1 WSES-FSAR-UNIT-3  5-xvi Revision 308A (10/15) UPDATE REFERENCE LIST  Chapter 5 Section    Cross References Revision 307 (Continued)
Section 5.4.2.1 EC-8458 (Continued)
Section 5.4.2.2 Section 5.4.2.3.1.1 Section 5.4.2.3.1.4 Section 5.4.2.4.1 Section 5.4.4 Table 5.4-2 Sheet 1 of 2 Table 5.4-2 Sheet 2 of 2 Table 5.4-3 Table 5.4-4 Figure 5.4-5 Figure 5.4-8 Section 5.4.11.1 
Section 5.4.1.3 EC-38245   
Revision 308A Section 5.4  LBDCR 15-028 WSES-FSAR-UNIT-3  6-i  ENGINEERED SAFETY FEATURES  CHAPTER 6  TABLE OF CONTENTS Section      Title      Page 6.0  ENGINEERED-SAFETY FEATURES      6.0-1 6.1  ENGINEERED SAFETY FEATURE MATERIALS    6.1-1 6.1.1  METALLIC MATERIALS        6.1-1
6.1.2  ORGANIC MATERIALS        6.1-7
6.1.3  POST ACCIDENT CHEMISTRY      6.1-10 6.2  CONTAINMENT SYSTEMS      6.2-1 6.2.1  CONTAINMENT FUNCTIONAL DESIGN      6.2-1 6.
==2.1  REFERENCES==
6.2-36
6.2.2  CONTAINMENT HEAT REMOVAL SYSTEMS    6.2-38 6.
==2.2  REFERENCES==
6.2-51
6.2.3  SECONDARY CONTAINMENT FUNCTIONAL DESIGN    6.2-51 6.2.4  CONTAINMENT ISOLATION SYSTEM      6.2-59
6.2.5  COMBUSTIBLE GAS CONTROL IN CONTAINMENT    6.2-66 6.
==2.5  REFERENCES==
6.2-82
6.2.6  CONTAINMENT LEAKAGE TESTING      6.2-83
6.2A  WATEMPT-A COMPUTER CODE TO CALCULATE THE SHIELD BUILDING  6.2A-1  ANNULUS TRANSIENT 6.2A  REFERENCES        6.2A-3
6.2B  EBASCO MODIFICATIONS TO THE CONTEMPT - LT MOD 26  6.2B-1  COMPUTER MODE 6.2B  REFERENCES        6.2B-9
6.2C  DECLASSIFICATION OF FAN COOLER DUCTWORK:    6.2C-1  HEAT AND STEAM REMOVAL AND CONTAINMENT MIXING 6.2C  REFERENCES        6.2C-7
WSES-FSAR-UNIT-3  6-ii Revision 14 (12/05)  CHAPTER 6  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 6.3  EMERGENCY CORE COOLING SYSTEM      6.3-1 6.3.1  DESIGN BASIS        6.3-1
6.3.2  SYSTEM DESIGN        6.3-4
6.3.3  PERFORMANCE EVALUATION      6.3-18
6.3.4  TESTS AND INSPECTIONS      6.3-29
6.3.5  INSTRUMENTATION REQUIREMENTS      6.3-20
==6.3  REFERENCES==
6.3-33
6.3  BIBLIOGRAPHY        6.3-34
6.4  HABITABILITY SYSTEMS        6.4-1 6.4.1  DESIGN BASES        6.4-1
6.4.2  SYSTEM DESIGN        6.4-2
6.4.3  SYSTEM OPERATIONAL PROCEDURES      6.4-5
6.4.4  DESIGN EVALUATION        6.4-7
6.4.5  TESTING AND INSPECTION      6.4-11
6.4.6  INSTRUMENTATION REQUIREMENTS      6.4-12 (DRN 05-1247, R14)
==6.4  REFERENCES==
6.4-13 (DRN 05-1247, R14) 6.5  FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS    6.5-1  6.5.1  ENGINEERED SAFETY FEATURE (ESF) FILTER SYSTEMS    6.5-1 6.5.2  CONTAINMENT SPRAY AS FISSION PRODUCT CLEANUP SYSTEM  6.5-10 6.5.3  FISSION PRODUCT CONTROL SYSTEMS      6.5-14 6.6  INSERVICE INSPECTION OF CLASS 2 AND 3 COMPONENTS  6.6-1 6.6.1  COMPONENTS SUBJECT TO EXAMINATION    6.6-1
6.6.2  ACCESSIBILITY        6.6-1
6.6.3  EXAMINATION TECHNIQUES AND PROCEDURES    6.6-1
WSES-FSAR-UNIT-3  6-iii    CHAPTER 6  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 6.6.4  INSPECTION INTERVALS        6.6-1
6.6.5  EXAMINATION CATEGORIES AND REQUIREMENTS    6.6-2
6.6.6  EVALUATION OF EXAMINATION RESULTS    6.6-2
6.6.7  SYSTEM PRESSURE TESTS      6.6-2
6.6.8  AUGMENTED INSERVICE INSPECTION TO PROTECT    6.6-2 AGAINST POSTULATED PIPING FAILURES
WSES-FSAR-UNIT-3  6-iv Revision 12 (10/02)  ENGINEERED SAFETY FEATURES  CHAPTER 6  LIST OF TABLES Table      Title 6.1-1  PRINCIPAL ESF PRESSURE RETAINING MATERIALS
6.1-2  ENGINEERED SAFETY FEATURES STRUCTURAL MATERIALS THAT COULD BE EXPOSED TO CORE COOLING WATERS OR CONTAINMENT SPRAY
6.1-3  COATING MATERIALS IN THE CONTAINMENT
6.1-4  CONTAINMENT COATING MATERIALS ASSUMED TO FALL
6.1-5  UNQUALIFIED COATINGS SUBJECT TO JET IMPINGEMENT AND/OR CONTAINMENT    SPRAY AND PURCHASED PRIOR TO THE ISSUANCE OF REGULATORY GUIDE 1.54, JUNE 1973
6.2-1  POSTULATED ACCIDENTS FOR CONTAINMENT DESIGN
6.2-2  CALCULATED VALUES FOR CONTAINMENT PARAMETERS
6.2-3  PRINCIPAL CONTAINMENT DESIGN PARAMETERS
6.2-4  SUMMARY OF CALCULATED CONTAINMENT PRESSURE AND TEMPERATURE
6.2-5  INITIAL CONDITIONS FOR LOCA CONTAINMENT PEAK PRESSURE-TEMPERATURE  ANALYSIS
6.2-6  ENGINEERED SAFETY FEATURE SYSTEMS OPERATING ASSUMPTIONS FOR LOCA CONTAINMENT PEAK PRESSURE ANALYSIS
6.2-7  CONTAINMENT PASSIVE HEAT SINKS
6.2-8  SUMMARY OF PASSIVE HEAT SINKS USED IN THE CONTAINMENT ANALYSIS (DRN 01-230, R12) 6.2-9  DELETED (DRN 01-230, R12) 6.2-10  ACCIDENT CHRONOLOGIES
6.2-11  ASSUMPTIONS USED IN ANALYSIS OF INADVERTENT CONTAINMENT SPRAY SYSTEM  ACTUATION
6.2-12  MASS AND ENERGY RELEASE DATA
6.2-13  MASS ENERGY RELEASE DATA
6.2-14  REACTOR CAVITY RELAP INPUT DATA
6.2-15  STEAM GENERATOR SUBCOMPARTMENT RELAY INPUT DATA
WSES-FSAR-UNIT-3  6-v Revision 12 (10/02)  ENGINEERED SAFETY FEATURES  CHAPTER 6  LIST OF TABLES (Cont'd)
Table      Title 6.2-16  PRESSURIZER SUBCOMPARTMENT RELAY INPUT DATA
6.2-17  SUMMARY OF REACTOR COOLANT SYSTEM POSTULATED PIPE RUPTURES (DRN 01-230, R12) 6.2-18  DELETED (DRN 01-230, R12) 6.2-19  BLOWDOWN AND REFLOOD MASS AND ENERGY RELEASE DATA
6.2-20  INTENTIONALLY BLANK
6.2-21  DESIGN DATA FOR CONTAINMENT FAN COOLERS
6.2-22  DESIGN DATA FOR CONTAINMENT SPRAY SYSTEM COMPONENTS
6.2-23  CONTAINMENT HEAT REMOVAL SYSTEM DELAY TIMES (OFFSITE POWER AVAILABLE) 6.2-24  CONTAINMENT HEAT REMOVAL SYSTEM DELAY TIMES (LOSS OF OFFSITE POWER) 6.2-25  LOCATION AND QUANTITY OF MAJOR THERMAL INSULATION THERMAL INSULATION MATERIALS INSIDE CONTAINMENT
6.2-26  MATERIALS OF CONSTRUCTION FOR INSULATION USED INSIDE CONTAINMENT 6.2-27  FAILURE MODE AND EFFECTS ANALYSES CONTAINMENT HEAT REMOVAL SYSTEMS
6.2-28  DESIGN DATA FOR SHIELD BUILDING VENTILATION SYSTEM COMPONENTS
6.2-29  ADDITIONAL INFORMATION TO BE PROVIDED FOR DUAL - CONTAINMENT PLANTS
6.2-30  SHIELD BUILDING VENTILATION SYSTEM VALVE POSITIONS
6.2-31  FAILURE MODES AND EFFECT ANALYSIS - SHIELD BUILDING VENTILATION SYSTEM
6.2-32  CONTAINMENT PENETRATIONS AND ISOLATION VALVES
6.2-32a  FLUID SYSTEM PIPING DRAWINGS FOR CONTAINMENT PENETRATIONS AND ISOLATION  VALVES
6.2-33  DESIGN DATA FOR HYDROGEN ANALYZER SYSTEM
6.2-34  DESIGN DATA FOR HYDROGEN RECOMBINER SYSTEM
6.2-35  DESIGN DATA FOR CONTAINMENT ATMOSPHERE RELEASE SYSTEM COMPONENTS
6.2-36  PARAMETERS FOR ANALYSIS OF HYDROGEN GENERATION AND CONTROL 
WSES-FSAR-UNIT-3  6-vi Revision 14 (12/05)  ENGINEERED SAFETY FEATURES  CHAPTER 6  LIST OF TABLES (Cont'd)
Table      Title 6.2-37  CONTAINMENT ZINC AND ALUMINUM INVENTORY 6.2-38  FAILURE MODE AND EFFECTS ANALYSIS - HYDROGEN ANALYZER SYSTEM
6.2-39  FAILURE MODE AND EFFECTS ANALYSIS - HYDROGEN RECOMBINER
6.2-40  FAILURE MODE AND EFFECTS ANALYSIS - CARS
6.2-41  ELECTRICAL PENETRATION AND ASSEMBLIES
6.2-42  HATCHES AND AIR LOCKS
6.2-43  PENETRATIONS NOT REQUIRING TYPE C LEAK TESTING
6.2-44  CONTAINMENT ISOLATION VALVE WITH APPLIED TEST PRESSURE IN OPPOSITE DIRECTION
6.2-45  TYPICAL COMPONENTS CALCULATED AND QUALIFICATION TEMPERATURES
6.3-1  FAILURE MODE AND EFFECTS ANALYSIS SAFETY INJECTION SYSTEM
6.3-2  SAFETY INJECTION SYSTEM COMPONENTS PARAMETERS
6.3-3  POST-LOCA INSTRUMENTATION
6.3-4  SAFETY INJECTION SYSTEM PROCESS FLOW DATA
6.3-5 LONG TERM COOLING INSTRUMENTATION  6.3-5a  CORE AND SYSTEM PARAMETERS USED IN THE LTC ANALYSIS  (DRN 00-0550; 05-255, R13-B; 05-1247, R14) 6.3-6 HIGH PRESSURE SAFETY INJECTION PUMP MINIMUM DELIVERED FLOW TO THE RCS FOR A SMALL BREAK LOCA 6.3-6a DELETED (DRN 05-255, R13-B; 05-1247, R14)  6.3-7 DELETED (DRN 00-0550) 6.4-1  SUMMARY OF MAIN CONTROL ROOM HEAT RATE CALCULATIONS 6.4-2  SUMMARY SHEET FOR MAIN CONTROL ROOM AIR CONDITIONING SYSTEM
6.4-3  CONTROL ROOM AIR CONDITIONING SYSTEM DAMPER AND ISOLATION VALVE POSITIONS
6.4-4 GASES  AND VAPORS DETECTABLE BY BROAD RANGE GAS DETECTION SYSTEM
6.4-5  DELETED
WSES-FSAR-UNIT-3  6-vii Revision 14 (12/05)  ENGINEERED SAFETY FEATURES  CHAPTER 6  LIST OF TABLES (Cont'd)
Table      Title 6.5-1  COMPARISON OF ESF AIR FILTRATION SYSTEMS WITH (REGULATORY POSITIONS OF  REGULATORY GUIDE 1.52) (6/73)
6.5-2  CVAS OPERATING VALVE SCHEDULE
6.5-3  CONTROLLED VENTILATION AREA SYSTEM FAILURE MODES AND EFFECTS ANALYSIS (DRN 05-1247, R14) 6.5-4  DELETED (DRN 05-1247, R14) 6.5-5  SECONDARY CONTAINMENT OPERATION FOLLOWING A DESIGN BASIS ACCIDENT 6.5-6  CONTROLLED VENTILATION AREAS SYSTEM DESIGN BASIS DELAY TIMES (LOSS OF OFFSITE POWER)
WSES-FSAR-UNIT-3  6-viii Revision 14 (12/05)  ENGINEERED SAFETY FEATURES  CHAPTER 6  LIST OF FIGURES Figure      Title 6.1-1  DELETED (DRN 01-230, R12) 6.2-1  DELETED  (DRN 05-1247, R14) 6.2-1a  DELETED 6.2-1b  DELETED
6.2-1c  DELETED
6.2-1d  DELETED  6.2-1e  DELETED 6.2-1f  DELETED
6.2-1g  DELETED
6.2-1h  DELETED
6.2-1i  DELETED  6.2-1j  DELETED 6.2-1k  DELETED
6.2-1l  DELETED
6.2.1m  CONTAINMENT PRESSURE - 19.24 FT2 Hot Leg Break / Peak Containment Pressure 6.2.1n  CONTAINMENT VAPOR AND SUMP TEMPERATURE - 19.24 FT2 Hot Leg Break 6.2.1o  NOT USED
6.2.1p  CONTAINMENT PRESSURE - 9.82 FT2 Discharge Leg Break / Peak Cont. Pressure at 24 hours 6.2.1q  CONTAINMENT VAPOR AND SUMP TEMPERATURE - 9.82 FT2 Discharge Leg Break 6.2.1r  CONTAINMENT PRESSURE - 7.88 FT2 MSLB HFP - Failure of one Train of Containment Heat  Removal System / Peak Pressure Case 6.2.1s  CONTAINMENT TEMPERATURE - 7.88 FT2 MSLB HFP - Failure of one Train of Containment  Heat Removal System / EQ Case (DRN 05-1247, R14)  6.2-2  DELETED 6.2-3  DELETED  6.2-4  DELETED 6.2-4a  DELETED  6.2.5  DELETED 6.2-6  DELETED (DRN 01-230, R12)
WSES-FSAR-UNIT-3  6-ix Revision 304 (06/10)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 03-2060, R14) 6.2-6a  DELETED (DRN 03-2060, R14)  6.2.7a  DELETED
6.2-7b  DELETED (DRN 01-230, R12) 6.2-7c  DELETED 6.2-7d  DELETED
6.2.7e  DELETED
6.2-7f  DELETED
6.2-8  FIGURE NUMBER NOT USED
6.2-8a  DELETED
6.2-8b  DELETED  6.2-8c  DELETED
6.2-9  DELETED 6.2-10  FIGURE NUMBER NOT USED 6.2-10a  DELETED
6.2-10b  DELETED
6.2-10c  DELETED (DRN 01-230, R12) 6.2-11  DELETED 6.2-12  FIGURE NUMBER NOT USED (DRN 05-1247, R14) 6.2-12a  CONTAINMENT FAN COOLER PERFORMANCE  (DRN 05-1247, R14) (EC-706, R304) 6.2-12b  DELETED (EC-706, R304) 6.2-13  PRESSURE DIFFERENTIAL ACROSS SHIELD BUILDING FOLLOWING INADVERTENT SPRAY  ACTUATION (SHEET 1 OF 2)
6.2-13  PRESSURE DIFFERENTIAL ACROSS SHIELD BUILDING FOLLOWING INADVERTENT SPRAY  ACTUATION (SHEET 2 OF 2)  6.2-13a  DELETED 6.2-13b  DELETED (DRN 01-230, R12) 6.2-13c  DELETED 6.2-13d  DELETED (DRN 01-230, R12) 6.2-13e  GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL WSES-FSAR-UNIT-3  6-x Revision 12 (10/02)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title 6.2-13f  GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13g  GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13h  GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13i  GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13j  GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-14  REACTOR CAVITY SUBCOMPARTMENT MODEL
6.2-15  REACTOR CAVITY SUBCOMPARTMENT MODEL
6.2-16  STEAM GENERATOR SUBCOMPARTMENT MODEL
6.2-17  STEAM GENERATOR SUBCOMPARTMENT MODEL
6.2-18  STEAM GENERATOR SUBCOMPARTMENT MODEL
6.2-19  PRESSURIZER SUBCOMPARTMENT MODEL
6.2-20  CEFLASH - 4A REACTOR COOLANT SYSTEM NODAL MODEL (LEGEND FOLLOWS) 6.2-20a  LEGEND FOR FIGURE 6.2-20
6.2-20b  CEFLASH-4A FEEDWATER LINE BREAK NODAL MODEL
6.2-20c  CEFLASH-4A FEEDWATER LINE NODAL MODEL DESCRIPTION 6.2-21  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21a  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21b  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21c  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21d  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN  VOL. 1 6.2-21e  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21f  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21g  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21h  REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-22  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 WSES-FSAR-UNIT-3  6-xi Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title 6.2-22a  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22b  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22c  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22d  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22e  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22f  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22g  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22h  REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2  (DRN 05-1247, R14) 6.2-23  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN    VOL. 15
6.2-23a  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN    VOL. 15
6.2-23b  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN    VOL. 15
6.2-23c  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK    VOL. 15
6.2-23d  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN    VOL. 15
6.2-23e  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN    VOL. 15
6.2-23f  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN    VOL. 15
6.2-24  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-24a  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-24b  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-24c  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-24d  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-24e  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15 (DRN 05-1247, R14)
WSES-FSAR-UNIT-3  6-xii Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-1247, R14) 6.2-24f  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25a  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25b  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25c  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25d  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25e  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-25f  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK    IN VOL. 15
6.2-26  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-26a  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-26b  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-26c  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-26d  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-26e  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-26f  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK    IN VOL. 15
6.2-27  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15
6.2-27a  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15
6.2-27b  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15 (DRN 05-1247, R14)
WSES-FSAR-UNIT-3  6-xiii Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-1247, R14) 6.2-27c  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15
6.2-27d  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15
6.2-27e  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15
6.2-27f  STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15 (DRN 05-1247, R14) 6.2-27g  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  FEEDWATER CIRCUM. BREAK IN VOL. 22
6.2-27h  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  FEEDWATER CIRCUM. BREAK IN VOL. 22
6.2-27i  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  FEEDWATER CIRCUM. BREAK IN VOL. 22
6.2-27j  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  FEEDWATER CIRCUM. BREAK IN VOL. 22
6.2-27k  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  FEEDWATER CIRCUM. BREAK IN VOL. 22
6.2-27l  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  FEEDWATER CIRCUM. BREAK IN VOL. 22
6.2-27m  STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2  CIRCUM. BREAK IN VOL. 22
6.2-28  FIGURE NUMBER NOT USED
6.2-28a  PRESSURIZER SURGE LINE BREAK IN VOL. 1
6.2-28b  PRESSURIZER SURGE LINE BREAK IN VOL. 1
6.2-28c  PRESSURIZER SURGE LINE BREAK IN VOL. 1
6.2-28d  PRESSURIZER SURGE LINE BREAK IN VOL. 1
6.2-28e  PRESSURIZER SURGE LINE BREAK IN VOL. 1
6.2-28f  PRESSURIZER SURGE LINE BREAK IN VOL. 1 6.2-28g  PRESSURIZER SURGE LINE BREAK IN VOL. 1
6.2-29  FIGURE NUMBER NOT USED
6.2-29a  PRESSURIZER SAFETY RELIEF LINE BREAK IN VOL. 3 6.2-29b  PRESSURIZER SAFETY RELIEF LINE BREAK IN VOL. 3 WSES-FSAR-UNIT-3  6-xiv Revision 15 (03/07)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title 6.2-29c  PRESSURIZER SPRAY LINE DE GUILL BREAK IN VOL. 3
6.2-29d  PRESSURIZER SPRAY LINE DE GUILL BREAK IN VOL. 3 (DRN 06-1061, R15) 6.2-30a  0.6 x DE SLOT BREAK IN PUMP DISCHARGE LEG - FAN COOLER HEAT REMOVAL CAPACITY (DRN 06-1061, R15) 6.2-30a1  DELETED (DRN 06-1061, R15) 6.2-30b  0.6 x DOUBLE ENDED SLOT BREAK IN PUMP DISCHARGE LEG EFFECTIVE SPRAY AND SPILLAGE TO CONTAINMENT
6.2-30c  0.6 x DOUBLE ENDED SLOT BREAK IN PUMP DISCHARGE LEG CONDENSING HEAT TRANSFER COEFFICIENT FOR STATIC HEAT SINKS (DRN 06-1061, R15) 6.2-31  FIGURE NUMBER NOT USED (DRN 06-1061, R15) 6.2-31a  0.6 x DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG MINIMUM CONTAINMENT  PRESSURE
6.2-31b  0.6 x DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG CONTAINMENT TEMPERATURE 6.2-31c  0.6 x DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG SUMP TEMPERATURE (DRN 06-1061, R15) 6.2-32  FIGURE NUMBER NOT USED
6.2-32a  VELOCITY VS. TIME FOR NODE (29, 25)
* 6.2-32b  SAFETY RELATED COMPONENT HEAT SINK MODELS
6.2-32c  HEAT TRANSFER COEFFICIENT VS. TIME FOR 102% POWER MSLB WITH ONE COOLING TRAIN FAILURE
6.2-32d  SOLA MODEL OF CONTAINMENT TIME = 0.00 SEC.
6.2-32e  SOLA VELOCITY PROFILE TIME = 0.05 SEC.
6.2-32f  SOLA VELOCITY PROFILE TIME = 0.50 SEC.
6.2-32g  SOLA VELOCITY PROFILE TIME = 1.00 SEC.
6.2-32h  SOLA VELOCITY PROFILE TIME = 1.45 SEC.
6.2-32i  HEAT STRUCTURE MODEL FOR FAN COOLER MOTOR
6.2-32j  EQUIPMENT QUALIFICATION SURFACE VELOCITIES
6.2-33  FIGURE NUMBER NOT USED
6.2-33a  EQUIPMENT TEMP. VS. TIME FOLLOWING 102% POWER MSLB WITH ONE COOLING TRAIN FAILURE
6.2-34  DELETED
WSES-FSAR-UNIT-3  6-xv Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title 6.2-34a  COMPONENT DIAGRAMS (DRN 01-417) 6.2-35  DESIGN DATA FOR CONTAINMENT ATMOSPHERE RELEASE SYSTEM COMPONENTS (DRN 01-417) 6.2-36  HVAC - REACTOR BUILDING
6.2-37  HVAC - REACTOR BUILDING - SECTIONS
6.2-38  HVAC - REACTOR BUILDING
6.2-39  HVAC - REACTOR BUILDING
6.2-40  CONTAINMENT SPRAY PUMP CHARACTERISTICS
6.2-41  CONTAINMENT SPRAY PATTERNS - LOOP "A" PLAN
6.2-42  CONTAINMENT SPRAY PATTERNS - LOOP "B" - PLAN
6.2-43  CONTAINMENT SPRAY PATTERNS - LOOP "A" - ELEVATION
6.2-44  CONTAINMENT SPRAY PATTERNS - LOOP "B" - ELEVATION
6.2-45  SIS SUMP AND SCREEN DETAILS
6.2-45a  GRATING CAGE DESIGN AS TESTED
6.2-46  CONTAINMENT PRESSURE FOR SHIELD BUILDING ANNULUS TRANSIENT FOLLOWING  A 9.82 FT2 DESLS 6.2-47  FIGURE NUMBER NOT USED
6.2-47a  SHIELD BUILDING ANNULUS PRESSURE FOLLOWING A 9.82 FT2 DESLS 6.2-47b  SHIELD BUILDING ANNULUS PRESSURE FOLLOWING A 9.82 FT2 DESLS  6.2-47c  SBVS FAN FLOW CHARACTERISTICS VERSUS ANNULUS P 6.2-48  CONTAINMENT AND SHIELD BUILDING ANNULUS TEMPERATURE FOLLOWING A 9.82  FT2 DESLS 6.2-49  CONTAINMENT VESSEL SURFACE TEMPERATURE AS A FUNCTION OF TIME 6.2-49a  SHIELD BUILDING INTERIOR SURFACE TEMPERATURE AS A FUNCTION OF TIME
6.2-50  CONTAINMENT VESSEL TEMPERATURE GRADIENT AS A FUNCTION OF DISTANCE AND TIME
6.2-51  SBVS FAN PERFORMANCE CURVES
6.2-52  HYDROGEN ANALYZER SYSTEM FLOW DIAGRAM
6.2-53  COMBUSTIBLE GAS CONTROL SYSTEM HYDROGEN RECOMBINER SUBSYSTEM SCHEMATIC  FLOW DIAGRAM
6.2-54  POST-LOCA HYDROGEN AS A FUNCTION OF TIME WSES-FSAR-UNIT-3  6-xvi Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title 6.2-54a  DELETED
6.2-54b  DELETED
6.2-55  ZINC CORROSION RATE FOLLOWING A LOCA 6.2-55a  ALUMINUM CORROSION RATE FOLLOWING A LOCA 6.2-55b  ASSUMED HYDROGEN GENERATION RATE DUE TO PAINT FOLLOWING A LOCA
6.2-55c  LONG-TERM CONTAINMENT TEMP. TRANSIENT USED IN POST-LOCA HYDROGEN  GENERATION ANALYSIS
6.2-56  FAN COOLERS AH-1 (3A-SA) AND AH-1 (3B-SB) PEAK PRESSURE TRANSIENT  FOLLOWING A LOCA
6.2-57  FAN COOLERS AH-1 (3C-SA) AND AH-1 (3D-SB) PEAK PRESSURE TRANSIENT  FOLLOWING A LOCA
6.2-58  DUCT WORK PEAK PRESSURE TRANSIENT FOLLOWING A LOCA 6.2-59  DELETED
6.2-60  DELETED
6.2-61  DELETED
6.2-62  DELETED
6.2-63  DELETED
6.2-64  DELETED
6.2-65  CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 1 OF 4
6.2-66  CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 2 OF 4
6.2-67  CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 3 OF 4
6.2-68  CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 4 OF 4
6.2-69  GENERAL ARRANGEMENT 2'-6" X 6'-6" PERSONNEL LOCK 6.2-70  2'-6" X 6'-6" PERSONNEL LOCK INT & EXT DOOR DETAILS
6.2-71  PERSONNEL LOCK DOOR TIE-DOWN ASSEMBLY
6.2B-1  TEMP. GRADIENT IN GASEOUS AND LIQUID BOUNDARY LAYERS DURING HEAT SINK    SURFACE CONDENSATION
6.2B-2  SPRAY EFFICIENCY VS. STEAM/AIR RATIO (DRN 01-417) 6.3-1  FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 1 OF  (DRN 01-417) 6.3-1  FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 2 OF 4 WSES-FSAR-UNIT-3  6-xvii Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title 6.3-1  FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 3 OF 4
6.3-1  FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 4 OF 4
6.3-2  LPSI PUMP CHARACTERISTICS
6.3-2a  LPSI PUMP CHARACTERISTICS PUMP NO. 037225
6.3-2b  LPSI PUMP CHARACTERISTICS PUMP NO. 37256
6.3-3  HPSI PUMP CHARACTERISTICS
6.3-3a  HPSI PUMP CHARACTERISTICS PUMP NO. 0672174
6.3-3b  HPSI PUMP CHARACTERISTICS PUMP NO. 0672175
6.3-3c  HPSI PUMP CHARACTERISTICS PUMP NO. 0672176
6.3-4  FLOW DIAGRAM - SAFETY INJECTION SYS. INJECTION MODE
6.3-5  FLOW DIAGRAM - SAFETY INJECTION SYS. SHORT TERM RECIRCULATION
6.3-6  FLOW DIAGRAM - SAFETY INJECTION SYS. LONG TERM RECIRCULATION (LARGE    BREAKS)
6.3-7 FLOW DIAGRAM - SAFETY INJECTION SYS. LONG TERM RECIRCULATION (SMALL BREAKS) 6.3-8  FLOW DIAGRAM - SAFETY INJECTION SYS. SHUTDOWN COOLING MODE
6.3-9  LONG TERM COOLING PLAN
6.3-10  CORE FLUSH BY HOT SIDE INJECTION FOR 9.8 FT2 COLD LEG BREAK 6.3-11  INNER VESSEL BORIC ACID CONCENTRATION VS. TIME
6.3-12  RCS REFILL TIME VS. BREAK AREA
6.3-13  OVERLAP OF ACCEPTABLE LTC PROCEDURES IN TERMS OF COLD LEG BREAK SIZE
6.3-14  RCS PRESSURE AT DECISION POINT VS. BREAK AREA
6.4-1  CONTROL ROOM AIR CONDITIONING SYSTEM NORMAL OPERATING MODE 6.4-2  CONTROL ROOM AIR CONDITIONING SYSTEM EMERGENCY OPERATING MODE (HIGH  RADIATION) 6.4-3 CONTROL ROOM AIR CONDITIONING SYSTEM EMERGENCY OPERATING MODE (TOXIC GAS) 6.4-4  MAIN CONTROL ROOM BREATHING AIR SYSTEM
6.5-1  AN ARRANGEMENT DIAGRAM OF INSTRUMENTATION AND TESTING NOZZLES
6.5-2  FIGURE NUMBER NOT USED
WSES-FSAR-UNIT-3  6-xviii Revision 14 (12/05)  CHAPTER 6  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-1247, R14) 6.5-2a  DELETED
6.5-2b  DELETED
6.5-3 DELETED (DRN 05-1247, R14) 6.5-4  HVAC - REACTOR BUILDING WSES-FSAR-UNIT-3  6-xix Revision 13-A (09/04)  UPDATE REFERENCE LIST  Chapter 6 Section    Cross References Revision 12-B Table 6.2-32a Sht 2  ER-W3-2003-0132-000/DRN 03-274
Figure 6.4-1  ER-W3-1065-000/DRN 02-1612 Figure 6.4-2 Figure 6.4-3
Revision 13 Section 6.2.6.4  ER-W3-2002-0102-000/DRN 02-385 Table 6.4-4  ER-W3-2000-0948-000/DRN 02-1386
Table 6.3-1 Sht 16  ER-W3-2002-0335-000/DRN 02-1896 Figure 6.3-1 Sht 4
Table 6.2-32 Sht 29  ER-W3-2002-0585-000/DRN 03-169 Table 6.2-32 Sht 30
Table 6.2-32 Sht 47  ER-W3-2002-0283-002/DRN 03-1014 Table 6.2-32 Sht 48 Table 6.2-43 Sht 2
Section 6.2.2.2  ER-W3-2000-0912-001/DRN 03-1355 Table 6.2-25 Sh 1  ER-W3-2003-0687-000/DRN 03-1838 Table 6.2-25 Sht 2 Table 6.2-25 Sht 3 Table 6.2-26
Section 6.3.3.1  ER-2003-0117-000/DRN 03-1943 Revision 13-A Table 6.2-32 Sht 47  ER-W3-2002-0227-000/DRN 03-1543 Table 6.2-32 Sht 48 Table 6.2-44 Section 6.2.4.3.1
Table 6.2-32 Sht 62  ER-W3-2004-0419-000/DRN 04-1139 Table 6.2-32 Sht 63 Table 6.2-32 Sht 64 Table 6.2-32 Sht 65 Table 6.2-32 Sht 78 Table 6.2-32 Sht 79
Table 6.2-32 Sht 49  ER-W3-2004-0396-002/DRN 04-1220 WSES-FSAR-UNIT-3  6-xx Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 6 Section    Cross References 
Revision 13-B Section 6.2.1.1.1  ER-W3-2004-271/DRN 04-631 Section 6.2.1.3.7 Section 6.3.2.9.8 Section 6.3.3.1 Section 6.3.3.3 Section 6.3.3.3.1 Section 6.3.3.3.2 Section 6.3.3.4 Table 6.2-32 Sht. 85 Table 6.3-6 Table 6.3-6a
Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2060 Section 6.1.1.2 Section 6.2.1.1.1 Section 6.2.1.1.3 Section 6.2.1.2.3 Section 6.2.1.3.1 Section 6.2.1.3.6 Section 6.2.1.4 Section 6.2.1.4.1 Section 6.2.1.4.2 Section 6.2.1.4.3 Section 6.2.1.5.1 Section 6.2.1.5.2 Section 6.2.1.5.3 Section 6.2.1.5.3.2 Section 6.2.1.5.3.4 Section 6.2.1.5.3.6 Section 6.2.1.5.4 Section 6.2.2.2.2.1 Section 6.2.3.3.1 Section 6.2.4.1 Section 6.3.1.4.2 Section 6.3.2.9.8 Section 6.3.3.1 Section 6.3.3.2.1 Section 6.3.3.2.2 Section 6.3.3.2.3 Section 6.3.3.4.2 Section 6.3.3.5 Reference 6.2.1 Reference 6.2.2 
WSES-FSAR-UNIT-3  6-xxi Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 6 Section    Cross References 
Revision 14 Cont'd Table 6.2-1 sh 1 ER-W3-2001-1149-000/DRN 03-2060 Cont'd Table 6.2-3 Table 6.2-4 Table 6.2-5 Table 6.2-6 sh 2 Table 6.2-7 sh 2-3 Table 6.2-7 sh 5 Table 6.2-10 sh 1-2 Table 6.2-12 sh 16-18 Table 6.2-12 sh 19-22 Table 6.2.12G Table 6.2-12-13 sh 3-6 Table 6.2-13C sh 1-2 Table 6.2-19 sh 1-2 Table 6.2-23 Table 6.2-24 Table 6.2-32 sh 1 Table 6.2-32 sh 4 Table 6.2-32 sh 7 Table 6.2-32 sh 9 Table 6.2-32 sh 85 Table 6.3-2 Table 6.3-5 Table 6.3-5A Table 6.3-6 Figure 6.2-1A Figure 6.2-1B Figure 6.2-1C Figure 6.2-1D Figure 6.2-1E Figure 6.2-1F Figure 6.2-1G Figure 6.2-1H Figure 6.2-1I Figure 6.2-1J Figure 6.2-1K Figure 6.2-1L Figure 6.2-1M Figure 6.2-1N Figure 6.2-1O Figure 6.2-1P Figure 6.2-1Q Figure 6.2-1R Figure 6.2-1S Figure 6.2.6A Figure 6.2-12a Figure 6.2-22a Figure 6.2-23a-f Figure 6.2-24 Figure 6.2-24a-f Figure 6.2-25 Figure 6.2-25a-f WSES-FSAR-UNIT-3  6-xxii Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 6 Section    Cross References Revision 14 Cont'd Figure 6.2-26 ER-W3-2001-1149-000/DRN 03-2060 Cont'd Figure 6.2-26a-f Figure 6.2-27 Figure 6.2-27a-f Figure 6.2-30a Figure 6.2-56 Figure 6.3-9 Figure 6.3-10 Figure 6.3-12 Figure 6.3-13 Figure 6.3-14 
Section 6.3.3.1 ER-W3-2001-1149-000/DRN 05-196 Table 6.3-1 sh 7 Table 6.3-17 sh 13 Table 6.3-1 sh 17 
Section 6.3.3.4.1 ER-W3-2001-1149-000/DRN 05-315 Section 6.3.3.4.2 Section 6.3.3.4.4 Reference 6.3 Table 6.3-11 
Section 6.3.3.1 ER-W3-2001-1149-001/DRN 05-545 Section 6.3.3.3 Section 6.3.3.3.1 Section 6.3.3.3.2 Section 6.3.3.3.3 Section 6.3.3.3.4 Table 6.3-6 Table 6.3-6a Figure 6.2-30b Figure 6.2-31A-C 
Section 6.2.2.2.2 ER-W3-2001-1149-007/DRN 05-12 Table of Contents ER-W3-2001-1149-013/DRN 05-1247 Appendix 6.2A Table 6.2-1 sh 2 Table 6.2-12 sh 15 
Section 6.0 ER-W3-2004-0276-000/DRN 04-705 Section 6.1.3 Section 6.2.1.1.1 Section 6.2.3.1 Section 6.2.3.3.3 Section 6.2.4.2.3 Section 6.4.1 Section 6.4.2.2 Section 6.4.2.3 Section 6.4.2.4 Section 6.4.3.3 Section 6.4.4.1 WSES-FSAR-UNIT-3  6-xxiii Revision 14-A (03/06)  UPDATE REFERENCE LIST  Chapter 6  Section    Cross References Revision 14 Cont'd Section 6.5.1 ER-W3-2004-0276-000/DRN 04-705 Cont'd Section 6.5.1.1 Section 6.5.1.2.1.2 Section 6.5.1.2.2 Section 6.5.1.3 Section 6.5.2.1 Section 6.5.2.2 Section 6.5.2.3 Section 6.5.2.6 Section 6.5.3.1 Reference 6.4 Table 6.4-1 Table 6.4-2 Table 6.5-1 sh 1 Table 6.5-4 Table 6.5-5 Figure 6.5-2a-b Figure 6.5-3 
Section 6.2.1.1.3 ER-W3-2004-0276-002/DRN 05-1004 Table 6.2-2 page 1-2 ER-W3-2004-0478-000/DRN 04-1422 Table 6.2-15 sh 1-2 
Table 6.2-32 sh 2 ER-W3-2004-0618-000/DRN 05-41 Table 6.2-32 sh 5 Table 6.2-32 sh 8-12 Table 6.2-32 sh 59 Table 6.2-32 sh 77 
Section 6.2.6.1 ER-W3-2005-0012-000/DRN 05-75 Section 6.2.3.1 ER-W3-2005-0145-000/DRN 05-785 Section 6.2.3.2.2 Section 6.2.3.3.1 Appendix 6.2A 
Section 6.5.2.2 ER-W3-2005-0328-000/DRN 05-1138 Table 6.2-3 ER-W3-2005-0500-000/DRN 05-1550 Revision 14-A Section 6.2.1.1.3 ER-W3-2005-0546-000/DRN 05-1769  Section 6.3.3.5 ER-W3-2006-0057-000/DRN 06-230 WSES-FSAR-UNIT-3  6-xxiv Revision 15 (03/07)  UPDATE REFERENCE LIST  Chapter 6  Section    Cross References Revision 14-B Section 6.0 ER-W3-2004-0373-001/DRN 05-1135 Section 6.2.5.1 Section 6.2.5.2.2 Section 6.2.5.3 Section 6.2.5.4 Section 6.2.5 
Figure 6.2-38 ER-W3-2006-0108-000/DRN 06-326 Revision 15 Section 6.1.2.4 ER-W3-2003-0394-001/DRN 06-1026 Section 6.2.2.2.2.1 Section 6.2.2.3.2 Section 6.2.2.3.2.1 Table 6.2-22 Sh. 1 Figure 6.2-45 Section 6.3.2.2.2.3 
Figure 6.4-1 ER-W3-2003-0485-000/DRN 05-1062 Figure 6.4-2 Figure 6.4-3 
Section 6.2.2.3.2.1 ER-W3-2005-0395-000/DRN 05-1332 Table 6.2-22 Sh. 1 Section 6.3.2.2.2.3 
Table 6.3-6 ER-W3-2005-0447-002/DRN 05-1457
Table of Contents ER-W3-2005-0447-004/DRN 06-1061 Section 6.2.1.5.3 Section 6.2.1.5.3.1 Section 6.2.1.5.4 Table 6.2-7 Sh. 3 Table 6.2-19 Sh. 1 Table 6.2-19 Sh. 2 Table 6.2-19 Sh. 3 Figure 6.2-30A Figure 6.2-30B Figure 6.2-30c Figure 6.2-31A Figure 6.2-31B Figure 6.2-31C Section 6.3.3.1 Section 6.3.3.3.1 Section 6.3.3.3.2 Section 6.3.3.3.3 Section 6.3.3.4.1 Section 6.3.3.4.4 Section 6.3.3.5 Table 6.3-5A Figure 6.3-9 thru Figure 6.3-14 
WSES-FSAR-UNIT-3  6-xxv Revision 302 (12/08)  UPDATE REFERENCE LIST  Chapter 6  Section    Cross References Revision 301 Section 6.4.6.1 EC-5000081434 Section 6.5.1.6 
Section 6.4.4.2 EC-5000082258
Section 6.2.3.3.2 EC-5000082406 Table 6.2-28 Sh. 3 EC-5000081471 Section 6.4.2.2 Section 6.4.3.3 Table 6.4-1 Table 6.4-2 Section 6.5.3.2 
Revision 302 Section 6.3.3.5 EC-935 Table 6.2-32 Sh. 47 Table 6.2-32 Sh. 48 
Section 6.1.2.4 EC-999 Section 6.2.2.1 Section 6.2.2.2.2.1 Section 6.3.1.4 
Section 6.2.2.2.2.1 EC-1002 Section 6.2.2.3.2.1 Table 6.2-22 Sh. 1 Section 6.3.2.2.2.3 
Section 6.6.8 EC-2013
Section 6.4.4.2 EC-5435
Section 6.2.5.2 EC-6494 Table 6.2-34 Table 6.2-36 Table 6.2-37 Table 6.2-39 Figure 6.2-53 Figure 6.2-54 Figure 6.2-55 Figure 6.2-55a Figure 6.2-55b Figure 6.2-55c 
Section 6.2.1.5.3 EC-9533 Section 6.2.1.5.3.1 Section 6.2.1.5.3.2 Section 6.2.1.5.4 Section 6.2.1:  References Table 6.2-19 Sh. 1 
WSES-FSAR-UNIT-3  6-xxvi Revision 306 (05/12)  UPDATE REFERENCE LIST  Chapter 6  Section    Cross References Revision 302 (Continued)
Table 6.2-19 Sh. 2 Table 6.2-19 Sh. 3 Figure 6.2-30A Figure 6.2-30B Figure 6.2-30c Figure 6.2-31A Figure 6.2-31B Figure 6.2-31C Section 6.3.3.1 Section 6.3:  References Table 6.3-2 Sh. 2 
Revision 303 Table 6.2-32 Sh. 45 EC-14945
Revision 304 Table of Contents EC-706 Section 6.2.1.1.3 Table 6.2-2 Pg. 2 Table 6.2-3 Table 6.2-11 Sh. 1 Table 6.2-11 Sh. 2 Figure 6.2-12b (Deleted)
Figure 6.2-13 Sh. 1 Figure 6.2-13 Sh. 2 Table 6.2-1 Sh. 3 
Revision 305 Table 6.2-32 Sheet 47 of 85 EC-14765 Table 6.2-32 Sheet 48 of 85 Table 6.3-1 Sheet 5 of 17 
Section 6.2 EC-19087 Table 6.2-1 Sheet 3 of 3 Table 6.2.2 Sheet 1 of 2 
Section 6.3.2.8 EC-26496 Table 6.3-1 Sheet 1 of 17 
Revision 306 Section 6.2.1.2.1 EC-29816 Table 6.2-1 Sheet 2 Table 6.2-1 Sheet 3 
Section 6.3.3.4.4 EC-35592 Table 6.3-5A WSES-FSAR-UNIT-3  6-xxvii Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 6  Section    Cross References Revision 307 Table 6.2-26 EC-1020
Section 6.1.1.1.1 EC-2800
Section 6.2.2.2.2.2 EC-8437 Table 6.2.25 Sheet 1 of 3 Table 6.2-26 
Section 6.2.1.1.1 EC-8458 Section 6.2.1.1.3 Section 6.2.1.3 Section 6.2.1.3.7 Section 6.2.1.3.8 Section 6.2.1.4 Section 6.2.1.4.2 Section 6.2.1.4.3 Section 6.2.1.5.3 Section 6.2.1.5.4 Section 6.2.1 References Table 6.2.1 Sheet 1 of 3 Table 6.2.2 Sheet 1 of 2 Table 6.2.3 Table 6.2-4 Table 6.2-5 Table 6.2-6 Sheet 1 of 2 Table 6.2-7 Sheet 3 of 5 Table 6.2-7 Sheet 4 of 5 Table 6.2-8 Sheet 1 of 2 Table 6.2-8 Sheet 2 of 2 Table 6.2-10 Sheet 1 of 2 Table 6.2-10 Sheet 2 of 2 Table 6.2-12 Sheet 1 of 24 Table 6.2-12 Sheet 2 of 24 Table 6.2-12 Sheet 6 of 24 thru Table 6.2-12 Sheet 13 of 24  Table 6.2-12 Sheet 15 of 24 thru Table 6.2-12 Sheet 24 of 24  Table 6.2-19 Sheet 1 of 3 thru Table 6.2-19 Sheet 3 of 3  Figure 6.2-1m  Figure 6.2-1n Figure 6.2-1p Figure 6.2-1q Figure 6.2-1r Figure 6.2-1s Figure 6.2-30B Figure 6.2-31A Figure 6.2-31B Figure 6.2-31C Section 6.3.3.1 Section 6.3.3.3.3 Section 6.3.3.3.4 Section 6.3.3.4.4 WSES-FSAR-UNIT-3  6-xxviii Revision 308A (10/15)  UPDATE REFERENCE LIST  Chapter 6  Section    Cross References Revision 307 (Continued Table 6.3-5A EC-8458 (Continued)
Table 6.3-6 
Section 6.2.2.3.2.1 EC-25199 Table 6.2-22 Sheet 1 of 3 Section 6.3.2.2.2.3 
Section 6.3.3.8 EC-30976
Section 6.2.2.2.1 EC-40195 Table 6.2-21 Sheet 1 of 2 
Section 6.2.2.4.1 EC-40281 Table 6.2-21 Sheet 1 of 2 
Section 6.3.2.2.2.3 EC-40296 
Revision 308 Section 6.3.2.2.1 EC 45607 Section 6.3.2.5.1 Section 6.3.2.9.6 Section 6.3.2.9.7 
Revision 308A Section 6.2.5.2.1  LBDCR 15-030 WSES-FSAR-UNIT-3  7-i Revision 10 (10/99)  INSTRUMENTATION AND CONTROLS  CHAPTER 7  TABLE OF CONTENTS Section      Title      Page
7.0  INSTRUMENTATION AND CONTROLS      7.1-1 
==7.1  INTRODUCTION==
7.1-1 7.1.1  IDENTIFICATION OF SAFETY RELATED SYSTEMS    7.1-1
7.1.2  IDENTIFICATION OF SAFETY CRITERIA    7.1-5
7.2  REACTOR PROTECTIVE SYSTEM      7.2-1  7.2.1  DESCRIPTION        7.2-1
7.2.2  ANALYSIS        7.2-22
7.3  ENGINEERED SAFETY FEATURES SYSTEMS    7.3-1 7.3.1  DESCRIPTION        7.3-1
7.3.2  ANALYSIS        7.3-25
7.4  SYSTEMS REQUIRED FOR SAFE SHUTDOWN    7.4-1 7.4.1  DESCRIPTION        7.4-1
7.4.2  ANALYSIS        7.4-7
7.5  SAFETY RELATED DISPLAY INSTRUMENTATION    7.5-1 7.5.1  DESCRIPTION        7.5-1
7.5.2  ANALYSIS        7.5-8
7.5A  PLANT MONITORING COMPUTER      7.5A-I 7.6  ALL OTHER INSTRUMENTATION SYSTEMS REQUIRED FOR SAFETY  7.6-1 7.6.1  DESCRIPTION        7.6-1
7.6.2  ANALYSIS        7.6-5
7.7  CONTROL SYSTEMS NOT REQUIRED FOR SAFETY    7.7-1  7.7.1  DESCRIPTION        7.7-1
WSES-FSAR-UNIT-3  7-ii Revision 10 (10/99)  CHAPTER 7  TABLE OF CONTENTS (Cont'd)
Section      Title      Page
7.7.2  DESIGN COMPARISON      7.7-19
7.7.3  ANALYSIS        7.7-19
==7.7  REFERENCES==
7.7-19 7.7A  PLANT SAFETY PARAMETER DISPLAY SYSTEM (SPDS)    7.7A-i 7.7A.1  DESCRIPTION        7.7A-i
7.8  ATWS MITIGATION SYSTEMS      7.8-1 7.
==8.1  INTRODUCTION==
7.8-1
7.8.2  DESIGN BASIS        7.8-1
7.8.3  SYSTEM DESCRIPTION      7.8-1
7.8.4  SAFETY EVALUATION      7.8-3
7.8.5  INSPECTION AND TESTING REQUIREMENTS    7.8-3
WSES-FSAR-UNIT-3  7-iii Revision 14 (12/05)  CHAPTER 7  INSTRUMENTATION AND CONTROLS  LIST OF TABLES Table      Title
7.2-1  REACTOR PROTECTIVE SYSTEM BYPASSES
7.2-2  REACTOR PROTECTIVE SYSTEM MONITORED PLANT VARIABLE RANGES
7.2-3  REACTOR PROTECTIVE SYSTEM SENSORS
7.2-4  REACTOR PROTECTIVE SYSTEM DESIGN MARGINS
7.2-5  PLANT PROTECTION SYSTEM FAILURE MODE AND EFFECTS ANALYSIS (DRN 03-2061, R14) 7.2-6  DELETED (DRN 03-2061, R14) 7.3-1  DESIGN BASIS EVENTS REQUIRING ESF SYSTEM ACTION
7.3-2  ESFAS SENSORS AND SETPOINTS
7.3-3  ESFAS BYPASSES
7.3-4  AUXILIARY SUPPORTING SYSTEMS REQUIREMENTS
7.3-5  COMPONENTS ACTUATED ON SIAS
7.3-6  COMPONENTS ACTUATED ON RAS
7.3-7  COMPONENTS ACTUATED ON CSAS
7.3-8  COMPONENTS ACTUATED ON CIAS
7.3-9  COMPONENTS ACTUATED ON MSIS
7.3-10  COMPONENTS ACTUATED ON EFAS
7.3-11  MONITORED VARIABLES REQUIRED FOR ESF SYSTEM PROTECTIVE ACTION
7.3-12  DRAWING COMPARISON (DRN 03-2061, R14) 7.3-13  DELETED (DRN 03-2061, R14) 7.4-1  INDICATORS ON AUXILIARY CONTROL PANEL LCP-43 7.4-2  SDCS SUCTION LINE VALVES ACTION ON LOSS OF POWER SUPPLY
7.4-3  CONTROL STATIONS ON AUXILIARY CONTROL PANEL LCP-43 7.5-1  SAFETY RELATED PANEL MOUNTED DISPLAY INSTRUMENTATION
7.5-2  DELETED
WSES-FSAR-UNIT-3  7-iv  LIST OF TABLES (Cont'd)  Table      Title
7.5-3  ACCIDENT MONITORING INSTRUMENTATION
7.7-1  COLSS MONITORED PLANT VARIABLES WSES-FSAR-UNIT-3  7-v Revision 10 (10/99)  CHAPTER 7  INSTRUMENTATION AND CONTROLS  LIST OF FIGURES Figure      Title
7.1-1  SIMPLIFIED PPS CABINET LAYOUT (REAR VIEW) 7.1-2  TYPICAL PPS BAY LAYOUT
7.1-3  AUXILIARY RELAY CABINET A (FRONT VIEW) 7.2-1  TYPICAL MEASUREMENT CHANNEL FUNCTIONAL DIAGRAM (PRESSURIZER PRESSURE) 7.2-2  REED SWITCH POSITION TRANSMITTER CABLE ASSEMBLIES
7.2-3  CEA POSITION SIGNALS WITHIN REACTOR PROTECTION SYSTEM 7.2-4  CEA POSITION SYSTEMS BLOCK DIAGRAM
7.2-5  EXCORE NEUTRON FLUX MONITORING SYSTEM 7.2-6  CORE PROTECTION CALCULATOR SYSTEM BLOCK DIAGRAM
7.2-7  PLANT PROTECTION SYSTEM SIMPLIFIED FUNCTIONAL DIAGRAM
7.2-8  TYPICAL TRIP CHANNEL BYPASS
7.2-9  BASIC PPS TESTING SYSTEM (SHOWN FOR REACTOR PROTECTION SYSTEM)
7.2-10  PLANT PROTECTION SYSTEM INTERFACE LOGIC DIAGRAM
7.2-11  PPS BYPASS AND BLOCK SCHEMATIC
7.2-11a  PPS BYPASS AND BLOCK SCHEMATIC
7.2-12  PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM
7.2-13  PPS 2/4 LOGIC MATRIX SCHEMATIC
7.2-14  RPS TRIP PATH
7.2-15  TYPICAL RAS-MSIS-EFAS TRIP PATH CIRCUIT
7.2-16  CSAS-SIAS-CIAS TRIP PATH CIRCUITS
7.2-17  ESFAS ACTUATION RELAY CABINET SCHEMATIC DIAGRAM FOR TYPICAL    ACTUATION SIGNAL
7.2-18  ESFAS AUXILIARY RELAY CABINET SIMPLIFIED FUNCTIONAL DIAGRAM FOR MSIS  AND EFAS
WSES-FSAR-UNIT-3  7-vi Revision 10 (10/99)  CHAPTER 7  LIST OF FIGURES (Cont'd)
Figure      Title
7.2-19  CHANNEL POWER DISTRIBUTION
7.2-20  PPS CALIBRATION AND TEST PANEL SCHEMATIC
7.3-1  PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM (SHEETS 1 OF 3)
7.3-1  PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM (SHEETS 2 OF 3)
7.3-1  PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM (SHEETS 3 OF 3)
7.3-2  SAFETY INJECTION ACTUATION SYSTEM LOGIC DIAGRAM
7.3-3  CONTAINMENT ISOLATION ACTUATION SYSTEM LOGIC DIAGRAM
7.3-4  CONTAINMENT SPRAY AND SAFETY INJECTION SUMP RECIRCULATION ACTUATION SYSTEMS LOGIC DIAGRAM
7.3-5  NSSS ESFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM FOR A TYPICAL  ACTUATION SIGNAL
7.3-6  TYPICAL NSSS ENGINEERED SAFETY FEATURES ACTUATION FUNCTIONAL DIAGRAM
7.3-7  MAIN STEAM ISOLATION ACTUATION SYSTEM LOGIC DIAGRAM
7.3-8  NSSS ESFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM MSIS INITIATION CIRCUIT
7.3-9  EMERGENCY FEEDWATER ACTUATION SYSTEM LOGIC DIAGRAM
7.3-10  NSSS EFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM FOR  EFAS-1 (EFAS-2) INITIATION CIRCUIT
7.3-11  SHIELD BUILDING VENTILATION SYSTEM-INSTRUMENT SCHEMATIC
7.3-12  EMERGENCY FEEDWATER PARAMETERS
7.3-13  EFAS/MSIS INTERFACE LOGIC DIAGRAM
7.4-1  SHUTDOWN COOLING SYSTEM SUCTION LINE VALVES INTERLOCKS BLOCK DIAGRAM 7.4-2  GENERAL ARRANGEMENT OF THE AUXILIARY CONTROL PANEL LCP-43 7.5-1  LOCAL INSTRUMENT RACKS OR CABINETS CONCEPTUAL LAYOUT 7.5-2  INSTRUMENT CABINET C-1A (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT)
WSES-FSAR-UNIT-3  7-vii Revision 11 (05/01)  CHAPTER 7  LIST OF FIGURES (Cont'd)
Figure      Title
7.5-3  INSTRUMENT CABINET C-1B (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT)
7.5-4  INSTRUMENT CABINET C-1C (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT) 7.5-5  INSTRUMENT CABINET C-1D (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT) 7.5-6  INSTRUMENT CABINET C-27A (LOCATION EL -35'-0 MSL INSIDE CONTAINMENT) 7.5-7  INSTRUMENT CABINET C-27B (LOCATION EL -35'-0 MSL REACTOR AUX BLD'G) 7.5-8  DELETED
7.5A-1  DELETED
7.5A-2  DELETED
7.5A-3  REMOTE MULTIPLEXER SITE
7.5A-4  DELETED
7.5A-5  LOCATION OF CRT DISPLAYS ON THE MAIN CONTROL BOARD
7.7-1  REACTOR REGULATING SYS. 1 AND 2 MEASUREMENT CHANNEL BLOCK DIAGRAM    (TYPICAL)
7.7-2  CEDMCS-RPS INTERFACE BLOCK DIAGRAM 
7.7-3  PRESSURIZER PRESSURE CONTROL MEASUREMENT CHANNEL BLOCK DIAGRAM    (TYPICAL)
7.7-4  PRESSURIZER LEVEL CONTROL MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL) 7.7-5  FEEDWATER CONTROL SYSTEM 1 MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL) 7.7-6  FEEDWATER CONTROL SYSTEM 2 MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL) 7.7-7  STEAM BYPASS CONTROL SYSTEM SIMPLIFIED BLOCK DIAGRAM 7.7-8  FUNCTIONAL DIAGRAM OF THE CORE OPERATING LIMIT SUPERVISORY SYSTEM 7.7-9  REACTOR POWER CUTBACK SYSTEM SIMPLIFIED BLOCK DIAGRAM
7.7-10  INTENTIONALLY DELETED
7.8-1  DIVERSE REACTOR TRIP SCHEMATIC
7.8-2  DIVERSITY BETWEEN THE EXISTING REACTOR TRIP SYSTEM AND THE DIVERSE REACTOR TRIP SYSTEM/DIVERSE TURBINE TRIP
7.8-3  DIVERSE EMERGENCY FEEDWATER ACTUATION SYSTEM (DEFAS) SYSTEM
7.8-4  DIVERSITY BETWEEN THE EXISTING EFW SYSTEM AND THE DIVERSE EFW SYSTEM
7.8-5  ATWS POWER SUPPLY INTERFACE WSES-FSAR-UNIT-3  7-viii Revision 13-B (01/05)  UPDATE REFERENCE LIST  Chapter 7 Section    Cross References 
Revision 12-B Section 7.2.1.1.1.12  ER-W3-2000-0249-000/DRN 03-7 Table 7.5-3 Sht. 15  ER-W3-2002-0352-002/DRN 02-1634
Revision 12-C Table 7.5-3 Sht. 20  ER-W3-2003-0296-000/DRN 03-839
Revision 13 Appendix 7.5A  ER-W3-2002-0560-000/DRN 03-287 Table 7.5-3 Sht 1  ER-W3-1999-0372-000/DRN 03-517 Table 7.5-3 Sht 32 Table 7.5-3 Sht 33 Table 7.5-3 Sht 34
Section 7.4.1.3  ER-W3-2003-0505-000/DRN 03-1275 Table 7.5-3 Sht 26  ER-W3-2003-0508-000/DRN 03-1276 Table 7.5-3 Sht 27 Table 7.5-3 Sht 28 Table 7.5-3 Sht 29
Section 7.7.1.7  ER-W3-2003-0585-000/DRN 03-1609 Table 7.3-13 Sht 2  ER-W3-2002-0585-000/DRN 03-1617
Section 7.7.1.7  ER-W3-2003-0681-000/DRN 03-1873 Table 7.5-3 Sht 4 Table 7.5-3 Sht 38 Table 7.7-1
Section 7.7.1.4.1  ER-W3-2003-0755-000/DRN 03-2155 Section 7.4.2.5
Revision 13-A Section 7.5.2.7.1.1  ER-W3-2004-0382-000/DRN 04-991 Table 7.5-3 Sht 21 Table 7.5-3 Sht 37
Revision 13-B Section 7.7.1.5.3.2  ER-W3-2004-0767-001/DRN 04-934 WSES-FSAR-UNIT-3  7-ix Revision 14-B (06/06)  UPDATE REFERENCE LIST  Chapter 7 Section    Cross References Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2061 Section 7.2.1.1.2.4 Section 7.2.1.2 Section 7.2.2.2.1 Section 7.2.2.2.4 Section 7.2.2.3.3 Section 7.3 Section 7.3.1.1.1.9.6  Section 7.3.1.2.1 Section 7.3.2.1.3 Section 7.4.1.2 Section 7.4.2.1 Reference 7.7 Table 7.2-2 Table 7.2-6 Table 7.3-2 Table 7.3-13 
Section 7.2.1.1.1.3 ER-W3-2002-0110-001/DRN 04-1097 Section 7.2.2.2 Section 7.2.2.2.3 Section 7.7.1.5.3.3 
Section 7.2.1.1.1.13 ER-W3-2003-0055-000/DRN 04-384 Section 7.2.1.1.5 Table 7.2-1 
Table 7.5-3 sh 21 ER-W3-2003-0055-000/DRN 04-744 Table 7.5-3 sh 38 Table 7.7-1 
Section 7.2.1.1.1.8 ER-W3-2003-0353-000/DRN 05-130 Section 7.7.1.5.5.3.3  Table 7.2-4 Table 7.3-2 
Section 7.5.2.7.1.1 ER-W3-2004-0276-000/DRN 04-1967 Table 7.5-3 sh 33 
Figure 7.3-12 ER-W3-2005-0019-000/DRN 05-408 Revision 14-A Section 7.7.1.4.3 ER-W3-2005-0436-000/DRN 05-1393 Revision 14-B Section 7.3.1.1.9 ER-W3-2004-0373-001/DRN 05-1382 Section 7.5.2.7.1.1 Table 7.5-3 sh 16 
WSES-FSAR-UNIT-3  7-x Revision 305 (11/11)  UPDATE REFERENCE LIST  Chapter 7  Section    Cross References Revision 15 Table 7.3-2 ER-W3-2006-0282-000/DRN 06-884 Table 7.5-3 Sh. 7 Table 7.5-3 Sh. 16 Table 7.5-3 Sh. 30 
Table 7.5-3 Sh. 8 ER-W3-2006-0223-000/DRN 06-909
Section 7.3.1.1.6.2 ER-W3-2007-0010-000/DRN 07-43 Revision 301 Section 7.7.1.4.1 EC-1037
Table 7.5-3 Sh. 33 EC-2768 Table 7.5-3 Sh. 34 
Revision 302 Section 7.6.1.1.1 EC-935 Table 7.4-2 Figure 7.4-1 
Revision 303 Table 7.5-3 Sh. 33 EC-12583 Table 7.5-3 Sh. 34 
Revision 304 Section 7.2.1.1.1.4 EC-13881 Section 7.7.1.5.3.5 
Section 7.7.1.1.1 EC-18522
Section 7.7.1.7 EC-18688 Table 7.7-1 Table 7.5-3 Sh. 3 
Revision 305 Section 7.4.1.3 EC-14765 Section 7.6.1.1.1 Section 7.6.2.1 Table 7.4-2 Table 7.4-3 Sheet 3 of 11 Table 7.4-3 Sheet 6 of 11 Table 7.5-3 Sheet 13 of 40 
Section 7.2.1.1.5 EC-22790
Section 7.6.2.1 EC-23616 WSES-FSAR-UNIT-3  7-xi Revision 308 (11/14)  UPDATE REFERENCE LIST  Chapter 7  Section    Cross References Revision 306 Table 7.5-1 (Sheet 2 of 27) EC-12329 Table 7.5-1 (Sheet 7 of 27)
Table 7.5-1 (Sheet 16 of 27)
Table 7.5-1 (Sheet 22 of 27)
Table 7.5-1 (Sheet 23 of 27) 
Revision 307 Section 7.1.1.7 EC-2800 Appendix 7.5A 
Table 7.2-2 EC-8460 Table 7.2-4 Table 7.3-2 Figure 7.3-12 Table 7.5-3 Sheet 37 of 40 Table 7.5-3 Sheet 38 of 40 Section 7.7 References 
Section 7.3.1.1.6.1 EC-33720 Appendix 7.5A EC-36174
Section 7.3.1.1.6.1 EC-41355 Section 7.4.1.2 Section 7.4.2.3 
Revision 308 Table 7.5-3 Sh. 1 of 40 EC 46532
WSES-FSAR-UNIT-3  8-i  CHAPTER 8  ELECTRIC POWER  TABLE OF CONTENTS Section      Title      Page 8.0  ELECTRIC POWER        8.1-1 
==8.1  INTRODUCTION==
8.1-1 8.1.1  UTILITY GRID DESCRIPTION      8.1-1
8.1.2  OFFSITE POWER SYSTEM      8.1-1
8.1.3  ONSITE POWER SYSTEM      8.1-1
8.1.4  DESIGN BASES        8.1-3
8.1A  STATION BLACKOUT EVALUATION    8.1A-1
8.2  OFFSITE POWER SYSTEM      8.2-1 8.2.1  DESCRIPTION        8.2-1
8.2.2  ANALYSIS        8.2-9
8.3  ONSITE POWER SYSTEMS      8.3-1 8.3.1  AC POWER SYSTEMS      8.3-1
8.3.2  DC POWER SYSTEM      8.3-42
8.3.3  FIRE PROTECTION FOR CABLE SYSTEMS    8.3-49
WSES-FSAR-UNIT-3  8-ii  CHAPTER 8  ELECTRIC POWER  LIST OF TABLES Table      Title 8.1-1  SAFETY-RELATED EQUIPMENT IDENTIFICATION
8.1-2  AUXILIARY LOADING
8.1-3  FSAR CROSS-REFERENCE OF DISCUSSION OF SRP ACCEPTANCE CRITERIA  FOR ELECTRIC POWER
8.2-1  POWER TRANSFORMER RATINGS
8.2-2  ISOLATED PHASE BUS RATINGS
8.2-3  MAIN GENERATOR RATINGS
8.2-4  SWITCHGEAR RATINGS
8.2-5  RATINGS OF LOW VOLTAGE EQUIPMENT
8.3-1  DIESEL GENERATOR LOADING SEQUENCE
8.3-2  RATINGS OF CLASS 1E ELECTRICAL DISTRIBUTION EQUIPMENT
8.3-3  BATTERY 3A-S LOADING (SAFETY RELATED DIVISION A DC LOADS)
8.3-4  BATTERY 3B-S LOADING (SAFETY RELATED DIVISION B DC LOADS)
8.3-5  BATTERY 3AB-S LOADING (SAFETY RELATED DIVISION AB LOADING)
8.3-6  4.16 KV ENGINEERED SAFETY FEATURES SYSTEM SINGLE FAILURE ANALYSIS 8.3-7  480 V ENGINEERED SAFETY FEATURES SYSTEM SINGLE FAILURE ANALYSIS
8.3-8  208Y/120 V AC SYSTEM SINGLE FAILURE ANALYSIS
8.3-9  120 V UNINTERRUPTIBLE VITAL AC SYSTEM SINGLE FAILURE ANALYSIS 8.3-10  125 V DC ENGINEERED SAFETY FEATURE SYSTEM SINGLE FAILURE ANALYSIS
8.3-11  SINGLE FAILURE ANALYSIS OF TRANSFER TO PREFERRED POWER SOURCE UPON UNIT    TRIP
8.3-12  EQUIPMENT IDENTIFICATION
WSES-FSAR-UNIT-3  8-iii Revision 11 (05/01)  CHAPTER 8  LIST OF TABLES (Cont'd)
Table    Title 8.3-13  DESIGN BASIS OF ONSITE POWER SOURCE UNDERVOLTAGE PROTECTION
8.3-14  SEQUENCE OF EVENTS UNDER DEGRADED VOLTAGE CONDITIONS 8.3-15  INFORMATION CIRCUIT ANALYSIS
8.3-16  INFORMATION CIRCUITS FAILURE ANALYSIS FOR ANNUNCIATOR SYSTEMS
8.3-17  INFORMATION CIRCUITS FAILURE ANALYSIS FOR COMPUTER SYSTEM
8.3-18  USERS OF GROUND SYSTEM DESIGN COMPUTER PROGRAM
8.3-19  VITAL SUPPORTING SYSTEMS FOR CLASS 1E EQUIPMENT
8.3-20  BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATIONS (CEP) (DRN E9900733, R11) 8.3-21 INFORMATION CIRCUITS FAILURE ANALYSIS FOR ISOLATION PANEL (POWER SUPPLIES WITH LOW VOLTAGE OUTPUT,  (DRN E9900733, R11) 
WSES-FSAR-UNIT-3  8-iv Revision 14-A (03/06)  CHAPTER 8  ELECTRIC POWER  LIST OF FIGURES Figure      Title  (DRN 05-1767, R14-A) 8.1-1  SYSTEM MAP - ENTERGY LOUISIANA, LLC (DRN 05-1767, R14-A) 8.1-2  THE ENTERGY ELECTRIC SYSTEM MAP (DRN 99-0733, R11) 8.1-2a  SOUTHERN/METRO DISTRICTS AND LP&L INDUSTRIAL CORRIDOR (DRN 99-0733, R11) 8.1-3  SOUTHWEST POWER POOL 8.1-4  PREFERRED POWER SYSTEM SWITCHYARD ONE LINE DIAGRAM (SHEET 1 OF 2) 8.1-4  PREFERRED POWER SYSTEM SWITCHYARD ONE LINE DIAGRAM (SHEET 2 OF 2) 8.1-5  PREFERRED POWER SYSTEM SWITCHING STATION ONE LINE DIAGRAM (DRN 01-418, R11) 8.1-6  PREFERRED POWER SYSTEM MAIN ONE LINE DIAGRAM (DRN 01-418, R11) 8.1-7  ONSITE POWER SYSTEM MAIN ONE LINE DIAGRAM (DRN 01-418, R11) 8.1-8  ONSITE POWER SYSTEM 125V DC & 120V AC ONE LINE DIAGRAM (DRN 01-418. R11) 8.1-9  SYSTEM SAB TRANSFER ONE LINE DIAGRAM 8.2-1  TRANSMISSION LINE SYSTEM
8.2-2  230 KV OVERHEAD LINES FALLING RADIUS & CLEARANCES 8.2-3  BUS TRANSFER FROM UNIT AUXILIARY TO STARTUP TRANSFORMERS UPON LOSS OF    MAIN GENERATOR
8.2-4  WATERFORD 230 KV SWITCHYARD BY A NO. 5 PROFILES
8.2-5  WATERFORD PROPERTY CROSSOVER OF 230 KV AND 115 KV LINES (DRN 99-0733, R11) 8.3-1  ONSITE POWER SYSTEM DIESEL GENERATOR LOGIC DIAGRAM (DRN 99-0733, R11) 8.3-2  BATTERY 3A-S LOADING CYCLE 8.3-2a  BATTERY 3A-S LOADING CYCLE
8.3-3  BATTERY 3B-S LOADING CYCLE
8.3-3a  BATTERY 3B-S LOADING CYCLE
8.3-4  BATTERY 3AB-S LOADING CYCLE
8.3-4a  BATTERY 3AB-S LOADING CYCLE
8.3-5  CLASS 1E 4160 VOLT BUS UNDERVOLTAGE DETECTION SCHEME FOR 3A3-S, 3AB3-S BUSES
WSES-FSAR-UNIT-3  8-v Revision 11 (05/01)  CHAPTER 8  LIST OF FIGURES (Cont'd)
Figure      Title 8.3-6  CLASS 1E 4160 VOLT BUS UNDERVOLTAGE DETECTION SCHEME FOR 3B3-S BUS
8.3-7  6.9 KV CONTAINMENT PENETRATIONS-125V DC CONTROL POWER FOR RCP MOTOR    FEEDER BREAKERS
8.3-8  4.0KV MOTOR & 4.16KV BUS 3A3-S AND 3AB-S OVERCURRENT PROTECTION    CRITERIA
8.3-9  480V MOTOR & STATION SERVICE TRANSFORMER OVERCURRENT PROTECTION CRITERIA
8.3-10  480V MCC FEEDERS OVERCURRENT PROTECTION CRITERIA
8.3-11  480V MCC COMBINATION MOTOR CONTROLLERS-MOTOR OVERCURRENT PROTECTION    CRITERIA
8.3-12  INFORMATION CIRCUITS, TYPICAL CABLE ROUTING OF ANNUNCIATOR CIRCUITS 8.3-13  TYPICAL ANNUNCIATOR LOGIC CABINET AND CABLES LISTING
8.3-14  TYPICAL MULTIPLEXOR CABINET AND CABLES LISTING (DRN E9900733, R11) 8.3-15  TYPICAL ROUTING FROM A SOLENOID VALVE TO CP-19 (DRN E9900733, R11) 8.3-16  TYPICAL ROUTING FROM A MOTOR CONTROL CENTER TO A MULTIPLEXOR 8.3-17  INFORMATION CIRCUITS, ANNUNCIATOR LOGIC CABINET (CP-19)WIRING DIAGRAM    (PARTIAL)
8.3-18  INFORMATION CIRCUITS, ANNUNCIATOR LOGIC CABINET ARRANGEMENT
8.3-19  TIME-CURRENT CHARACTERISTICS OF FIELD CONTACT, FUSE & CABLE FOR MAXIMUM    CREDIBLE FAULT AT CP-19
8.3-20  INFORMATION CIRCUITS - TYPICAL CABLE ROUTING OF COMPUTER MULTIPLEXOR    CIRCUITS
8.3-21  INFORMATION CIRCUITS MULTIPLEXORS WIRING DIAGRAM (PARTIAL) 8.3-22  INFORMATION CIRCUITS - TYPICAL MULTIPLEXOR CABINET ARRANGEMENT 8.3-23  INFORMATION CIRCUITS - COMPUTER MULTIPLEXOR/ANNUNCIATOR LOGIC CABINET    ARRANGEMENT
8.3-24 INFORMATION CIRCUITS - COMPUTER MULTIPLEXOR AND ANNUNCIATOR COMMON FIELD CONTACTS 8.3-25 DELETED
8.3-25a  EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE UPON LOCA OR MSLB WITH LOSS OF OFFSITE POWER WSES-FSAR-UNIT-3  8-vi Revision 11 (05/01)  CHAPTER 8  LIST OF FIGURES (Cont'd)
Figure      Title 8.3-25b  EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON LOCA OR MSLB WITH LOSS OF OFFSITE POWER (SHEET 1 OF 2)
8.3-25b  EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON LOCA OR MSLB WITH LOSS OF OFFSITE POWER (SHEET 2 OF 2)
8.3-26  DELETED
8.3-26a  EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE UPON SHUTDOWN WITH LOSS OF OFFSITE POWER
8.3-26b  EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON SHUTDOWN WITH LOSS OF OFFSITE POWER (SHEET 1 OF 2)
8.326b  EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON SHUTDOWN WITH LOSS OF OFFSITE POWER (SHEET 2 OF 2)
8.3-27  DELETED
8.3-27a  EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU    1d DURING LOCA OR MSLB WITH LOOP
8.3-27b  EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU    1d DURING LOCA OR MSLB WITH LOOP
8.3-27c  EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU    1d DURING SHUTDOWN WITH LOOP SUPPORTS
8.3-27d  EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU    1d DURING LOOP
8.3-28 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION - 1500 MCM/6.9 KV 8.3-29  BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION - 500 MCM/480V 8.3-30  BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION - 250 MCM/480V 8.3-31  BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION NO. 2/0, 4&8 AWG    SIZE CONDUCTORS, @ 480 VOLT
8.3-32  BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION NO. 14 AWG    CONDUCTOR, @ 120 VOLT
8.3-33  EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS
8.3-34  SPECIFIC SEPARATION CRITERIA FOR PROCESS INSTRUMENTATION CABINETS
8.3-35  SAMPLE OF INTERNAL WIRING FOR PROCESS INSTRUMENTATION CABINETS
8.3-36  SEQUENCER CIRCUIT
8.3-37  UNDERVOLTAGE RELAY CRITERIA-TEST CURVE FOR RELAYS 27-1, 2, 3 WSES-FSAR-UNIT-3  8-vii Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 8 Section    Cross References Revision 12-B Table 8.1-1 Sht 1  ER-W3-1998-1220-00/DRN E99-150
Table 8.2-1  ER-W3-2000-0297-003/DRN 03-2
Revision 13 Section 8.2.1.3  ER-W3-2002-0595-000/DRN 03-1484 Section 8.2.1.6.3 Section 8.2.1.6.5 Figure 8.2-3
Figure 8.1.5  ER-W3-2002-0595-000/DRN 03-1725 Figure 8.3-2A  ER-W3-2003-0761-000/DRN 03-213 Figure 8.3-3A
Revision 13-A Table 8.3-1  ER-W3-2004-0298-000/DRN 04-673 Figure 8.3-25a Sht 1 Figure 8.3-25a Sht 2 Figure 8.3-25b Sht 1 Figure 8.3-25b Sht 2 Figure 8.3-26a Sht 1 Figure 8.3-26a Sht 2 Figure 8.3-26b Sht 1 Figure 8.3-26b Sht 2 Figure 8.3-27a Figure 8.3-27b Figure 8.3-27c Figure 8.3-27d
Revision 14 Section 8.2.1.2 ER-W3-2001-1149-000/DRN 05-838 Section 8.2.1.6.3 Section 8.2.2.1 Table 8.3-1 sht 18 Table 8.3-1 shts 1-11 Table 8.3-1 sht 13 Table 8.3-1 shts 15-20 Figure 8.3.25a sht 2 Figure 8.3.25b sht 1 Figure 8.3.26-a sht 1 Figure 8.3-26b sht 1 Figure 8.3-27a Figure 8.3-27b Figure 8.3-27c Figure 8.3-27d WSES-FSAR-UNIT-3  8-viii Revision 15 (03/07)  UPDATE REFERENCE LIST  Chapter 8 Section    Cross References Revision 14 Cont'd Section 8.2.13 ER-W3-2002-0595-000/DRN 03-1496 Figure 8.1-5 ER-W3-2002-0595-000/DRN 03-1731 Section 8.2.1.4.1 ER-W3-2002-0595-000/DRN 04-535 Figure 8.1-5 
Table 8.2-3 ER-W3-2002-0602-000/DRN 04-5
Table 8.2-1 ER-W3-2004-0008-000/DRN 04-1116
Table 8.2-1 ER-W3-2004-0009-000/DRN 04-1832
Table 8.3-1 sh 8 ER-W3-2004-0122-000/DRN 04-1551 Table 8.3-1 sh 17 Table 8.3-1 sh 20 Table 8.1-2 sh 2 Figure 8.3-33 
Table 8.3-1 sh 18 ER-W3-2004-0122-000/DRN 05-980 Table 8.3-1 sh 20 Figure 8.1-2 sh 4 Figure 8.3-1 sh 8 Figure 8.3-1 sh 18 Figure 8.3-33 
Appendix 8.1A-3 ER-W3-2004-0520-000/DRN 04-1680 Revision 14-A Table of Contents ER-W3-2005-0548-000/DRN 05-1767 Section 8.1.1 Section 8.1.4.1 Section 8.1.4.3 Section 8.2.2.1 
Revision 14-B Appendix 8.1A ER-W3-2006-0118-000/DRN 06-339 Revision 15 Section 8.3.1.1.2.13 ER-W3-2001-1026-000/DRN 06-709 Table 8.3-10 Table 8.3-2 Sh. 3 Table 8.3-2 Sh. 4 
WSES-FSAR-UNIT-3  8-ix Revision 305 (11/11)  UPDATE REFERENCE LIST  Chapter 8  Section    Cross References Revision 301 Table 8.3-1 EC-5000082353 Figure 8.3.25a Sh. 1 Figure 8.3.25a Sh. 2 Figure 8.3.25b Sh. 1 Figure 8.3.25b Sh. 2 Figure 8.3-26a Sh. 1 Figure 8.3-26a Sh. 2 Figure 8.3.26b Sh. 1 Figure 8.3-26b Sh. 2 Figure 8.3.27a Figure 8.3.27b Figure 8.3.27c Figure 8.3.27d 
Section 8.3.2.1.1 EC-5000082399 Figure 8.3-4 Figure 8.3-4A 
Section 8.3.1.1.1 EC-774
Table 8.3-16 Sh. 1 EC-5000082263 Table 8.3-16 Sh. 2 Figure 8.3-17 Figure 8.3-19 
Revision 302 Table 8.1-1 Sh. 1 EC-935
Section 8.3.2.1.1 EC-7960 Table 8.3-2 Sh. 3 
Revision 304 Table 8.1-2 Sh. 1 EC-19206 Table 8.1-2 Sh. 2 Table 8.1-2 Sh. 3 Table 8.1-2 Sh. 4 
Revision 305 Table 8.3-1 EC-26817 Figure 8.3-25a Sheet 1 Figure 8.3-25a Sheet 2 Figure 8.3-25b Sheet 1 Figure 8.3-25b Sheet 2 Figure 8.3-26a Sheet 1 Figure 8.3-26a Sheet 2 Figure 8.3-26b Sheet 1 Figure 8.3-26b Sheet 2 Figure 8.3-27a Figure 8.3-27b Figure 8.3-27c Figure 8.3-27d WSES-FSAR-UNIT-3  8-x Revision 308A (10/15)  UPDATE REFERENCE LIST  Chapter 8  Section    Cross References Revision 307 Table 8.3-21 Sheet 1 of 2 EC-38908 Table 8.3-21 Sheet 2 of 2 
Revision 308 Section 8.1.4.3 LBDCR 14-010 Section 8.3.1.2.4 Section 8.3.1.2.20 Table 8.1-3 Sh. 1 of 7 Table 8.1-3 Sh. 5 of 7 
Section 8.3.1.1.2 LBDCR 14-009 
Revision 308A Figure 8.3-31  LBDCR 15-022
Figure 8.3-33  LBDCR 15-002
WSES-FSAR-UNIT-3  9-i Revision 306 (05/12)  CHAPTER 9  AUXILIARY SYSTEMS  TABLE OF CONTENTS Section      Title      Page 9.0  AUXILIARY SYSTEMS        9.1-1 9.1  FUEL STORAGE AND HANDLING      9.1-1 9.1.1  NEW FUEL STORAGE      9.1-1 (EC-14275, R306) 9.1.2  SPENT FUEL STORAGE IN THE FUEL HANDLING AND  9.1-4 CONTAINMENT BUILDINGS (EC-14275, R306) 9.1.3  FUEL POOL SYSTEM (SPENT FUEL POOL COOLING AND  9.1-8    CLEANUP SYSTEM)
9.1.4  FUEL HANDLING SYSTEM      9.1-15 (EC-14275, R306) 9.1.5  SPENT FUEL DRY CASK STORAGE    9.1-40 (EC-14275, R306) 9.2  WATER SYSTEMS        9.2-1 9.2.1  STATION SERVICE WATER SYSTEM    9.2-1
9.2.2  COOLING SYSTEM FOR REACTOR AUXILIARIES    9.2-1
9.2.3  DEMINERALIZED WATER MAKEUP SYSTEM    9.2-6 (DRN 00-691, R11-A) 9.2.4  POTABLE AND SANITARY WATER SYSTEM    9.2-11
9.2.5  ULTIMATE HEAT SINK      9.2-12
9.2.6  CONDENSATE STORAGE FACILITIES    9.2-18 (DRN 00-691, R11-A) 9.2.7  TURBINE CLOSED COOLING WATER SYSTEM    9.2-20 (DRN 00-691, R11-A) 9.2.8  PRIMARY WATER STORAGE FACILITIES    9.2-22 (DRN 00-691, R11-A) 9.2.9  ESSENTIAL SERVICES CHILLED WATER SYSTEM    9.2-24
9.3  PROCESS AUXILIARIES        9.3-1 9.3.1  COMPRESSED AIR SYSTEM      9.3-1 (DRN 00-691, R11-A) 9.3.2  PROCESS SAMPLING SYSTEM      9.3-3 (DRN 00-691, R11-A) 9.3.3  EQUIPMENT AND FLOOR DRAINAGE SYSTEMS    9.3-8 (DRN 00-691, R11-A) 9.3.4  CHEMICAL AND VOLUME CONTROL SYSTEM    9.3-15 9.3.5  STANDBY LIQUID CONTROL SYSTEM (BWRs)    9.3-38 (DRN 00-691, R11-A)
WSES-FSAR-UNIT-3  9-ii Revision 11-A (02/02)  CHAPTER 9  TABLE OF CONTENTS (Cont'd)
Section      Title    Page (DRN 00-691, R11-A) 9.3.6  SHUTDOWN COOLING SYSTEM (RESIDUAL HEAT REMOVAL  9.3-38 SYSTEM)
9.3.7  HYDROGEN SYSTEM      9.3-51
9.3.8  POST ACCIDENT SAMPLING SYSTEM    9.3-53
9.3.9  NITROGEN SYSTEM      9.3-57
==9.3  REFERENCES==
9.3-60 (DRN 00-691, R11-A) 9.4  AIR CONDITIONING, HEATING, COOLING AND VENTILATION    9.4-1  SYSTEMS 9.4.1  CONTROL ROOM AIR CONDITIONING SYSTEM    9.4-1 9.4.2  FUEL HANDLING BUILDING VENTILATION SYSTEM 9.4-4
9.4.3  REACTOR AUXILIARY BUILDING VENTILATION SYSTEM  9.4-8 (DRN 00-691, R11-A) 9.4.4  TURBINE BUILDING VENTILATION SYSTEM    9.4-24
9.4.5  REACTOR BUILDING VENTILATION SYSTEM    9.4-25
9.5  OTHER AUXILIARY SYSTEMS      9.5-1 (DRN 00-691, R11-A) 9.5.1  FIRE PROTECTION SYSTEM      9.5-1
9.5.2  COMMUNICATION SYSTEMS      9.5-246
9.5.3  LIGHTING SYSTEMS      9.5-251
9.5.4  DIESEL GENERATOR FUEL OIL STORAGE AND TRANSFER  9.5-252 SYSTEMS
9.5.5  DIESEL GENERATOR JACKET WATER COOLING SYSTEM  9.5-255
9.5.6  DIESEL ENGINE STARTING SYSTEM    9.5-258
9.5.7  DIESEL GENERATOR LUBRICATION SYSTEM    9.5-260
9.5.8  DIESEL GENERATOR COMBUSTION AIR INTAKE AND EXHAUST  9.5-263    SYSTEM
WSES-FSAR-UNIT-3  9-iii Revision 15 (03/07)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF TABLES Table      Title 9.1-1  Fuel Pool System Process Flow Data
9.1-2  Refueling and Spent Fuel Pool Water Chemistry
9.1-3  Principal Components Design Data Summary
9.1-4  Failure Mode and Effects Analysis Fuel Pool System
9.1-5  Major Tools and Servicing Equipment Required for Refueling Functions 9.1-6  Reactor Building Crane Data
9.1-7  FHB Building Crane Data (Cask Crane)
(DRN 99-0971) 9.1-8  Fuel Assembly Parameters used in Criticality Analysis (DRN 99-0971) 9.2-1  Design Data for the Component Cooling Water System and Auxiliary Component  Cooling Water System Components
9.2-2  CCWS and ACCWS Temperature and Flow Control Description 9.2-3  Heat Removal and Water Requirements for the CCWS
9.2-4  Failure Modes and Effects Analysis for the CCWS and ACCWS Post LOCA 9.2-5  CCWS and ACCWS Instrument Application 9.2-6  Design Data for PWTP Components (DRN 06-873, R15) 9.2-7  DELETED (DRN 06-873, R15) 9.2-8  Principal Cooling Tower Components Dry Cooling Towers (DRN 00-691, R11-A) 9.2-9  Estimated Wet-Dry Cooling Tower Heat Dissipation for all Operations 9.2-10  Water Requirements for Wet Cooling Towers Post LOCA Essential Loads (DRN 00-691, R11-A) 9.2-11  Cooling Tower Instrument Application 9.2-12  Design Data for Condensate Storage System 9.2-13  Design Data for Turbine Closed Cooling Water System Components
9.2-14  Turbine Plant Operating Flow Rates and Calculated Heat Loads WSES-FSAR-UNIT-3  9-iv Revision 11-A (02/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF TABLES (Cont'd)
Table      Title 9.2-15  Design Data for Primary Water Storage System
9.2-16  Safety Related and Nonsafety Related Air Handling Units 9.2-17  Essential Services Chilled Water System Failure Mode and Effects    Analysis (DRN 00-691, R11-A) 9.3-1a  Safety Class Valves with Air Accumulators (DRN 00-691, R11-A) 9.3-1b  Safety Class Valves with Nitrogen Accumulators
9.3-2  Design Data for Compressed Air System Components
9.3-3  Primary Sample Points
9.3-4  Secondary Sample Points
9.3-5  Sub-system Construction Materials
9.3-6  Decontamination Areas
9.3-7  Reactor Coolant and Reactor Makeup Water Chemistry
9.3-8  CVCS Design Transients (DRN 00-691, R11-A) 9.3-9 Principal Component Design Data Summary (DRN 00-691, R11-A) 9.3-10  DELETED
9.3-11  Chemical and Volume Control System Process Parameters
9.3-12  Schedule of Waste Generation 9.3-13  Chemical and Volume Control System Process Flow Data
9.3-14  CVCS Component Diesel Loading
9.3-15  Chemical and Volume Control System (Boron Addition Portion) Failure  Mode and Effects Analysis
9.3-16  Shutdown Cooling System (SDCS) Failure Mode and Effects Analysis 9.3-17  Shutdown Cooling Heat Exchanger Data
9.3-18  Shutdown Cooling System Valves Design Pressures and Temperatures 
WSES-FSAR-UNIT-3  9-v Revision 11-A (02/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF TABLES (Cont'd)
Table      Title 9.3-19  DELETED
9.3-20  Required Valve Actuations Accomplished from the Main Control Room 9.3-21  Design and Materials Data for Bulk Gas Storage Tubes
(DRN 00-703, R11-A) 9.3-21A  Design and Materials Data for Essential Air Accumulators (DRN 00-703, R11-A) 9.3-22  Shutdown Cooling System Relief Valve Parameters
9.4-1  Design Space Temperatures and Humidities for Normal Plant Operation 9.4-2  Design Data for Control Room Air Conditioning System Components 9.4-3  Control Room Air Conditioning System Failure Modes and Effects  Analysis
9.4-4  Design Data for Fuel Handling Building Ventilation System
9.4-5  F.H.B. Ventilation System Failure Modes and Effects Analysis 9.4-6  Design Data for Reactor Auxiliary Building Normal Ventilation  System
9.4-7  Design Data for Personnel Decontamination Area Ventilation System 9.4-8  Design Data for Emergency Diesel Generator Ventilation System 9.4-9  Design Data for RAB H&V Room Ventilation System
9.4-10  Design Data for RAB Cable Vault and Switchgear Areas Ventilation System
9.4-11  RAB Cable Vault and Switchgear Areas Ventilation System Failure Modes  and Effects Analysis
9.4-12  Design Data for RAB Hot Machine Shop and Decontamination Area Ventilation System
9.4-13  Design Data for RAB Air Conditioning System
9.4-14  Design Data for Controlled Ventilation Area Systems (CVAS) Fan Coolers 9.4-15  Design Data for Turbine Building Ventilation System
WSES-FSAR-UNIT-3  9-vi Revision 11-A (02/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF TABLES (Cont'd)
Table      Title 9.4-16  Design Data for Airborne Radioactivity Removal System
9.4-17  Design Data for Containment Atmosphere Purge System 9.4-18  Design Data for Reactor Cavity Cooling System
9.4-19  Design Data for Control Element Drive Mechanism (CEDM) Cooling System 9.4-20  Design Data for Annulus Negative Pressure System (ANPS)
9.4-21  Comparison of Normal Ventilation System Air Cleaning Unit with  Regulatory Guide 1.140 (March 1978)
9.5-1  Design Data - Diesel Generator Fuel Oil Storage and Transfer System 9.5-2  Diesel Generator Fuel Oil Storage and Transfer Systems Failure Mode  and Effects Analysis
9.5-3  Design Parameters for Diesel Generator Jacket Cooling Water System 9.5-4  Design Data - Diesel Engine Starting System Components (DRN 00-691, R11-A) 9.5-5  Design Parameters for Diesel Generator Lube Oil System Components (DRN 00-691, R11-A) 9.5-6  Summary of Onsite Communication System Capabilities and Noise Consideration During Transients and/or Accidents 9.5.1-1  Tabulation of Doors which are Located Within Fire Walls 9.5.1-2  Fire Protection System Failure Mode and Effects Analysis 9.5.1-3  Fire Areas/Zones (DRN 00-691, R11-A) 9.5.1-4  Minimum Equipment Requirement for Safe Plant Shutdown Following a Cable Vault and Control  Room Fire (DRN 00-691, R11-A)
WSES-FSAR-UNIT-3  9-vii Revision 11-A (02/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF FIGURES  Figure      Title (DRN 00-691, R11-A) 9.1-1  New Fuel Storage Racks (DRN 00-691, R11-A) 9.1-2  Spent Fuel Pit Liner (Sheet 1 of 2)
9.1-2  Spent Fuel Pit Liner (Sheet 2 of 2) (DRN 00-691, R11-A) 9.1-3  Plan Arrangement of Spent Fuel Pool Storage Racks (Sheet 1 of 3) (DRN 00-691, R11-A) 9.1-3  Rack Assembly - Type 64-1 thru 64-12 (Sheet 2 of 3)
9.1-3  Rack Assembly - Type 80-1 thru 80-4 (Sheet 3 of 3) (DRN 01-419) 9.1-4  Flow Diagram Fuel Pool System (DRN 01-419) 9.1-5  Fuel Handling Equipment Arrangement (Typical) 9.1-6  Dual-Masted Refueling Machine
9.1-7  Fuel Handling Tools
9.1-8  Reactor Vessel Head Lift Rig
9.1-9  Core Support Barrel Lift Rig
9.1-10  Upper Guide Structure Lift Rig
9.1-11  Spent fuel Handling Machine
9.1-12  New Fuel Elevator
9.1-13  Underwater TV System
9.1-14  Deleted
9.1-15  Deleted
9.1-16  Hydraulic Power Unit
9.1-17  Refueling Pool Seals
9.1-18  Fuel Handling Building Crane Clearance Diagram (Plan) 9.1-19  Fuel Handling Building Cane Clearance Diagram (Section) 9.1-20  Reactor Building - Reactor Bridge Crane Clearance
9.1-21  Spent Fuel Pool Cooling System - Thermal Performance for Maximum Heat Load 9.1.22  Spent Fuel Pool Cooling System - Thermal Performance for Normal Head Load WSES-FSAR-UNIT-3  9-viii Revision 11 (05/01)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF FIGURES (Cont'd)
Figure      Title 9.2-1  Flow Diagram - Component Closed Cooling Water System (Sheet 1 of 6) 9.2-1  Flow Diagram - Component Closed Cooling Water System (Sheet 2 of 6) 9.2-1  Flow Diagram - Component Closed Cooling Water System (Sheet 3 of 6) (DRN 01-419) 9.2-1  Flow Diagram - Component Closed Cooling Water System (Sheet 4 of 6) (DRN 01-419) 9.2-1  Flow Diagram - Component Closed Cooling Water System (Sheet 5 of 6) (DRN 01-419) 9.2-1  Flow Diagram - Component Closed Cooling Water System (Sheet 6 of 6) (DRN 01-419) 9.2-2  Flow Diagram - Primary Water, Condensate Storage and Makeup  Demineralizer (Sheet 1 of 3)
9.2-2  Flow Diagram - Primary Water, Condensate Storage and Makeup  Demineralizer (Sheet 2 of 3)
9.2-2  Flow Diagram - Primary Water, Condensate Storage and Makeup  Demineralizer (Sheet 3 of 3)
9.2-3  DELETED  (3 SHEETS)
9.2-4  Heat Load Dissipation of Ultimate Heat Sink After LOCA 9.2-4a  Wet Cooling Tower Integrated Heat Load Curve After LOCA 9.2-5  Heat Removal Capacity of Dry Cooling Tower vs. Dry Bulb Temperature 9.2-5a  Ultimate Heat Sink Design Basis Meteorological Conditions 9.2-6  Simplified Flow Diagram of Wet and Dry Cooling Towers
9.2-7  Turbine Building Closed Cooling Water System (Sheet 1 of 2) 9.2-7  Turbine Building Closed Cooling Water System (Sheet 2 of 2) 9.2-8  Essential Services Chilled Water System (Sheet 1 of 3) 9.2-8  Essential Services Chilled Water System (Sheet 2 of 3) (DRN 01-419) 9.2-8  Essential Services Chilled Water System ( Sheet 3 of 3) (DRN 01-419) 9.2-9  Flow Diagram - Potable Water System
WSES-FSAR-UNIT-3  9-ix Revision 11-A (02/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF FIGURES (Cont'd)  Figure      Title 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 1 of 9) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 2 of 9) (DRN 01-419) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 3 of 9) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 4 of 9) (DRN 01-419) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 5 of 9) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 6 of 9) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 7 of 9) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 8 of 9) 9.3-1  Flow Diagram - Service and Instrument Air Systems (Sheet 9 of 9) 9.3-2  Flow Diagram Sampling System (Sheet 1 of 6) 9.3-2  Flow Diagram Sampling System (Sheet 2 of 6) (DRN 01-419) 9.3-2  Flow Diagram Sampling System (Sheet 3 of 6) (DRN 01-419) (DRN 00-691, R11-A) 9.3-2  Flow Diagram Post Accident Sampling System (Sheet 4 of 6) (DRN 00-691, R11-A) 9.3-2  Flow Diagram Waste Gas Analyzer System (Sheet 5 of 6) 9.3-2  Flow Diagram Sampling System (Sheet 6 of 6) (DRN 01-419) 9.3-3  Flow Diagram - Sump Pump Systems Turbine Building and Yard (Sheet 1 of 3) (DRN 01-419) 9.3-3  Flow Diagram - Sump Pump Systems Reactor Auxiliary Building (Sheet 2 of 3) 9.3-3  Flow Diagram - Sump Pump Systems Reactor Building, Fuel Handling Building,  Cooling Tower Area and Intake Structure (Sheet 3 of 3)
9.3-4  Reactor, Turbine and Fuel Handling Building Drainage Systems
9.3-5  Reactor Auxiliary Building Drainage Systems (DRN 01-419) 9.3-6  Flow Diagram Chemical and Volume Control System (Sheet 1 of 3) (DRN 01-419) 9.3-6  Flow Diagram Chemical and Volume Control System (Sheet 2 of 3) 9.3-6  Flow Diagram Chemical and Volume Control System (Sheet 3 of 3) 9.3-7  Normal Cooldown All System Components Operating WSES-FSAR-UNIT-3  9-x Revision 11-B (06/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF FIGURES (Cont'd)
Figure      Title 9.3-8  Limited Cooldown One LPSI Pump and One SDHX Operating 9.3-8A  Cooldown Without A-C Coolant Temperatures In Loop B (Atmospheric Dump  Valve And Main Steam Cross-Connect Unavailable) (DRN 00-691, R11-A) 9.3-8B  Cooldown Without A-C Coolant Temperatures In Loop A (Atmospheric Dump  Valve Operable) (DRN 00-691, R11-A) 9.3-9  Hydrogen Storage System
9.3-10  SDCS Relief Valves
9.3-11  Post Accident Sampling System (DRN 01-1335, R11-B 9.4-1  Flow Diagram - Control Room Air Conditioning System (Sheet 1 of 2) 9.4-1  Flow Diagram - Control Room Air Conditioning System (Sheet 2 of 2) (DRN 01-1335, R11-B) 9.4-2  Fuel Handling Building Ventilation System
9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 1 of 9) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 2 of 9) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 3 of 9) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 4 of 9) (DRN 01-419) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 5 of 9) (DRN 01-419) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 6 of 9) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 7 of 9) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 8 of 9) 9.4-3  Reactor Auxiliary Building Ventilation Systems (Sheet 9 of 9) 9.4-4  RAB Cable Vault and Switchgear Areas Ventilation System 9.4-5  RAB Hot Machine Shop and Decontamination Area Ventilation System (DRN 01-419) 9.4-6  Turbine Building Ventilation Systems (DRN 01-419) 9.4-7  Reactor Building Ventilation Systems WSES-FSAR-UNIT-3  9-xi Revision 11-B (06/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF FIGURES (Cont'd)
Figure      Title 9.5-1  Telephone Communication System Diagram (Sheet 1 of 4) 9.5-1  Telephone Communication System Diagram (Sheet 2 of 4) (DRN 01-419) 9.5-1  Telephone Communication System Diagram (Sheet 3 of 4) (DRN 01-419) 9.5-1  Telephone Communication System Diagram (Sheet 4 of 4) 9.5-2  Paging Communication System Diagram (Sheet 1 of 2) 9.5-2  Paging Communication System Diagram (Sheet 2 of 2) 9.5-3  Diesel Generator Fuel Oil Storage and Transfer System 9.5-3a  Emergency Diesel Miscellaneous Piping
9.5-4  Diesel Engine Jacket Water Cooling System Schematic
9.5-5  Diesel Engine Starting System Schematic 9.5-6  Diesel Generator Lubrication System 9.5-7  Diesel Generator Combustion Air Intakes and Exhausts 9.5-8  Emergency Communication System Diagram - (Magneto/Sound Powered System) 9.5.1-1  Flow Diagram - Fire, Makeup and Domestic Water (Sheet 1 of 3) 9.5.1-1  Flow Diagram - Fire, Makeup and Domestic Water (Sheet 2 of 3) 9.5.1-1  Flow Diagram - Fire, Makeup and Domestic Water (Sheet 3 fo 3) (DRN 01-419) 9.5.1-2  Fire Protection Cooling Towers - Plan (DRN 01-419) 9.5.1-3  Fire Protection Reactor Auxiliary Building Plan EL -35.00' 9.5.1-4  Fire Protection Reactor Auxiliary Building Plan EL -4.00' 9.5.1-5  Fire Protection Reactor Auxiliary Building Plan EL +21.00' 9.5.1-6  Fire Protection Reactor Auxiliary Building Plan EL +46.00' (DRN 00-691, R11-A) 9.5.1-7  Fire Protection Reactor Auxiliary Building Section Sheet 1 (DRN 00-691, R11-A)
WSES-FSAR-UNIT-3  9-xii Revision 11-B (06/02)  CHAPTER 9  AUXILIARY SYSTEMS  LIST OF FIGURES (Cont'd)  Figure      Title 9.5.1-8  Fire Protection Reactor Auxiliary Building Sections Sheet 2 9.5.1-9  Fire Protection Reactor Auxiliary Building Sections 3 Sheet 3 (DRN 00-691, R11-A) 9.5.1-10  Fire Protection Reactor Auxiliary Building Sections Sheet 4 (DRN 00-691, R11-A) 9.5.1-11  Fire Protection Fuel Handling Building - Plans
9.5.1-12  Fire Protection Fuel Handling Building - Sections 9.5.1-13  Fire Protection Reactor Building - Plan EL -35.00' EL -4.00' (DRN 01-419) 9.5.1-14  Fire Protection Reactor Building - Plan EL +21.00' (DRN 01-419) 9.5.1-15  Fire Protection Reactor Building - Plan EL +46.00' 9.5.1-16  Fire Protection Turbine Building Ground Floor Plan EL 15.00' 9.5.1-17  Fire Protection Turbine Building Mezz. Floor Plan EL +40.00' 9.5.1-18  Fire Protection Turbine Building Operating Floor Plan EL +67.00' 9.5.1-19  Fire Protection Turbine Building Sections "B-B" and "C-C" 9.5.1-20  Fire Protection Turbine Building Section "A-A" 9.5.1-21  Fire Protection Auxiliary Building Plan EL +35.00' WSES-FSAR-UNIT-3  9-xiii Revision 13 (04/04)  UPDATE REFERENCE LIST  Chapter 9 Section    Cross References Revision 12-B Section 9.3.3.2.2.4  ER-W3-2002-0663-001/DRN 03-213 Section 9.2.9.3  ER-W3-2000-0563-000/DRN 02-1623 Table 9.3-13 Sh 4  ER-W3-2003-0132-000/DRN 03-275
Table 9.5.1-1 Sh 1  ER-W3-2002-0469-000/DRN 02-1351 Figure 9.5.1-16 Figure 9.5.1-17 Figure 9.5.1-20
Figure 9.4-3 Sh 8  ER-W3-2001-1065-000/DRN 02-1534
Revision 12-C Section 9.5.1.2.2  ER-W3-2003-0220-000/DRN 03-578 Section 9.5.1.3.1
Section 9.5.4.1  ER-W3-2003-0227-000/DRN 03-635 Section 9.5.4.2 Section 9.5.5.3 Section 9.5.6.2 Section 9.5.6.3 Section 9.5.7.2 Section 9.5.7.3 Table 9.5-1 Sht 1 Table 9.5-1 Sht 3 Table 9.5-2 Sht 1 Table 9.5-2 Sht 2 Table 9.5-3 Table 9.5-4 Sht 1 Table 9.5-4 Sht 2 Table 9.5-5 Sht 2
Revision 13 Figure 9.5-1 Sht 2  ER-W3-2000-0147-001/DRN 02-147
Table 9.2-1 Sht 5  ER-W3-2000-1073-000/DRN 02-1197
Section 9.3.4.3.2  ER-W3-2000-0106-002/DRN 03-760 Section 9.5.1.2.2  ER-W3-2001-1024-009/DRN 03-993 Section 9.5.1.3.2
Section 9.1.4.2.2.6  ER-W3-2002-0430-000/DRN 03-1341 WSES-FSAR-UNIT-3  9-xiv Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 9 Section    Cross References Revision 13 Table 9.3-15 Sht 40  ER-W3-2003-0502-001/DRN 03-2021 Table 9.3-15 Sht 42
Figure 9.4.4  ER-W3-2003-0170-000/DRN 04-249 Revision 13-A Figure 9.3-1 Sht 6  ER-W3-2004-128/DRN 04-992 Figure 9.3-1 Sht 9
Revision 13-B Table 9.1-3 Sht. 5  ER-W3-2004-0205/DRN 04-487
Figure 9.1-5  ER-W3-2004-0377/DRN 04-1069
Table 9.2-12 Sht.2  ER-W3-2003-0489-000/DRN 04-92
Figure 9.3-2 Sht. 1  ER-W3-2001-0377-000/DRN 02-1052
Figure 9.5-1 Sht. 2  ER-W3-2003-0769-002/DRN 04-1393 Figure 9.5-2 Sht. 2
Revision 14 Section 9.1.4.2.2.13 ER-W3-2001-0305-001/DRN 02-176 Section 9.1.4.2.3.3 Table 9.1-5 sh 1 Figure 9.1-5 Figure 9.1-17 
WSES-FSAR-UNIT-3  9-xv Revision 14-A (03/06)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 14 Cont'd Section 9.1.3.3 ER-W3-2001-1149-000/DRN 03-2063 Section 9.2.5.2 Section 9.2.5.3.2 Section 9.3-4.22 Section 9.3.6.1.2 Section 9.3.6.2.1 Section 9.3.6.2.2 Section 9.3.6.3.1 Section 9.3.6.3.3 Section 9.3.6.3.4 Table 9.1-3 sh 6-8 Table 9.2-3 sh 1-2 Table 9.2-9 Table 9.2-10 Table 9.3-11 Table 9.3-17 sh 1-2 Figure 9.3-7 Figure 9.3-8 Figure 9.3-8A Figure 9.3-8B 
Table 9.3-4 shts 1-3 ER-W3-2001-1149-000/DRN 05-251 Section 9.1.3.1 ER-W3-2001-1149-000/DRN 05-968 Section 9.3.8.3 ER-W3-2004-0276-000/DRN 04-977 Section 9.4.1.1 
Figure 9.5-3a ER-W3-2004-0324-000/DRN 04-1816 Section 9.2.5.3.3 ER-W3-2004-0615-000/DRN 05-446 Table 9.2.9 
Section 9.2.5.3.3 ER-W3-2004-0615-001/DRN 05-1668 Section 9.3.4.2.1.2 ER-W3-2005-0056-000/DRN 05-332 Table 9.4-10 sh 1 ER-W3-2005-0065-000/DRN 05-365
Figure 9.4-3 ER-W3-2005-0070-000/DRN 05-519 Section 9.4.5.8.1 ER-W3-2005-0145-000/DRN 05-787 Revision 14-A Section 9.1 ER-W3-2005-0396-000/DRN 05-1365 Table 9.1-8 sheet 1 
Table 9.2-4 sheet 1 ER-W3-2004-0523-000/DRN 05-1663 Table 9.2-4 sheet 2 
Figure 9.3-1 sheet 9 ER-W3-2003-0409-000/DRN 05-1434 Section 9.4.5.6.1 ER-W3-2004-0331-000/DRN 05-1480 Table 9.4-1 sheet 2 WSES-FSAR-UNIT-3  9-xvi Revision 15 (03/07)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 14-B Section 9.2.5.3.2 ER-W3-2005-0465-000/DRN 05-1652 Table 9.2-1 sh 1 Table 9.2-1 sh 2 Table 9.2-1 sh 3 Table 9.2-3 sh 1 Table 9.2-3 sh 2 Table 9.2-9 Table 9.2-10 Figure 9.2-4 Figure 9.2-4A Figure 9.2-5A 
Section 9.5.2.3 ER-W3-2005-0096-000/DRN 06-233 Figure 9.5-1 sh 2 Figure 9.5-2 sh 2 
Figure 9.5-4 ER-W3-2005-0442-000/DRN 06-281 Table 9.2-4 sh 1 ER-W3-2006-0178-000/DRN 06-500
Revision 15 Section 9.4.3.5.2.3 ER-W3-2003-0735-000/DRN 03-1988 Table 9.2-5 Sh. 1 
Table 9.2-4 ER-W3-2004-0523-000/DRN 05-1663
Section 9.1.4.2.2.15 ER-W3-2006-0223-000/DRN 06-843 Table 9.1-3 Sh. 1 Table 9.1-3 Sh. 2 Table 9.1-3 Sh. 3 Table 9.1-3 Sh. 4 Table 9.1-3 Sh. 7 Table 9.1-6 Sh. 1 Table 9.1-6 Sh. 2 Section 9.2.9.2.4 Table 9.2-1 Sh. 4 Table 9.3-9 Sh. 6 Table 9.3-4 Sh. 1 Table 9.3-4 Sh. 2 Table 9.3-4 Sh. 3 Table 9.3-9 Sh. 1 Section 9.4.1.2.1 Section 9.4.1.3 Table 9.4-9 Sh. 1 Table 9.4-16 Sh. 1 Table 9.5-4 Sh. 1 
Table of Contents ER-W3-2006-0281-000/DRN 06-873 Section 9.5.1.3.2 ER-W3-2006-0284-000/DRN 06-874 Table 9.5.1-3 Sh. 3 Table 9.5.1-2 Sh. 1 
Section 9.3.6.5 ER-W3-2006-0282-000/DRN 06-886 WSES-FSAR-UNIT-3  9-xvii Revision 302 (12/08)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 15 (Cont'd)
Table 9.2-3 Sh. 1 ER-W3-2006-0223-000/DRN 06-898 Table 9.2-3 Sh. 2 Section 9.4.1.3 Section 9.4.5.2.2 Section 9.3.6.2.1 
Table 9.3-3  ER-W3-2006-0223-000/DRN 06-901
Section 9.2.4.5 ER-W3-2006-0223-000/DRN 06-910 Section 9.3.4.2.1.4 ER-W3-2004-0094-003/DRN 06-1142 Table 9.3-7 
Table 9.5-1 Sh. 1 ER-W3-2006-0397-000/DRN 06-1167
Revision 301 Section 9.5.1.2.3 EC-5000081435 Section 9.5.1.3.1 Section 9.5.1.3.2 Table 9.5.1-3 Sh. 1 Figure 9.5.1-8 
Section 9.1.4.2.1.1 EC-5000082257 Section 9.1.4.2.1.2 
Section 9.5.6.2 EC-5000082405 Table 9.5-4 Sh. 1 Figure 9.5-5 
Section 9.1.1.3 EC-5000082411 Section 9.1.2.3 Section 9.1:  References 
Section 9.3.3.2.2.1 EC-2097 Section 9.4.5.2.3 EC-5000082470 Table 9.4-2 Sh. 4 
Revision 302 Section 9.3.6.2.1 EC-935 Section 9.3.6.3.1 Table 9.3-1a 
Table 9.4-2 Sh. 1 EC-2188 Table 9.4-2 Sh. 3 Table 9.4-10 Sh. 1 Table 9.4-10 Sh. 2 Table 9.4-14 Sh. 1 Table 9.4-14 Sh. 2 Table 9.4-14 Sh. 3 Table 9.4-14 Sh. 4 Table 9.4-14 Sh. 5 
WSES-FSAR-UNIT-3  9-xviii Revision 304 (06/10)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 302 (Continued)
Table 9.4-14 Sh. 6 Table 9.4-14 Sh. 7 
Section 9.5.1.3.1 EC-4606
Section 9.5.1.1.3 EC-9506 Section 9.5.1.3.2 
Revision 303 Section 9.2.4.2 EC-530 Section 9.2.5 Section 9.2.5.3.2 Section 9.2.5.3.3 Table 9.2-9 
Section 9.1.2.1 EC-8884 Section 9.1:  References 
Section 9.1.4.2.2.16 EC-11204 Section 9.3.4.2.1.2 EC-14241 Section 9.3.4.2.1.5 
Revision 304 Section 9.3.4 EC-13560 Table 9.3-9 Sh. 2 
Section 9.5.1.3.2 EC-18551
Section 9.5.1.3.2 EC-18667 Figure 9.5.1-8 Figure 9.5.1-9 
Section 9.1.1.1 EC-18742 Section 9.1.1.2 Section 9.1.1.3 Section 9.1.2.1 Section 9.1.2.2 Section 9.1.2.3 Section 9.1.2.4.1 Section 9.1.2.4.2 Section 9.1.2.4.3 Section 9.1:  References Table 9.1-2 Table 9.1-8 Sh. 1 Table 9.1-8 Sh. 2 
Section 9.5.1.3.2 EC-18843
Section 9.1.2.3 EC-22227 WSES-FSAR-UNIT-3  9-xix Revision 305 (11/11)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 305 Section 9.3.4.1.1 EC-4019 Section 9.3.4.2.1.2 Section 9.3.4.2.1.4 Section 9.3.4.2.2 Table 9.3-13 Sheet 3 of 4 Table 9.3-15 Sheet 46 of 60 Table 9.3-7 
Section 9.3.6.2.1 EC-14765 Section 9.3.6.2.2 Section 9.3.6.2.3 Table 9.3-20 Sheet 1 of 2 
Section 9.1.3.1 EC-8477 Section 9.1.3.2.1 Section 9.1:  References Table 9.1-1 Table 9.2-2 Sheet 1 of 3 Table 9.2-3 Sheet 1 of 2 Table 9.2-3 Sheet 2 of 2 Table 9.2-9 Figure 9.1-21 Figure 9.1-22 
Section 9.1.4.1.3 EC-14270 Section 9.1.4.2.2.14 Section 9.1.4.2.3.2 Section 9.1.4.3.1 Table 9.1-7 Figure 9.1-18 Figure 9.1-19 
Section 9.5.1.3.2 EC-18305
Section 9.5.3.2 EC-23470
Section 9.5.1.3.2 EC-23997
Section 9.5.1.3.1 EC-25884 Section 9.5.1.3.2 
Table 9.2-1 Sheet 4 of 5 EC-26241 Table 9.5-1 Sheet 3 of 3 Table 9.5-4 Sheet 2 of 2 
Section 9.1.2.2 EC-28458 EC-30504
Section 9.5.6.2 EC-31660 WSES-FSAR-UNIT-3  9-xx Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 306 Table of Contents EC-14275 Section 9.1.2 Section 9.1.2.1 Section 9.1.2.2 Section 9.1.4.1.3 Section 9.1.4.2.1 Section 9.1.4.2.2.14 Section 9.1.4.2.3.2 Section 9.1.4.3.1 Section 9.1.5 Section 9.1:  References Figure 9.1-3 Sheet 1 Figure 9.1-19 
Section 9.5.1.3.2 EC-15965 Section 9.4.3.4.1 EC-17580 Section 9.4.3.4.2 Section 9.4.3.4.2.1 Table 9.4-1 Sheet 1 Figure 9.4-5 
Section 9.5.1.3.2 EC-19062
Section 9.2.5.2 EC-32877
Section 9.1.4.1.2 EC-35729 Section 9.1.4.4 
Revision 307 Figure 9.3-1 Sheet 6 EC-8435
Section 9.3.4.1.1 EC-8458 Section 9.3.4.1.2 Table 9.3-11 Section 9.3.6.1 Section 9.3.6.1.2 Section 9.3.6.3.2 Section 9.3.6.3.3 
Section 9.2.5.3.2 EC-8465 Table 9.2-3 Sheet 1 of 2 Table 9.2-3 Sheet 2 of 2 Table 9.2-9 Table 9.2-10 Table 9.3-4 Sheet 1 of 3 thru Table 9.3-4 Sheet 3 of 3  Figure 9.2-4  Figure 9.2-4A Figure 9.2-5a Figure 9.3-8A Figure 9.3-8B 
WSES-FSAR-UNIT-3  9-xxi Revision 308A (10/15)  UPDATE REFERENCE LIST  Chapter 9  Section    Cross References Revision 307 (Continued)
Section 9.2.2.2.1 EC-30976 Table 9.2-2 Sheet 2 of 3 Section 9.3.6.2.1 Section 9.3.6.2.2 Section 9.3.6.3.1 Section 9.3.6.3.2 Table 9.3-16 Sheet 7 of 11 
Section 9.4.5.7.1 EC-33471
Section 9.2.5.3.1 EC-38632
Section 9.3.9.2.1 EC-41095
Section 9.3.1.1 EC-41355 Section 9.3.6.3.3 Section 9.3.9.1 Section 9.3.9.3 Table 9.2-4 Sheet 2 of 2 
Section 9.5.2.2.1 EC-43424
Section 9.1.4.1.3 EC-44151
Revision 308 Section 9.2.5.3.3 LBDCR 13-018 Section 9.4.3.3.2 LBDCR 14-011 Section 9.5.1.2.2 EC 35260
Section 9.5.1.6.4 LBDCR 13-015 Section 9.5.1.3.2 LBDCR 14-020 Table 9.5-4 Sh. 1 of 2 EC 43474
Revision 308A Section 9.3  LBDCR 15-028 WSES-FSAR-UNIT-3  10-i    CHAPTER 10  STEAM AND POWER CONVERSION SYSTEM  TABLE OF CONTENTS Section      Title      Page 10.0  STEAM AND POWER CONVERSION SYSTEM    10.1-1 10.1  SUMMARY DESCRIPTION      10.1-1 10.2  TURBINE GENERATOR        10.2-1 10.2.1  DESIGN BASES        10.2-1
10.2.2  DESCRIPTION        10.2-1
10.2.3  TURBINE DISK INTEGRITY      10.2-7
10.2.4  EVALUATION        10.2-15
==10.2  REFERENCES==
10.2-15
10.3  MAIN STEAM SUPPLY SYSTEM      10.3-1 10.3.1  DESIGN BASES        10.3-1
10.3.2  DESCRIPTION        10.3-2
10.3.3  EVALUATION        10.3-4
10.3.4  INSPECTION AND TESTING REQUIREMENTS    10.3-5
10.3.5  WATER CHEMISTRY      10.3-5
10.3.6  STEAM AND FEEDWATER SYSTEM    10.3-8
==10.3  REFERENCES==
10.3-9
10.4  OTHER FEATURES OF STEAM AND POWER CONVERSION SYSTEM  10.4-1 10.4.1  MAIN CONDENSER      10.4-1
10.4.2  MAIN CONDENSER EVACUATION SYSTEM    10.4-4
10.4.3  TURBINE GLAND SEALING SYSTEM    10.4-6
10.4.4  STEAM BYPASS SYSTEM      10.4-7
WSES-FSAR-UNIT-3  10-ii    CHAPTER 10  STEAM AND POWER CONVERSION SYSTEM  TABLE OF CONTENTS (Cont'd)
Section      Title      Page 10.4.5  CIRCULATING WATER SYSTEM      10.4-9
10.4.6  CONDENSATE CLEAN-UP SYSTEM    10.4-12
10.4.7  CONDENSATE AND FEEDWATER SYSTEMS    10.4-16
10.4.8  STEAM GENERATOR BLOWDOWN SYSTEM    10.4-22
10.4.9  EMERGENCY FEEDWATER SYSTEM    10.4-28
10.4.10  CHEMICAL FEED SYSTEM      10.4-36 10.4.9A  EMERGENCY FEEDWATER SYSTEM RELIABILITY ANALYSIS  10.4.9B-i 
WSES-FSAR-UNIT-3  10-iii Revision 11 (05/01)  CHAPTER 10  STEAM AND POWER CONVERSION SYSTEM  LIST OF TABLES Table      Title 10.2-1  EXTRACTION STEAM VALVE ARRANGEMENTS FOR TURBINE OVERSPEED PROTECTION
10.2-2  TURBINE OVERSPEED PROTECTION DEVICES
10.2-3  LOW PRESSURE TURBINE MATERIALS
10.3-1  MAIN STEAM SUPPLY SYSTEM MAIN STEAM LINE SAFETY VALVES
10.3-2  STEAM GENERATOR BLOWDOWN CHEMISTRY LIMITS
10.3-3  FEEDWATER OPERATING CHEMISTRY LIMITS
10.3-4  DELETED
10.3-5  BRANCH CONNECTIONS BETWEEN MSIV'S AND TURBINE STOP VALVES
10.3-6  DELETED
10.3-7  DELETED
10.3-8  DELETED
10.3-9  DELETED
10.4-1  MAIN CONDENSER PERFORMANCE AND DATA
10.4-2  CIRCULATING WATER SYSTEM COMPONENT DATA
10.4-3  CONDENSATE PUMP DATA
10.4-4  HEATER DRAIN PUMP DATA
10.4-5  STEAM GENERATOR FEEDWATER PUMP DATA
10.4-5a  AUXILIARY FEEDWATER PUMP DATA
10.4-6  FEEDWATER HEATER DATA
10.4-7  STEAM GENERATOR BLOWDOWN TANK AND PUMP DATA
10.4-8  STEAM GENERATOR BLOWDOWN HEAT EXCHANGERS DATA (DRN 99-2262, R11) 10.4-9  DELETED (DRN 99-2262, R11) 10.4-10  REGENERATIVE WASTE TANK PUMP AND PUMP DATA (DRN 99-2262, R11) 10.4-11  DEMINERALIZER COMPONENT DESIGN DATA (DRN 99-2262, R11)
WSES-FSAR-UNIT-3  10-iv    CHAPTER 10  STEAM AND POWER CONVERSION SYSTEM  LIST OF TABLES (Cont'd)
Table      Title 10.4-11a  BLOWDOWN BOOSTER PUMP
10.4-12  EMERGENCY FEEDWATER SYSTEM COMPONENT DESIGN DATA
10.4-13  CONDENSATE STORAGE POOL CHEMICAL COMPOSITION
10.4-14  EMERGENCY FEEDWATER SYSTEM FAILURE MODE AND EFFECTS ANALYSIS
10.4-15  EMERGENCY FEEDWATER SYSTEM INSTRUMENTATION APPLICATION
10.4-16  CONDENSATE DEMINERALIZER EFFLUENT WATER QUALITY
10.4-17  CONDENSATE CLEAN-UP DESIGN DATA
10.4.9A-1 EVALUATION OF THE WATERFORD SES UNIT NO. 3 EMERGENCY FEEDWATER SYSTEM VERSUS THE REQUIREMENTS OF STANDARD REVIEW PLAN (SRP) 10.4.9 AND BRANCH TECHNICAL POSITION (BTP) ASB 10-1
10.4.9A-2 EVALUATION OF THE WATERFORD SES UNIT NO. 3 EMERGENCY FEEDWATER SYSTEM VERSUS THE NRC EFW SHORT AND LONG TERM RECOMMENDATIONS
10.4.9A-3 COMPARISON OF WATERFORD EFW SYSTEM WITH NRC EFW SYSTEM FLOW    REQUIREMENTS
10.4.9B-1 COMPONENT LIST MANUAL VALVES
10.4.9B-2 EFS FAILURE MODES AND EFFECTS ANALYSIS
10.4.9B-3 MINIMAL CUT SETS - CASE 1
10.4.9B-4 MINIMAL CUT SETS - CASE 2
10.4.9B-5 DELETED
10.4.9B-6 BASIC EVENT CAUSES AND PROBABILITIES
10.4.9B-7 EFS VALVES SUBJECT TO ASME SECTION XI TESTING
10.4.9B-8 SUMMARY OF TEST AND MAINTENANCE CONTRIBUTIONS TO COMPONENT AVAILABILITY 10.4.9B-9 DOMINANT CUT SETS - CASE 1
10.4.9B-10 DOMINANT CUT SETS - CASE 2
10.4.9B-11 DOMINANT CUT SETS - CASE 3
WSES-FSAR-UNIT-3  10-v Revision 14 (12/05)  CHAPTER 10 (DRN 04-719, R14)  STEAM AND POWER CONVERSION SYSTEM (DRN 04-719, R14)  LIST OF FIGURES Figure      Title 10.2-1  STEAM PRESSURE VARIATION WITH POWER
10.2-2  HEAT BALANCE MAXIMUM GUARANTEED
10.2-3  HEAT BALANCE MAX CALCULATED (NOT GUARANTEED)
10.2-4  FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 1 OF 4)
10.2-4  FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 2 OF 4)
10.2-4  FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 3 OF 4)
10.2-4  FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 4 OF 4)
10.2-5  TURBINE OVERSPEED PROTECTION ELECTRO-HYDRAULIC SYSTEM
10.2-6  DIGITAL ELECTRO-HYDRAULIC (DEH) CONTROL SYSTEM
10.2-7  TURBINE HIGH-PRESSURE ELEMENT  (DRN 04-719, R14) 10.2-8  DELETED (DRN 04-719, R14)  10.2-9  OVERSPEED PROTECTION CONTROLLER
10.3-1  MAIN STEAM ISOLATION VALVE
10.3-2  LOCATIONS OF PROCESS SAMPLE POINTS
10.4-1  FLOW DIAGRAM CIRCULATING, SERVICE & INTAKE COOLING WATER SYSTEMS (SHEET 1 OF 2) (DRN 01-420) 10.4-1  FLOW DIAGRAM CIRCULATING, SERVICE & INTAKE COOLING WATER SYSTEMS (SHEET 2 OF 2)
10.4-2  FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 1 OF 6) (DRN 01-420) 10.4-2  FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 2 OF 6) 10.4-2  FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 3 OF 6) 10.4-2  FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 4 OF 6)
WSES-FSAR-UNIT-3  10-vi Revision 12-C (07/03)  CHAPTER 10  TEAM AND POWER CONVERSION SYSTEM  LIST OF FIGURES Figure      Title 10.4-2  FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 5 OF 6) 10.4-2  FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 6 OF 6)  (DRN 03-683, R12-C) 10.4-3  FLOW DIAGRAM TURBINE BUILDING MISCELLANEOUS SYSTEMS (SHEET 1 OF 2) 10.4-3  FLOW DIAGRAM TURBINE BUILDING MISCELLANEOUS SYSTEMS (SHEET 2 OF 2) (DRN 03-683, R12-C)  (DRN 01-420, R11) 10.4-4  FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 1 OF 4) (DRN 01-420, R11) 10.4-4  FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 2 OF 4)
10.4-4  FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 3 OF 4)
10.4-4  FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 4 OF 4)
10.4-5  FLOW DIAGRAM STEAM GENERATOR BLOWDOWN SYSTEM (SHEET 1 OF 2)
10.4-5  FLOW DIAGRAM STEAM GENERATOR BLOWDOWN SYSTEM (SHEET 2 OF 2)
10.4-6  EMERGENCY FEEDWATER SYSTEM
10.4-7  DELETED
10.4-8  BACKWASH TREATMENT SYSTEM FLOW DIAGRAM
10.4-9  CONDENSATE POLISHER SYSTEM FLOW DIAGRAM
10.4.9A-1 DELETED
10.4.9B-1 WSES-3 SIMPLIFIED EFS FLOW DIAGRAM (APPENDIX 10.4.9A) 10.4.9B-2 EFS FAULT TREE, CASE 1 - LMFW (APPENDIX 10.4.9A) 10.4.9B-3 EFS FAULT TREE, CASE 2 - LMFW/LOOP (APPENDIX 10.4.9A) 10.4.9B-4 EFS FAULT TREE, CASE 3 - LMFW/SB (APPENDIX 10.4.9A) 
WSES-FSAR-UNIT-3  10-vii Revision 14 (12/05)  UPDATE REFERENCE LIST  Chapter 10 Section    Cross References Revision 12-B 10.4.2.5    ER-W3-2002-0663-001/DRN 03-214 
Revision 12-C Figure 10.2-6  ER-W3-2001-0274-000/DRN 03-556 Figure 10.4-3 Sht 1  ER-W3-2003-0255-000/DRN 03-683 Figure 10.4-3 Sht 2
Revision 13 Section 10.4.7.3 ER-W3-2002-0288-002/DRN 03-1888 Section 10.3.1 ER-W3-2003-0755-001/DRN 03-2157 Section 10.4.1
Revision 13-A Figure 10.2-6 Sht. 2 ER-W3-2003-0142-000/DRN 04-987 Figure 10.2-6 Sht. 3 
Section 10.4.5.3 ER-W3-2004-0265-000/DRN 04-616 Revision 14 Section 10.3.1 ER-W3-2001-1149-000/DRN 03-2064 Section 10.3.3 Section 10.4.1.1 Section 10.4.1.2 Section 10.4.1.3 Section 10.4.2.2 Section 10.4.4.1 Section 10.4.4.2 Section 10.4.6.1 Section 10.4.7.1 Section 10.4.7.2 Section 10.4.8 Table 10.4-1 Table 10.4-6 Table 10.4-17 sh 1 Figure 10.2-1 Figure 10.2-2 Figure 10.2-3 sh 1 
Table 10.4.9A-3 shts 2-3 ER-W3-2001-1149-000/DRN 05-544 WSES-FSAR-UNIT-3  10-viii Revision 15 (03/07)  UPDATE REFERENCE LIST  Chapter 10 Section Cross References Revision 14 Cont'd Table Of Contents ER-W3-2003-0053-000/DRN 04-719 Section 10.2.1 Section 10.2.2.2.1 Section 10.2.3.1.1 Section 10.2.3.3 Section 10.2.3.5 Reference 10.2 Figure 10.2-7 Figure 10.2-8 
Section 10.2.4 ER-W3-2003-0053-000/DRN 05-861 Table 10.4-1 ER-W3-2004-0007-000/DRN 04-1702
Section 10.4.9.1.a ER-W3-2004-0276-002/DRN 05-870 Section 10.4.7.3 ER-W3-2004-0602-000/DRN 05-235 Section 10.4.9.3.2 ER-W3-2004-0615-000/DRN 05-447 Section 10.4.8.2 ER-W3-2004-0618-000/DRN 05-151 Section 10.4.8.3 
Section 10.4.6.2.1 ER-W3-2005-0126-000/DRN 05-565 Figure 10.2-4 sh 3 ER-W3-2005-0500-00/DRN 05-1559
Revision 14-A Section 10.4.5.3 ER-W3-2005-0054-000/DRN 05-1425 Revision 14-B Figure 10.4-1 sh 1 ER-W3-2006-0172-000/DRN 06-502
Revision 15 Section 10.2.3.6 ER-W3-2006-0164-000/DRN 06-722 Section 10.2.3.7 
Section 10.2.2.1 ER-W3-2006-0047-000/DRN 06-812 Section 10.4.9.2 ER-W3-2006-0223-000/DRN 06-841 Table 10.4-2 Sh. 1 Table 10.4-4 Table 10.4-7 Sh. 2 Table 10.4-8 Table 10.4-11a 
Table 10.4.9A-1 Sh. 1 ER-W3-2006-0223-000/DRN 06-907 Section 10.4.9.3.6 ER-W3-2007-0010-000/DRN 07-28 WSES-FSAR-UNIT-3  10-ix Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 10 Section Cross References Revision 303 Section 10.4.9.1 EC-530 Section 10.4.9.2 Section 10.4.9.3.2 
Revision 304 Figure 10.4-6 EC-3926 Table 10.4.9B-1 Sh. 3 Table 10.4-9B-2 Sh. 6 Table 10.4-9B-2 Sh. 7 Table 10.4.9B-2 Sh. 8 Table 10.4.9B-2 Sh. 9 Figure 10.4.9B-1 
Table 10.4-12 EC-19372
Revision 305 Section 10.3.6.2 EC-29980
Revision 306 Section 10.4.10.2 EC-34060 Section 10.4.10.5 Section 10.4.9B.3.2 Section 10.4.9B.5.1.1 
Section 10.4.5.5 EC-34124
Section 10.4.5.2 EC-34828 Figure 10.4-1 Sheet 1 of 2 
Revision 307 Section 10.2.2.1 EC-8465 Section 10.3.5.1 Table 10.3-5 Sh. 2 of 2 Section 10.4.7.1 Section 10.4.7.3 Table 10.4-1 Table 10.4-6 Figure 10.2-1 Figure 10.2-2 Figure 10.2-3 Sh. 1 Figure 10.2-3 Sh. 2 Figure 10.2-3A Figure 10.2-3B Figure 10.2-3C Figure 10.2-3D Figure 10.2-3E Figure 10.3-2 WSES-FSAR-UNIT-3  10-x Revision 308 (11/14)  UPDATE REFERENCE LIST  Chapter 10 Section Cross References Revision 307 (Continued)
Appendix 10.4.9B EC-33720 Table 10.4-9B-1 Table 10.4-9B-2 Table 10.4-9B-3 Table 10.4-9B-4 Table 10.4-9B-5 Table 10.4-9B-6 Table 10.4-9B-7 Table 10.4-9B-8 Table 10.4-9B-9 Table 10.4-9B-10 Table 10.4-9B-11 Section 10.4.9.2 
Section 10.4.9.2 EC-40342
Section 10.3.1 EC-41355 Section 10.4.9.3.1 Table 10.4-14 Table 10.4.9A-1 Sh. 2 of 7 Table 10.4.9A-2 Sh. 8 of 11 
Table 10.4.9A-1 Sh. 4 of 7 EC-42115 Table 10.4.9A-1 Sh. 5 of 7 
Revision 308 Table 10.4-3 EC 47045
WSES-FSAR-UINT-3  11-i Revision 14 (12/05)  CHAPTER 11  RADIOACTIVE WASTE MANAGEMENT  TABLE OF CONTENTS Section      Title    Page (DRN 03-2065, R14) 11.0  RADIOACTIVE WASTE MANAGEMENT
11.1  SOURCE TERMS      11.1-1 (DRN 03-2065, R14) 11.1.1  DESIGN BASIS SOURCE TERMS    11.1-1
11.1.2  DEPOSITED CORROSION PRODUCTS    11.1-3 11.1.3  NEUTRON ACTIVATION PRODUCTS    11.1-6
11.1.4  TRITIUM PRODUCTION IN REACTOR COOLANT  11.1-7
11.1.5  TRITIUM CONCENTRATION AND RELEASES    11.1-8
11.1.6  SPENT FUEL POOL FISSION PRODUCT AND CORROSION  11.1-9    PRODUCT ACTIVITIES
11.1.7  LEAKAGE SOURCES      11.1-10
11.1.8  STEAM GENERATOR ACTIVITY MODEL    11.1-10 
==11.1  REFERENCES==
11.1-12
11.1A  APPENDIX - DERIVATION OF RESIDENCE TIMES    11.1A-1 11.1A.1  CIRCULATING CRUD      11.1A-1
11.1A.2  DEPOSITED CRUD      11.1A-3
11.2  LIQUID WASTE MANAGEMENT SYSTEM    11.2-1 11.2.1  DESIGN BASES      11.2-1
11.2.2  SYSTEM DESCRIPTION      11.2-5
11.2.3  RADIOACTIVE RELEASES      11.2-8
11.3  GASEOUS WASTE MANAGEMENT SYSTEMS    11.3-1 11.3.1  DESIGN BASES      11.3-1
11.3.2  SYSTEM DESCRIPTION      11.3-4
11.3.3  RADIOACTIVE RELEASES      11.3-5
11.4  SOLID WASTE MANAGEMENT SYSTEM    11.4-1 
WSES-FSAR-UINT-3  11-ii  CHAPTER 11  TABLE OF CONTENTS (Cont'd)
Section      Title    Page 11.4.1  DESIGN BASES      11.4-1
11.4.2  SWMS DESCRIPTION      11.4-2
11.4.3  IN-PLANT SOLIDIFICATION SYSTEM DESCRIPTION  11.4-2 11.4.4  VENDOR SOLIDIFICATION SYSTEM    11.4-3 11.4.5  SPENT RESIN HANDLING SYSTEM DESCRIPTION  11.4-4
11.4.6  RADIOACTIVE FILTER HANDLING    11.4-8
11.4.7  DRY ACTIVE WASTE HANDLING    11.4-8
11.4.8  SOLIDIFICATION BUILDING      11.4-9 11.4.9  COMPACTOR BUILDING      11.4-9 11.4.10  STORAGE FACILITIES      11.4-10
11.4.11  RADIOACTIVE MATERIAL PACKAGING    11.4-12
11.4.12  RADIOACTIVE MATERIAL SHIPPING    11.4-13 11.5  PROCESS AND EFFLUENT RADIOLOGICAL MONITORING AND  11.5-1  SAMPLING SYSTEMS 11.5.1  DESIGN BASES      11.5-1
11.5.2  SYSTEM DESCRIPTION      11.5-3
11.5.3  EFFLUENT RADIOLOGICAL MONITORING SYSTEM  11.5-15
11.5.4  PROCESS MONITORING AND SAMPLING    11.5-17 
WSES-FSAR-UINT-3  11-iii Revision 14 (12/05)  CHAPTER 11  RADIOACTIVE WASTE MANAGEMENT  LIST OF TABLES Table      Title 11.1-1  Basis for Reactor Coolant Radioisotope Concentrations 11.1-2  Maximum Reactor Coolant Radioisotope Concentration One Percent Failed Fuel,  No Continuous Gas Stripping of Volume Control Tank
11.1-3  Average Reactor Coolant Radioisotope Concentration (No Gas Stripping) (DRN 03-2065, R14) 11.1-4  DELETED (DRN 03-2065, R14) 11.1-5  Measured Radioactive Crud Activity (dpm/mg-crud) 11.1-6  Activation Rates
11.1-7  System Parameters
11.1-8  Average and Maximum Residence Times, Days (DRN 03-2065, R14) 11.1-9  Activation Rates 11.1-10  Long-lived Crud Activity
11.1-11  Reactor Coolant Circulating Crud Activity (DRN 03-2065, R14) 11.1-12  Equilibrium Crud Film Thickness 11.1-13  Tritium Activation Reactions
11.1-14  Parameters Used in Tritium Production Determination
11.1-15  Tritium Production In Reactor Coolant
11.1-16  Tritium Production and Release at Operating PWRs 11.1-17  Fission and Corrosion Product Activities In the Spent Fuel Pool  (Ci/gram) 11.1-18  Equipment Leakage Assumptions
11.1-19  Basis for Design Basis Activities For the Steam Generator 11.1-20  Steam Generator Liquid Activities (Design Basis) 11.2-1  BMS Equipment Description
11.2-2  WMS Equipment Description
WSES-FSAR-UINT-3  11-iv Revision 14 (12/05)  CHAPTER 11  RADIOACTIVE WASTE MANAGEMENT  LIST OF TABLES (Cont'd)
Table      Title 11.2-3  Sources, Volumes, and Activities for BMS Liquid Influents
11.2-4  Sources, Volumes, and Activities of WMS Liquid Influents  (DRN 05-1248, R14) 11.2-5  Deleted (DRN 05-1248, R14) 11.2-6  BMS Equipment Decontamination Factors 11.2-7  WMS Equipment Decontamination Factors 11.2-8  FPS Equipment Decontamination Factors 11.2-9  Boron Management System Process Data
11.2-10  Waste Management System Process Flow Point Data 11.2-11  Source Terms (No Gas Stripping) Liquid Effluents
11.2-12  Principal Parameters and Conditions Used In Radiological Effluent Evaluations 11.2-13  Fraction of Effluent Concentration (EC) Averaged Over One Year 11.2-14  Aquatic Exposure Pathways (mrem/yr)
11.3-1  GWMS Equipment Description
11.3-2  Sources To The Vent Gas Collection Header
11.3-3  Sources and Volumes To The Gas Surge Tank
11.3-4  Activities of Sources To The GSH During Normal Operations Including    Anticipated Operational Occurrences (Ci/yr) 11.3-5  Source Terms (No Continuous Gas Stripping of Volume Control Tank)  Noble Gases and Iodines
11.3-6  Source Terms (No Continuous Gas Stripping of Volume Control Tank)  Particulates
11.3-7  Maximum Individual Doses From Terrestrial Pathways (No Continuous Gas  Stripping of Volume Control Tank) 11.3-8  Average Annual Airborne Radionuclide Concentrations (Ci/cc) 
WSES-FSAR-UINT-3  11-v Revision 308 (11/14) CHAPTER 11  RADIOACTIVE WASTE MANAGEMENT  LIST OF TABLES (Cont'd)
Table      Title 11.3-9  Filtration Provision
11.3-9a  HVAC Radioactive Release Point Data
11.3-10  Gaseous Waste Management System Process Data 11.4-1  Solid Waste Management System Component Summary Data 11.4-2  Solid Waste Management Process Data
11.4-3  Solid Waste Management Storage Capacity 11.4-4  Quantities of Input During Normal Operations Including Anticipated  Operational Occurrences to Solid Waste Management System 11.4-5  Quantities of Output During Normal Operations Including Anticipated  Operational Occurrences From Solid Waste Management System 11.4-6  Deleted
11.4-7  Annual Activities (Curies/Year) of Spent Resin Input to the Spent Resin  Tank During Normal Operations Including Anticipated Operational Occurrences 11.4-8  Annual Activities (Curies/Year) of Spent Filter Cartridges Input to the  Solid Waste Management System During Normal Operations Including    Anticipated Operational Occurrences
11.4-9  Basis for Activities Provided in Tables 11.4-6 Through 11.4-8 11.4-10  Comparison of Waterford 3 Design Criteria With Regulatory Guide 1.143,  "Design Guidance for Radioactive Waste Management Systems, Structures,    and Components Installed in Light-Water-Cooled Nuclear Power Plants,"  October 1979, and Branch Technical Position ETSB 11-3, "Design Guidance  for Solid Radioactive Waste Management Systems Installed in Light-Water-  Cooled Nuclear Power Reactor Plants."
11.4-11  Anticipated Waste for Storage in the Low Level Radwaste Facility (LBDCR 14-007, R308) 11.4-12  Original Steam Generator Storage Facility Radioactive Isotope Inventory (LBDCR 14-007, R308) 11.5-1  Process and Effluent Radiation Monitors 11.5-2  Primary Sample Points
11.5-3  Secondary Sample Points
11.5-4  Local Samples WSES-FSAR-UINT-3  11-vi Revision 307 (07/13)  CHAPTER 11  RADIOACTIVE WASTE MANAGEMENT  LIST OF FIGURES Figure      Title 11.2-1  Flow Diagram Boron Management System (Sheet 1 of 3) 11.2-1  Flow Diagram Boron Management System (Sheet 2 of 3) 11.2-1  Flow Diagram Boron Management System (Sheet 3 of 3) 11.2-2  Flow Diagram Waste Management System (Sheets 1 of 5) 11.2-2  Flow Diagram Waste Management System (Sheets 2 of 5) 11.2-2  Flow Diagram Waste Management System (Sheets 3 of 5) 11.2-2  Flow Diagram Waste Management System (Sheets 4 of 5) 11.2-2  Flow Diagram Waste Management System (Sheets 5 of 5) 11.3-1  Flow Diagram Gaseous Waste Management System 11.3-2  Flow Diagram Gaseous Waste Management System Waste Gas Compressor 11.4-1  Portable Solidification System Site Plan - Location 11.4-2 Solidification Building Plan View EL. +21 West Side RAB (DRN 02-221, R11-A) 11.4-3  DELETED 11.4-4  DELETED (DRN 02-221, R11-A) 11.4-5  Spent Resin Transfer System
11.4-6  Flow Diagram Solid Waste Management System 11.4-7  Interim Onsite Radwaste Storage Containers Laydown Location (LBDCR 13-009, R307) 11.4-8  SK-A-001, Low Level Radwaste Facility (LBDCR 13-009, R307) (DRN 99-2361, R11) 11.5-1  Three Stage Airborne Monitor (DRN 99-2361, R11)
WSES-FSAR-UINT-3  11-vii Revision 14 (12/05) UPDATE REFERENCE LIST  Chapter 11 Section    Cross References 
Revision 12-B 11.5.2.4.9  ER-W3-2002-0663-001/DRN 03-215 Table 11.5-4 Sht 1  ER-W3-29003-0132-000/DRN 03-276
Revision 13 Figure 11.2-1 Sht 1  ER-W3-2004-0123-000/DRN 04-350 Figure 11.2-1 Sht 2 Figure 11.2-1 Sht 3
Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2065 Section 11.0 Section 11.1.1.1 Section 11.1.1.2 Section 11.1.2 Section 11.1.3.1 Section 11.1.3.2 Section 11.1.4.1 Section 11.1.4.2 Section 11.1.5 Section 11.1.7 Section 11.1.8 Section 11.2.1.4 Section 11.2.3 Section 11.3.1 Section 11.4.5.2 Section 11.4.10.4 Section 11.5.2.4.1.7 Reference 11.1 Table 11.1-1 Table 11.1-2 Table 11.1-3 sh 1-2 Table 11.1-4 Table 11.1-5 Table 11.1-6 Table 11.1-7 Table 11.1-8 Table 11.1-9 Table 11.1-10 Table 11.1-11 Table 11.1-13 Table 11.1-14 Table 11.1-15 Table 11.1-16 Table 11.1-17 Table 11.1-19 Table 11.1-20 
WSES-FSAR-UINT-3  11-viii Revision 306 (05/12) UPDATE REFERENCE LIST  Chapter 11 Section    Cross References 
Revision 14 Cont'd Table 11.2-4 ER-W3-2001-1149-000/DRN 03-2065 (Cont'd) Table 11.2-5 Table 11.2-11 sh 1-2 Table 11.2-12 Table 11.2-12 sh 1 Table 11.2-13 Table 11.2-14 sh 1-2 Table 11.3-4 Table 11.3-5 Table 11.3-6 Table 11.3-7 sh 1-2 Table 11.3-8 Table 11.4-1 Table 11.4-7 Table 11.4-9 Figure 11.2-2 sh 1 Figure 11.2-2 sh 2 
Table of Contents ER-W3-2001-1149-013/DRN 05-1248 Table 11.5-1 sh 1 ER-W3-2005-0107-000/DRN 05-1038
Table 11.5-1 sh 1-3 ER-W3-2005-0131-000/DRN 05-575 Revision 15 Section 11.2.2.1 ER-W3-2006-0034-000/DRN 06-537 Table 11.2-9 Sh. 2 Section 11.2.1.5 
Table 11.2-2 Sh. 2 ER-W3-2004-0112-000/DRN 06-558
Section 11.5.2.1.6.3 ER-W3-2005-0471-000/DRN 06-1028 Revision 301 Table 11.5-1 Sh. 2 EC-1629
Revision 302 Figure 11.3-2 EC-5854
Revision 306 Section 11.5.2.1.1 EC-12329 WSES-FSAR-UINT-3  11-ix Revision 308 (11/14) UPDATE REFERENCE LIST  Chapter 11 Section    Cross References Revision 307 Table 11.1-19 EC-8458 Table 11.2-12 Sheet 1 of 3 
Section 11.3-1 EC-37911
Table of Contents LBDCR 13-009 Section 11.4.10.5 Table 11.4-11 Sheet 1 of 7 thru Table 11.4-11 Sheet 7 of 7  Figure 11.4-8 Section 11.4.10.6 LBDCR 13-010
Revision 308 Table of Contents LBDCR 14-007 Section 11.4.10.7 Section 11.4.10.8 Table 11.4-12 Sh. 1 of 2 Table 11.4-12 Sh. 2 of 2 
Section 11.2.1 EC 47424 Section 11.3.1 
WSES-FSAR-UNIT-3  12-i  CHAPTER 12  RADIATION PROTECTION  TABLE OF CONTENTS Section      Title    Page 12.0  RADIATION PROTECTION      12.1-1
12.1  ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES  12.1-1  ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA)  12.1.1  POLICY CONSIDERATIONS      12.1-1
12.1.2  DESIGN CONSIDERATIONS      12.1-1
12.1.3  OPERATIONAL CONSIDERATIONS    12.1-9
12.1.4  DECOMMISSIONING CONSIDERATIONS    12.1-10
12.2  RADIATION SOURCES      12.2-1 12.2.1  CONTAINED SOURCES      12.2-1 12.2.2  AIRBORNE RADIOACTIVE MATERIAL SOURCES  12.2-5 
==12.2  REFERENCES==
12.2-9
12.3  RADIATION PROTECTION DESIGN FEATURES    12.3-1 12.3.1  FACILITY DESIGN FEATURES    12.3-1
12.3.2  SHIELDING        12.3-12
12.3.3  VENTILATION      12.3-19
12.3.4  AREA RADIATION AND AIRBORNE RADIOACTIVITY  12.3-21 MONITORING INSTRUMENTATION
==12.3  REFERENCES==
12.3-32
12.3A  TMI SHIELDING STUDY      12.3A-1 12.3A.1  INTRODUCTION        12.3A-1
12.3A.2  SOURCE TERMS      12.3A-1
12.3A.3  ANALYZED SYSTEMS AND AREA DOSE RATES    12.3A-3
12.3A  REFERENCES
WSES-FSAR-UNIT-3  12-ii  CHAPTER 12  TABLE OF CONTENTS (Cont'd)
Section      Title    Page 12.4  DOSE ASSESSMENT      12.4-1
12.4.1  ANTICIPATED DOSE RATES      12.4-1
12.4.2  ESTIMATES OF PLANT PERSONNEL EXPOSURES (DIRECT)  12.4-1 
==12.4  REFERENCES==
12.4-6
12.5  HEALTH PHYSICS PROGRAM      12.5-1 12.5.1  ORGANIZATION      12.5-1
12.5.2  EQUIPMENT, INSTRUMENTATION, AND FACILITIES  12.5-3 12.5.3  PROCEDURES      12.5-6
WSES-FSAR-UNIT-3  12-iii Revision 308 (11/14) CHAPTER 12  LIST OF TABLES Table      Title 12.2-1  Neutron Fluxes Outside the Reactor Pressure Vessel
12.2-2  Neutron Leakage Rate from Axial Regions of the Reactor Vessel 12.2-3  Gamma Fluxes at Full Power Operation
12.2-4  Reactor Coolant System Sources (Gamma Spectra) at Shutdown 12.2-5  Reactor Coolant System Sources (Material Activation Spectra) at Shutdown 12.2-6  Pressurizer Steam Section Activity
12.2-7  Maximum Activity Inventory in CVCS Components (Curies)
12.2-8  Maximum Activity Inventory in BMS Components (Curies)
12.2-9  Maximum Activity Inventory in FPS Components
12.2-10  Maximum and Expected Activity Inventory in SIS Components (Curies) 12.2-11  Maximum Activity Inventory in WMS Components (Curies) (DRN 03-2066, R14) 12.2-12  LOCA Core Inventory (Curies/MWt) 12.2-12a  Core Inventory for Steaming Events (Curies) (DRN 03-2066, R14) 12.2-13  Fission Product Gamma Source in Containment Building (Mev/sec) 12.2-14  Assumptions and Parameters used to Calculate Airborne Concentrations 12.2-15  Average Airborne C/MPC in Reactor Auxiliary Building, Turbine Building,  Containment and Fuel Handling Building (DRN 02-110, R12) 12.2-15a Average Airborne C/DAC in Reactor Auxiliary Building, Turbine Building, Containment, and Fuel    Handling Building (DRN 02-110, R12) 12.2-16  Reactor Auxiliary Building Room by Room C/MPC and Whole Body Dose  Commitment Values (DRN 02-110, R12) 12.2-16a  Reactor Auxiliary Building Room by Room C/DAC and Dose Commitment Values (DRN 02-110, R12) (DRN 03-2066, R14) 12.2-17  18-Group Gamma-Ray Source Strengths per Fuel Assembly 3 Days after Shutdown (DRN 03-2066, R14)  (LBDCR 14-007, R308) 12.2-18  Waterford 3 Original Steam Generator Storage Facility Radioactive Isotope Inventory (LBDCR 14-007, R308) 12.3-1  Allowable Dose Rates 12.3-2  Area Radiation Monitors
12.3-3  Airborne Radiation Monitors
12.3-4  Neutron Streaming Dose Rates in Containment WSES-FSAR-UNIT-3  12-iv Revision 14 (12/05)  CHAPTER 12  LIST OF TABLES (Cont'd)
Table      Title  (DRN 03-2066, R14) 12.3A-1  TMI Source Term for Shielding Evaluation (DRN 03-2066, R14)  12.3A-2  SIS Sump Water Total Source Strengths
12.3A-3  SIS Sump Water Noble Gas Source Strength Ratios
12.3A-4  SIS Sump Water Halogen Source Strength Ratios
12.3A-5  SIS Sump Water All Others Source Strength Ratios 12.3A-6  Containment Gaseous Total Source Strengths 12.3A-7  Containment Plateout Total Source Strengths 12.3A-8  System Containing Radioactive Material
12.3A-9  Areas Requiring Accessibility Following An Accident
12.4-1a  Estimate of Personnel Exposure (Man-Rem)
12.4-1b  Estimate of Personnel Exposure During Maintenance (Man-Rem) 12.4-2  Data from Operating PWR Plants
12.4-3  Yearly Averages and Grand Average for Number of Personnel and Man-Rem  Doses for Operating PWR Plants
12.4-4  Distribution Man-Rem Doses for Various Functions
12.5-1  Counting Room Instrumentation 12.5-2  Portable Radiological Survey Instrumentation 12.5-3  Personnel Monitoring Instrumentation 12.5-4  Health Physics Equipment
WSES-FSAR-UNIT-3  12-v  CHAPTER 12  RADIATION PROTECTION  LIST OF FIGURES Figure      Title 12.1-1  Radiation Doses from Various Decommissioning Activities
12.1-2  Radiation Doses from Decommissioning
12.3-1  Radiation Zones Reactor Auxiliary Building Plan EL(+)46.00' 12.3-1a  Radiation Zones Reactor Auxiliary Building Plan EL(+)21.00' 12.3-1b  Radiation Zones Reactor Auxiliary Building Plan EL(-)4.00' 12.3-2  Radiation Zones Reactor Auxiliary Building Plan EL(-)35.00' 12.3-2a  Radiation Zones Reactor Auxiliary Building Section (Sheet 1) 12.3-2b  Radiation Zones Reactor Auxiliary Building Section (Sheet 2) 12.3-3  Radiation Zones Reactor Auxiliary Building Section (Sheet 3) 12.3-3a  Radiation Zones Reactor Auxiliary Building Plan & Sections (Sheet 4) 12.3-3b  Radiation Zones Fuel Handling Building Plans
12.3-4  Radiation Zones Fuel Handling Building Sections
12.3-4a  Radiation Zones Reactor Building Plan EL(+)46.00'
12.3-4b  Radiation Zones Reactor Building Plan EL(+)21.00'
12.3-5  Radiation Zones Reactor Building Plan EL(-)4.00' 12.3-5a  Radiation Zones Reactor Building Plan EL(-)35.00' 12.3-5b  Radiation Zones Reactor Building Section (Sheet 1) 12.3-6  Radiation Zones Reactor Building Sections (Sheet 2) 12.3-6a  Radiation Zones Reactor Building Section (Sheet 3) 12.3-6b  Radiation Zones Turbine Building Operating Floor - Plan 12.3-7  Radiation Zones Turbine Building Mezzanine Floor - Plan
12.3-7a  Radiation Zones Turbine Building Ground Floor - Plan
12.3-7b  Radiation Zones Turbine Building Section
WSES-FSAR-UNIT-3  12-vi Revision 307 (07/13)  CHAPTER 12  RADIATION PROTECTION  LIST OF FIGURES (Cont'd)
Figure      Title 12.3-8  Radiation Zones Turbine Building Sections (LBDCR 13-010, R307) 12.3-8a  Radiation Zones Original Steam Generator Storage Facility (LBDCR 13-010, R307)  12.3-9  Reactor Auxiliary Building Normal Ventilation System Ductwork Plan View 12.3-10  Reactor Auxiliary Building Normal Ventilation System Ductwork Section View 12.3-11  Radiation Monitoring System Block Diagram
12.3-12  Intentionally Deleted (DRN 99-2362, R11) 12.3-13  Intentionally Deleted (DRN 99-2362, R11) 12.3-14  Main Control Room Radiation Monitors
12.3-15  Containment Atmosphere Particulate, Iodine & Gas Radiation Monitor 12.3A-1  Shielding and Iodine Study Plot Plan
12.3A-2  Shielding and Iodine Reactor Building Plan EL-4.00' and 35.00'
12.3A-3  Shielding and Iodine Study Reactor Building Plan EL 21.00'
12.3A-4  Shielding and Iodine Study Reactor Auxiliary Building Plan EL-35.00' 12.3A-5  Shielding and Iodine Study Reactor Auxiliary Building Plan EL-4.00' 12.3A-6  Shielding and Iodine Study Reactor Auxiliary Building Plan EL 7.00' 12.3A-7  Shielding and Iodine Study Reactor Auxiliary Building Plan EL +21.00' 12.3A-8  Shielding and Iodine Study Reactor Auxiliary Building Plan El +46.00' WSES-FSAR-UNIT-3  12-vii Revision 14-B (06/06) UPDATE REFERENCE LIST  Chapter 12 Section    Cross References Revision 12-B Table 12.3A-9    ER-W3-1999-1044/DRN 03-114
Revision 13 Section 12.1.2    ER-W3-2002-0621-000/DRN 03-1135 Section 12.1.3 Section 12.4.2.1 Section 12.5.3.7.2 Section 12.5.1
Section 12.5.2.1    ER-W3-2002-0621-000/DRN 03-1429 Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2066 Section 12.1.4 Section 12.2.1.4 Section 12.2.1.5 Section 12.2.1.9 Section 12.3-14 Section 12.3.1.8 Section 12.3.24 Section 12.3.3.1 Section 12.3A.2 Section 12.3A.3.1 Section 12.3A.3.10 Reference 12.3A Table 12.2-12 Table 12.2-12a Table 12.2-17 Table 12.3-1 Table 12.3A-1 
Section 12.3A-1 ER-W3-2001-1149-013/DRN 05-1249 Section 12.3.2.1 ER-W3-2004-0276-001/DRN 05-144 Section 12.3A.2 Section 12.3A.3.8 Table 12.3A-9 sh-2 Figure 12.3A-2 Figure 12.3A-3 Figure 12.3A-7 Figure 12.3A-8 
Table 12.2-3 ER-W3-2005-0083-000/DRN 05-455 Table 12.2-15a sh 1-2 Table 12.2-16a sh 1-4 
Revision 14-B Section 12.3.1.4 ER-W3-2005-0418-000/DRN 06-319 WSES-FSAR-UNIT-3  12-viii Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 12  Section    Cross References  Revision 15  Section 12.5.2.2.3 ER-W3-2006-0210-000/DRN 06-625 Section 12.5.3.7.1 
Section 12.3.4.2.3.1 ER-W3-2005-0471-000/DRN 06-1029 Revision 301  Section 12.3A.1 EC-5000082374 Section 12.3A.3 Section 12.3A.3.1 Table 12.3A-9 Sh. 1  Revision 303  Section 12.5.2.2.3 EC-14865 Section 12.5.3.7.1 Table 12.5-3  Revision 305  Table 12.2-16 Sheet 3 of 4 EC-4019 Table 12.2.16a Sheet 3 of 4 
Section 12.5.1.3 EC-27665 Section 12.5.2 Section 12.5.3 Table 12.5-1 Table 12.5-2 Table 12.5-3 Table 12.5-4 
Revision 306 Section 12.3.4.1.3 EC-12329 Section 12.3.1.4 EC-14275 Section 12.3.1.9 Section 12.5.3.2.4 
Revision 307  Section 12.3A.3.2 EC-30976 Table 12.3A-9 Sheet 1 of 2 
Section 12.5.1.1 LBDCR 13-005
Section 12.2.1.10 LBDCR 13-009 Table 12.2-11 Sheet 1 of 6 thru Table 12.2-11 Sheet 6 of 6  Table 12.3-1 Table of Contents LBDCR 13-010 Section 12.3.2.2 Section 12.2.1.11 Figure 12.3-8a Table 12.3-1 WSES-FSAR-UNIT-3  12-ix Revision 308 (11/14)  UPDATE REFERENCE LIST  Chapter 12 Section    Cross References Revision 308 Table of Contents LBDCR 14-007 Table 12.2-12 Sh. 1 of 2 Table 12.2-12 Sh. 2 of 2 
Section 12.2.1.12 LBDCR 13-020 Section 12.2.2 
WSES-FSAR-UNIT-3  13-i Revision 308 (11/14)  CHAPTER 13  ORGANIZATIONAL STRUCTURE  TABLE OF CONTENTS 
Section      Title      Page  (LBDCR 13-015, R308) 13.1  ORGANIZATION AND RESPONSIBILITY      13.1-1 13.1.1  ORGANIZATIONAL ARRANGEMENT      13.1-1 (DRN 01-462, R11-A) 13.1.2  FACILITY STAFF QUALIFICATIONS 13.1-1 (DRN 01-462, R11-A; LBDCR 13-015, R308) 13.2  TRAINING        13.2-1  (LBDCR 13-015, R308) 13.2.1  DELETED (DRN 01-462, R11-A) 13.2.2  DELETED 13.2.3  DELETED (DRN 01-462, R11-A) 13.3  WRITTEN PROCEDURES        13.3-1 13.4  RECORDS        13.4-1
13.4.1  DELETED
13.4.2  DELETED
13.4.3  DELETED
13.5  REVIEW AND AUDIT OF OPERATIONS      13.5-1 13.5.1  ON-SITE SAFETY REVIEW COMMITTEE (OSRC)    13.5-1 13.5.2  SAFETY REVIEW COMMITTEE (SRC)      13.5-1 13.6  PLANT SECURITY        13.6-1
13.7  EMERGENCY PREPAREDNESS      13.7-1
13.7.1  EMERGENCY PLAN        13.7-1
13.7.2  EMERGENCY RESPONSE FACILITIES      13.7-1 (LBDCR 13-015, R308)
WSES-FSAR-UNIT-3  13-ii    CHAPTER 13  ORGANIZATIONAL STRUCTURE  LIST OF APPENDICES Appendix    Title    Page 13A      DELETED    13A-1
WSES-FSAR-UNIT-3  13-iii Revision 308 (11/14)  CHAPTER 13  ORGANIZATIONAL STRUCTURE  LIST OF TABLES 
Tables      Title 13.1-1  DELETED (DRN 01-462, R11-A; LBDCR 13-015, R308) 13.1-2  DELETED 13.1-3  DELETED (DRN 01-462, R11-A; LBDCR 13-015, R308)
WSES-FSAR-UNIT-3  13-iv Revision 308 (11/14)  CHAPTER 13  ORGANIZATIONAL STRUCTURE  LIST OF FIGURES 
Figure      Title  (LBDCR 13-015, R308 13.1-1  WATERFORD 3 MANAGEMENT STRUCTURE 13.1-2  WATERFORD 3 OPERATIONS MANAGEMENT STRUCTURE
13.1-3  WATERFORD 3 SITE PROJECTS AND MAINTENANCE SERVICES MANAGEMENT STRUCTURE (EC-31856, R306) 13.1-4  DELETED (EC-31856, R306)  13.1-5  DELETED
13.1-6  DELETED
13.1-7  DELETED
13.1-8  DELETED (LBDCR 13-015, R308)  13.1-9  DELETED
13.1-10 DELETED  (DRN 04-979, R14; LBDCR 13-015, R308) 13.1-11  DELETED (DRN 04-979, R14; LBDCR 13-015, R308)
WSES-FSAR-UNIT-3  13-v Revision 303 (06/09)  UPDATE REFERENCE LIST  Chapter 13 Section    Cross References Revision 12-C Section 13.1.2.2  ER-W3-2003-0249-000/DRN 03-658 Section 13.1.2.3 Section 13.5.1.2 Section 13.5.1.3 Table 13.1-2
Revision 13 Section 13.1.2.5.2  ER-W3-2003-0369-000/DRN 03.1136 Table 13.1-2
Revision 13-A Section 13.5.1.3  ER-W3-2003-0492-000/DRN 03-1228 Revision 14 Table Of Contents ER-W3-2004-0364-000/DRN 04-979 Section 13.1.1.1.3 Section 13.1.1.2 Section 13.1.1.2.4 Section 13.1.1.2.4.1 Section 13.1.1.2.4.2 Section 13.1.1.2.5 Section 13.1.1.2.7 Section 13.1.2.1 Section 13.1.2.3 Section 13.1.2.5 Section 13.1.2.6 Section 13.1.2.7 Section 13.1.2.8 Table 13.1-2 Table 13.1-3 sh 1 Figure 13.1-2 Figure 13.1-3 Figure 13.1-4 Figure 13.1-5 Figure 13.1-6 Figure 13.1-7 Figure 13.1-11 
Revision 303 Section 13.1.1 EC-14568 Section 13.1.1.1 Section 13.1.1.1.1 Section 13.1.1.1.1.1 Section 13.1.1.1.3 Section 13.1.1.1.5 Section 13.1.1.2 Section 13.1.1.2.2 Section 13.1.1.2.2.3 WSES-FSAR-UNIT-3  13-vi Revision 307 (07/13)  UPDATE REFERENCE LIST  Chapter 13 Section    Cross References Revision 303 (Continued)
Section 13.1.1.2.4.1 EC-14568 Section 13.1.1.2.5 Section 13.1.1.2.6 Section 13.1.1.2.6.1 Section 13.1.2.1 Section 13.1.2.3 Figure 13.1-1 Figure 13.1-2 Figure 13.1-3 Figure 13.1-4 Figure 13.1-5 Figure 13.1-6 Figure 13.1-7 Figure 13.1-8 
Figure 13.1-11 EC-15541
Revision 305 Table 13.1-3  EC-27124 Section 13.1.1.2.4 Section 13.1.1.2.4.1 
Revision 306 Table of Contents  EC-31856 Section 13.1.1 Section 13.1.2 Table 13.1-2 Table 13.1-3 Figure 13.1-1 Figure 13.1-2 Figure 13.1-3 Figure 13.1-4 Figure 13.1-5 Figure 13.1-6 Figure 13.1-7 Figure 13.1-8 Figure 13.1-11 
Revision 307 Section 13.1.2.1 LBDCR 13-005 Table 13.1-2 Section 13.2 Section 13.2.2.3 
Revision 308 Table of Contents LBDCR 13-015 Section 13.1 Section 13.1.1 Section 13.1.2 WSES-FSAR-UNIT-3  13-vii Revision 308 (11/14)  UPDATE REFERENCE LIST  Chapter 13 Section    Cross References Revision 308 (Continued)
Section 13.2 LBDCR 13-015 Section 13.3 Section 13.4 Section 13.5 Section 13.5.1 Section 13.5.2 Section 13.5.3 Section 13.6 Section 13.7 Section 13.7.1 Section 13.7.2 
WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM14-iTABLE OF CONTENTSSectionTitlePage14.0INITIAL TEST PROGRAM14.2-114.1SPECIFIC INFORMATION TO BE INCLUDED IN PSAR14.2-114.2SPECIFIC INFORMATION TO BE INCLUDED IN FSAR14.2-114.2.1SUMMARY OF TEST PROGRAM AND OBJECTIVES14.2-114.2.2ORGANIZATION AND STAFFING14.2-314.2.3TEST PROCEDURES14.2-1714.2.4CONDUCT OF TEST PROGRAM14.2-19 14.2.5REVIEW, EVALUATION, AND APPROVAL OF TEST RESULTS14.2-2014.2.6TEST RECORDS14.2-2114.2.7COMPARISON OF TEST PROGRAM WITH REGULATORY GUIDES 14.2-21AND IEEE STANDARDS14.2.8UTILIZATION OF REACTOR OPERATING AND TESTING14.2-26EXPERIENCES IN DEVELOPMENT OF TEST PROGRAM14.2.9TRIAL USE OF PLANT PROCEDURES14.2-26 14.2.10INITIAL FUEL LOADING AND INITIAL CRITICALITY14.2-27 14.2.11TEST PROGRAM SCHEDULE14.2-3114.2.12INDIVIDUAL TEST DESCRIPTION14.2-31 WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM14-iiLIST OF TABLESTableTitle14.2-1PHASE II TESTS14.2-2PHASE III TESTS 14.2-3PHASE II TEST FORMAT14.2-4PHASE III TEST FORMAT14.2-5POWER ASCENSION TESTING SEQUENCE WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM14-iiiLIST OF FIGURESFigureTitle14.2-1WATERFORD STARTUP GROUP 14.2-2NUCLEAR OPERATIONS FUNCTIONAL ORGANIZATION CHART14.2-3JOINT TEST GROUP14.2-4PHASE III ORGANIZATIONAL CHART WSES-FSAR-UNIT-3  14-iv Revision 306 (05/12)  UPDATE REFERENCE LIST  Chapter 14  Section Cross References Revision 14-A Section 14.2.12.3.32.4 ER-W3-2004-0331-000/DRN 05-1545 Revision 305 Section 14.2.12.2.18.3 EC-14270 Revision 306 Section 14.2.10.1 EC-12329
Section 14.2.12.2.68.3 EC-34060 WSES-FSAR-UNIT-315-iRevision 11-A (02/02)CHAPTER 15ACCIDENT ANALYSESTABLE OF CONTENTSSectionTitlePage15.0TRANSIENT ANALYSES15.0-1(DRN 00-592)15.0.1IDENTIFICATION OF CAUSES AND FREQUENCY CLASSIFICATION15.0-1(DRN 00-592)15.0.2SYSTEMS OPERATION15.0-215.0.3CORE AND SYSTEM PERFORMANCE15.0-315.0.4BARRIER PERFORMANCE15.0-915.0.5RADIOLOGICAL CONSEQUENCES15.0-9
==15.0REFERENCES==
15.0-1115.1INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.1-1(TURBINE PLANT)15.1.1MODERATE FREQUENCY INCIDENTS15.1-115.1.2INFREQUENT INCIDENTS15.1-1115.1.3LIMITING FAULTS15.1-18
==15.1REFERENCES==
15.1-3515.2DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.2-1(TURBINE PLANT)15.2.1MODERATE FREQUENCY INCIDENTS15.2-115.2.2INFREQUENT INCIDENTS15.2-815.2.3LIMITING FAULTS15.2-14
==15.2REFERENCES==
15.2-2115.3DECREASE IN REACTOR COOLANT FLOW RATE15.3-115.3.1MODERATE FREQUENCY INCIDENTS15.3-115.3.2INFREQUENT INCIDENTS15.3-215.3.3LIMITING FAULTS15.3-5 WSES-FSAR-UNIT-315-iiCHAPTER 15TABLE OF CONTENTS (Contd)SectionTitlePage
==15.3REFERENCES==
15.3-13 15.4REACTIVITY AND POWER DISTRIBUTION ANOMALIES15.4-115.4.1MODERATE FREQUENCY INCIDENTS15.4-1 15.4.2INFREQUENT EVENTS15.4-21 15.4.3LIMITING FAULTS15.4-21
==15.4REFERENCES==
15.4-3515.5INCREASE IN REACTOR COOLANT SYSTEM INVENTORY15.5-115.5.1MODERATE FREQUENCY INCIDENTS15.5-115.5.2INFREQUENT INCIDENTS15.5-4 15.5.3LIMITING FAULTS15.5-5 15.6DECREASE IN REACTOR COOLANT SYSTEM INVENTORY15.6-115.6.1MODERATE FREQUENCY INCIDENTS15.6-1 15.6.2INFREQUENT INCIDENTS15.6-115.6.3LIMITING FAULTS15.6-1
==15.6REFERENCES==
15.6-26 15.7RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT15.7-115.7.1MODERATE FREQUENCY INCIDENTS15.7-115.7.2INFREQUENT INCIDENTS15.7-115.7.3LIMITING FAULTS15.7-1
==15.7REFERENCES==
15.7-1015.8ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS)15.8-115.9MISCELLANEOUS15.9.1MODERATE FREQUENCY INCIDENTS WSES-FSAR-UNIT-3 15-iii Revision 14 (12/05)CHAPTER 15 TABLE OF CONTENTS (Cont'd) Section      Title      PageAPPENDIX 15A SUPPLEMENTAL INFORMATION FOR CHAPTER 15    15A-1    IN RESPONSE TO WATERFORD SES - 3 SER (NUREG-0787) OPEN ITEMS 8 THROUGH 11 APPENDIX 15B CONTAINMENT LEAKAGE AND DOSE CALCULATION    15B-1    MODELS (DRN 05-543, R14)APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15    15C-1    IN RESPONSE TO WATERFORD SES - 3 SER (NUREG-0787) SUPPLEMENT NO. 1 CONFIRMATORY ITEMS 15.3.1 AND 15.3.2 (DELETED) APPENDIX 15D SUPPLEMENTAL CYCLE SPECIFIC EVENT ANALYSES  15D-1    (DELETED) (DRN 05-543, R14)
WSES-FSAR-UNIT-315-ivRevision 12 (10/02)CHAPTER 15LIST OF EVENTS15.1INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.1.1.1Decrease in Feedwater Temperature15.1.1.2Increase in Feedwater Flow15.1.1.3Increase in Main Steam Flow15.1.1.4Inadvertent Opening of S.G.A. Dump. Valve or S.G. Safety Valve15.1.2.1Decrease in Feedwater Temperature with Single Active Failure(SAF)*15.1.2.2Increase in Feedwater Flow with SAF*15.1.2.3Increase in Main Steam Flow with SAF*15.1.2.4Inadvertent Opening of S.G. ADV's or Safety Valves with SAF*15.1.3.1Steam System Piping Failures Post Trip Return - To-Power(DRN 02-1479)15.1.3.2Steam System Piping Failures Inside and Outside Containment -Modes 3 and 4 with all CEAs on the Bottom(DRN 02-1479)15.1.3.3Steam System Piping Failure:  Pre-Trip Power Excursion Analysis15.2DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.2.1.1Loss of External Load15.2.1.2Turbine Trip15.2.1.3Loss of Condenser Vacuum15.2.1.4Loss of Normal AC Power15.2.2.1Loss of External Load with SAF*15.2.2.2Turbine Trip with SAF*15.2.2.3Loss of Condenser Vacuum with SAF*15.2.2.4Loss of Normal AC Power with SAF*15.2.2.5Loss of Normal Feedwater Flow15.2.3.1Feedwater System Pipe Breaks WSES-FSAR-UNIT-315-vRevision 12 (10/02)CHAPTER 15LIST OF EVENTS (Cont'd)15.2.3.2Loss of Normal Feedwater Flow with SAF* in the Steam Bypass System15.3DECREASE IN REACTOR COOLANT FLOW RATE15.3.1.1Partial Loss of Forced Reactor Coolant Flow15.3.2.1Total Loss of Forced Reactor Coolant Flow15.3.2.2Partial Loss of Forced Reactor Coolant Flow with SAF*15.3.3.1Single Reactor Coolant Pump Shaft Seizure/Sheared Shaft15.3.3.2Single reactor Coolant Pump Shaft Seizure with Stuck OpenSecondary Safety Valve15.4REACTIVITY AND POWER DISTRIBUTION ANOMALIES15.4.1.1Uncontrolled CEA Withdrawal from Subcritical Conditions15.4.1.2Uncontrolled CEA Withdrawal from Low Power Conditions15.4.1.3Uncontrolled CEA Withdrawal at Power15.4.1.4CEAMisoperation15.4.1.5CVCS Malfunction (Inadvertent Boron Dilution)(DRN 02-1479)15.4.1.6Start of an Inactive Reactor Coolant System Pump - Modes3, 4 or 5 with all CEAs on the Bottom15.4.1.7Uncontrolled CEA Withdrawal from a Subcritical Condition -Modes 3, 4, or 5 with all CEAs on the Bottom(DRN 02-1479)15.4.2NOT APPLICABLE15.4.3.1Inadvertent Loading of a Fuel Assembly into the Improper Position15.4.3.2CEA Ejection15.5INCREASE IN REACTOR COOLANT INVENTORY15.5.1.1CVCS Malfunction15.5.1.2Inadvertent Operation of the ECCS during Power Operation15.5.2.1CVCS Malfunction with Component SAF*
WSES-FSAR-UNIT-3  15-vi Revision 14 (12/05)  CHAPTER 15  LIST OF EVENTS (Cont'd) 
15.6  DECREASE IN REACTOR COOLANT INVENTORY 15.6.1  NOT APPLICABLE
15.6.2  NOT APPLICABLE
15.6.3.1  Primary Sample or Instrument Line Break 15.6.3.2  Steam Generator Tube Rupture 15.6.3.3  LOCA 15.6.3.4  Inadvertent Opening of Pressurizer Safety Valve 15.7  RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT 15.7.1  NOT APPLICABLE
15.7.2  NOT APPLICABLE (DRN 04-704, R14) 15.7.3.1  Deleted 15.7.3.2  Deleted (DRN 04-704, R14)  15.7.3.3  Postulated Radioactive Releases due to Liquid Containing Tank Failures 15.7.3.4  Design Basis Fuel Handling Accident 15.7.3.5  Spent Fuel Cask Drop Accidents 15.9  MISCELLANEOUS 15.9.1.1  Asymmetric Steam Generator Transient 
  *(SAF) incident with a concurrent single failure of an active component.
WSES-FSAR-UNIT-3  15-vii Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES Table      Title 15.0-1  Chapter 15 Subsection Designation
15.0-2  Chapter 15 Initiating Events (DRN 05-543, R14) 15.0-3  Reactor Protective System Trips Used In The Safety Analysis 15.0-4  Chapter 15 Initial Conditions
15.1-1  Sequence of Events for an Increase in Main Steam Flow
15.1-2  Assumptions for the Increased Main Steam Flow Event
15.1-3  Sequence of Events for the Inadvertent Opening of a Steam Generator Atmospheric Dump Valve
15.1-4  Assumptions for the Inadvertent Opening of a Steam Generator Atmospheric Dump Valve (DRN 05-543, R14) 15.1-5  Mass Release - Inadvertent Opening of Steam Generator Atmospheric  Dump Valve (DRN 04-704, R14) 15.1-6  Deleted 15.1-7 Deleted (DRN 04-704, R14)  (DRN 05-543, R14) 15.1-8  Sequence of Events for the Increased Main Steam Flow in Combination with  a Loss of Offsite Power (Typical NSSS Response)
15.1-8A  Sequence of Events for the Increased Main Steam Flow In Combination with a Loss of Offsite Power (worst DNB Performance Case)
15.1-8B  Initial Conditions for the Increased Main Steam Flow in Combination with a Loss of Offsite Power
15.1-8C  Sequence of Events for the HFP IOADV with LOOP Event
15.1-8D  Assumption Table for the HFP IOADV with LOOP Event (DRN 05-543, R14) 15.1-9  Mass Release - Inadvertent Opening of Steam Generator Atmospheric Dump  Valve With Concurrent Loss of Offsite Power
15.1-10  Parameters Used in Evaluating the Radiological Consequences of a Postulated Inadvertent Opening of a Steam Generator Atmospheric Dump Valve With Concurrent Loss of Offsite Power
15.1-11  Radiological Consequences Due to a Postulated Inadvertent Opening of a Steam Generator Atmospheric Dump Valve With Concurrent Loss of Offsite Power
WSES-FSAR-UNIT-3  15-viii Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)
Table      Title (DRN 05-543, R14) 15.1-12  Sequence of Events For the Return to Power Steam Line Break Hot Full Power, Loss of    Offsite Power, Inside Containment
15.1-13  Sequence of Events For the Return to Power Steam Line Break Hot Full Power, no Loss of Offsite Power, Inside Containment
15.1-14  DELETED
15.1-14A Sequence of Events for the Return to Power Steam Line Break Hot Zero Power, Loss of Offsite Power, Inside Containment
15.1-14B Sequence of Events for the Return to Power Steam Line Break Hot Zero Power, no Loss of Offsite Power, Inside Containment
15.1-15  Assumptions For the Return to Power Steam Line Break Hot Full Power, Loss of Offsite Power, Inside Containment
15.1-15A Assumptions for the Return to Power Steam Line Break Hot Full Power, no Loss of Offsite Power, Inside Containment
15.1-16  Assumptions For the Return to Power Steam Line Break Hot Zero Power, Loss of Offsite Power, Inside Containment
15.1-16A Assumptions for the Return to Power Steam Line Break Hot Zero Power, no Loss of Offsite Power, Inside Containment
15.1-17  Parameters Used in Evaluating the Radiological Consequences of a Main Steam Line Break Accident
15.1-18  Zero Power Steam Line Break Secondary System Mass Releases (DRN 05-543, R14) 15.1-19  Zero Power Steam Line Break Steam Generator Liquid Volume Fractions and  Emergency Feedwater Flowrate to the Intact Steam Generator
15.1-20  Radiological Consequences Due to a Postulated Main Steam Line Break
15.1-21  Assumption for Large Steam Line Breaks During Mode 3 Operation With and Without Concurrent Loss of Offsite Power (DRN 05-543, R14) 15.1-22  Sequence of Events for a Large Steam Line Break* During Mode 3 Operation With  Concurrent Loss of Offsite Power
15.1-23  Reactor Protection System Trips and Transient Effects Considered for Pretrip  Power Excursion Main Steam System Piping Failures 15.1-24  Sequence of Events for the Steam System Piping Failure Event Outside Containment Pretrip Power Excursion With Loss of Offsite Power (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-ix Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)
Table      Title (DRN 05-543, R14) 15.1-24A Sequence of Events for the Steam System Piping Failure Event Inside Containment    Pretrip Power Excursion with Loss of Offsite Power (DRN 05-543, R14) 15.1-25  Key Parameters Assumed for the Steam Piping Failures Event Inside Containment  Pre-Trip Power Excursions
15.1-26  Key Parameters Assumed for the Steam Piping Failures Event Outside Containment Pre-Trip Power Excursions (DRN 04-704, R14) 15.1-27  Parameters Used in Evaluating the Radiological Consequences of a Postulated    Increased Main Steam Flow Event with a Concurrent Loss of Offsite Power
15.1-28  Radiological Consequences Due to a Postulated Increased Main Steam Flow Event with a Concurrent Loss of Offsite Power (DRN 04-704, R14) 15.2-1  Sequence of Events For the Loss of Condenser Vacuum (DRN 05-543, R14) 15.2-2  Deleted 15.2-3  Deleted
15.2-4  Deleted
15.2-4a  Deleted
15.2-5  Deleted (DRN 05-543, R14) 15.2-6  Sequence of Events For the Loss of Normal Feedwater 15.2-7  Assumptions For the Loss of Normal Feedwater Analysis (DRN 02-1713, R12-B; 05-543, R14) 15.2-8  Sequence of Events For the Large Feedwater System Pipe Break (DRN 05-543, R14) 15.2-9  Assumptions For the Large Feedwater System Pipe Break (DRN 05-543, R14) 15.2-9a  Assumptions For the Limiting Small Feedwater System Pipe Break (DRN 05-543, R14) 15.2-9b  Sequence of Events for the Limiting Small Feedwater System Pipe Break (DRN 02-1713, R12-B) (DRN 05-543, R14) 15.2-10  Sequence of Events For the Loss of Feedwater Flow With Active Failure  in the Steam Bypass System (DRN 04-704, R14) 15.2-11  Parameters Used in Evaluating the Radiological Consequences of a Feedwater Line Break
15.2-12  Radiological Consequences of a Design Basis Feedwater Line Break (DRN 04-704, R14)
WSES-FSAR-UNIT-3  15-x Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)
Table      Title 15.2-13  Assumptions for the Loss of Feedwater Flow with Active Failure in the Steam Bypass System
15.3-1  Sequence of Events For the Total Loss of Forced Reactor Coolant Flow (DRN 05-543, R14) 15.3-2  Assumed Initial Conditions For the Total Loss of Forced Reactor Coolant Flow (DRN 05-543, R14) 15.3-3 Sequence of Events For the RCP Sheared Shaft Event with a Loss of AC Power at Time of Trip (DRN 05-543, R14)  (DRN 00-119, R11) 15.3-4  Assumed Initial Conditions For the Single Reactor Coolant Pump Shaft  Seizure With Loss of Offsite Power (Barrier Performance) (DRN 00-119, R11) (DRN 00-119. R11; 05-543, R14) 15.3-4a  Deleted (DRN 00-119, R11; 05-543, R14)  15.3-4b  Deleted (DRN 00-119, R11) 15.3-5  Deleted (DRN 00-119, R11)  15.3-5a  Deleted (DRN 00-119, R11) 15.3-6  Deleted (DRN 00-119, R11)  (DRN 05-543, R14) 15.3-7  Assumed Initial Conditions for the RCP Event with a Loss of AC Power at Time of Trip (DRN 05-543, R14)  15.4-1  Sequence of Events For the Uncontrolled CEA Withdrawal From Subcritical Power Conditions (DRN 05-543, R14) 15.4-2  Assumptions For the Uncontrolled CEA Withdrawal from Subcritical Conditions 15.4-3  Sequence of Events For the Uncontrolled CEA Withdrawal at Hot Zero Power  15.4-4  Assumptions For the Uncontrolled CEA Withdrawal at HZP  15.4-5  Deleted  15.4-6  Deleted  15.4-7  Sequence of Events For CEA Withdrawal at Power 15.4-8  Assumptions For CEA Withdrawal at Power WSES-FSAR-UNIT-3  15-xi Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)
Table      Title  (DRN 02-1479, R12) 15.4-9  Assumptions For the CEA Drop Event (DRN 05-543, R14)  15.4-10  Deleted
15.4-11  Deleted
15.4-12  Deleted (DRN 05-543, R14) 15.4-13  Sequence of Events For the CEA Drop Event (DRN 05-543, R14)  15.4-14  Deleted
15.4-15  Deleted
15.4-16  Deleted (DRN 02-1479, R12) 15.4-17  Assumptions for the Mode 5 Partially Drained Inadvertent Boron Dilution    Analysis (DRN 03-1610, R13) 15.4-18  Deleted (DRN 03-1610, R13)  (DRN 03-1610, R13) 15.4-18(a) Deleted 15.4-18(b) Deleted (DRN 03-1610, R13)  (DRN 05-543, R14) 15.4-19  CEA Ejection Sequence of Events (Full Power) 15.4-20  Deleted
15.4-21  Deleted
15.4-22  Deleted
15.4-23  Assumptions For the CEA Ejection Full Power 15.4-24  Assumptions For the CEA Ejection Peak RCS Pressure Case  15.4-25  Deleted  15.4-26  Deleted  15.4-27  CEA Ejection Peak RCS Pressures Sequence of Events WSES-FSAR-UNIT-3  15-xii Revision 15 (03/07)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)
Table      Title (DRN 06-1062, R15) 15.4-28  CEA Ejection Results (Full Power) (DRN 06-1062, R15) 15.4-29  Deleted 15.4-30 Deleted (DRN 05-543, R14) (DRN 00-119, R11) 15.4-31  Parameters Used in Evaluating the Radiological Consequences of a CEA Ejection    Accident (DRN 05-543, R14) 15.4-32  Deleted (DRN 05-543, R14)  15.4-33 Radiological Consequences of a Postulated CEA Ejection Accident (DRN 00-119, R11)  (DRN 00-119, R11; 05-543, R14) 15.4-34  Deleted 15.4-35 Deleted
15.4-36  Deleted (DRN 00-119, R11)  (DRN 03-1610, R13) 15.4-37  Maximum Difference in Measured Symmetric Instrument Power for Representative Worst    Case Undetectable Misload During Power Ascension Testing
15.4-38  Maximum Power Peaking Factors Occurring for Representative Worst Case Undetectable Misload (DRN 03-1610, R13)  15.5-1  Assumptions For the CVCS Malfunction Analysis
15.5-2  Sequence of Events For the CVCS Malfunction Event (DRN 01-301, R10) 15.6-1  Sequence of Events For a Letdown Line Break Outside Containment (DRN 01-301, R10)  15.6-2  Assumptions For Letdown Line Break Outside Containment
15.6-3  Parameters Used in Evaluating the Radiological Consequences of a Letdown Line Rupture
15.6-4  Radiological Consequences of a Letdown Line Rupture in the Reactor Auxiliary Building (DRN 05-1201, R14) 15.6-5  Deleted. (DRN 05-1201, R14)
WSES-FSAR-UNIT-3  15-xiii Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)  Table      Title (DRN 05-1201, R14) 15.6-6  Deleted (DRN 05-1201, R14)  15.6-7  Deleted
15.6-8  Deleted (DRN 05-1201, R14) 15.6-9  Deleted 15.6-10  Deleted (DRN 05-1201, R14)  15.6-11  Intentionally Deleted
15.6-12  Time Sequence of Important Events for Large LOCA (Seconds After Break) (DRN 00-0551, R10) 15.6-12a Sequence of Events for Small Break LOCA (Time, Seconds After Break) (DRN 00-0551, R10) (DRN 05-543, R14) 15.6-13 General System Parameters and Initial Conditions (Large Break LOCA Spectrum  Analysis) (DRN 05-543, R14)  (DRN 00-0551, R10) 15.6-13a General System Parameters and Initial Conditions (For the Small Break LOCA ECCS  Performance Analysis  (DRN 00-0551, R10)  (DRN 05-543, R14) 15.6-13b Deleted (DRN 05-543, R14)  (DRN 00-0551, R10) 15.6-13c General System Parameters and Initial Conditions (For the Inadvertent Opening of a  Pressurizer Safety Valve) (DRN 00-0551, R10)  (DRN 05-543, R14) 15.6-14  Peak Clad Temperatures and Oxidation Percentages For the Large Break Analysis (DRN 05-543, R14)  (DRN 00-0551, R10) 15.6-14a Peak Cladding Temperatures and Oxidation Percentages for Small Breaks (DRN 00-0551, R10)  15.6-15  Large Break Spectrum
15.6-16  Variables Plotted as a Function of Time for Each Large Break in the Spectrum
WSES-FSAR-UNIT-3  15-xiv Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)  Table      Title 15.6-16a Variables Plotted as a Function of Time for Each Small Break
15.6-17  Additional Variables Plotted as a Function of Time For the Cycle 2 Worst Large Break
15.6-18  Parameters Used in Evaluating the Radiological Consequences of a Loss-of-Coolant Accident (DRN 05-1551, R14) 15.6-18a Parameters Used in Evaluating the Radiological Consequences of a Small Break    Loss-of-Coolant Accident 15.6-18b Radiological Consequences of a Small Break Loss-of-Coolant Accident (DRN 05-1551, R14)  15.6-19  Leakage Sources From ESF Systems to Reactor Auxiliary Building (DRN 05-1551, R14) 15.6-20  Deleted (DRN 05-1551, R14)  15.6-21  Sequence of Events for an Inadvertent Opening of a Pressurizer Safety Valve
15.6-22  Variable Plotted as a Function of Time for an Inadvertent Opening of a Pressurizer Safety Valve
15.6-23  Results of LOCA Analysis for an Inadvertent Opening of a Pressurizer Safety Valve (DRN 05-543, R14) 15.6-24  Sequence of Events Steam Generator Tube Rupture With LOOP 15.6-25  Assumptions for 3716 MWt SGTR with LOOP (DRN 05-543, R14)  15.6-26  Assumptions Steam Generator Tube Rupture With a Loss of Offsite Power (Radiological Consequences Case)
15.6-27  Integrated Parameter Values Steam Generator Tube Rupture With a Loss of Offsite Power (Radiological Consequences Case)
15.6-28  Radiological Consequences Steam Generator Tube Rupture With a Loss of Offsite Power (Radiological Consequences Case)
15.7-1  Assumptions For Waste Gas Decay Tank Release Accident
15.7-2  Radiological Releases and Exposures as a Result of a Waste Gas Decay Release Accident  15.7-3  Assumptions for Liquid Tank Rupture (Release to Atmosphere)
WSES-FSAR-UNIT-3  15-xv Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSES  LIST OF TABLES (Cont'd)  Table      Title 15.7-4  Maximum Isotopic Inventories in Equipment Classified as Non-Safety, Non-Seismic (Curies) Waste Management System
15.7-5  Radiological Exposures as a result of Liquid Waste System Failure
15.7-6  Parameters Used in Evaluating the Radiological Consequences of a Fuel Handling Accident
15.7-7  Radiological Consequences of a Postulated Fuel Handling Accident in the Fuel Handling Building
15.7-8  Information Needed to Evaluate Containment Isolation Capability During Refueling Accident (DRN 05-543, R14) 15.9-1  Sequence of Events For the ASGT 15.9-2  Assumptions for the ASGT Event (DRN 05-543, R14) 15A.1-1  Summary Significant Differences Between CESEC-III and CESERC-I 15A.1-2  Comparison of Results Steam-Generator Tube rupture With LOP (DRN 04-704, R14) 15B-3  Effective Dose Equivalent Weighting Factors (ICRP30) 15B-4  Powers 10% Natural Deposition Model (DRN 04-704, R14) 15A.1-3  Comparison of Results Full Power Steam Line Break, Inside Containment, With Loss  of Offsite Power, HPSI Pump Failure, Automatic Actuation of Auxiliary Feedwater
15A.2-1  Affected Steam Generator Liquid Inventory at Low Level Trip
15B-1  Isotope Properties
15B-2  ICRP 30 Isotope Properties
15C.1-1  Assumptions for the Analysis of the Limiting Small Feedwater System Pipe Break
15C.1-2  Assumptions For the Reanalysis of the Limiting Small Feedwater System Pipe Break
15C.1-3  Sequence of Events for the Reanalysis of the Limiting Small Feedwater System Pipe Break  15D.1-1  Deleted  15D.1-2  Deleted (DRN 05-1201, R14) 15D.2-1  Deleted  15D.2-2  Deleted (DRN 05-1201, R14)
WSES-FSAR-UNIT-3  15-xvi Revision 14 (12/05)  CHAPTER 15  ACCIDENT ANALYSIS  LIST OF FIGURES  Figure      Title (DRN 05-543, R14) 15.0-1  Deleted (DRN 05-543, R14)  15.1-1  Increased Main Steam Flow Core Power vs. Time (DRN 05-543, R14) 15.1-2  Increased Main Steam Flow Core Average Heat Flux vs. Time 15.1-3  Increased Main Steam Flow Reactor Coolant System Pressure vs. Time
15.1-4  Increased Main Steam Flow Minimum DNBR vs. Time
15.1-5  Increased Main Steam Flow Reactor Coolant System Temperatures vs. Time
15.1-6  Increased Main Steam Flow Pressurizer Level vs. Time (DRN 05-543, R14)  15.1-7  Increased Main Steam Flow Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.1-8  Increased Main Steam Flow Total Steam Flow vs. Time (DRN 05-543, R14)  15.1-9  Increased Main Steam Flow Feedwater Flow vs. Time
15.1-10  Increased Main Steam Flow Feedwater Enthalpy vs. Time (DRN 05-543, R14) 15.1-11  Increased Main Steam Flow Steam Generator Liquid Mass vs. Time (DRN 05-543, R14)  15.1-12  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Power vs.
Time
15.1-13  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Heat Flux vs.
Time
15.1-14  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve RCS Pressure vs.
Time
15.1-15  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Reactor Coolant Temperature vs. Time
15.1-16  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Pressurizer Water Volume vs Time 15.1-17  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Pressure vs. Time 15.1-18  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Total Main Steam Flow vs. Time  15.1-19  Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Fluid Mass vs. Time WSES-FSAR-UNIT-3  15-xvii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)  Figure      Title (DRN 05-543, R14) 15.1-19A Inadvertent Opening of a Steam Generator Atmospheric Dump Valve DNBR vs. Time 15.1-20  Increased Main Steam Flow with Concurrent Single Failure Core Power vs. Time (Typical NSSS Response)
15.1-21  Increased Steam Flow with Concurrent Single Failure Core Heat Flux vs. Time (Typical NSSS Response)
15.1-22  Increased Main Steam Flow with Concurrent Single Failure RCS Pressure vs. Time (Typical NSSS Response) (DRN 05-543, R14)  15.1-23  Increased Main Steam Flow with Concurrent Single Failure Minimum Hot Channel DNBR vs. Time (DRN 05-543, R14) 15.1-24  Increased Main Steam Flow with Concurrent Single Failure Reactor Coolant  Temperatures vs. Time (Typical NSSS Response)
15.1-25  Increased Main Steam Flow with Concurrent Single Failure Pressurizer Liquid Volume vs. Time (Typical NSSS Response)
15.1-26  Increased Main Steam Flow with Concurrent Single Failure Steam Generator Pressure vs. Time (Typical NSSS Response)
15.1-27  Increased Main Steam Flow with Concurrent Single Failure Main Steam Flow vs. Time (Typical NSSS Response)
15.1-28  Increased Main Steam Flow with Concurrent Single Failure Feedwater Flow vs. Time (Typical NSSS Response)
15.1-29  Increased Main Steam Flow with Concurrent Single Failure Feedwater Enthalpy vs. Time (Typical NSSS Response)
15.1-30  Increased Main Steam Flow with Concurrent Single Failure Steam Generator Liquid Mass vs. Time (Typical NSSS Response)
15.1-31  Deleted
15.1-31a Increased Main Steam Flow with Concurrent Single Failure Total Integrated Safety Valve Flow vs. Time (Typical NSSS Response)
15.1-32  Increased Main Steam Flow with Concurrent Single Failure Core Flow vs. Time (Typical NSSS Response)
15.1-32a HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Core Power vs. Time
15.1-32b HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Core Heat Flux vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xviii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.1-32c HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC    Power RCS Pressure vs. Time
15.1-32d HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Minimum Hot Channel DNBR vs. Time
15.1-32e HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Reactor Coolant Temperatures vs. Time
15.1-32f HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Pressurizer Liquid Volume vs. Time
15.1-32g HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Steam Generator Pressure vs. Time
15.1-32h HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Main Steam Flow vs. Time
15.1-32i HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Feedwater Flow vs. Time
15.1-32j HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Feedwater Enthalpy vs. Time
15.1-32k HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Steam Generator Liquid Mass vs. Time
15.1-32l HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Total Integrated Safety Valve Flow vs. Time
15.1-32m HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Core Flow vs. Time
15.1-33  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Power vs. Time
15.1-34  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Heat Flux vs. Time
15.1-35  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Pressure vs. Time
15.1-36  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Coolant System Temperatures vs. Time
15.1-37  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power, Steam Generator Pressure vs. Time
15.1-38  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactivity vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xix Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.1-38a Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite    Power Pressurizer Level vs. Time
15.1-38b Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Flow vs. Time
15.1-38c Return-to-Power Steam Line Break Inside Containment, Hot Full Power SLB, Loss of Offsite Power Feedwater Flow vs. Time
15.1-38d Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Generator Mass vs. Time
15.1-38e Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time
15.1-38f Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Vessel vs. Time
15.1-38g Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power DNBR vs. Time (DRN 05-543, R14)  15.1-39  Deleted
15.1-40  Deleted
15.1-41  Deleted
15.1-42  Deleted
15.1-43  Deleted
15.1-44  Deleted
15.1-45  Deleted
15.1-46  Deleted  (DRN 05-543, R14) 15.1-47 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Core Power vs. Time 15.1-48 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Core Heat Flux vs. Time 15.1-49 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Pressurizer Pressure vs. Time 15.1-50  Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xx Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.1-51  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Reactor Coolant System Temperature vs. Time 15.1-52  Deleted
15.1-53  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Steam Generator Pressure vs. Time 15.1-54  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Steam Flow vs. Time 15.1-55  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Feedwater Flow vs. Time 15.1-56  Deleted
15.1-57  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Steam Generator Mass vs. Time 15.1-58  Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Reactivity vs. Time 15.1-58a Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Pressurizer Level vs. Time 
15-1-58b Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Integrated Safety Injection Flow vs. Time 15-1-58c Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of  Offsite Power Reactor Vessel Upper Head Level vs. Time 15.1-59  Deleted
15.1-60  Deleted
15.1-61  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Core Power vs. Time 15.1-62 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Core Heat Flux vs. Time 15.1-63  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Pressurizer Pressure vs. Time 15.1-64  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Reactor Coolant System Temperature vs. Time  15.1-65  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Pressurizer Level vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxi Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.1-66  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Steam Generator Pressure vs. Time 15.1-67  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Steam Flow vs. Time 15.1-68  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Feedwater Flow vs. Time 15.1-69  Deleted
15.1-70  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Steam Generator Mass vs. Time 15.1-71  Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Reactivity vs. Time 15.1-72  Deleted
15.1-72a Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Integrated Safety Injection Flow vs. Time 15.1-72b Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power Reactor Vessel Level vs. Time 15.1-72c Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of  Offsite Power DNBR vs. Time 15.1-72d Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Core Power vs. Time 15.1-72e Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Core Heat Flux vs. Time 15.1-72f Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Pressurizer Pressure vs. Time 15.1-72g Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Reactor Coolant System Temperatures vs. Time 15.1-72h Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Pressurizer Pressure vs. Time 15.1-72i Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Reactivity vs. Time 15.1-72j Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Pressurizer Level vs. Time  15.1-72k Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Steam Flow vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.1-72l Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Feedwater Flow vs. Time 15.1-72m Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Steam Generator Mass vs. Time 15.1-72n Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Integrated Safety Injection Flow vs. Time 15.1-72o Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of  Offsite Power Reactor Vessel Upper Head Level vs. Time 15.1-73  Deleted
15.1-74  Deleted
15.1-75  Deleted (DRN 03-220, R12-B) 15.1-75a Deleted (DRN 03-220, R12-B; 05-543, R14)  15.1-76  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Core Power vs.
Time
15.1-77  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Reactor Coolant System Pressure vs. Time
15.1-78  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Reactor Coolant Temperature vs. Time
15.1-79  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Pressurizer Water Volume vs. Time
15.1-80  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Steam Generator Pressure vs. Time 15.1-81  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Steam Mass Release  From Break vs. Time 15.1-82  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Feedwater Flow  vs. Time
15.1-83  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Feedwater Enthalpy vs. Time
15.1-84  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Steam Generator Liquid Inventory vs. Time
15.1-85  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Reactivity vs. Time WSES-FSAR-UNIT-3  15-xxiii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.1-86  Main Steam Line Break Modes 3 & 4 With Loss of AC Power Integrated Steam Mass Release From Break vs. Time (DRN 05-543, R14) 15.1-87  Inside Containment Steam Line Break, Pre-Trip Power Excursion Core Power vs. Time 15.1-88  Inside Containment Steam Line Break, Pre-Trip Power Excursion Core Heat Flux vs.
Time
15.1-89 Inside Containment Steam Line Break, Pre-Trip Power Excursion Reactor Coolant  System Temperatures vs. Time 15.1-90  Inside Containment Steam Line Break, Pre-Trip Power Excursion Reactor Coolant System Pressure vs. Time
15.1-91  Inside Containment Steam Line Break, Pre-Trip Power Excursion Reactivity vs. Time
15.1-92  Inside Containment Steam Line Break, Pre-Trip Power Excursion Steam Generator Pressure vs. Time
15.1-93  Inside Containment Steam Line Break, Pre-Trip Power Excursion DNBR vs. Time
15.1-94  Inside Containment Steam Line Break, Pre-Trip Power Excursion Steam Generator Level vs. Time
15.2-1  Loss of Condenser Vacuum Core Power vs. Time (DRN 05-543, R14)  15.2-2  Loss of Condenser Vacuum Core Average Heat Flux vs. Time
15.2-3  Loss of Condenser Vacuum Pressurizer Pressure vs. Time (DRN 05-543, R14) 15.2-3a  Loss of Condenser Vacuum RCS Pressure vs. Time (DRN 05-543, R14)  15.2-4  Loss of Condenser Vacuum Minimum DNBR vs. Time (DRN 05-543, R14) 15.2-5  Loss of Condenser Vacuum Core Coolant Temperatures vs. Time (DRN 05-543, R14)  15.2-6  Loss of Condenser Vacuum Pressurizer Water Volume vs. Time (DRN 05-543, R14) 15.2-7  Loss of Condenser Vacuum SG Pressure vs. Time 15.2-8  Loss of Condenser Vacuum Total Steam Flowrate per SG vs. Time
15.2-9  Loss of Condenser Vacuum Feedwater Flowrate per SG vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxiv Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.2-10  Loss of Condenser Vacuum Feedwater Enthalpy vs. Time
15.2-11  Loss of Condenser Vacuum Secondary Liquid Mass vs. Time (DRN 05-543, R14) 15.2-12  Loss of Condenser Vacuum Primary Safety Valve Flowrate vs. Time 15.2-13  Loss of Condenser Vacuum SG Safety Valve Flowrate vs. Time
15.2-14  Deleted
15.2-15  Deleted
15.2-16  Deleted
15.2-17  Deleted
15.2-18  Deleted
15.2-19  Deleted
15.2-20  Deleted
15.2-21  Deleted
15.2-22  Deleted
15.2-23  Deleted
15.2-24  Deleted
15.2-25  Deleted
15.2-25a Deleted
15.2-25b Deleted
15.2-25c Deleted
15.2-25d Deleted
15.2-25e Deleted  15.2-25f Deleted  15.2-25g Deleted  15.2-25h Deleted
15.2-25i Deleted
15.2-25j Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxv Revision 14 (12/05) CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.2-26  Loss of Normal Feedwater Flow Core Power vs. Time (DRN 05-543, R14) 15.2-27  Loss of Normal Feedwater Flow Core Heat Flux vs. Time 15.2-28  Loss of Normal Feedwater Flow Reactor Coolant System Pressure vs. Time
15.2-29  Loss of Normal Feedwater Flow Reactor Coolant System Temperatures vs. Time (DRN 05-543, R14)  15.2-30  Loss of Normal Feedwater Flow Pressurizer Water Volume vs. Time
15.2-31  Loss of Normal Feedwater Flow Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.2-32  Loss of Normal Feedwater Flow Secondary Steam Flowrate vs. Time 15.2-33  Loss of Normal Feedwater Flow Feedwater Flowrate per Steam Generator vs.
Time (DRN 05-543, R14)  15.2-34  Loss of Normal Feedwater Flow Feedwater Enthalpy vs. Time
15.2-35  Loss of Normal Feedwater Flow Secondary Liquid Mass vs. Time (DRN 05-543, R14) 15.2-36  Loss of Normal Feedwater Flow Safety Valve Flowrate per Steam  Generator vs. Time
15.2-36a Loss of Normal Feedwater Flow Minimum DNBR vs. Time (DRN 02-1713, R12-B) 15.2-37  Feedwater System Pipe Break (Large) Core Power vs. Time 15.2-38  Feedwater System Pipe Break (Large) Core Heat Flux vs. Time
15.2-39  Feedwater System Pipe Break (Large) RCS Pressure vs. Time
15.2-40  Feedwater System Pipe Break (Large) Minimum DNBR vs. Time
15.2-41  Feedwater System Pipe Break (Large) RCS Temperature vs. Time
15.2-42  Feedwater System Pipe Break (Large) Pressurizer Water Volume vs. Time
15.2-43  Feedwater System Pipe Break (Large) SG Pressure vs. Time
15.2-44  Feedwater System Pipe Break (Large) Steam Flowrate vs. Time  15.2-45  Feedwater System Pipe Break (Large) Feedwater Flow (Intact Side) vs. Time  15.2-46  Feedwater System Pipe Break (Large) Feedwater Enthalpy (Intact Side) vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxvi Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.2-47  Feedwater System Pipe Break (Large) SG Liquid Mass vs. Time 15.2-48  Feedwater System Pipe Break (Large) Core Flow (Fraction) vs. Time
15.2-49  Feedwater System Pipe Break P (Large) ressurizer Safety Valve Flowrate vs.
Time
15.2-50  Feedwater System Pipe Break (Large) Secondary Safety Valve Flowrate vs.
Time
15.2-51  Feedwater System Pipe Break (Large) Rupture Discharge FLowrate 
15.2-52  Feedwater System Pipe Break (Large) SG Water Level vs. Time (DRN 02-1713, R12-B)  15.2-52a Feedwater System Pipe Break (Large) Rupture Discharge Enthalpy vs. Time (DRN 02-1713, R12-B) 15.2-53  Feedwater System Pipe Break (Large) Reactivity vs. Time 15.2-53a Deleted
15.2-53a1 Feedwater System Pipe Break (Large) RCS Pressure vs. Break Size
15.2-53a2 Feedwater System Pipe Break (Small) RCS Pressure vs. Break Size
15.2-53b Feedwater System Pipe Break (Small) RCS Pressure vs. Time
15.2-53c Feedwater System Pipe Break (Small) SG Pressure vs. Time
15.2-53d Feedwater System Pipe Break (Small) Pressurizer Water Volume vs. Time (DRN 02-1713, R12-B)  15.2-53e Feedwater System Pipe Break (Small) Core Power vs. Time
15.2-53f Feedwater System Pipe Break (Small) Core Heat Flux vs. Time
15.2-53g Feedwater System Pipe Break (Small) RCS Temperature vs. Time
15.2-53h Feedwater System Pipe Break (Small) Core Flow (Fraction) vs. Time
15.2-53i Feedwater System Pipe Break (Small) Steam Flowrate vs. Time
15.2-53j Feedwater System Pipe Break (Small) Feedwater Flow (Intact Side) vs. Time
15.2-53k Feedwater System Pipe Break (Small) Feedwater Enthalpy (Intact Side) vs. Time  15.2-53l Feedwater System Pipe Break (Small) SG Liquid Mass vs. Time 15.2-53m Feedwater System Pipe Break (Small) SG Water Level vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxvii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.2-53n Feedwater System Pipe Break (Small) Pressurizer Safety Valve Flowrate vs. Time 15.2-53o Feedwater System Pipe Break (Small) Secondary Safety Valve Flowrate vs. Time
15.2-53p Feedwater System Pipe Break (Small) Reactivity vs. Time
15.2-53q Feedwater System Pipe Break (Small) Rupture Discharge Flowrate vs. Time
15.2-53r Feedwater System Pipe Break (Small) Rupture Discharge Enthalpy vs. Time
15.2-53s Feedwater System Pipe Break (Small) Minimum DNBR vs. Time
15.2-54  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Core Power vs. Time
15.2-55  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Core Heat Flux vs.
Time
15.2-56  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Pressurizer Pressure vs. Time
15.2-57  Loss of Normal Feedwater Flow with an Active Failure in the SBCS RCS Temperature vs. Time
15.2-58  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Pressurizer Water Volume vs. Time
15.2-59  Loss of Normal Feedwater Flow with an Active Failure in the SBCS SG Pressure vs.
Time
15.2-60  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Secondary Steam Flowrate vs. Time
15.2-61  Loss of Normal Feedwater Flow with an Active Failure in the SBCS EFW Flowrate per SG vs. Time
15.2-62  Loss of Normal Feedwater Flow with an Active Failure in the SBCS EFW Enthalpy vs.
Time
15.2-63  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Secondary Liquid Mass vs. Time
15.2-64  Deleted
15.2-65  Loss of Normal Feedwater Flow with an Active Failure in the SBCS Minimum DNBR vs.
Time
15.3-1  Total Loss of Forced Reactor Coolant Flow Core Power vs. Time 15.3-2  Total Loss of Forced Reactor Coolant Flow Core Heat Flux vs. Time 15.3.3  Total Loss of Forced Reactor Coolant Flow Pressurizer Pressure vs. Time (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxviii Revision 14 (12/05) CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.3-4  Total Loss of Forced Reactor Coolant Flow Minimum Hot Channel DNBR vs. Time 15.3-5  Total Loss of Forced Reactor Coolant Flow Reactor Coolant Temperatures vs. Time
15.3-6  Total Loss of Forced Reactor Coolant Flow Core Flow vs. Time 
15.3-7  Deleted (DRN 05-543, R14)  15.3-8  Total Loss of Forced Reactor Coolant Flow Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.3-9  Total Loss of Forced Reactor Coolant Flow Integrated Steam Generator Safety  Valve Flow vs. Time
15.3-10  Total Loss of Forced Reactor Coolant Flow Pressurizer Liquid Volume vs. Time (DRN 05-543, R14)  15.3-11  Sheared Shaft With Loss of Offsite Power Core Power vs. Time
15.3-12  Sheared Shaft with Loss of Offsite Power Core Heat Flux vs. Time (DRN 05-543, R14) 15.3-13  Sheared Shaft With Loss of Offsite Power RCS Temperatures vs. Time 15.3-14  Sheared Shaft With Loss of Offsite Power RCS Pressure vs. Time (DRN 05-543, R14)  15.3-15  Sheared Shaft With Loss of Offsite Power Reactivity vs. Time
15.3-16  Sheared Shaft With Loss of Offsite Power Steam Generator Pressure vs. Time
15.3-17  Sheared Shaft With Loss of Offsite Power Pressurizer Liquid Volume vs. Time (DRN 05-543, R14) 15.3-18  Sheared Shaft With Loss of Offsite Power Reactor Coolant System  Flows vs. Time
15.3-18a Sheared Shaft with Loss of Offsite Power Minimum Hot Channel DNBR vs. Time (DRN 05-543, R14)  15.3-19  Deleted 15.3-20  Deleted  15.3-21  Deleted 15.3-22  Deleted
15.3-23  Deleted
WSES-FSAR-UNIT-3  15-xxix Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.3-24  Deleted
15.3-25  Deleted
15.3-26  Deleted
15.3-27  Deleted
15.3-28  Deleted
15.3-29  Deleted
15.3-30  Deleted
15.3-31  Deleted (DRN 05-543, R14) 15.3-32  Deleted (DRN 05-543, R14)  15.4-1  CEA Withdrawal From Subcritical Core Power vs. Time
15.4-2  CEA Withdrawal from Subcritical Core Heat Flux vs. Time
15.4-3  CEA Withdrawal from Subcritical Reactor Coolant System Temperatures vs. Time
15.4-4  CEA Withdrawal from  Subcritical Reactor Coolant System Pressure vs. Time
15.4-5  CEA Withdrawal from Subcritical Steam Generator Pressure vs. Time
15.4-6  CEA Withdrawal from Subcritical Reactivity vs. Time
15.4-7  CEA Withdrawal from Subcritical Peak Linear Heat Rate vs. Time 15.4-8  CEA Withdrawal at Low Power Core Power vs. Time 15.4-9  CEA Withdrawal at Low Power Core Heat Flux vs. Time
15.4-10  CEA Withdrawal at Low Power Reactor Coolant System Temperatures vs. Time
15.4-11  CEA Withdrawal at Low Power Reactor Coolant System Pressure vs. Time
15.4-11a CEA Withdrawal at Low Power Steam Generator Pressure vs. Time
15.4-11b CEA Withdrawal at Low Power Reactivity vs. Time
WSES-FSAR-UNIT-3  15-xxx Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.4-12  Deleted 15.4-13  Deleted
15.4-14  Deleted
15.4-15  Deleted
15.4-16  Deleted
15.4-17  Deleted
15.4-18  Deleted
15.4-19  Deleted
15.4-20  Deleted
15.4-21  Deleted
15.4-22  Deleted
15.4-23  Deleted
15.4-24  Deleted
15.4-25  CEA Withdrawal at Power Core Heat Flux vs. Time (DRN 05-543, R14)  15.4-26  CEA Withdrawal at Power Peak Linear Heat Generation Rate vs. Time
15.4-27  CEA Withdrawal at Power Reactor Coolant System Pressure vs. Time
15.4-28  CEA Withdrawal at Power Core Power vs. Time
15.4-29  CEA Withdrawal at Power Minimum DNBR vs. Time
15.4-30  CEA Withdrawal at Power Reactor Coolant Temperature vs. Time
15.4-31  CEA Withdrawal at Power Pressurizer Water Volume vs. Time
15.4-32  CEA Withdrawal at Power Steam Generator Pressure vs. Time
15.4-33  CEA Withdrawal at Power Steam Flow vs. Time
15.4-34  CEA Withdrawal at Power Feedwater Flow vs. Time
15.4-35  CEA Withdrawal at Power Feedwater Enthalpy vs. Time WSES-FSAR-UNIT-3  15-xxxi Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.4-36  CEA Withdrawal at Power Steam Generator Liquid Mass vs. Time
15.4-37  CEA Withdrawal at Power Secondary Safety Valve Flow vs. Time (DRN 02-1479, R12) 15.4-38  CEA Misoperation Single CEA Drop Core Power vs. Time  (DRN 05-543, R14) 15.4-39  CEA Misoperation Single CEA Drop Core Average Heat Flux vs. Time (DRN 05-543, R14)  15.4-40  CEA Misoperation Single CEA Drop Reactivities vs. Time
15.4-41  CEA Misoperation Single CEA Drop RCS Temperatures vs. time (DRN 05-543, R14) 15.4-42  CEA Misoperation Single CEA Drop System Pressure vs. Time (DRN 05-543, R14)  15.4-43  CEA Misoperation Single CEA Drop Steam Generator Pressure vs. Time
15.4-44  CEA Misoperation Single CEA Drop Pressurizer Level vs.
Time
15.4-45  Deleted
15.4-46  Deleted
15.4-47  Deleted
15.4-48  Deleted
15.4-49  Deleted 15.4-50  Deleted 15.4-51  Deleted
15.4-52  Deleted
15.4-53  Deleted
15.4-54  Deleted
15.4-55  Deleted (DRN 02-1479, R12)
WSES-FSAR-UNIT-3  15-xxxii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 02-1479, R12) 15.4-56  Deleted 15.4-57  Deleted (DRN 02-1479, R12)  15.4-58  Deleted (DRN 02-1479, R12; 05-543, R14) 15.4-59  Deleted (DRN 05-543, R14)  15.4-60  Deleted
15.4-61  Deleted (DRN 02-1479, R12) (DRN 03-1610, R13) 15.4-62  Deleted 15.4-63  Deleted
15.4-64  Deleted
15.4-65  Deleted
15.4-65a Deleted
15.4-65b Deleted (DRN 03-1610, R13)  (DRN 05-543, R14) 15.4-66  Deleted 15.4-67  HFP Ejection Core Power vs. Time
15.4-68  HFP Ejection Peak Core Power vs. Time
15.4-69  HFP Ejection Core Heat Flux vs. Time
15.4-70  HFP Ejection Peak Core Heat Flux vs. Time
15.4-71  HFP Ejection Hot & Average Channel Fuel & Clad Temperatures vs. Time
15.4-72  HFP Ejection Reactivity Components vs. Time
15.4-73  CEA Ejection RCS Pressure vs. Time for Peak RCS Pressure 
15.4-74  Deleted
15.4-75  Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxxiii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.4-76  Deleted 15.4-77  Deleted
15.4-78  Deleted
15.4-79  Deleted
15.4-80  Deleted
15.4-81  Deleted
15.4-82  Deleted
15.4-83  Deleted
15.4-84  Deleted
15.4-85  Deleted (DRN 05-543, R14)  15.4-86  Deleted (DRN 05-543, R14) 15.4-87  Deleted 15.4-88  Deleted
15.4-89  Deleted
15.4-90  Deleted
15.4-91  Deleted
15.4-92  Deleted
15.4-92a Deleted
15.4-93  Deleted 15.4-94  Deleted
15.4-95  Deleted 15.4-96  Deleted
15.4-97 Deleted (DRN 05-543, R14) (DRN 03-1610, R13) 15.4-98  Locations of Incore Neutron Detectors 15.4-99  Power Distribution for Representative Worst Case Undetectable Misload (DRN 03-1610, R13)
WSES-FSAR-UNIT-3  15-xxxiv Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.5-1  CVCS Malfunction Core Power vs. Time
15.5-2  CVCS Malfunction Core Average Heat Flux vs. Time
15.5-3  CVCS Malfunction Coolant System Pressure vs. Time
15.5-4  CVCS Malfunction Core Coolant Temperatures vs. Time
15.5-5  CVCS Malfunction Reactivity vs. Time
15.5-6  CVCS Malfunction Pressurizer Steam Volume vs. Time
15.5-7  CVCS Malfunction Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.6-1  Deleted 15.6-2  Deleted
15.6-3  Deleted
15.6-4  Deleted
15.6-5  Deleted
15.6-6  Deleted
15.6-7  Deleted
15.6-8  Deleted
15.6-9  Deleted 15.6-10  Deleted 15.6-11  Deleted
15.6-12  Deleted
15.6-13 Deleted
15.6-14  Deleted
15.6-15  Deleted
15.6-16  Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxxv Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title  (DRN 05-543, R14) 15.6-17  Deleted 15.6-18  Deleted
15.6-19  Deleted
15.6-20  Deleted
15.6-21  Deleted
15.6-22  Deleted
15.6-23  Deleted
15.6-24  Deleted
15.6-25  Deleted 
15.6-26  Deleted
15.6-27  Deleted
15.6-28  Deleted
15.6-29  Deleted
15.6-30 Deleted
15.6-31  Deleted (DRN 05-543, R14)  15.6-32  Deleted
15.6-33  Deleted
15.6-34  Deleted
15.6-35  Deleted
WSES-FSAR-UNIT-3  15-xxxvi Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure          Title  (DRN 05-543, R14) 15.6-35A SGTR with LOOP Core Power vs. Time 15.6-35B SGTR with LOOP Core Heat
15.6-35C Deleted
15.6-35D SGTR with LOOP RCS Pressure vs. Time
15.6-35E Deleted
15.6-35F SGTR with LOOP RCS Temperature vs. Time
15.6-35G Deleted
15.6-35H SGTR with LOOP Pressurizer Water Volume vs. Time
15.6-35I SGTR with LOOP RCS Inventory vs. Time
15.6-35J Deleted
15.6-35K SGTR with LOOP SG Pressure vs. Time
15.6-35L SGTR with LOOP Feedwater Flowrate per SG vs. Time
15.6-35M Deleted
15.6-35N SGTR with LOOP Primary to Secondary Leak Rate vs. Time
15.6-35O Deleted
15.6-35P SGTR with LOOP SG Liquid Mass vs. Time
15.6-35Q SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time
15.6-35R SGTR with LOOP Integrated Primary to Secondary Leak Flow vs. Time
15.6-36  Deleted
15.6-37  Deleted 
15.6-38  Deleted
15.6-39  Deleted
15.6-40  Deleted
15.6-41  Deleted 15.6-42  Deleted  15.6-43  Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxxvii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title  (DRN 05-543, R14) 15.6-44  Deleted 15.6-45  Deleted
15.6-46  Deleted
15.6-47  Deleted
15.6-48  Deleted
15.6-49  Deleted
15.6-50  Deleted
15.6-51  Deleted
15.6-52  Deleted
15.6-53  Deleted
15.6-54  Deleted
15.6-55  Deleted
15.6-56  Deleted
15.6-57  Deleted
15.6-58  Deleted
15.6-59  Deleted
15.6-60  Deleted
15.6-61  Deleted
15.6-62  Deleted (DRN 05-543, R14)  15.6-63  Deleted
15.6-64  Deleted
15.6-65  Deleted
15.6-66  Deleted
15.6-67  Deleted
WSES-FSAR-UNIT-3  15-xxxviii Revision 14 (12/05)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15.6-68  Deleted
15.6-69  Deleted
15.6-70  Deleted
15.6-71  Deleted
15.6-72  Deleted
15.6-73  Deleted
15.6-74  Deleted
15.6-75  Deleted
15.6-76  Deleted
15.6-77  Deleted
15.6-78  Deleted
15.6-79  Deleted
15.6-80  Deleted
15.6-81  Deleted
15.6-82  Deleted
15.6-83  Deleted
15.6-84  Deleted
15.6-85  Deleted
15.6-86  Deleted
15.6-87  Deleted
15.6-88  Deleted
15.6-89  Deleted
15.6-90  Deleted
15.6-91  Deleted (DRN 05-543, R14) 15.6-92  Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xxxix Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.6-93  Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center    Hot Assembly Node
15.6-94  Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate
15.6-95  Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot)
15.6-96  Deleted
15.6-97 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly  Quality 15.6-98  Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure
15.6-99  Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood
15.6-100 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature
15.6-101 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power
15.6-102 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node
15.6-103 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate
15.6-104 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flowrate (Above and Below Hot Spot)
15.6-105 Deleted
15.6-106 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality
15.6-107 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure
15.6-108 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood
15.6-109 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature (DRN 06-1062, R15) 15.6-109a Deleted 15.6-109b Deleted (DRN 05-543, R14; 06-1062, R15 WSES-FSAR-UNIT-3  15-xl Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title  (DRN 05-543, R14; 06-1062, R15 15.6-109c Deleted 15.6-109d Deleted
15.6-109e Deleted
15.6-109f Deleted
15.6-109g Deleted
15.6-109h Deleted
15.6-109i Deleted
15.6-109j Deleted
15.6-109k Deleted (DRN 06-1062, R15)  15.6-109l Deleted
15.6-110 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power
15.6-111 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure Center Hot Assembly Node
15.6-112 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate
15.6-113 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flowrate (Above and Below Hot Spot)
15.6-114 Deleted
15.6-115 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality  15.6-116 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure
15.6-117 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood
15.6-118 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xli Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 06-1062, R15) 15.6-118a Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Mid Annulus Flow Rate 15.6-118b Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Quality Above and Below Core 15.6-118c Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Core Pressure Drop 15.6-118d Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs 15.6-118e Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Water Level in Downcomer During Reflood 15.6-118f Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Hot Spot Gap Conductance 15.6-118g Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Maximum Local cladding Oxidation Percentage 15.6-118h Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot 15.6-118i Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Hot Spot Heat Transfer Coefficient 15.6-118j Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Hot Pin Pressure
15.6-118k Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Core Bulk Channel Flow Rate (DRN 06-1062, R15) 15.6-119 Deleted 15.6-120 Deleted
15.6-121 Deleted
15.6-122 Deleted
15.6-123 Deleted
15.6-124 Deleted
15.6-125 Deleted
15.6-126 Deleted  15.6-127 Deleted WSES-FSAR-UNIT-3  15-xlii Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 06-1062, R15) 15.6-127a Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Core Power 15.6-127b Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Pressure in Center Hot Assembly Node 15.6-127c Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Leak Flow Rate
15.6-127d Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) 15.6-127e Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Hot Assembly Quality 15.6-127f Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Containment Pressure 15.6-127g Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Mass Added to Core During Reflood 15.6-127h Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Peak Cladding Temperature (DRN 06-1062, R15) (DRN 05-543, R14) 15.6-128 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature versus    Break Area (DRN 05-543, R14)  (DRN 00-0551) 15.6-129 Deleted 15.6-130 Deleted
15.6-131 Deleted
15.6-132 Deleted
15.6-133 Deleted
15.6-134 Deleted
15.6-135 Deleted  15.6-136 Deleted  15.6-137 Deleted
15.6-138 Deleted
15.6-139 Deleted
15.6-140 Deleted  (DRN 00-0551)
WSES-FSAR-UNIT-3  15-xliii Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title  (DRN 00-0551) 15.6-141 Deleted 15.6-142 Deleted
15.6-143 Deleted
15.6-144 Deleted
15.6-145 Deleted
15.6-146 Deleted
15.6-147 Deleted
15.6-148 Deleted
15.6-149 Deleted
15.6-150 Deleted
16.6-151 Deleted
15.6-152 Deleted  (DRN 00-0551) (DRN 05-543, R14) 15.6-153 Deleted 15.6-154 Deleted
15.6-155 Deleted
15.6-156 Deleted  (DRN 00-0551) 15.6-157 Deleted  (DRN 00-0551) 15.6-158 Deleted 15.6-159 Deleted  (DRN 00-0551) 15.6-160 Deleted (DRN 05-543, R14)  15.6-161 Deleted
15.6-162 Deleted
15.6-163 Deleted
15.6-164 Deleted
15.6-165 Deleted
15.6-166 Deleted  (DRN 00-0551)
WSES-FSAR-UNIT-3  15-xliv Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 00-0551) 15.6-167 Deleted 15.6-168 Deleted (DRN 00-0551)  (DRN 05-543, R14) 15.6-169 Deleted 15.6-170 Deleted
15.6-171 Deleted
15.6-172 Deleted (DRN 00-0551) 15.6-173 Deleted (DRN 00-0551)  15.6-174 Deleted
15.6-175 Deleted (DRN 00-0551) 15.6-176 Deleted (DRN 05-543, R14)  15.6-177 Peak Cladding Temperature vs. Break Size for the Small Break LOCA Analysis
15.6-178 Inadvertent Opening of a Pressurizer Safety Valve Normalized Total Core Power  (DRN 00-0551)  15.6-179 Inadvertent Opening of a Pressurizer Safety Valve Inner Vessel Pressure
15.6-180 Inadvertent Opening of a Pressurizer Safety Valve Leak Flow Rate
15.6-181 Inadvertent Opening of a Pressurizer Safety Valve Inner Vessel Inlet Flow Rate
15.6-182 Inadvertent Opening of a Pressurizer Safety Valve Inner Vessel Two-Phase Mixture Height
15.6-183 Inadvertent Opening of a Pressurizer Safety Valve Heat Transfer Coefficient at Hot Spot
15.6-184 Inadvertent Opening of a Pressurizer Safety Valve Coolant Temperature at Hot Spot 15.6-185 Inadvertent Opening of a Pressurizer Safety Valve Clad Surface Temperature  at Hot Spot (DRN 05-543, R14) 15.6-186 Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xlv Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-543, R14) 15.6-187 Deleted 15.6-188 Deleted
15.6-189 Deleted
15.6-190 Deleted
15.6-191 Deleted
15.6-192 Deleted
15.6-193 Deleted
15.6-194 Deleted
15.6-195 Deleted
15.6-196 Deleted
15.6-197 Deleted
15.6-198 Deleted
15.6-199 Deleted
15.6-200 Deleted
15.6-201 Deleted
15.6-202 Deleted
15.6-203 Deleted
15.6-204 Deleted
15.6-205 Deleted (DRN 00-0551; 06-1062, R15) 15.6-206 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Core    Power
15.6-207 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner    Vessel Pressure
15.6-208 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Break    Flow Rate
15.6-209 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner    Vessel Inlet Flow Rate (DRN 00-0551; 05-543, R14; 06-1062, R15)
WSES-FSAR-UNIT-3  15-xlvi Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 00-0551; 05-543, R14; 06-1062, R15) 15.6-210 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner    Vessel Two-Phase Mixture Level
15.6-211 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Heat    Transfer Coefficient at Hot Spot
15.6-212 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Coolant    Temperature at Hot Spot
15.6-213 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Cladding    Temperature at Hot Spot
15.6-214 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Core    Power
15.6-215 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner    Vessel Pressure
15.6-216 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Break    Flow Rate
15.6-217 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner    Vessel Inlet Flowrate
15.6-218 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner    Vessel Two-Phase Mixture Level
15.6-219 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Heat    Transfer Coefficient at Hot Spot
15.6-220 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Coolant    Temperature at Hot Spot
15.6-221 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Cladding    Temperature at Hot Spot (DRN 00-0551; 06-1062, R15) (DRN 05-256, R13-B) 15.6-222 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Core    Power
15.6-223 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Inner    Vessel Pressure
15.6-224 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Break    Flowrate
15.6-225 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Inner    Vessel Inlet Flowrate
15.6-226 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Inner    Vessel Two-Phase Mixture Level (DRN 05-256, R13-B; 05-543, R14)
WSES-FSAR-UNIT-3  15-xlvii Revision 15 (03/07)  CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title (DRN 05-256, R13-B; 05-543, R14) 15.6-227 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Heat    Transfer Coefficient at Hot Spot
15.6-228 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Coolant    Temperature at Hot Spot
15.6-229 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break    Cladding Temperature at Hot Spot (DRN 05-256, R13-B)  15.6-230 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam    Generator No. 1 Pressure
15.6-231 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam    Generator No. 2 Pressure
15.6-232 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam    Generator No. 1 Secondary Flowrate
15.6-233 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam    Generator No. 2 Secondary Flowrate
15.9-1  Asymmetric Steam Generator Transient Core Power vs. Time
15.9-2  Asymmetric Steam  Generator TransientCore Average Heat Flux vs. Time
15.9-3  Asymmetric Steam Generator Transient RCS Temperatures vs. Time
15.9-4  Asymmetric Steam Generator Transient System Pressure vs. Time
15.9-5 Asymmetric Steam Generator Transient Steam Generator Pressure vs. Time
15.9-6  Asymmetric Steam Generator Transient DNBR vs. Time (DRN 05-543, R14)  15A.1-1  Steam Generator Tube Rupture With a Concurrent Loss of Normal AC Power RCS Pressure vs. Time
15A.1-2  Steam Generator Tube Rupture With LOP Reactor Vessel Liquid Volume vs. Time  15A.1-3  Full Power Steam Line Break, IC LOP, HPSI Pump Failure, Stuck CEA, Automatic Actuation of AFW Reactor Coolant System Pressure vs. Time 15A.1-4  Full Power Steam Line Break, IC, LOP, HPSI Pump Failure, Stuck CEA, Automatic Actuation of AFW Reactor Vessel Liquid Volume vs. Time
15A.2-1  Steam Generator Heat Transfer Characteristics
15A.2-2  Discharge Enthalpy vs. Steam Generator Liquid Inventory
15A.2-3  Steam Generators
WSES-FSAR-UNIT-3  15-xlviii Revision 15 (03/07) CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title 15A.2-4  Maximum RCS Pressure vs. Break Area
15A.3-1  Full Power Main Steam Line Break Maximum Post-Trip Reactivity vs.
Time of Loss of Offsite Power
15A.3-2  Full Power Main Steam Line Break Minimum Post-Trip DNBR vs. Time of Loss of Offsite Power
15A.4-1  Minimum DNBR vs. Time Increased Main Steam Flow With Loss of Offsite Power
15B-1  Containment Leakage Dose Model (DRN 05-543, R14) 15C.1-1  Deleted 15C.1-2  Deleted
15C.1-3  Deleted
15C.1-4  Deleted
15C.1-5  Deleted (DRN 05-543, R14)  15C.1-6  Deleted
15C.1-7  Deleted
15C.1-8  Deleted
15C.1-9  Deleted
15D.1-1  Deleted
15D.1-2  Deleted
15D.1-3  Deleted  15D.1-4  Deleted 15D.1-5  Deleted
15D.1-6  Deleted
15D.1-7  Deleted (DRN 05-543, R14) 15D.2-1  Deleted 15D.2-2  Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-xlix Revision 15 (03/07) CHAPTER 15  LIST OF FIGURES (Cont'd)
Figure      Title  (DRN 05-543, R14) 15D.2-3  Deleted 15D.2-4  Deleted
15D.2-5  Deleted
15D.2-6  Deleted
15D.2-7  Deleted (DRN 05-543, R14)
WSES-FSAR-UNIT-3  15-l Revision 15 (03/07) UPDATE REFERENCE LIST  Chapter 15 Section    Cross References Revision 12-B 15-ix    ER-W3-2002-0603-009/DRN 02-1713 15-xxii 15-xxiii 15.2.3.1 Table 15.2-8 Sh 1 & 2 Table 15.2-9 Table 15.2-9a Table 15.2-9b Sh 1 & 2 Figure 15.2-37 thru 15.2-53d Appendix 15C (all)
15-xix    ER-W3-2003-0059-000/DRN 03-220 15.6.3.1 Table 15.6-1 Table 15.6-2 Table 15.6-3 Table 15.6-4 Figure 15.1-75a Figure 15.6-1
15.6.3.1  ER-W3-2002-0628-000/DRN 02-1742
15.6.3.2.3.4  ER-W3-2001-0424-000/DRN 03-99
Revision 12-C Section 15.7.3.4.1  ER-W3-2002-0319-000/DRN 03-179
Revision 13 Table 15.6-13a Sht 1  ER-W3-2003-0117-000/DRN 03-1964 Table 15.6-13a Sht 2 Table 15.6-13b
TOC Page 15-xi  ER-W3-2003-0585-000/DRN 03-1610 TOC Page 15-xii TOC Page 15-xiii TOC Page 15-xxvii TOC Page 15-xxix Section 15.4.3.1.1.1 WSES-FSAR-UNIT-3  15-li Revision 15 (03/07) UPDATE REFERENCE LIST  Chapter 15 Section    Cross References Revision 13 Section 15.4.3.1.1.2 Section 15.4.3.1.2.1 Table 15.4-18  ER-W3-2003-0585-000/DRN 03-1610 Table 15.4-18a Table 15.4-18b Table 15.4-37 Table 15.4-38 Table 15.4-62 Table 15.4-63 Table 15.4-64 Table 15.4-65a Table 15.4-65b Table 15.4-98 Table 15.4-99
Section 15.0.3.1.12  ER-W3-2003-0654-000/DRN 04-524 Section 15.1.2.4.2
Revision 13-B Section 15.6.3.3.3.2  ER-W3-2004-271/DRN 04-632 Section 15.6.3.3.3.2.1 Section 15.6.3.3.3.2.3 Section 15.6 Table 15.6-12a Table 15.6-13a Sht. 1 Table 15.6-13a Sht. 2 Table 15.6-14a Figure 15.6-222 Figure 15.6-223 Figure 15.6-224 Figure 15.6-225 Figure 15.6-226 Figure 15.6-227 Figure 15.6-228 Figure 15.6-229 WSES-FSAR-UNIT-3 15-lii Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 15 Section    Cross ReferencesRevision 14Sections, Tables and Figures ER-W3-2001-1149-000 DRN 05-543 ER-W3-2001-1149-000 DRN 05-560 ER-W3-2001-1149-007 DRN 05-13 ER-W3-2001-1149-014 DRN 05-1201 ER-W3-2002-0110-001 DRN 04-1098 ER-W3-2004-0276-000 DRN 04-704 ER-W3-2004-0276-002 DRN 05-645 ER-W3-2005-0019-000 DRN 05-359 ER-W3-2005-0145-000 DRN 05-791 ER-W3-2005-0500-000 DRN 05-1551 Revision 15Table of Contents ER-W3-2005-0447-004/DRN 06-1062 Section 15.0 Table 15.0-4 Section 15.1.1.3.1 Section 15.1.1.4.1 Section 15.1.2.3.1 Section 15.1.2.4.1 Section 15.1.3.1.1 Section 15.1.3.2.1 Section 15.1.3.3.1 Section 15.2.1.3.1 Section 15.2.2.5.1 Section 15.2.3.1 Section 15.2.3.2.1 Section 15.3.2.1.1 Section 15.3.3.1.1 Section 15.4.1.1.1 Section 15.4.1.2.1 Section 15.4.1.3.1 Section 15.4.1.4.1 Section 15.4.1.5.1 Section 15.4.1.6.1 Section 15.4.1.7.1 Section 15.4.3.2.1 Section 15.4.3.2.3 Table 15.4-19 Table 15.4-23 Table 15.4-28 WSES-FSAR-UNIT-3 15-liii Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 15 Section    Cross ReferencesRevision 15 (Contd)Figure 15.4-67 ER-W3-2005-0447-004/DRN 06-1062 (Continued) Figure 15.4-68 Figure 15.4-69 Figure 15.4-70 Figure 15.4-71 Figure 15.4-72 Section 15.5.1.1 Section 15.5.2.1.1 Section 15.6.3.1.1 Section 15.6.3.2.1.1 Section 15.6.3.2.1.4 Section 15.6.3.3.3.1.1 Section 15.6.3.3.3.1.3 Section 15.6.3.3.3.2.1 Section 15.6.3.3.3.2.3 Section 15.6:  References Table 15.6-12 Table 15.6-12a Table 15.6-13 Table 15.6-13a Sh. 1 Table 15.6-13a Sh. 2 Table 15.6-14 Table 15.6-14a Figure 15.6-92 Figure 15.6-93 Figure 15.6-94 Figure 15.6-95 Figure 15.6-97 Figure 15.6-98 Figure 15.6-99 Figure 15.6-100 Figure 15.6-101 Figure 15.6-102 Figure 15.6-103 Figure 15.6-104 Figure 15.6-106 Figure 15.6-107 Figure 15.6-108 Figure 15.6-109 Figure 15.6-109a Figure 15.6-109b WSES-FSAR-UNIT-3 15-liv Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 15 Section    Cross ReferencesRevision 15 (Contd)Figure 15.6-109c ER-W3-2005-0447-004/DRN 06-1062 (Continued) Figure 15.6-109d Figure 15.6-109e Figure 15.6-109f Figure 15.6-109g Figure 15.6-109h Figure 15.6-109i Figure 15.6-109j Figure 15.6-109k Figure 15.6-110 Figure 15.6-111 Figure 15.6-112 Figure 15.6-113 Figure 15.6-115 Figure 15.6-116 Figure 15.6-117 Figure 15.6-118 Figure 15.6-118a Figure 15.6-118b Figure 15.6-118c Figure 15.6-118d Figure 15.6-118e Figure 15.6-118f Figure 15.6-118g Figure 15.6-118h Figure 15.6-118i Figure 15.6-118j Figure 15.6-118k Figure 15.6-127a Figure 15.6-127b Figure 15.6-127c Figure 15.6-127d Figure 15.6-127e Figure 15.6-127f Figure 15.6-127g Figure 15.6-127h Figure 15.6-128 Figure 15.6-177 Figure 15.6-206 Figure 15.6-207 Figure 15.6-208 WSES-FSAR-UNIT-3  15-lv Revision 301 (09/07) UPDATE REFERENCE LIST  Chapter 15 Section    Cross References Revision 15 (Contd)
Figure 15.6-209 ER-W3-2005-0447-004/DRN 06-1062 (Continued) Figure 15.6-210  Figure 15.6-211  Figure 15.6-212  Figure 15.6-213  Figure 15.6-214  Figure 15.6-215  Figure 15.6-216  Figure 15.6-217  Figure 15.6-218  Figure 15.6-219  Figure 15.6-220  Figure 15.6-221  Figure 15.6-222  Figure 15.6-223  Figure 15.6-224  Figure 15.6-225  Figure 15.6-226  Figure 15.6-227  Figure 15.6-228  Figure 15.6-229  Figure 15.6-230  Figure 15.6-231  Figure 15.6-232  Figure 15.6-233  Section 15.9.1.1.1  Table 15.9-2 Revision 301 Section 15.1.2.3.5.1 EC-5000081470 Section 15.1.2.3.5.2  Section 15.1.2.4.5.2  Section 15.1.3.3.5.1.2  Table 15.1-10 Sh. 1  Table 15.1-10 Sh. 2  Table 15.1-17 Sh. 1  Table 15.1-17 Sh. 2  Table 15.1-27 Sh. 1  Table 15.1-27 Sh. 2 WSES-FSAR-UNIT-3  15-lvi Revision 301 (09/07) UPDATE REFERENCE LIST  Chapter 15 Section    Cross References Revision 301 (Contd)
Section 15.2.3.1.3.1.5.2 EC-5000081470 (Contd) Table 15.2-11 Sh. 1  Table 15.2-11 Sh. 2  Section 15.3.3.1.4.2  Section 15.3.3.1.4.3  Section 15.3.3.1.5  Table 15.3-4 Sh. 1  Section 15.4.3.2.5.1.2  Section 15.4.3.2.5.1.4  Table 15.4-31 Sh. 1  Table 15.4-31 Sh. 2  Section 15.6.3.1.5.1  Section 15.6.3.1.5.1.2  Section 15.6.3.1.5.1.5  Section 15.6.3.1.5.2  Section 15.6.3.3.5.1.1  Section 15.6.3.3.5.1.2  Section 15.6.3.3.6  Table 15.6-3 Sh. 1  Table 15.6-18 Sh. 2  Table 15.6-18 Sh. 3  Table 15.6-18A Sh. 1  Table 15.6-18A Sh. 2  Section 15.7.3.4.2.1  Section 15.7.3.4.5.1  Table 15.7-6 Sh. 1  Table 15.7.6 Sh. 2  Section 15B.1.1.1  Section 15B.1.2  Section 15B.1.3  Section 15B.1.4  Section 15B.3.1  Section 15B.4:  References    Section 15.6.3.3.6 EC-3277 Section 15B.1.3  Section 15B.1.4 
WSES-FSAR-UNIT-3  15-lvii Revision 304 (06/10) UPDATE REFERENCE LIST  Chapter 15  Section    Cross References Revision 302 Section 15.6.3.3.3.1 EC-9533 Section 15.6.3.3.3.1.1  Section 15.6.3.3.3.1.2  Section 15.6.3.3.3.1.3  Section 15.6.3.3.3.2.1  Section 15.6.3.3.3.2.3  Section 15.6:  References  Table 15.6-12  Table 15.6-12a  Table 15.6-13  Table 15.6-13a Sh. 1  Table 15.6-14  Table 15.6-14a  Table 15.6-15  Figures 15.6-92 thru 15.6-128  Figures 15.6-129 thru 15.6-176 Figure 15.6-177  Figure 15.6-206 thru 15.6-233  Section 15.0  Section 15.1.3.1.3.1  Section 15.1.3.1.3.2  Section 15.1.3.1.3.3  Table 15.1-13 Revision 304 Section 15.0 EC-13881 Section 15.0.3.1.1  Section 15.0.3.1.11  Section 15.0.3.3.2  Section 15.0.3.3.3  Section 15.0.5  Section 15.0:  References  Table 15.0-1  Table 15.0-2 Sh. 1  Table 15.0-2 Sh. 2  Table 15.0-3  Section 15.1.1.3.3.1  Section 15.1.1.3.3.3  Section 15.1.1.4.3.3  Section 15.1.2.3.3.3 WSES-FSAR-UNIT-3 15-lviii Revision 304 (06/10)UPDATE REFERENCE LIST Chapter 15 Section    Cross ReferencesRevision 304 (Contd)Section 15.1.2.4.3.1 EC-13881 (Continued) Section 15.1.2.4.3.3 Section 15.1.3.3.3.1 Section 15.1.3.3.3.3 Table 15.1-1 Table 15.1-8 Table 15.1-8A Table 15.1-8C Table 15.1-24 Table 15.1-24A Figure 15.1-4 Figure 15.1-19a Figure 15.1-23 Figure 15.1.32d Figure 15.1-93 Section 15.2.1.2.1 Section 15.2.1.3.2 Section 15.2.1.3.3.1 Section 15.2.1.3.3.3 Section 15.2.2.5.3.1 Section 15.2.2.5.3.3 Section 15.2.3.1.3.1.1 Section 15.2.3.1.3.1.3 Figure 15.2-4 Figure 15.2-36a Figure 15.2-40 Figure 15.2-53s Figure 15.2-65 Section 15.3.2.1.2 Section 15.3.3.1.3.3 Table 15.3-1 Table 15.3-3 Table 15.3-7 Figure 15.3-4 Figure 15.3-18a Section 15.4.1.1.3 Section 15.4.1.2.3 Section 15.4.1.3.3 Section 15.4.1.4.2.1 Section 15.4.1.4.2.2 Table 15.4-1 Table 15.4-3 WSES-FSAR-UNIT-3  15-lix Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 15  Section    Cross References  Revision 304 (Cont'd)
Table 15.4-7 EC-13881 (Continued)
Table 15.4-13 Figure 15.4-7a Figure 15.4-11d Figure 15.4-29 Figure 15.4-44b Section 15.5.1.1.3 Section 15.5.1.1.4 Section 15.5.2.1.2 Section 15.5.2.1.3 Table 15.5-1 Table 15.5-2 Section 15.6.3.1.3.3 Section 15.6.3.2.1.2 Section 15.6.3.2.1.3 Figure 15.6-1d Figure 15.6-35S Table 15.9-1 Figure 15.9-6 
Figure 15.4-98 EC-18668
Revision 305 Section 15.7.3.4.1 EC-28875 Section 15.7.3.5.1 EC-30504 Revision 306 Section 15.7.3.4.1 EC-14275 Section 15.7.3.5.1 
Section 15.6.3.2.1.2 EC-34230 Section 15.6.3.2.1.3 Table 15.6-24 
Revision 307 Section 15.0 EC-8458 Section 15.0.3.1 Section 15.0.3.1.4 Section 15.0.3.3.3 Section 15.0.5 Section 15.0 References Table 15.0-2 Sheet 1 of 2 Table 15.0-3 Table 15.0-4 Section 15.1.1.3.1 Section 15.1.1.4.1 Section 15.1.2.3.1 Section 15.1.2.4.1 Section 15.1.2.4.3.1 WSES-FSAR-UNIT-3  15-lx Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 15  Section    Cross References Revision 307 (Continued)
Section 15.1.2.4.5.2 EC-8458 (Continued) Section 15.1.3.1.1 Section 15.1.3.1.3.2 Section 15.1.3.1.3.3 Table 15.1-12 Table 15.1-13 Table 15.1-14A Table 15.1-14B Table 15.1-15 Table 15.1-15A Table 15.1-16 Table 15.1-16A Figure 15.1-33 Figure 15.1-34 Figure 15.1-35 Figure 15.1-36 Figure 15.1-37 Figure 15.1-38 Figure 15.1-38a thru Figure 15.1-38g Figure 15.1-47 Figure 15.1-48 Figure 15.1-49 Figure 15.1-51 Figure 15.1-53 Figure 15.1-54 Figure 15.1-55 Figure 15.1-57 Figure 15.1-58 Figure 15.1-58a Figure 15.1-58b Figure 15.1-58c Figure 15.1-61 thru Figure 15.1-68 Figure 15.1-70 Figure 15.1-71 Figure 15.1-72a thru Figure 15.1-72o Section 15.1.3.2.1 Section 15.1.3.2.3.2 Section 15.1.3.2.3.3 Table 15.1-21 Table 15.1-22 Section 15.1.3.3.1 Section 15.1.3.3.2 Section 15.1.3.3.3.2 Section 15.1.3.3.3.3 Table 15.1-24 Table 15.1-24a Table 15.1-25 Table 15.1-26 Figure 15.1-87 thru Figure 15.1-94 WSES-FSAR-UNIT-3  15-lxi Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 15  Section    Cross References Revision 307 (Continued)
Section 15.2.1.3.1 EC-8458 (Continued) Section 15.2.1.3.3.2 Section 15.2.1.3.3.3 Section 15.2.1.4.2 Section 15.2.2.5.1 Section 15.2.2.5.3.3 Section 15.2.3.1 Section 15.2.3.1.2 Section 15.2.3.1.3.1.3  Section 15.2.3.1.4.1 Section 15.2.3.1.4.3.1  Section 15.2.3.1.4.4 Section 15.2.3.2.1 Section 15.2.3.2.3.2 Section 15.2 References Table 15.2-1 Table 15.2-2 Table 15.2-6 Table 15.2-7 Table 15.2-8 Table 15.2-9 Table 15.2-9a Table 15.2-9b Table 15.2-10 Table 15.2-13 Figure 15.2-1 thru Figure 15.2-3 Figure 15.2-3a Figure 15.2-4 thru Figure 15.2-13 Figure 15.2-26 thru Figure 15.2-36 Figure 15.2-36a Figure 15.2-37 thru Figure 15.2-52 Figure 15.2-52a Figure 15.2-53 Figure 15.2-53a.1 Figure 15.2-53a.2 Figure 15.2-53b thru Figure 15.2-53s Figure 15.2-54 thru Figure 15.2-63 Figure 15.2-65 Section 15.3.2.1.1 Section 15.3.3.1.1 Section 15.4.1.1.1 Section 15.4.1.2.1 Section 15.4.1.3.1 Section 15.4.1.4.1 Section 15.4.1.5.1 Section 15.4.1.6.1 Section 15.4.1.7.1 Section 15.4.3.2.1 Section 15.5.1.1 WSES-FSAR-UNIT-3  15-lxii Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 15  Section    Cross References Revision 307 (Continued)
Section 15.5.2.1.1 EC-8458 (Continued) Section 15.6.3.1.2 Section 15.6.3.2.1.1 Section 15.6.3.3.3.1 Section 15.6.3.3.3.1.3  Section 15.6.3.3.3.2.1  Section 15.6.3.3.3.2.3  Table 15.6-12 Table 15.6-12a Table 15.6-13 Table 15.6-13a Sheet 1 of 2 Table 15.6-14 Table 15.6-14a Figure 15.6-92 thru Figure 15.6-100 Figure 15-6-100a thru Figure 15.6-100k Figure 15.6-101 thru Figure 15.6-127 Figure 15.6-127a thru Figure 15.6-127h Figure 15.6-128 thru Figure 15.6-177 Figure 15.6-206 thru Figure 15.6-241 Section 15.9.1.1.1 Section 15.9.1.1.3.3 Table 15.9-1 Table 15.9-2 Figure 15.9-1 thru Figure 15.9-6 
Section 15.7.3.4.2.1 EC-38571 Section 15.7.3.4.2.2 Section 15.7.3.4.5.1 Section 15.7.3.4.6 Table 15.7-6 Sheet 1 of 2 
Section 15.1.2.3.5.1 EC-40444 Section 15.1.2.3.5.2 Section 15.1.2.4.5.2 Section 15.1.3.3.4 Section 15.1.3.3.5.1.1  Section 15.1.3.3.5.1.2  Table 15.1-10 Sheet 1 of 2 Table 15.1-17 Sheet 2 of 3 Table 15.1-27 Sheet 1 of 2 Section 15.2.3.1.3.1.5.1.1  Table 15.2-11 Sheet 1 of 2 Section 15.3.3.1.4.2 Table 15.3-4 Sheet 1 of 2 Section 15.4.3.2.5.1.1  Section 15.4.3.2.5.1.2 WSES-FSAR-UNIT-3  15-lxiii Revision 307 (07/13) UPDATE REFERENCE LIST  Chapter 15  Section    Cross References Revision 307 (Continued)
Table 15.4-31 Sheet 1 of 2 EC-40444 (Continued) Section 15.6.3.2.1.2 Section 15.6.3.3.6 Table 15.6-3 Sheet 1 of 2 Table 15.6-18A Sheet 1 of 3 Table 15.6-26 Sheet 1 of 2 
WSES-FSAR-UNIT-317-iCHAPTER 17QUALITY ASSURANCETABLE OF CONTENTSSectionTitlePage17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-317.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTIONThis section is not applicable to FSAR.
WSES-FSAR-UNIT-317.2-117.2QUALITY ASSURANCE DURING OPERATIONSThis section is covered in a separate Quality Assurance Program Manual which has beensubmitted to the NRC.
}}
}}

Revision as of 00:46, 6 May 2018

Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Table of Contents
ML16256A121
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A121 (298)


Text

WSES-FSAR-UNIT-3 1-i Revision 11-A (02/02) CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT TABLE OF CONTENTS Section Title Page

1.0 INTRODUCTION

AND GENERAL DESCRIPTION OF PLANT 1.1-1

1.1 INTRODUCTION

1.1-1 1.2 GENERAL PLANT DESCRIPTION 1.2-1 1.2.1 PRINCIPAL SITE CHARACTERISTICS 1.2-1 (DRN 01-758, R11-A) 1.2.2 CONCISE PLANT DESCRIPTION 1.2-2 (DRN 01-758, R11-A) 1.3 COMPARISONS 1.3-1 1.3.1 COMPARISONS WITH SIMILAR FACILITY DESIGNS 1.3-1 1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION 1.3-1

1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4-1 1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION 1.5-1 1.5.1 FRETTING AND VIBRATIONS TESTS OF FUEL ASSEMBLIES 1.5-1

1.5.2 DEPARTURE FROM NUCLEATE BOILING (DNB) TESTING 1.5-1

1.5.3 FUEL ASSEMBLY STRUCTURAL TESTS 1.5-1

1.5.4 FUEL ASSEMBLY FLOW MIXING TESTS 1.5-2

1.5.5 REACTOR FLOW MODEL TESTING AND EVALUATION 1.5-2

1.5.6 FUEL ASSEMBLY FLOW TESTS 1.5-3

1.5.7 CONTROL ELEMENT DRIVE MECHANISM (CEDM) TESTS 1.5-3 1.5.8 DNB IMPROVEMENT 1.5-4

1.5 REFERENCES

1.5-4 1.6 MATERIAL INCORPORATED BY REFERENCE 1.6-1 1.7 ELECTRICAL, INSTRUMENTATION, AND CONTROL DRAWINGS 1.7-1 WSES-FSAR-UNIT-3 1-ii CHAPTER 1 TABLE OF CONTENTS (Cont'd)

Section Title Page 1.8 COMPARISON OF WATERFORD 3 DESIGN WITH NRC REGULATORY 1.8-1 GUIDES 1.

8.1 INTRODUCTION

1.8-1

1.9 THREE MILE ISLAND - 2 (TMI-2) ACTION PLAN REQUIREMENTS 1.9-1 FOR APPLICANTS FOR AN OPERATING LICENSE 1.9.1 SHIFT TECHNICAL ADVISOR (I.A.1.1) 1.9-1 1.9.2 SHIFT SUPERVISOR ADMINISTRATIVE DUTIES (I.A.1.2) 1.9-1 1.9.3 SHIFT MANNING (I.A.1.3) 1.9-2

1.9.4 IMMEDIATE UPGRADING OF REACTOR OPERATOR AND SENIOR 1.9-2 REACTOR OPERATOR TRAINING AND QUALIFICATIONS (I.A.2.1) 1.9.5 ADMINISTRATION OF TRAINING PROGRAMS (I.A.2.3) 1.9-2 1.9.6 REVISE SCOPE AND CRITERIA FOR LICENSING EXAMINATIONS 1.9-3 (I.A.3.1)

1.9.7 INDEPENDENT SAFETY ENGINEERING GROUP (I.B.1.2) 1.9-3

1.9.8 SHORT-TERM ACCIDENT ANALYSIS AND PROCEDURE REVISION 1.9-4 (I.C.1)

1.9.9 SHIFT RELIEF AND TURNOVER PROCEDURES (I.C.2) 1.9-5 1.9.10 SHIFT SUPERVISOR RESPONSIBILITIES (I.C.3) 1.9-5 1.9.11 CONTROL ROOM ACCESS (I.C.4) 1.9-5

1.9.12 PROCEDURES FOR FEEDBACK OF OPERATING EXPERIENCE TO 1.9-6 PLANT STAFF (I.C.5)

1.9.13 GUIDANCE ON PROCEDURES FOR VERIFYING CORRECT PER- 1.9-7 FORMANCE OF OPERATING ACTIVITIES (I.C.6)

1.9.14 NSSS VENDOR REVIEW OF PROCEDURES (I.C.7) 1.9-7 1.9.15 CONTROL ROOM DESIGN REVIEWS (I.D.1) 1.9-8

1.9.16 PLANT SAFETY PARAMETER DISPLAY SYSTEM (I.D.2) 1.9-8

WSES-FSAR-UNIT-3 1-iii Revision 11-A (02/02) CHAPTER 1 TABLE OF CONTENTS (Cont'd)

Section Title Page 1.9-17 TRAINING DURING LOW-POWER TESTING (I.G.1) 1.9-9 1.9.18 REACTOR COOLANT SYSTEM VENTS (II.B.1) 1.9-9

1.9.19 DESIGN REVIEW OF PLANT SHIELDING AND ENVIRONMENTAL 1.9-10 QUALIFICATION OF EQUIPMENT FOR SPACES/SYSTEMS WHICH MAY BE USED IN POST-ACCIDENT OPERATIONS (II.B.2)

1.9.20 POST-ACCIDENT SAMPLING CAPABILITY (II.B.3) 1.9-11

1.9.21 TRAINING FOR MITIGATING CORE DAMAGE (II.B.4) 1.9-11 1.9.22 PERFORMANCE TESTING OF BOILING-WATER REACTOR AND 1.9-12 PRESSURIZED-WATER REACTOR RELIEF AND SAFETY VALVES (II.D.1)

1.9.23 DIRECT INDICATION OF RELIEF-AND-SAFETY-VALVE POSITION 1.9-12 (II.D.3)

1.9.24 AUXILIARY FEEDWATER SYSTEM EVALUATION (II.E.1.1) 1.9-13

1.9.25 AUXILIARY FEEDWATER SYSTEM AUTOMATIC INITIATION AND 1.9-14 FLOW INDICATION (II.E.1.2)

1.9.26 EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS 1.9-15 (II.E.3.1)

1.9.27 DEDICATED HYDROGEN PENETRATIONS (II.E.4.1) 1.9-16

1.9.28 CONTAINMENT ISOLATION DEPENDABILITY (II.E.4.2) 1.9-17 1.9.29 ADDITIONAL ACCIDENT-MONITORING INSTRUMENTATION 1.9-19 (II.F.1)

1.9.30 INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE 1.9-28 COOLING (II.F.2)

1.9.31 EMERGENCY POWER FOR PRESSURIZER EQUIPMENT (II.G.1) 1.9-28 1.9.32 IE BULLETINS ON MEASURES TO MITIGATE SMALL-BREAK LOCAs 1.9-28 AND LOSS OF FEEDWATER ACCIDENTS (II.K.1) (DRN 01-758, R11-A) 1.9.33 ORDERS ON B&W PLANTS (II.K.2) 1.9-29 (DRN 01-758, R11-A) 1.9.34 FINAL RECOMMENDATIONS OF B&O TASK FORCE (II.K.3) 1.9-31 WSES-FSAR-UNIT-3 1-iv Revision 11-A (02/02) CHAPTER 1 TABLE OF CONTENTS (Cont'd)

Section Title Page 1.9.35 EMERGENCY PREPAREDNESS - SHORT TERM (III.A.1.1) 1.9-35

1.9.36 UPGRADE EMERGENCY SUPPORT FACILITIES (III.A.1.2) 1.9-35

1.9.36a IMPROVING LICENSEE EMERGENCY PREPAREDNESS - LONG 1.9-36 TERM (III.A.2)

1.9.37 INTEGRITY OF SYSTEMS OUTSIDE CONTAINMENT LIKELY TO 1.9-36 CONTAIN RADIOACTIVE MATERIAL FOR PRESSURIZED-WATER REACTORS AND BOILING-WATER REACTORS (III.D.1.1) 1.9.38 IMPROVED INPLANT IODINE INSTRUMENTATION UNDER 1.9-40 ACCIDENT CONDITIONS (III.D.3.3)

1.9.39 CONTROL-ROOM HABITABILITY REQUIREMENTS (III.D.3.4) 1.9-43 (DRN 01-758, R11-A) 1.9A RESPONSE TO SECTION II.F.2 OF NUREG-0737 1.9A-1 INADEQUATE CORE COOLING INSTRUMENTATION (DRN 01-758, R11-A) 1.9A.1 INTRODUCTION 1.9A-1

1.9A.2 FUNCTIONAL DESCRIPTION OF ICCI 1.9A-2

1.9A.3 ICCI SENSOR DESIGN DESCRIPTION 1.9A-3

1.9A.4 SIGNAL PROCESSING AND DISPLAY 1.9A-7

1.9A.5 SYSTEM VERIFICATION TESTING 1.9A-12

1.9A.6 ICCI SYSTEM QUALIFICATION 1.9A-13

1.9A.7 OPERATING INSTRUCTIONS 1.9A-13

1.9A.8 COMPARISON OF DOCUMENTATION REQUIREMENTS WITH 1.9A-14 THIS REPORT

1.9A.9 SCHEDULE FOR ICCI IMPLEMENTATION 1.9A-14

1.9A REFERENCES 1.9A-15 1A FSAR ACRONYMS 1A-1

WSES-FSAR-UNIT-3 1-v Revision 11-A (02/02) CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT LIST OF TABLES Table Title (DRN 01-758, R11-A) 1.3-1 PLANT PARAMETER COMPARISON FOR WATERFORD 3 CYCLE 1 (DRN 01-758, R11-A) 1.7-1 ELECTRICAL, INSTRUMENTATION AND CONTROL DRAWINGS

1.9-1 TMI-RELATED REQUIREMENTS FOR NEW OPERATING LICENSES

1.9-2 TMI INFORMATION REQUIRED FOR CONTROL-ROOM HABITABILITY EVALUATION (TASK ACTION PLAN ITEM III.D.3.4) 1.9-3 CONTAINMENT ISOLATION VALVES PROVIDED WITH CAPABILITY FOR MANUAL OVERRIDE

1.9-4 ADDITIONAL ACCIDENT MONITORING INSTRUMENTATION

1.9A-1 DEFINITION OF ICC EVENT PROGRESSION INTERVALS 1.9A-2 COMPARISON OF ICCI TO DOCUMENTATION REQUIREMENTS OF ITEM II.F.2 OF NUREG-0737

1.9A-3 COMPARISON OF ICCI TO ATTACHMENT 1 OF II.F.2

1.9A-4 COMPARISON OF ICCI TO APPENDIX B OF NUREG-0737

WSES-FSAR-UNIT-3 1-vi Revision 11-A (02/02) CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT LIST OF FIGURES Figure Title 1.2-1 PLOT PLAN

1.2-2 SITE PLAN

1.2-3 GENERAL ARRANGEMENT TURBINE BUILDING GROUND FLOOR - PLAN

1.2-4 GENERAL ARRANGEMENT TURBINE BUILDING MEZZANINE FLOOR - PLAN

1.2-5 GENERAL ARRANGEMENT TURBINE BUILDING OPERATING FLOOR - PLAN

1.2-6 GENERAL ARRANGEMENT TURBINE BUILDING - SECTION

1.2-7 GENERAL ARRANGEMENT TURBINE BUILDING - SECTIONS

1.2-8 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL + 46.00' 1.2-9 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL + 21.00' 1.2-10 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL - 4.00' 1.2-11 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN EL - 35.00' 1.2-12 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - SECTION

1.2-13 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - SECTION (DRN 01-758, R11-A) 1.2-14 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - (SH. 3) (DRN 01-758, R11-A) 1.2-15 GENERAL ARRANGEMENT FUEL HANDLING BUILDING - PLANS

1.2-16 GENERAL ARRANGEMENT FUEL HANDLING BUILDING - SECTIONS

1.2-17 GENERAL ARRANGEMENT REACTOR BUILDING PLAN - EL + 46.00' (DRN 01-758, R11-A) 1.2-18 GENERAL ARRANGEMENT REACTOR BUILDING - PLAN - EL + 21.00' (DRN 01-758, R11-A) 1.2-19 GENERAL ARRANGEMENT REACTOR BUILDING - PLAN EL - 4.00' (DRN 01-758, R11-A) 1.2-20 GENERAL ARRANGEMENT REACTOR BUILDING - SECTION (SHEET 1)

1.2-21 GENERAL ARRANGEMENT REACTOR BUILDING - SECTION (SH 2) (DRN 01-758, R11-A) 1.2-22 GENERAL ARRANGEMENT REACTOR BUILDING - SECTIONS (DRN 01-758, R11-A) 1.2-23 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING - PLANS AND SECTIONS - (SHEET 4) (DRN 01-758, R11-A)

WSES-FSAR-UNIT-3 1-vii CHAPTER 1 LIST OF FIGURES (Cont'd)

Figure Title 1.2-24 GENERAL ARRANGEMENT COOLING TOWERS - PLAN

1.2-25 GENERAL ARRANGEMENT COOLING TOWERS - SECTIONS

1.9-1 DELETED

1.9-2 DELETED

1.9-3 BLOCK DIAGRAM, WIDE-RANGE GAS MONITOR

1.9-4 DETECTOR RANGES, WIDE-RANGE GAS MONITOR

1.9A-1 DEFINITION OF INTERVALS IN EVENT PROGRESSION 1.9A-2 ICC INSTRUMENTATION SYSTEM

1.9A-3 HJTC SENSOR

1.9A-4 HJTC SPLIT PROBE DESIGN CONFIGURATION

1.9A-5 HJTC SENSOR AXIAL LOCATIONS

1.9A-6 INADEQUATE CORE COOLING REACTOR VESSEL LEVEL CABLE ROUTING 1.9A-7 CORE EXIT TEMPERATURE MEASUREMENT SCHEME

1.9A-8 CORE EXIT THERMOCOUPLE CORE LOCATIONS

1.9A-9 INADEQUATE CORE COOLING CORE EXIT THERMOCOUPLES CABLE ROUTING 1.9A-10 HJTC LEVEL LOGIC

1.9A-11 HEATER POWER CONTROL LOGIC

WSES-FSAR-UNIT-3 1-viii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 1 Section Cross References

Revision 12-B None

Revision 12-C Page 1A-7 ER-W3-2003-0249-000/DRN 03-657 Page 1.9-4 Revision 13 Page 1.9A-6 ER-W3-2003-0681/DRN 03-1872

Revision 13-A Section 1.1 ER-W3-2000-1018-009/DRN 04-1302

Revision 13-B Figure 1.2-3 ER-W3-2004-0500/DRN 04-1514

Section 1.7 ER-W3-2004-0502/DRN 04-1444 Table 1.7-1

Revision 14 Section 1.1 ER-W3-2001-1149-000/DRN 03-2054 Section 1.2.1.3 Section 1.2.2.1.1 Section 1.2.2.1.2 Section 1.2.2.9 Section 1.6 Section 1.8.1.46 Section 1.8.1.145 Section 1.9.28 Section 1.9A.1.1 Section 1.9A.2.3 Section 1.9A.3.1 Section 1.9A.3.3 Section 1.9A.4.1.1 Section 1.9A.4.1.2 Section 1.9A.4.1.3 Section 1.9A.6

Figure 1.2-4 ER-W3-2002-0602-001/DRN 03-1184 Figure 1.9A-5 ER-W3-2004-0137-000/DRN 04-1958

WSES-FSAR-UNIT-3 1-ix Revision 304 (06/10) UPDATE REFERENCE LIST Chapter 1 Section Cross References Revision 14 Cont'd Section 1.2.2.2 ER-W3-2004-0276-000/DRN 04-1619 Section 1.8.1.4 Section 1.8.1.24 Section 1.8.1.25 Section 1.8.1.77 Section 1.8.1.183 Section 1.9.28 Section 1.9.37 Section 1.9.39

Revision 14-A Section 1.9.37 ER-W3-2005-0378-000/DRN 05-1265 Revision 14-B Figure 1.2-7 ER-W3-2005-0442-000/DRN 06-278 Revision 15 Appendix 1A ER-W3-2006-0210-000/DRN 06-623

Section 1.8.1.46 ER-W3-2006-0258-000/DRN 06-802 Section 1.2.2.1.1 ER-W3-2005-0447-004/DRN 06-1058

Revision 301 Figure 1.2-18 EC-1396

Section 1.8.1.23 EC-1837

Section 1.8.1.45 EC-5000082437

Table 1.9-2 Sh. 1 EC-5000082445

Revision 302 Figure 1.9A-5 EC-6607

Revision 303 Figure 1.2-17 EC-8039

Revision 304 Figure 1.9A-5 EC-10453

Section 1.5.2 EC-13881 Section 1.6

Section 1.2.2.3.1 EC-15702 WSES-FSAR-UNIT-3 1-x Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 1 Section Cross References Revision 304 Cont'd Section 1.2.2.6 EC-16212

Section 1.9A.3.3 EC-18688 Section 1.9A.4 Section 1.9A.4.1.3 Figure 1.9A-8

Revision 305 Figure 1.2-4 EC-8038

Section 1.6 EC-19087 Section 1.8.45

Section 1.8.1.133 EC-26965

Revision 306 Section 1.9.29 EC-12329 Section 1.9A.4 Section 1.9A.4.2 Table 1.9A-3 Table 1.9A-4 (Sheet 1)

Appendix 1A EC-14275 Section 1.2.2.6

Figure 1.2-18 EC-17580

Revision 307 Section 1.2.2.1.2 EC-1020

Table 1.7-1 EC-2800 Section 1.8.1.31

Section 1.8.1.83 EC-8458

Figure 1.2-17 EC-27161 Figure 1.2-20

Section 1.2.2.1.1 EC-30663

Section 1.9.24 EC-33720

Section 1.8.1.40 EC-40281

Revision 308 Section 1.8.1.9 LBDRC 14-010

Section 1.8.1.143 EC 47424

WSES-FSAR-UNIT-3 1-xi Revision 309 (06/16) Chapter 1

Section Cross References Revision 308 Cont'd Section 1.9.2 LBDCR 13-015 Section 1.9.7 Section 1.9.10

Revision 308A Section 1.9 LBDCR 15-028

Revision 309 Section 1.9.13 LBDCR 15-027 Section 1.9.17 LBDCR 13-014

WSES-FSAR-UNIT-3 2-i Revision 307 (07/13) SITE CHARACTERISTICS CHAPTER 2 TABLE OF CONTENTS Section Title Page

2.0 SITE CHARACTERISTICS 2.1-1 2.1 GEOGRAPHY AND DEMOGRAPHY 2.1-1 2.1.1 SITE LOCATION AND DESCRIPTION 2.1-1 2.1.2 EXCLUSION AREA AUTHORITY AND CONTROL 2.1-3 2.1.3 POPULATION DISTRIBUTION 2.1-5

2.1 REFERENCES

2.1-24

NEARBY INDUSTRIAL, TRANSPORTATION AND MILITARY 2.2-1 FACILITIES 2.2.1 LOCATIONS AND ROUTES 2.2-1

2.2.2 DESCRIPTIONS 2.2-1 (EC-39014, R307) 2.2.3 EVALUATION OF POTENTIAL ACCIDENTS 2.2-11 (EC-39014, R307)

2.2 REFERENCES

2.2-57 2.2A EVALUATION OF ACTUAL HAZARDOUS CHEMICAL RELEASES 2.2A-1 POSTULATED TO OCCUR NEAR THE WATERFORD 3 SITE 2.2A.1 ANALYSIS OF THE POSSIBLE CONSEQUENCES OF THE 2.2A-1 LIVINGSTON, LOUISIANA DERAILMENT ACCIDENT ON THE WATERFORD 3 PLANT

2.2A.2 ANALYSIS OF THE POTENTIAL CONSEQUENCES OF THE 2.2A-7 DECEMBER 11, 1982 EXPLOSION AT THE UNION CARBIDE PLANT ON WSES-3

2.2A REFERENCES 2.2A-10

2.3 METEOROLOGY 2.3-1 2.3.1 REGIONAL CLIMATOLOGY 2.3-1

2.3.2 LOCAL METEOROLOGY 2.3-6

2.3.3 ONSITE METEOROLOGICAL MEASUREMENTS PROGRAM 2.3-9

WSES-FSAR-UNIT-3 2-ii CHAPTER 2 TABLE OF CONTENTS (Cont'd) Section Title Page

2.3.4 SHORT-TERM (ACCIDENT) DIFFUSION ESTIMATES 2.3-17 2.3.5 LONG TERM (ROUTINE) DIFFUSION ESTIMATES 2.3-20

2.3 REFERENCES

2.3-22

2.4 HYDROLOGIC ENGINEERING 2.4-1 2.4.1 HYDROLOGIC DESCRIPTION 2.4-1

2.4.2 FLOODS 2.4-5

2.4.3 PROBABLE MAXIMUM FLOOD (PMF) ON STREAMS AND 2.4-12 RIVERS

2.4.4 POTENTIAL DAM FAILURES, SEISMICALLY INDUCED 2.4-20 2.4.5 PROBABLE MAXIMUM SURGE AND SEICHE FLOODING 2.4-20

2.4.6 PROBABLE MAXIMUM TSUNAMI FLOODING 2.4-32

2.4.7 ICE EFFECTS 2.4-32

2.4.8 COOLING WATER CANALS AND RESERVOIRS 2.4-33 2.4.9 CHANNEL DIVERSIONS 2.4-33

2.4.10 FLOODING PROTECTION REQUIREMENTS 2.4-33 2.4.11 LOW WATER CONSIDERATION 2.4-34

2.4.12 DISPERSION, DILUTION, AND TRAVEL TIMES OF 2.4-36 ACCIDENTAL RELEASES OF LIQUID EFFLUENTS IN SURFACE WATERS

2.4.13 GROUNDWATER 2.4-37

2.4.14 TECHNICAL SPECIFICATIONS AND EMERGENCY OPERATION 2.5-51 REQUIREMENTS

2.4 REFERENCES

2.4-52

2.5 GEOLOGY AND SEISMOLOGY 2.5-1 2.5.1 BASIC GEOLOGIC AND SEISMIC INFORMATION 2.5-2

2.5.2 VIBRATORY GROUND MOTION 2.5-41

WSES-FSAR-UNIT-3 2-iii CHAPTER 2 TABLE OF CONTENTS (Cont'd)

Section Title Page

2.5.3 SURFACE FAULTING 2.5-52

2.5.4 STABILITY OF SUBSURFACE MATERIALS 2.5-58

2.5.5 STABILITY OF SLOPES 2.5-103

2.5.6 EMBANKMENTS AND DAMS 2.5-103

2.5 REFERENCES

2.5-104

2.5 BIBLIOGRAPHY 2.5-111

2.5A LABORATORY TESTING 2.5A-1 2.5A GENERAL SAMPLE HANDLING 2.5A-1 2.5A.1 CLASSIFICATION TESTS 2.5A-1

2.5A.2 STRENGTH TESTS 2.5A-2

2.5A.3 CONSOLIDATION TESTS 2.5A-4

2.5A.4 ELASTIC PROPERTIES 2.5A-4

2.5A.5 LIQUEFACTION TESTS 2.5A-5

2.5A.6 SUMMARY OF TESTS RESULTS 2.5A-5

2.5B BORING LOGS 2.5B-1 2.5C PROCEDURE FOR SOILS CONTROL AND FILTER 2.5C-0 AND BACKFILL SPECIFICATION

WSES-FSAR-UNIT-3 2-iv CHAPTER 2 SITE CHARACTERISTICS LIST OF TABLES Table Title

2.1-1 Resident Population Within 50 Miles of Waterford 3

2.1-2 Towns With Over 1,000 Persons Within 10 Miles of Waterford 3

2.1-3 Cities, Towns, and Communities With Over 10,000 Persons Within 50 Miles of Waterford 3

2.1-4 Total Estimated Peak Daily And Seasonal Transient Population 1977 and 2030

2.1-5 Peak Daily and Seasonal Transient Population Within 10 Miles Of Waterford 3

2.1-6 Estimated Average Sunday Participation In Recreational Activity Within 10 Miles of Waterford 3

2.1-7 Combined Daily And Seasonal Recreational Transient Population Within 10 Miles Of Waterford 3

2.1-8 Transportation Transient Population Within 10 Miles Of Waterford 3 (passengers per day)

2.1-9 Peak Daily Industrial Employment Within 10 Miles Of Waterford 3

2.1-10 Cumulative Population Density By Sectors Within 30 Miles Of Waterford Unit 3, 1981

2.1-11 Cumulative Population Density By Sectors Within 30 Miles of Waterford Unit 3, 2030

2.1-12 Major Transportation Facilities Within the LPZ

2.1-13 1977 Peak Daily Population Distribution Within The Low Population Zone

2.1-14 Summary Comparison Of Demographic Methodologies

2.1-15 Correlation And Regression Of Growth Rates Versus Development Suitability Within Five Miles Of Waterford 3, 1973-1977

2.1-16 Probability Of Residential Development Within Different Levels Of Development Suitability

WSES-FSAR-UNIT-3 2-v Revision 307 (07/13) CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.2-1 Major Industries Within Five Miles Of Waterford 3

2.2-2 Truck Traffic Accidents In The Vicinity Of Waterford 3 (1974-1986) 2.2-3 Products Used, Produced, Stored, By Industries Within Five Miles Of Waterford 3 (EC-5000082218, R301) 2.2-3a Industrial Facilities Storing Significant Quantities of Toxic Materials Within Five Miles of Waterford 3

2.2-3b Hazardous Materials Stored or Processed in the Waterford 3 Vicinity 2.2-3c Hazardous Materials Shipped on the Mississippi River by Industrial Facilities in the Waterford 3 Vicinity (EC-39014, R307) 2.2-3d Hazardous Materials Carried on Union Pacific Railroad in 2011 in the Vicinity of Waterford 3

2.2-3e Hazardous Materials Carried Through Good Hope, LA in 2011 on Canadian National Railway

2.2-3f Hazardous Materials Carried on Kansas City Southern Railway Through St. Charles Parish in 2011 (EC-39014, R307) (EC-38835, R307) 2.2-3g Hazardous Materials Shipped by Truck on Louisiana Highway 18 in Waterford 3 Vicinity (EC-38835, R307) 2.2-4 Deleted 2.2-4a Materials Transported New Waterford 3 Posing Potential Hazards

2.2-4b Deleted (EC-39014, R307) 2.2-5 Hazardous Freight Transported on the Mississippi River Between River Miles 123 and 137 in 2010 (EC-39014, R307) 2.2-6 Major Pipelines Carrying Hazardous Materials Within Two Miles of Waterford 3 2.2-7 Oil And Gas Fields Within Five Miles Of Waterford 3 (EC-5000082218, R301) 2.2-8 Trips and Drafts Of Vessels On The Mississippi River, Between Baton Rouge To, But Not Including, New Orleans, La., 1975

2.2-9 Commercial Vessel Casualties On The Mississippi River Between Mile 124 and 135 Reported In Fiscal Year 1976

2.2-10 Mississippi River Terminals, Docks, Mooring Locations And Warehouses In The Vicinity Of Waterford 3

2.2-11 Forecast Of Aircraft Operations For The St. John The Baptist Parish Airport WSES-FSAR-UNIT-3 2-vi Revision 307 (07/13) CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.2-12 Aircraft Operations For New Orleans International Airport 2.2-13 Aircraft Operations Forecasts For New Orleans International Airport

2.2-14 Aircraft Accidents Occurring On Or Within Five Miles Of New Orleans International Airport, 1966-1976

2.2-15 Vessel Casualties On The Mississippi River Between New Orleans And Baton Rouge Fiscal Years 1969-1971

2.2-16 Time and Drafts Of Vessels Mississippi River - Baton Rouge, La.,

But Not Including New Orleans, La., 1970

2.2-17 Rail, Truck And Barge Accident Probability

2.2-18 Centerline Concentrations For Methane Plume Of 67 LBM/Sec Source, Stability Class F, Wind Speed 2.6 Ft./Sec Assuming No Buoyancy 2.2-19 Releases From Ruptured Pipelines

2.2-20 Dimension of Propane Plume Downwind of 325 Ft3/Sec Source (6 In. LPG Line) Stability Category F, Wind Speed 2.6 Ft/Sec

2.2-21 Dimension of Propane Plume Downwind of 1000 Ft/Sec Source, (8 In. LPG Line) Stability Category F, Wind Speed 2.6 Ft/Sec

2.2-22 Blast And Seismic Parameters For Shock Waves From Propane Detonations (EC-38835, R307) 2.2-23 Dimension Of Methane Plume Downwind Of 2893 Ft3/Sec Source Stability Category F, Wind Speed 2.6 Ft/Sec. No Buoyancy (EC-38835, R307) 2.2A-1 Toxic Chemicals Lost In Train Derailment 2.2A-2 Chemical Released In Derailment Posing Potential Hazards To Control Room Habitability

2.2A-3 Waterford Steam Electric Station Unit 3 Onsite Meteorological Data: 1972-1978 Summary of Maximum Persistence Occurrences 2.2A-4 Calculational Assumptions Used in Acrolein Release Analysis 2.3-1 Recurrence Interval And Wind Speed (Fastest Mile) At New Orleans, Louisiana (At 30 Ft.)

2.3-2 Fastest Mile Wind Speed And Wind Direction New Orleans, Louisiana WSES-FSAR-UNIT-3 2-vii CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-2(a) Ultimate Heat Sink Meteorological Design Parameters

2.3-3 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-4 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-5 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-6 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-7 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-8 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-9 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-10 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-11 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-12 New Orleans, La. Moisant International Airport Percentage Frequencies Of Wind Direction And Speed

2.3-13 New Orleans, La. Moisant International Airport Percentage Frequencies of Wind Direction and Speed

2.3-14 New Orleans, La. Moisant International Airport Percentage Frequencies of Wind Direction and Speed

2.3-15 New Orleans, La. Moisant International Airport Percentage Frequencies of Wind Direction and Speed

2.3-15a New Orleans, La. Moisant International Airport Percentage Frequencies of Wind Direction and Speed

2.3-16 [Wind Rose Data for January] 1973-1975 and 1978 at Waterford 3 Site 2734. Observations

WSES-FSAR-UNIT-3 2-viii CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-17 [Wind Rose Data for February] 1973-1975 and 1977-1978 at Waterford 3 Site 2585. Observations

2.3-18 [Wind Rose Data for March] 1973-1975 and 1977 at Waterford 3 Site 2706. Observations

2.3-19 [Wind Rose Data for April] 1973-1975 and 1977 at Waterford 3 Site 2751. Observations

2.3-20 [Wind Rose Data for May] 1973-1975 and 1977 at Waterford 3 Site 2790. Observations

2.3-21 [Wind Rose Data for June] 1973-1975 and 1977 at Waterford 3 Site 2716. Observations

2.3-22 [Wind Rose Data for July] 1972-1974 and 1977 at Waterford 3 Site 2886. Observations

2.3-23 [Wind Rose Data for August] 1972-1974 and 1977 at Waterford 3 Site 2746. Observations

2.3-24 [Wind Rose Data for September] 1972-1974 and 1977 at Waterford 3 Site 2616. Observations

2.3-25 [Wind Rose Data for October] 1972-1974 and 1977 at Waterford 3 Site 2647. Observations

2.3-26 [Wind Rose Data for November] 1972-1974 and 1977 at Waterford 3 Site 2731. Observations

2.3-27 [Wind Rose Data for December] 1972-1974 and 1977 at Waterford 3 Site 2843. Observations

2.3-28 Annual Wind Rose Data for July 1972-June 1975 and February 1977-February 1978 at Waterford 3 Site 32751. Observations

2.3-29 Average Monthly And Annual Temperature For Selected Stations In The New Orleans Areas (1931-1960)

2.3-30 Mean Monthly And Annual Maximum, Minimum, Average Temperatures Moisant International Airport (1931-1960)

2.3-31 Temperature Extremes, Moisant International Airport, New Orleans, Louisiana

2.3-32 Average Monthly Occurrences Of Extreme Temperatures Moisant International Airport, New Orleans, Louisiana (1947-1972)

WSES-FSAR-UNIT-3 2-ix CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-33 Mean Monthly And Annual Maximum, Minimum And Average Temperatures Waterford Nuclear Unit 3 On Site Data (July 1972-June 1975 And February 1977-February 1978)

2.3-34 Mean Relative Humidity And Number Of Days With Heavy Fog Moisant International Airport, New Orleans, Louisiana (1949-1972)

2.3-35 Average Monthly And Annual Precipitation For Selected Stations In The New Orleans Areas (1931-1960)

2.3-36 Extreme Monthly And Daily Precipitation (Inches) (1947-1972) And Mean Number Of Days With Rain (1947-1972) Moisant International Airport, New Orleans, Louisiana

2.3-37 Maximum Short Period Precipitation (Inches) Audubon Station, New Orleans, Louisiana (1889-1969)

2.3-38 Number Of Precipitation Occurrences By Hour Of Day For Moisant International Airport (1951-1960)

2.3-39 Annual And Seasonal Percentage Frequency Of Surface Wind Direction During Precipitation Naval Air Station-New Orleans, Louisiana, (1949-1965)

2.3-40 Percent Frequency Of Onsite Stability Classes July 1972 -

June 1975 And February 1977 - February 1978

2.3-41 Seasonal And Annual Average Morning And Afternoon Mixing Heights Waterford Area

2.3-42 Wind Distribution By Stability Class At Waterford 3, January Class A

2.3-43 Wind Distribution By Stability Class At Waterford 3, January Class B

2.3-44 Wind Distribution By Stability Class At Waterford 3, January Class C

2.3-45 Wind Distribution By Stability Class At Waterford 3, January Class D

2.3-46 Wind Distribution By Stability Class At Waterford 3, January Class E

2.3-47 Wind Distribution By Stability Class At Waterford 3, January Class F WSES-FSAR-UNIT-3 2-x CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-48 Wind Distribution By Stability Class At Waterford 3, January Class G

2.3-49 Wind Distribution By Stability Class At Waterford 3, February Class A

2.3-50 Wind Distribution By Stability Class At Waterford 3, February Class B

2.3-51 Wind Distribution By Stability Class At Waterford 3, February Class C

2.3-52 Wind Distribution By Stability Class At Waterford 3, February Class D

2.3-53 Wind Distribution By Stability Class At Waterford 3, February Class E

2.3-54 Wind Distribution By Stability Class At Waterford 3, February Class F

2.3-55 Wind Distribution By Stability Class At Waterford 3, February Class G

2.3-56 Wind Distribution By Stability Class At Waterford 3, March Class A

2.3-57 Wind Distribution By Stability Class At Waterford 3, March Class B

2.3-58 Wind Distribution By Stability Class At Waterford 3, March Class C

2.3-59 Wind Distribution By Stability Class At Waterford 3, March Class D

2.3-60 Wind Distribution By Stability Class At Waterford 3, March Class E

2.3-61 Wind Distribution By Stability Class At Waterford 3, March Class F

2.3-62 Wind Distribution By Stability Class At Waterford 3, March Class G

2.3-63 Wind Distribution By Stability Class At Waterford 3, April Class A WSES-FSAR-UNIT-3 2-xi CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-64 Wind Distribution By Stability Class At Waterford 3, April Class B

2.3-65 Wind Distribution By Stability Class At Waterford 3, April Class C

2.3-66 Wind Distribution By Stability Class At Waterford 3, April Class D

2.3-67 Wind Distribution By Stability Class At Waterford 3, April Class E

2.3-68 Wind Distribution By Stability Class At Waterford 3, April Class F

2.3-69 Wind Distribution By Stability Class At Waterford 3, April Class G

2.3-70 Wind Distribution By Stability Class At Waterford 3, May Class A

2.3-71 Wind Distribution By Stability Class At Waterford 3, May Class B

2.3-72 Wind Distribution By Stability Class At Waterford 3, May Class C

2.3-73 Wind Distribution By Stability Class At Waterford 3, May Class D

2.3-74 Wind Distribution By Stability Class AT Waterford 3, May Class E

2.3-75 Wind Distribution By Stability Class AT Waterford 3, May Class F

2.3-76 Wind Distribution By Stability Class At Waterford 3, May Class G

2.3-77 Wind Distribution By Stability Class At Waterford 3, June Class A

2.3-78 Wind Distribution By Stability Class At Waterford 3, June Class B

2.3-79 Wind Distribution By Stability Class At Waterford 3, June Class C WSES-FSAR-UNIT-3 2-xii CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-80 Wind Distribution By Stability Class At Waterford 3, June Class D

2.3-81 Wind Distribution By Stability Class At Waterford 3, June Class E

2.3-82 Wind Distribution By Stability Class At Waterford 3, June Class F

2.3-83 Wind Distribution By Stability Class At Waterford 3, June Class G

2.3-84 Wind Distribution By Stability Class At Waterford 3, July Class A

2.3-85 Wind Distribution By Stability Class At Waterford 3, July Class B

2.3-86 Wind Distribution By Stability Class At Waterford 3, July Class C

2.3-87 Wind Distribution By Stability Class At Waterford 3, July Class D

2.3-88 Wind Distribution By Stability Class At Waterford 3, July Class E

2.3-89 Wind Distribution By Stability Class At Waterford 3, July Class F

2.3-90 Wind Distribution By Stability Class At Waterford 3, July Class G

2.3-91 Wind Distribution By Stability Class At Waterford 3, August Class A

2.3-92 Wind Distribution By Stability Class At Waterford 3, August Class B

2.3-93 Wind Distribution By Stability Class At Waterford 3, August Class C

2.3-94 Wind Distribution By Stability Class At Waterford 3, August Class D

2.3-95 Wind Distribution By Stability Class At Waterford 3, August Class E WSES-FSAR-UNIT-3 2-xiii CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-96 Wind Distribution By Stability Class At Waterford 3, August Class F

2.3-97 Wind Distribution By Stability Class At Waterford 3, August Class G

2.3-98 Wind Distribution By Stability Class At Waterford 3, September Class A

2.3-99 Wind Distribution By Stability Class At Waterford 3, September Class B

2.3-100 Wind Distribution By Stability Class At Waterford 3, September Class C

2.3-101 Wind Distribution By Stability Class At Waterford 3, September Class D

2.3-102 Wind Distribution By Stability Class At Waterford 3, September Class E

2.3-103 Wind Distribution By Stability Class At Waterford 3, September Class F

2.3-104 Wind Distribution By Stability Class At Waterford 3, September Class G

2.3-105 Wind Distribution By Stability Class At Waterford 3, October Class A

2.3-106 Wind Distribution By Stability Class AT Waterford 3, October Class B

2.3-107 Wind Distribution By Stability Class At Waterford 3, October Class C

2.3-108 Wind Distribution By Stability Class At Waterford 3, October Class D

2.3-109 Wind Distribution By Stability Class At Waterford 3, October Class E

2.3-110 Wind Distribution By Stability Class At Waterford 3, October Class F

2.3-111 Wind Distribution By Stability Class At Waterford 3, October Class G WSES-FSAR-UNIT-3 2-xiv CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-112 Wind Distribution By Stability Class At Waterford 3, November Class A

2.3-113 Wind Distribution By Stability Class At Waterford 3, November Class B

2.3-114 Wind Distribution By Stability Class At Waterford 3, November Class C

2.3-115 Wind Distribution By Stability Class At Waterford 3, November Class D

2.3-116 Wind Distribution By Stability Class At Waterford 3, November Class E

2.3-117 Wind Distribution By Stability Class At Waterford 3, November Class F

2.3-118 Wind Distribution By Stability Class At Waterford 3, November Class G

2.3-119 Wind Distribution By Stability Class At Waterford 3, December Class A

2.3-120 Wind Distribution By Stability Class At Waterford 3, December Class B

2.3-121 Wind Distribution By Stability Class At Waterford 3, December Class C

2.3-122 Wind Distribution By Stability Class At Waterford 3, December Class D

2.3-123 Wind Distribution By Stability Class At Waterford 3, December Class E

2.3-124 Wind Distribution By Stability Class At Waterford 3, December Class F

2.3-125 Wind Distribution By Stability Class At Waterford 3, December Class G

2.3-126 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class A

2.3-127 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class B WSES-FSAR-UNIT-3 2-xv Revision 14 (12/05) CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.3-128 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class C

2.3-129 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class D

2.3-130 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class E

2.3-131 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class F

2.3-132 Wind Distribution By Stability Class At Waterford 3, Annual Total, Class G

2.3-133 Average Monthly Data Recovery, Waterford Onsite Meteorological Monitoring Program (July 1972-June 1975 and February 1977-February 1978)

2.3-134 Waterford SES-Unit 3 Annual Average Dilution Factors (July 1972- June 1975 and February 1977-February 1978)

2.3-135 Waterford SES-Unit 3 Annual Average Dilution Factors At The Minimum Site Boundary (914m) (July 1972-June 1975 and February 1977-February 1978)

(DRN 03-2055, R14) 2.3-136 Waterford SES-Unit 3 Short-term (Accident) Dilution Factors (Sec/m3) (1997-2001) (DRN 03-2055, R14) 2.3-137 Storms in Excess of 50 MPH Since 1963 2.3-138 Waterford Onsite Meteorological Monitoring System

2.3-139 Summary of Meteorological Monitoring Program Parameters Measured At Primary And Backup Systems (DRN 01-156, R11-A) 2.3-140 DELETED (DRN 01-156, R11-A) 2.3-141 Waterford Operational Meteorological Monitoring System Accuracies

2.4-1 Municipal Water Intakes Downstream Of Waterford 3 Discharge (River Mile 129.6)

2.4-2 Flood-Crest Elevation Near The Waterford Site WSES-FSAR-UNIT-3 2-xvi Revision 11 (05/01) CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.4-3 Maximum Discharges for 1973 Flood

2.4-4 Original And Adjusted Project Design Flood Flow Lines

2.4-5 Streamflow In The Mississippi River 1900-1976 (DRN 99-2493) 2.4-6 DELETED 2.4-6a DELETED

2.4-6b DELETED

2.4-6c DELETED (DRN 99-2493) 2.4-7 Hypothetical Flood Peaks On The Mississippi And Atchafalaya Rivers

2.4-8 Computations Of Static And Dynamic Head Following Levee Failure

2.4-9 Computations Of Static And Dynamic Head 2.4-10 Probable Maximum Hurricane Parameters Zone B - Mile 660 -

New Orleans, Louisiana

2.4-10a Comparison Of Hurricane Surge Computations For South Pass Approach

2.4-11 Continental Shelf Profiles For Open Coast Surge Computations 2.4-12 Frequency Analysis Of Mississippi River Discharge Charge At Tarbert Landing

2.4-13 Water Well And Test Hole Data For St. Charles Parish

2.4-14 Local Detailed Well Survey

2.4-15 Groundwater Quality At Site

2.5-1 Approximate Periods Of Movements Along Growth Faults In Louisiana

2.5-2 Oil Well Logs Used In Structural Correlations

2.5-3 Tonal Anomalies And Linear Trends In The Site Area WSES-FSAR-UNIT-3 2-xvii CHAPTER 2 LIST OF TABLES (Cont'd)

Table Title

2.5-4 Utilized Southern Louisiana Salt Domes

2.5-5 Salt Domes Near Waterford Site

2.5-6 Listing Of Historic Earthquakes In Order Of Distance From Waterford Site

2.5-7 Listing Of Historic Earthquakes In Order Of Decreasing Intensity

2.5-8 Listing Of Historic Earthquakes In Chronological Order

2.5-9 Summary Of Intensity Data Concerning The New Madrid Series, Donaldsonville Earthquake, Gulfport Earthquake, And Baton Rouge Earthquake

2.5-10 Results From Parametric Study Of Seismic Wave Transmission Characteristics

2.5-11 Results From Parametric Study Of Seismic Wave Transmission Characteristics

2.5-12 Pleistocene Soil Strata Zones

2.5-13 Unified Soil Classifications

2.5-14 Properties Of Subsurface Materials Design Values

2.5-15 Compacted Class A Backfill Index Properties Test Results 2.5-16 Monitoring Point Locations

2.5A-1 Laboratory Test Summary Table

2.5A-2 Summary Of Laboratory Permeability Tests

2.5A-3 Coefficient Of Permeability Computed From Consolidation Data

2.5A-4 Summary Of Organic Content Data

2.5A Notes On Tables

WSES-FSAR-UNIT-3 2-xviii SITE CHARACTERISTICS CHAPTER 2 LIST OF FIGURES Figure Title

2.1-1 THE REGION WITHIN 50 MILES OF WATERFORD 3

2.1-2 THE AREA WITHIN 5 MILES OF WATERFORD 3

2.1-3 WATERFORD 3 SITE AND NEARBY STRUCTURES

2.1-4 EFFLUENT RELEASE POINTS AND RESTRICTED AREA BOUNDARY

2.1-4a WATERFORD 3 SITE EXCLUSION ZONE AND PROPERTY BOUNDARY 2.1-5 1977 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-6 1980 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-7 1981 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-8 1990 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-9 2000 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-10 2010 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-11 2020 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-12 2030 RESIDENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-13 THE REGION WITHIN 10 MILES OF WATERFORD 3

2.1-14 1977 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-15 1980 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-16 1981 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-17 1990 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-18 2000 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-19 2010 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-20 2020 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-21 2030 RESIDENT POPULATION WITHIN 50 MILES OF WATERFORD 3 2.1-22 1977 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 WSES-FSAR-UNIT-3 2-xix Revision 307 (07/13) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.1-23 1980 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-24 1981 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-25 1990 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-26 2000 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-27 2010 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-28 2020 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-29 2030 TRANSIENT POPULATION WITHIN 10 MILES OF WATERFORD 3 2.1-30 RECREATIONAL FACILITIES WITHIN 10 MILES OF WATERFORD 3 2.1-31 TRANSPORTATION NETWORK WITHIN 10 MILES OF WATERFORD 3

2.1-32 MAJOR INDUSTRIAL PROPERTIES WITHIN 10 MILES OF WATERFORD 3 2.1-33 LOW POPULATION ZONE CULTURAL FEATURES

2.1-34 LOW POPULATION ZONE 1977 PEAK POPULATION DISTRIBUTION 2.2-1 MAJOR INDUSTRIES AND OIL AND GAS FIELDS WITHIN 5 MILES OF WATERFORD 3

2.2-2 TRANSPORTATION FACILITIES WITHIN 5 MILES OF WATERFORD 3 (EC-5000082218, R301) 2.2-3 DELETED (EC-39014, R307) 2.2-3A PIPELINES OF ACADIAN & EVANGELINE IN VICINITY OF WATERFORD 3 2.2-3B PIPELINES OF AIR PRODUCTS & NUSTAR IN WATERFORD 3 VICINITY 2.2-3C PIPELINES OF CHEVRON & BRIDGELINE IN VICNITY OF WATERFORD 3 (EC-39014, R307) 2.2-3D PIPELINES OF ENTERPRISE PRODUCTS OPERATING CO. IN VICINITY OF WATERFORD 3 2.2-3E PIPELINES OF GULF SOUTH PIPELINE IN VICINITY OF WATERFORD 3 (EC-5000082218, R301) (EC-39014, R307) 2.2-3F PIPELINES OF SHELL OIL & DCP MIDSTREAM IN VICINITY OF WATERFORD 3 2.2-3G PIPELINES OF UCAR IN VICINITY OF WATERFORD 3 (EC-39014, R307) 2.2-4 AIRPORTS AND LOW ALTITUDE FEDERAL AIRWAYS IN THE VICINITY OF WATERFORD 3 2.2-5 FIGURE NUMBER NOT USED 2.2-5A LANDING AND APPROACH PATHS, NEW ORLEANS INTERNATIONAL AIRPORT 2.2-5B LANDING AND APPROACH PATHS, NEW ORLEANS INTERNATIONAL AIRPORT WSES-FSAR-UNIT-3 2-xx Revision 301 (09/07) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.2-6 AIR ALERT ZONE IN THE VICINITY OF WATERFORD 3 2.2-7 OVERPRESSURE VS. SCALED RANGE FOR SURFACE BURST 2.2-8 DETONABLE CLOUD FOR 6" TEXACO LPG LINE 2.2-9 DETONABLE CLOUD FOR 8" UNION CARBIDE LINE

2.2-10 BLAST WAVE PARAMETER VS. SCALED DISTANCE 2.2-11 ENTRAINMENT COEFFICIENT VS. DENSIMETRIC FROUDE NO. (FROM REFERENCE 20)

2.2-12 100 LB/SEC BREAK GRAVITY SLUMPING MODEL RESULTS 2.2-13 VOLUME DISTANCE OF 100 LB/SEC SOURCE OF WIDTH L GIVING 2.4% CONCENTRATION 2.2-14 LATERAL DIFFUSION, Y, VS. DOWNWIND DISTANCE FROM SOURCE FOR PASQUILL'S TURBULENCE TYPES (SOURCE: REF. 71)

2.2-15 FAMILY OF HUGONIOT CURVES CORRESPONDING TO ZERO & 100 PERCENT REACTION OF STOICHIOMETRIC PROPANE AND AIR

2.2-16 OVERPRESSURES GENERATED BY DEFLAGRATIONS OF PROPANE AND HYDROGEN OXYGEN AND AIR MIXTURES

2.2-17 QUADRATIC REGRESSION LINE MAXIMUM DEBRIS DISTANCE VS. EQUIVALENT YIELD

2.2A-1 TOPOGRAPHIC MAP OF SITE AND VICINITY

2.2A-2 PERSISTENCE OF CALMS

2.2A-3 CONDITIONAL PROBABILITY OF EXCEEDING DISTANCE FROM TRACK FOLLOWING A FREIGHT TRAIN DERAILMENT

2.2A-4 PROBABILITY OF OCCURRENCE OF POOLS OR CLOUDS OF GIVEN DIMENSION - THAT MIGHT IGNITE AND CAUSE FIRES/EXPLOSIONS (GIVEN A SPILL HAS OCCURRED)

2.2A-5 FLAME HEIGHT VS. SIZE OF FIRE

2.2A-6 PROBABILITY OF MISSILES REACHING A DISTANCE FROM ACCIDENT LOCATION

2.2A-7 QUADRATIC REGRESSION LINE MAXIMUM DEBRIS DISTANCE VS. EQUIVALENT YIELD

2.2A-8 ACROLEIN CONCENTRATION VS. TIME 2.3-1 JANUARY WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA WSES-FSAR-UNIT-3 2-xxi Revision 301 (09/07) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.3-2 FEBRUARY WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-3 MARCH WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-4 APRIL WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-5 MAY WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-6 JUNE WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-7 JULY WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-8 AUGUST WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-9 SEPTEMBER WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-10 OCTOBER WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA

2.3-11 NOVEMBER WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA 2.3-12 DECEMBER WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA 2.3-13 ANNUAL WIND ROSE MOISANT INTERNATIONAL AIRPORT, NEW ORLEANS, LOUISIANA 2.3-14 ON-SITE WIND ROSE - JANUARY 1973-1975 & 1978 2.3-15 ON-SITE WIND ROSE - FEBRUARY 1973-1975 & 1977-1978 2.3-16 ON-SITE WIND ROSE - MARCH 1973-1975 & 1977 2.3-17 ON-SITE WIND ROSE - APRIL 1973-1975 & 1977

2.3-18 ON-SITE WIND ROSE - MAY 1973-1975 & 1977

2.3-19 ON-SITE WIND ROSE - JUNE 1973-1975 & 1977

2.3-20 ON-SITE WIND ROSE - JULY 1972-1974 & 1977 WSES-FSAR-UNIT-3 2-xxii CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.3-21 ON-SITE WIND ROSE - AUGUST 1972-1974 & 1977

2.3-22 ON-SITE WIND ROSE - SEPTEMBER 1972-1974 & 1977

2.3-23 ON-SITE WIND ROSE - OCTOBER 1972-1974 & 1977

2.3-24 ON-SITE WIND ROSE - NOVEMBER 1972-1974 & 1977

2.3-25 ON-SITE WIND ROSE - DECEMBER 1972-1974 & 1977

2.3-26 ON-SITE WIND ROSE - ANNUAL 1972-1975 & 1977-78

2.3-27 FIGURE NUMBER NOT USED

2.3-27a MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM CENTERLINE OF PLANT (SHEET 1 OF 4)

2.3-27b MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM CENTERLINE OF PLANT (SHEET 2 OF 4)

2.3-27c MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM CENTERLINE OF PLANT (SHEET 3 OF 4)

2.3-27d MAXIMUM TOPOGRAPHIC ELEVATION VS. DISTANCE FROM CENTERLINE OF PLANT (SHEET 4 OF 4)

2.3-28 TOPOGRAPHIC FEATURES WITHIN 5 MILES OF SITE 2.3-29 LOCATION OF METEOROLOGICAL TOWER

2.3-30 W1034 LOW THRESHOLD RECORDING WIND SYSTEM

2.3-31 W1034 LOW THRESHOLD RECORDING WIND SYSTEM

2.3-32 W1034 LOW THRESHOLD RECORDING WIND SYSTEM

2.3-33 SPECIFICATIONS FOR THE GILL ANEMOMETER BIVANE - MODEL NO. 21001

2.3-34 PHOTOGRAPH OF THE GILL ANEMOMETER BIVANE - MODEL NO. 21002 2.3-35 SPECIFICATION OF THE W101-P SKYVANE I WIND SENSOR 2.3-36 PHOTOGRAPH OF THE W101-P SKYVANE I WIND SENSOR 2.3-37 SPECIFICATIONS OF THE M731 DIGITAL DATA LOGGER

2.3-38 PHOTOGRAPH OF THE M731 DIGITAL DATA LOGGER WSES-FSAR-UNIT-3 2-xxiii Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.3-39 HORIZONTAL DISPERSION COEFFICIENTS

2.3-40 VERTICAL DISPERSION COEFFICIENTS

2.3-41 DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF X/Q AT THE MIN. SITE BOUNDARY - JULY 1972 - JUNE 1975 & FEB 1977-FEB 1978 - 1 HOUR PERIOD

2.3-42 DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE - JULY 1972-JUNE 1975 & FEB 1977 - FEB 1978 - 8 HOUR PERIOD

2.3-43 DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE - JULY 1972-JUNE 1975 & FEB 1972 - FEB 1978 - 16 HOUR PERIOD

2.3-44 DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE - JULY 1972-JUNE 1975 & FEB 1972 - FEB 1978 - 3 DAY PERIOD

2.3-45 DIRECTIONALLY INDEPENDENT - CUM. FREQUENCY DISTRIBUTION OF X/Q AT THE OUTER BOUNDARY OF THE LOW POPULATION ZONE JULY 1972-JUNE 1975 & FEB 1972 - FEB 1978 - 26 DAY PERIOD

2.3-46 DIAGRAM OF PRIMARY METEOROLOGICAL TOWER COMPOUND 2.3-47 LOCATIONS OF PRIMARY AND BACKUP METEOROLOGICAL MONITORING SYSTEMS (DRN 03-2055, R14) 2.3-48 SOURCE AND RECEPTOR LOCATIONS FOR CONTROL ROOM ATMOSPHERIC DISPERSION CALCULATIONS (DRN 03-2055, R14) 2.4-1 TOPOGRAPHIC MAP OF SITE AND VICINITY 2.4-2 REGIONAL HYDROGRAPHIC FEATURES 2.4-3 FLOOD CONTROL SCHEME IN THE LOWER MISSISSIPPI RIVER 2.4-4 COMPARISON BETWEEN 1973 FLOOD DISCHARGE & PDF DISCHARGE 2.4-5 SURFACE AND GROUNDWATER PUMPAGE TRENDS FOR ST. CHARLES PARISH

2.4-6 STAGE HYDROGRAPH AT RED RIVER LANDING, LA.

2.4-7 FLOOD FREQUENCY AT TARBERT LANDING AND BATON ROUGE, MISS. RIVER BY LOG-PEARSON TYPE III DISTRIBUTION 2.4-8 ROOF DRAINAGE 2.4-9 DETERMINATION OF MANNING ROUGHNESS COEFFICIENT WSES-FSAR-UNIT-3 2-xxiv Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.4-10 PROJECT DESIGN FLOOD FLOW LINE FROM VENICE TO NEW ORLEANS 2.4-11 BONNET CARRE' SPILLWAY OPERATION

2.4-12 PROJECT DESIGN FLOOD FLOW LINE AND LEVEE DESIGN GRADE 2.4-13 FLOOD STAGE - DISCHARGE CURVE AT WATERFORD SITE

2.4-14 COMPUTED RIVER PROFILE WITH FULL LEVEE DISCHARGE 2.4-15 DELETED

2.4-16 DELETED

2.4-17 DELETED

2.4-18 DELETED

2.4-19 DELETED

2.4-20 WATERFORD 3-SITE AREA

2.4-21 WATER PROFILE UNDER SUDDEN LEVEE FAILURE CONDITION 2.4-22 CRITICAL PMH PATHS

2.4-23 OPEN COAST SURGE HYDROGRAPH MOUTH OF MISSISSIPPI RIVER 2.4-24 EFFECT OF PMH SURGE ON RIVER STAGE PROFILE

2.4-25 OPEN COAST SURGE MAXIMUM FLOOD LEVELS

2.4-26 FLOW DURATION CURVE AT SITE

2.4-27 PEAK CONCENTRATION VS. DOWNSTREAM DISTANCE

2.4-28 LOCATION MAP OF GROUNDWATER REGION, SITE AREA, AND SITE 2.4-29 POINT BAR DEPOSITS OF MISSISSIPPI RIVER 2.4-30 CONFIGURATION OF THE TOP OF THE GRAMERCY AQUIFER

2.4-31 CONFIGURATION OF THE TOP OF THE NORCO AQUIFER

2.4-32 CONFIGURATION OF THE TOP OF THE GONZALES - NEW ORLEANS AQUIFER

2.4-33 GENERALIZED CROSS-SECTION THROUGH WATERFORD SITE WSES-FSAR-UNIT-3 2-xxv Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.4-34 CONFIGURATION OF THE POTENTIOMETRIC SURFACE IN THE GRAMERCY AQUIFER, FALL 1960

2.4-35 CONFIGURATION OF THE POTENTIOMETRIC SURFACE IN THE NORCO AQUIFER, FALL 1965

2.4-36 WATER LEVEL AND PUMPAGE NORCO AQUIFER AT NORCO

2.4-37 CONFIGURATION OF THE POTENTIOMETRIC SURFACE IN THE GONZALES- NEW ORLEANS AQUIFER, FALL 1965

2.4-38 WATER LEVELS IN GONZALES - NEW ORLEANS AQUIFER

2.4-39 WATER WELLS AND TEST HOLES IN SITE AREA

2.4-40 AREA OF DETAILED WELL SURVEY

2.4-41 AVERAGE MONTHLY GROUND WATER REQUIREMENTS FOR ST. JAMES, ST. CHARLES AND ST. JOHN THE BAPTIST PARISHES; 1970 - 2020

2.4-42 PIEZOMETRIC SURFACE IN E1 - 77 FT. SAND

2.4-43 ASSUMED PIEZOMETRIC SURFACE IN RECENT MATERIAL 2.5-1 SITE LOCATION MAP

2.5-2 REGIONAL PHYSIOGRAPHIC MAP (LAND)

2.5-3 REGIONAL PHYSIOGRAPHIC (SUBMARINE) 2.5-4 DELTAS OF THE MISSISSIPPI RIVER

2.5-5 GENERALIZED REGIONAL CROSS SECTIONS

2.5-6 REGIONAL STRATIGRAPHIC COLUMN

2.5-7 REGIONAL SURFICIAL GEOLOGY MAP GULF COASTAL PLAIN

2.5-8 SALT BASIN LOCATIONS (GENERALIZED)

2.5-9 GENERALIZED REGIONAL GROSS-SECTIONS 2.5-10 REGIONAL STRUCTURE MAP

2.5-11 REGIONAL BOUGUER GRAVITY ANOMALY MAP

2.5-12 VACHERIE FISSURE WSES-FSAR-UNIT-3 2-xxvi Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-13 FISK'S FEATURES OF THE DELTAIC PLAIN

2.5-14 WATERFORD SITE BOUNDARIES

2.5-15 TOPOGRAPHIC MAP OF SITE AND VICINITY

2.5-16 SURFACE GEOLOGY IN THE SITE AREA

2.5-17 EXAMPLE PETROLEUM TEST WELL ELECTRIC LOG SHOWING SITE AREA STRATIGRAPHY AND MARKER HORIZONS

2.5-18 OIL AND GAS TEST WELLS USED IN SITE STRUCTURE STUDY

2.5-19 FAULT SURFACES IN THE SITE AREA

2.5-20 SITE STRUCTURE - HORIZON 1 FROM ELECTRIC LOG SIGNATURE

2.5-21 SITE STRUCTURE - HORIZON 2 FROM ELECTRIC LOG SIGNATURE

2.5-22 SITE STRUCTURE - HORIZON 3 FROM ELECTRIC LOG SIGNATURE (LOWEST DATUM WITHOUT FAULTING)

2.5-23 SITE STRUCTURE - HORIZON 4 FROM ELECTRIC LOG SIGNATURE (HIGHEST DATUM WHICH REFLECTS FAULTING PATTERN)

2.5-24 SITE STRUCTURE - HORIZON 5 FROM ELECTRIC LOG SIGNATURE (RIDGEFIELD SAND)

2.5-25 SITE STRUCTURAL CROSS SECTION A

2.5-26 SITE STRUCTURAL CROSS SECTION B

2.5-27 SITE STRUCTURAL CROSS SECTION C

2.5-27a SITE STRUCTURAL CROSS-SECTION D

2.5-27b SITE STRUCTURAL CROSS-SECTION E

2.5-28 GEOLOGIC SECTION X-X'

2.5-29 GEOLOGIC SECTION Y-Y'

2.5-30 GEOLOGIC MAP OF WATERFORD 3 EXCAVATION

2.5-30a TOP OF PLEISTOCENE CONTOUR MAP

2.5-30b TOP OF PLEISTOCENE STUDY SECTION 1-1

WSES-FSAR-UNIT-3 2-xxvii Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-30c TOP OF PLEISTOCENE STUDY SECTION 2-2

2.5-30d TOP OF PLEISTOCENE STUDY SECTION 3-3

2.5-30e TOP OF PLEISTOCENE STUDY SECTION 4-4

2.5-30f LOCATION MAP FOR CROSS-SECTION 5-5

2.5-30g CROSS-SECTION 5-5

2.5-31 TONAL ANOMALIES & LINEAR TRENDS IN THE SITE AREA 2.5-31a ELEVATION OF TOP OF PLEISTOCENE DEPOSITS 2.5-32 FIGURE NUMBER NOT USED (DRN 01-360) 2.5-32a ELECTRIC LOG BORING TEST NO. B-3*

2.5-32b ELECTRIC LOG COMPANY BORE TEST NO. B-5*

2.5-32c ELECTRIC LOG COMPANY NO. B-7*

2.5-32d ELECTRIC LOG BORING COMPANY NO. 41*

2.5-32e ELECTRICAL LOG BORING NO. 42*

2.5-32f ELECTRICAL LOG BORING NO. 26* (DRN 01-360) 2.5-33 SITE BORING PLAN 2.5-34 TIME - DISTANCE PLOT FOR FIGURE 27 SEISMIC TRAVERSE A-A'

2.5-35 SEISMIC TRAVERSE A-A'

2.5-36 SEISMIC TRAVERSE B-B'

2.5-37 SEISMIC TRAVERSE C-C'

2.5-38 SEISMIC TRAVERSE D-D' (DRN 01-360)

  • Figures 2.5-32(a) through 2.5-32(f) are classified as historical pursuant to Waterford 3 Site Procedure W4.504 and Nuclear Energy Institute (NEI) 98-03. The figures have been physically removed from the UFSAR. However, the figures are incorporated by reference, and thus they continue to be a part of the UFSAR. These figures are available for references and use in Document Control, and they may be found as record ER-W3-01-0268-00-00 / DRN 01-360. (DRN 01-360)

WSES-FSAR-UNIT-3 2-xxviii Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-39 OIL & GAS PRODUCTION IN THE SITE AREA

2.5-40 CHANGE IN BENCHMARK ELEVATIONS 1938-1964

2.5-41 BENCHMARK LOCATION MAP SHOWING OIL AND GAS PRODUCTION NEAR MISSISSIPPI RIVER

2.5-42 HISTORIC EARTHQUAKE EPICENTERS WITH PROVINCES OF UNIQUE CRUSTAL PATTERNS, GEOLOGIC HISTORY AND EARTHQUAKE HISTORY 2.5-42a SEISMIC REFLECTION COVERAGE MAP

2.5-43 USC & GS ISOSEISMAL MAP OF DONALDSONVILLE EARTHQUAKE -

OCTOBER 19, 1930

2.5-44 WATERFORD SITE INTENSITY ACCELERATION RELATIONSHIP 2.5-45 SYNTHETIC EARTHQUAKE TIME - HISTORY 2.5-46 VACHERIE FISSURE DISPLACEMENT ACROSS FURROW

2.5-47 VACHERIE FISSURE SHAPE OF FISSURE

2.5-48 BORING PLOT PLAN

2.5-49 BORING PROFILE A-A'

2.5-50 BORING PROFILE B-B' & C-C'

2.5-51 BORING PROFILE D-D'

2.5-52 BORING PROFILE E-E' & F-F'

2.5-53 GRAIN SIZE DISTRIBUTION SUMMARY CURVE GRADE TO -40 FT. MSL 2.5-54 GRAIN SIZE DISTRIBUTION SUMMARY CURVE -40 FT. MSL TO -77 FT. MSL 2.5-55 GRAIN SIZE DISTRIBUTION SUMMARY CURVE -77 FT. MSL TO -92 FT. MSL 2.5-56 GRAIN SIZE DISTRIBUTION SUMMARY CURVE -92 FT. MSL TO -108 FT. MSL 2.5-57 GRAIN SIZE DISTRIBUTION SUMMARY CURVE -108 FT. MSL TO -116 FT. MSL 2.5-58 GRAIN SIZE DISTRIBUTION SUMMARY CURVE -127 FT. MSL TO -317 FT. MSL 2.5-59 GRAIN SIZE DISTRIBUTION SUMMARY CURVE -317 FT. MSL TO -500 FT. MSL WSES-FSAR-UNIT-3 2-xxix Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-60 LIQUID LIMIT VS. PLASTICITY INDEX GRADE TO -40 FT. MSL (RECENT MATERIAL)

2.5-61 LIQUID LIMIT VS. PLASTICITY INDEX -40 FT. MSL TO -77 FT. MSL 2.5-62 LIQUID LIMIT VS. PLASTICITY INDEX -92 FT. MSL TO -108 FT. MSL 2.5-63 LIQUID LIMIT VS. PLASTICITY INDEX - 108 FT. MSL TO -116 FT. MSL 2.5-64 LIQUID LIMIT VS. PLASTICITY INDEX -116 FT. MSL TO -127 FT. MSL 2.5-65 LIQUID LIMIT VS. PLASTICITY INDEX -127 FT. MSL TO -317 FT. MSL 2.5-66 UNCONFINED COMPRESSIVE STRENGTH AND COHESION VS. DEPTH 2.5-67 UNCONSOLIDATED UNDRAINED SHEAR STRENGTH GRADE TO -40 FT. MSL (RECENT MATERIAL)

2.5-68 UNCONSOLIDATED UNDRAINED SHEAR STRENGTH -40 FT. MSL TO -77 FT. MSL

2.5-69 UNCONSOLIDATED UNDRAINED SHEAR STRENGTH -127 FT MSL TO -317 FT MSL

2.5-70 CONSOLIDATED UNDRAINED SHEAR STRENGTH GRADE TO -40 FT. MSL (RECENT MATERIAL)

2.5-71 CONSOLIDATED UNDRAINED SHEAR STRENGTH -108 FT. MSL TO -116 FT. MSL 2.5-72 DRAINED SHEAR STRENGTH GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5-73 DRAINED SHEAR STRENGTH -77 FT. MSL TO -92 FT. MSL 2.5-74 DRAINED SHEAR STRENGTH - PLEISTOCENE CLAYS 2.5-75 OVERCONSOLIDATION RATIO VS. DEPTH

2.5-76 SEISMIC WAVE VELOCITY & SHEAR MODULUS VS. DEPTH 2.5-77 SHEAR MODULUS & DAMPING VS. STRAIN-RECENT MATERIAL (GRADE TO -40 FT. MSL)

2.5-78 SHEAR MODULUS & DAMPING VS. STRAIN-UPPER PLEISTOCENE (-40 FT. MSL TO -317 FT. MSL)

2.5-79 SHEAR MODULUS & DAMPING VS. STRAIN-LOWER PLEISTOCENE (BELOW -317 FT. MSL)

WSES-FSAR-UNIT-3 2-xxx Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-80 GENERALIZED SITE CROSS SECTION

2.5-81 EXCAVATION PLAN

2.5-82 EXCAVATIONS SECTIONS

2.5-83 DEWATERING SYSTEM PLAN

2.5-84 COMPACTED BACKFILL - STATISTICAL STUDY

2.5-85 COMPACTED BACKFILL - DRY DENSITY VS. RELATIVE DENSITY 2.5-86 COMPACTED BACKFILL - COMPACTION CURVE & GRAIN SIZE DISTRIBUTION CURVE

2.5-87 COMPACTED BACKFILL - EARTH PRESSURE COEFFICIENT VS. RADIAL STRAIN

2.5-88 COMPACTED BACKFILL - ACTIVE - PASSIVE MOHR'S CIRCLE PLOTS

2.5-89 SHEAR MODULUS & DAMPING VS. STRAIN-COMPACTED BACKFILL 2.5-90 CYCLIC SHEAR STRENGTH - COMPACTED BACKFILL

2.5-91 RESPONSE ANALYSIS MODEL

2.5-92 SHEAR STRESS AND ACCELERATION VS. DEPTH

2.5-93 FIGURE NUMBER NOT USED

2.5-93a GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS

2.5-93b GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS

2.5-93c GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS

2.5-93d GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS

2.5-93e GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS

2.5-93f GRAIN SIZE ANALYSES OF -55 FT. MSL MATERIALS

2.5-94 COMPACTION CURVES FOR -55 FT. MSL MATERIALS

2.5-95 FIGURE NUMBER NOT USED

2.5-95a GRAIN SIZE ANALYSES OF -77 FT. MSL MATERIALS

WSES-FSAR-UNIT-3 2-xxxi Revision 14 (12/05) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-95b GRAIN SIZE ANALYSES OF -77 FT. MSL MATERIALS

2.5-95c GRAIN SIZE ANALYSES OF -77 FT. MSL MATERIALS

2.5-96 CYCLIC SHEAR STRENGTH - IN SITU MATERIAL 2.5-97 LIQUEFACTION POTENTIAL FACTOR OF SAFETY PLOT

2.5-98 GRAIN SIZE AND VOID RATIO COMPARISONS WITH LEE AND FITTON 2.5-99 CYCLIC TEST COMPARISONS WITH LEE AND FITTON

2.5-100 STATIC PRESSURE DIAGRAM

2.5-101 DYNAMIC EARTH PRESSURE DIAGRAM

2.5-102 DESIGN CONCEPT OUTLINE

2.5-103 BEARING PRESSURE HISTORY AT -47 FT. MSL

2.5-104 CONSTRUCTION DIAGRAM - STAGE 1

2.5-105 CONSTRUCTION DIAGRAM - STAGE 2

2.5-106 CONSTRUCTION DIAGRAM - STAGE 3

2.5-107 CONSTRUCTION DIAGRAM - STAGE 4

2.5-108 CONSTRUCTION DIAGRAM - STAGE 5

2.5-109 CONSTRUCTION DIAGRAM - STAGE 6

2.5-110 CONSTRUCTION DIAGRAM - STAGE 7

2.5-111 CONSTRUCTION DIAGRAM - STAGE 8

2.5-112 INSTRUMENTATION PLOT PLAN

2.5-112a SETTLEMENT MONITORING POINTS (1981-84)

2.5-112b PRIMARY SETTLEMENT MONITORING POINT LOCATIONS (1985-1986) 2.5-112c SECONDARY SETTLEMENT MONITORING POINT LOCATIONS (1985-1986) 2.5-112d SETTLEMENT MONITORING POINT LOCATIONS

2.5-113 PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 1 OF 5 WSES-FSAR-UNIT-3 2-xxxii Revision 11 (05/01) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5-113 PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 2 OF 5 2.5-113 PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 3 OF 5 2.5-113 PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 4 OF 5 2.5-113 PIEZOMETER, HEAVE POINT AND EXTENSOMETER RESPONSES SHEET 5 OF 5 2.5-114 INCLINOMETER MOVEMENT NORTH-SOUTH DIRECTION

2.5-115 INCLINOMETER MOVEMENT EAST-WEST DIRECTION

2.5-116 SITE AREA SETTLEMENT SHEET 1 OF 2

2.5-116 SITE AREA SETTLEMENT SHEET 2 OF 2

2.5-117 COMPOSITE FOUNDATION MAT SETTLEMENT (SHEET 1 OF 3)

2.5-117 COMPOSITE FOUNDATION MAT SETTLEMENT (SHEET 2 OF 3)

2.5-117 COMPOSITE FOUNDATION MAT SETTLEMENT (SHEET 3 OF 3)

2.5-118 COMPOSITE FOUNDATION MAT DIFFERENTIAL SETTLEMENT CONTOURS 2.5A-1 GRAIN SIZE ANALYSES

2.5A-2 GRAIN SIZE ANALYSES

2.5A-3 GRAIN SIZE ANALYSES

2.5A-4 GRAIN SIZE ANALYSES

2.5A-5 GRAIN SIZE ANALYSES

2.5A-6 GRAIN SIZE ANALYSES

2.5A-7 GRAIN SIZE ANALYSES

2.5A-8 GRAIN SIZE ANALYSES

2.5A-9 GRAIN SIZE ANALYSES

2.5A-10 GRAIN SIZE ANALYSES

2.5A-11 GRAIN SIZE ANALYSES

2.5A-12 GRAIN SIZE ANALYSES

WSES-FSAR-UNIT-3 2-xxxiii Revision 11 (05/01) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-13 GRAIN SIZE ANALYSES

2.5A-14 GRAIN SIZE ANALYSES

2.5A-15 GRAIN SIZE ANALYSES

2.5A-16 GRAIN SIZE ANALYSES

2.5A-17 GRAIN SIZE ANALYSES

2.5A-18 GRAIN SIZE ANALYSES

2.5A-19 GRAIN SIZE ANALYSES

2.5A-20 GRAIN SIZE ANALYSES

2.5A-21 GRAIN SIZE ANALYSES

2.5A-22 GRAIN SIZE ANALYSES

2.5A-23 GRAIN SIZE ANALYSES

2.5A-24 GRAIN SIZE ANALYSES

2.5A-25 GRAIN SIZE ANALYSES

2.5A-26 GRAIN SIZE ANALYSES

2.5A-27 GRAIN SIZE ANALYSES

2.5A-28 GRAIN SIZE ANALYSES

2.5A-29 GRAIN SIZE ANALYSES

2.5A-30 GRAIN SIZE ANALYSES

2.5A-31 GRAIN SIZE ANALYSES

2.5A-32 GRAIN SIZE ANALYSES

2.5A-33 GRAIN SIZE ANALYSES

2.5A-34 GRAIN SIZE ANALYSES

2.5A-35 GRAIN SIZE ANALYSES

2.5A-36 GRAIN SIZE ANALYSES

WSES-FSAR-UNIT-3 2-xxxiv Revision 11 (05/01) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-37 GRAIN SIZE ANALYSES

2.5A-38 GRAIN SIZE ANALYSES

2.5A-39 GRAIN SIZE ANALYSES

2.5A-40 GRAIN SIZE ANALYSES

2.5A-41 GRAIN SIZE ANALYSES

2.5A-42 GRAIN SIZE ANALYSES

2.5A-43 GRAIN SIZE ANALYSES

2.5A-44 GRAIN SIZE ANALYSES

2.5A-45 GRAIN SIZE ANALYSES

2.5A-46 GRAIN SIZE ANALYSES

2.5A-47 GRAIN SIZE ANALYSES

2.5A-48 GRAIN SIZE ANALYSES

2.5A-49 GRAIN SIZE ANALYSES

2.5A-50 GRAIN SIZE ANALYSES

2.5A-51 GRAIN SIZE ANALYSES

2.5A-52 GRAIN SIZE ANALYSES

2.5A-53 GRAIN SIZE ANALYSES

2.5A-54 GRAIN SIZE ANALYSES

2.5A-55 GRAIN SIZE ANALYSES

2.5A-56 GRAIN SIZE ANALYSES

2.5A-57 GRAIN SIZE ANALYSES

2.5A-58 GRAIN SIZE ANALYSES

2.5A-59 GRAIN SIZE ANALYSES

2.5A-60 GRAIN SIZE ANALYSES

WSES-FSAR-UNIT-3 2-xxxv Revision 11 (05/01) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-61 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-62 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-63 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-64 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-65 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-66 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-67 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-68 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-69 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-70 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-71 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-72 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-73 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-74 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-75 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-76 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-77 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-78 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-79 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-80 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-81 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-82 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-83 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-84 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

WSES-FSAR-UNIT-3 2-xxxvi Revision 11 (05/01) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-85 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-86 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-87 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-88 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-89 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-90 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-91 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-92 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-93 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-94 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-95 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-96 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-97 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-98 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-99 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-100 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-101 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-102 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-103 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-104 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-105 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-106 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-107 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-108 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

WSES-FSAR-UNIT-3 2-xxxvii Revision 11 (05/01) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-109 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-110 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-111 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-112 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-113 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-114 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-115 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-116 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-117 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-118 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-119 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-120 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-121 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-122 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-123 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-124 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-125 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-126 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-127 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-128 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-129 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-130 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-131 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-132 UNCONSOLIDATED UNDRAINED STRENGTH TESTS WSES-FSAR-UNIT-3 2-xxxviii Revision 12-C (07/03) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-133 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-134 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-135 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-136 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-137 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-138 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-139 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-140 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-141 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-142 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-143 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-144 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-145 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-146 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-147 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-148 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-149 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-150 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-151 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-152 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-153 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-154 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-155 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-156 UNCONSOLIDATED UNDRAINED STRENGTH TESTS

WSES-FSAR-UNIT-3 2-xxxix Revision 12-C (07/03) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-157 CONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-158 CONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-159 CONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-160 CONSOLIDATED UNDRAINED STRENGTH TESTS

2.5A-161 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-162 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-163 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-164 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-165 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-166 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-167 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-168 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-169 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-170 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-171 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-172 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-173 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-174 CONSOLIDATION TESTS GRADE TO -40 FT. MSL (RECENT MATERIAL) 2.5A-175 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-176 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-177 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-178 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-179 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-180 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

WSES-FSAR-UNIT-3 2-xl Revision 12-C (07/03) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-181 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-182 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-183 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-184 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-185 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-186 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-187 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-188 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-189 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-190 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-191 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-192 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-193 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-194 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-195 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-196 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-197 CONSOLIDATION TESTS -40 FT. MSL TO -77 FT. MSL

2.5A-198 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-199 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-200 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-201 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-202 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-203 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-204 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

WSES-FSAR-UNIT-3 2-xli Revision 12-C (07/03) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-205 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-206 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-207 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-208 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-209 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-210 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-211 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-212 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-213 CONSOLIDATION TESTS -92 FT. MSL TO -108 FT. MSL

2.5A-214 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-215 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-216 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-217 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-218 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-219 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-220 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-221 CONSOLIDATION TESTS -108 FT. MSL TO -116 FT. MSL

2.5A-222 CONSOLIDATION TESTS -116 FT. MSL TO -127 FT. MSL

2.5A-223 CONSOLIDATION TESTS -116 FT. MSL TO -127 FT. MSL

2.5A-224 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-225 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-226 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-227 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-228 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

WSES-FSAR-UNIT-3 2-xlii Revision 12-C (07/03) CHAPTER 2 LIST OF FIGURES (Cont'd)

Figure Title

2.5A-229 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-230 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-231 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-232 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-233 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-234 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-235 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-236 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-237 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-238 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-239 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL 2.5A-240 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL 2.5A-241 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL 2.5A-242 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL 2.5A-243 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL 2.5A-244 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL 2.5A-245 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-246 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL

2.5A-247 CONSOLIDATION TESTS -127 FT. MSL TO -317 FT. MSL WSES-FSAR-UNIT-3 2-xliii Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 2 Section Cross References Revision 12-C Table 2.2-4 Sheet 2 ER-W3-2000-0948-000/DRN 02-1834 Table 2.2-4 Sheet 3 Table 2.2-4 Sheet 4 Table 2.2-4 Sheet 6 Table 2.2-4 Sheet 7 Table 2.2-4 Sheet 8 Table 2.2-4 Sheet 10 Table 2.2-4 Sheet 11 Table 2.2-4A Table 2.2-4B Table 2.2-3d (all 16 sheets)

Table 2.2-5 (both pages) Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2055 Section 2.1.1.3 Section 2.1.3.4.1 Section 2.2.3 Section 2.2.3.1 Section 2.2.3.1.4 Section 2.3.4 Section 2.4.3 References 2.3 Table 2.3-136 Figure 2.3-48

Section 2.2.3 ER-W3-2004-0276-000/DRN 05-149 Section 2.2.3.1.4 Section 2.2.3.2 Section 2.2.3.3.6

Section 2.2.3.3.6 ER-W3-2004-0276-002/DRN 05-845

Revision 15 Section 2.1.1.3 ER-W3-2006-0210-000/DRN 06-624

Section 2.2.3.1.3.2 ER-W3-2006-0281-000/DRN 06-869 Section 2.3.5.1 Section 2.4.3.7

Section 2.5.4.13.4 ER-W3-2006-0223-000/DRN 06-877

Section 2.2.3.1.3.1 ER-W3-2006-0223-000/DRN 06-905 Section 2.2.3.1.3.2 Section 2.3.5.1 Section 2.5.4.5.3.2

Section 2.2A.1.3 ER-W3-2006-0296-000/DRN 06-926 WSES-FSAR-UNIT-3 2-xliv Revision 302 (12/08) UPDATE REFERENCE LIST Chapter 2 Section Cross References Revision 301 Section 2.3.2.1.5 EC-1837 Section 2.3.2.2 Section 2.3.3.1.5 Section 2.3.3.1.7 Section 2.3.3.2 Section 2.3: References

Section 2.4.2.3.4 EC-5000082442 EC-2097

Table of Contents EC-5000082218 Section 2.2.1 Section 2.2.2.1.2 Section 2.2.2.2 Section 2.2.2.3 Section 2.2.2.4 Section 2.2.2.6 Section 2.2.3 Section 2.2.3.1.3.1.1 Section 2.2.3.3 Section 2.2.3.3.1 Section 2.2.3.3.2 Section 2.2.3.3.4 Section 2.2.3.3.5 Section 2.2.3.3.6 Section 2.2.: References Table 2.2-3A Table 2.2-3B Sh. 1 of 8 thru Sh. 8 of 8 Table 2.2-3C Table 2.2-3D Sh. 1 of 15 thru Sh. 15 of 15 Table 2-23E Sh. 1 of 11 thru Sh. 11 of 11 Table 2.2-3F Sh 1. of 4 thru Sh. 4 of 4 Table 2.2-3G Table 2.2-4 Table 2.2-4A Table 2.2-4B Table 2.2-5 Table 2.2-6 Sh. 1 of 2 thru Sh. 2 of 2 Table 2.2-7 Figure 2.2-1 Figure 2.2-2 Figure 2.2-3 Figure 2.2-3a Figure 2.2-3b Figure 2.2-3c Figure 2.2-3d Figure 2.2-3e

Revision 302 Section 2.4.2.2 LBDCR 2008-001 WSES-FSAR-UNIT-3 2-xlv Revision 307 (07/13) Section Cross References Revision 303 Section 2.4.11.5 EC-530 Section 2.4.11.6

Section 2.3.3.1.2 EC-8688

Revision 305 Section 2.4.1.1 EC-29230

Section 2.4.3.7 EC-30923

Revision 306 Section 2.4.3.5.3 EC-32952

Revision 307 Table of Contents EC-38835

Table of Contents EC-39014 Section 2.2.1 Section 2.2.2.2 Section 2.2.2.3 Section 2.2.3.1.3.1.1 Section 2.2.3.1.3.2 Section 2.2: REFERENCES Table 2.2-3A Table 2.2-3B Table 2.2-3D Table 2.2-3E Table 2.2-3F Table 2.2-3G Table 2.2-5 Table 2.2-6 Figure 2.2-1 Figure 2.2-3a Figure 2.2-3b Figure 2.2-3c Figure 2.2-3d Figure 2.2-3e Figure 2.2-3f Figure 2.2-3g

Section 2.2.3.1 EC-40308

Section 2.2.3.3.5 EC-41671 Section 2.2.3.3.6 Table 2.2-4A

Section 2.4-10 EC-42115

WSES-FSAR-UNIT-3 2-xlvi Revision 308 (11/14) Revision 308 Section 2.1.1.1 LBDCR 14-023

Section 2.4.10 EC 45161 WSES-FSAR-UNIT-3 3-i DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS CHAPTER 3 TABLE OF CONTENTS Section Title Page 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS 3.1-1 3.1 CONFORMANCE WITH NRC GENERAL DESIGN CRITERIA 3.1-1 3.1.1 CRITERION 1 - QUALITY STANDARDS AND RECORDS 3.1-1

3.1.2 CRITERION 2 - DESIGN BASES FOR PROTECTION AGAINST 3.1-2 NATURAL PHENOMENA

3.1.3 CRITERION 3 - FIRE PROTECTION 3.1-3

3.1.4 CRITERION 4 - ENVIRONMENTAL AND MISSILE DESIGN BASES 3.1-4

3.1.5 CRITERION 5 - SHARING OF STRUCTURES, SYSTEMS AND COMPONENTS 3.1-5

3.1.6 CRITERION 10 - REACTOR DESIGN 3.1-5

3.1.7 CRITERION 11 - REACTOR INHERENT PROTECTION 3.1-6

3.1.8 CRITERION 12 - SUPPRESSION OF REACTOR POWER OSCILLATIONS 3.1-6

3.1.9 CRITERION 13 - INSTRUMENTATION AND CONTROL 3.1-7

3.1.10 CRITERION 14 - REACTOR COOLANT PRESSURE BOUNDARY 3.1-8

3.1.11 CRITERION 15 - REACTOR COOLANT SYSTEM DESIGN 3.1-8

3.1.12 CRITERION 16 - CONTAINMENT DESIGN 3.1-9

3.1.13 CRITERION 17 - ELECTRIC POWER SYSTEMS 3.1-10

3.1.14 CRITERION 18 - INSPECTION AND TESTING OF ELECTRICAL 3.1-11 POWER SYSTEMS

3.1.15 CRITERION 19 - CONTROL ROOM 3.1-12

3.1.16 CRITERION 20 - PROTECTION SYSTEM FUNCTIONS 3.1-13

3.1.17 CRITERION 21 - PROTECTION SYSTEM RELIABILITY AND 3.1-14 TESTABILITY

3.1.18 CRITERION 22 - PROTECTION SYSTEM INDEPENDENCE 3.1-15

WSES-FSAR-UNIT-3 3-ii CHAPTER 3 TABLE OF CONTENTS (Cont'd)

Section Title Page 3..1.19 CRITERION 23 - PROTECTION SYSTEM FAILURE MODES 3.1-15

3.1.20 CRITERION 24 - SEPARATION OF PROTECTION AND CONTROL 3.1-16 SYSTEMS

3.1.21 CRITERION 25 - PROTECTION SYSTEM REQUIREMENTS FOR 3.1-16 REACTIVITY CONTROL MALFUNCTIONS

3.1.22 CRITERION 26 - REACTIVITY CONTROL SYSTEM REDUNDANCY 3.1-17 AND CAPABILITY

3.1.23 CRITERION 27 - COMBINED REACTIVITY CONTROL SYSTEMS 3.1-18 CAPABILITY

3.1.24 CRITERION 28 - REACTIVITY LIMITS 3.1-18

3.1.25 CRITERION 29 - PROTECTION AGAINST ANTICIPATED OPERATIONAL 3.1-19 OCCURRENCES

3.1.26 CRITERION 30 - QUALITY OF REACTOR COOLANT PRESSURE 3.1-19 BOUNDARY

3.1.27 CRITERION 31 - FRACTURE PREVENTION OF REACTOR COOLANT 3.1-20 PRESSURE BOUNDARY

3.1.28 CRITERION 32 - INSPECTION OF REACTOR COOLANT PRESSURE 3.1-21 BOUNDARY

3.1.29 CRITERION 33 - REACTOR COOLANT MAKEUP 3.1-22

3.1.30 CRITERION 34 - RESIDUAL HEAT REMOVAL 3.1-23

3.1.31 CRITERION 35 - EMERGENCY CORE COOLING 3.1-23

3.1.32 CRITERION 36 - INSPECTION OF EMERGENCY CORE COOLING 3.1-24 SYSTEM

3.1.33 CRITERION 37 - TESTING OF EMERGENCY CORE COOLING 3.1-24 SYSTEM

3.1.34 CRITERION 38 - CONTAINMENT HEAT REMOVAL 3.1-25

3.1.35 CRITERION 39 - INSPECTION OF CONTAINMENT HEAT REMOVAL 3.1-26 SYSTEM

WSES-FSAR-UNIT-3 3-iii CHAPTER 3 TABLE OF CONTENTS (Cont'd)

Section Title Page 3.1.36 CRITERION 40 - TESTING OF CONTAINMENT HEAT REMOVAL 3.1-27 SYSTEM

3.1.37 CRITERION 41 - CONTAINMENT ATMOSPHERE CLEANUP 3.1-27

3.1.38 CRITERION 42 - INSPECTION OF CONTAINMENT ATMOSPHERE 3.1-28 CLEANUP SYSTEMS

3.1.39 CRITERION 43 - TESTING OF ATMOSPHERE CLEANUP SYSTEMS 3.1-29

3.1.40 CRITERION 44 - COOLING WATER 3.1-30

3.1.41 CRITERION 45 - INSPECTION OF COOLING WATER SYSTEM 3.1-31

3.1.42 CRITERION 46 - TESTING OF COOLING WATER SYSTEM 3.1-31

3.1.43 CRITERION 50 - CONTAINMENT DESIGN BASIS 3.1-32

3.1.44 CRITERION 51 - FRACTURE PREVENTION OF CONTAINMENT 3.1-32 PRESSURE BOUNDARY

3.1.45 CRITERION 52 - CAPABILITY FOR CONTAINMENT LEAKAGE 3.1-33 RATE TESTING

3.1.46 CRITERION 53 - PROVISION FOR CONTAINMENT TESTING 3.1-34 AND INSPECTION

3.1.47 CRITERION 54 - PIPING SYSTEMS PENETRATING CONTAINMENT 3.1-34

3.1.48 CRITERION 55 - REACTOR COOLANT PRESSURE BOUNDARY 3.1-35 PENETRATION CONTAINMENT

3.1.49 CRITERION 56 - PRIMARY CONTAINMENT ISOLATION 3.1-36

3.1.50 CRITERION 57 - CLOSED SYSTEMS ISOLATION VALVES 3.1-37

3.1.51 CRITERION 60 - CONTROL OF RELEASES OF RADIOACTIVE 3.1-37 MATERIALS TO THE ENVIRONMENT

3.1.52 CRITERION 61 - FUEL STORAGE AND HANDLING AND 3.1-38 RADIOACTIVITY CONTROL

3.1.53 CRITERION 62 - PREVENTION OF CRITICALITY IN FUEL 3.1-39 STORAGE AND HANDLING

WSES-FSAR-UNIT-3 3-iv CHAPTER 3 TABLE OF CONTENTS (Cont'd)

Section Title Page 3.1.54 CRITERION 63 - MONITORING FUEL AND WASTE STORAGE 3.1-39

3.1.55 CRITERION 64F - MONITORING RADIOACTIVITY RELEASES 3.1-40

3.2 CLASSIFICATION OF STRUCTURES, COMPONENTS AND SYSTEMS 3.2-1 3.2.1 SEISMIC CLASSIFICATION 3.2-1

3.2.2 SYSTEM SAFETY CLASSIFICATION 3.2-2

3.3 WIND AND TORNADO LOADINGS 3.3-1 3.3.1 WIND LOADINGS 3.3-1

3.3.2 TORNADO 3.3-3

3.3 REFERENCES

3.3-5

3.4 WATER LEVEL (FLOOD) DESIGN 3.4-1 3.4.1 FLOOD PROTECTION 3.4-1

3.4.2 ANALYSIS PROCEDURE 3.4-2

3.5 MISSILE PROTECTION 3.5-1 3.5.1 DESIGN BASES 3.5-1

3.5.2 SYSTEMS TO BE PROTECTED 3.5-15

3.5.3 BARRIER DESIGN PROCEDURES 3.5-15

3.5 REFERENCES

3.5-22

3.6 PROTECTION AGAINST DYNAMIC EFFECTS ASSOCIATED WITH 3.6-1 THE POSTULATED RUPTURE OF PIPING 3.6.1 POSTULATED PIPING FAILURES IN FLUID SYSTEMS 3.6-1 BOTH INSIDE AND OUTSIDE OF CONTAINMENT

3.6.2 DETERMINATION OF BREAK LOCATIONS AND DYNAMIC EFFECTS 3.6-9 ASSOCIATED WITH THE POSTULATED RUPTURE OF PIPING

3.6 REFERENCES

3.6-33

WSES-FSAR-UNIT-3 3-v CHAPTER 3 TABLE OF CONTENTS (Cont'd)

Section Title Page

3.6A PIPE RUPTURE ANALYSIS 3.6A-1

3.6A.1 HIGH ENERGY PIPE BREAK INSIDE CONTAINMENT 3.6A-1

3.6A.2 HIGH ENERGY PIPE BREAK OUTSIDE CONTAINMENT 3.6A-11

3.6A.3 SUB COMPARTMENT PRESSURE ANALYSIS 3.6-15

3.6A.4 MODERATE ENERGY PIPING FAILURES - 3.6-16 INSIDE CONTAINMENT

3.6A.5 MODERATE ENERGY PIPING FAILURES - 3.6A-16 OUTSIDE CONTAINMENT

3.6A.6 FLOODING ANALYSIS 3.6A-16

3.6A.7 MAIN CONTROL ROOM HABITABILITY 3.6A-23

3.6B PIPE WHIP ANALYSIS 3.6B-1

3.6C BEND FORCE CALCULATION IN A PIPING SYSTEM 3.6C-1 USING CALPLOTF2421

3.7 SEISMIC DESIGN 3.7-1

3.7.1 SEISMIC INPUT 3.7-1

3.7.2 SEISMIC SYSTEM ANALYSIS 3.7-4

3.7.3 SEISMIC SUBSYSTEM ANALYSIS 3.7-13

3.7.4 SEISMIC INSTRUMENTATION 3.7-37

3.7 REFERENCES

3.7-41

3.7A SEISMIC DESIGN - PARAMETRIC STUDIES 3.7A-1

3.7A REFERENCES 3.7A-4

3.8 DESIGN OF CATEGORY I STRUCTURES 3.8-1

3.8.1 CONCRETE CONTAINMENT 3.8-1

3.8.2 STEEL CONTAINMENT 3.8-1

WSES-FSAR-UNIT-3 3-vi Revision 9 (12/97) CHAPTER 3 TABLE OF CONTENTS (Cont'd) Section Title Page

3.8.3 CONCRETE AND STEEL INTERNAL STRUCTURES OF 3.8-36 STEEL CONTAINMENT

3.8.4 OTHER SEISMIC CATEGORY I STRUCTURES 3.8-64

3.8.5 FOUNDATIONS 3.8-78

3.8 REFERENCES

3.8-81

3.9 MECHANICAL SYSTEMS AND COMPONENTS 3.9-1

3.9.1 SPECIAL TOPICS FOR MECHANICAL COMPONENTS 3.9-1

3.9.2 DYNAMIC SYSTEM ANALYSIS AND TESTING 3.9-29

3.9.3 ASME CODE CLASS 1, 2 AND 3 COMPONENTS, 3.9-46 COMPONENT SUPPORTS AND CORE SUPPORT STRUCTURES 3.9.4 CONTROL ELEMENT DRIVE MECHANISMS 3.9-64

3.9.5 REACTOR PRESSURE VESSEL INTERNALS 3.9-72

3.9.6 IN-SERVICE TESTING OF PUMPS AND VALVES 3.9-79

3.9 REFERENCES

3.9-80

3.9A SEISMIC CONSIDERATIONS FOR EQUIPMENT SPECIFICATIONS 3.9A-1

3.9B DESCRIPTION OF SEISMIC ANALYSIS AND SUMMARY OF RESULTS 3.9B-1 FOR NON-NSSS SUPPLIED ACTIVE PUMPS AND THEIR SUPPORTS

3.9B.1 CHILLED WATER PUMPS 3.9B-1

3.9B.2 CONTAINMENT SPRAY PUMPS 3.9B-1

3.9B.3 DIESEL OIL TRANSFER PUMP 3.9B-3

3.9B.4 COMPONENT COOLING WATER PUMPS 3.9B-7

3.9B.5 AUXILIARY COMPONENT COOLING WATER PUMPS 3.9B-9

3.9B.6 EMERGENCY FEEDWATER PUMPS 3.9B-12

3.9B.7 COMPONENT COOLING WATER MAKE-UP PUMPS 3.9B-17

3.9B.8 DIESEL ENGINE DRIVEN LUBE OIL PUMP 3.9B-20

3.9B.9 DIESEL ENGINE DRIVEN JACKET WATER PUMP 3.9B-20 WSES-FSAR-UNIT-3 3-vii CHAPTER 3 TABLE OF CONTENTS (Cont'd)

Section Title Page 3.9C DESCRIPTION OF SEISMIC ANALYSIS AND SUMMARY 3.9C-1 OF RESULTS FOR NON-NSSS SUPPLIED ACTIVE VALVES 3.9D NSSS COMPUTER CODE VERIFICATION 3.9D-1 3.9E ASYMMETRIC LOADS 3.9E-1 3.10 SEISMIC QUALIFICATIONS OF SEISMIC CATEGORY I 3.10-1 INSTRUMENTATION AND ELECTRICAL EQUIPMENT 3.10.1 SEISMIC QUALIFICATION CRITERIA 3.10-1

3.10.2 METHODS AND PROCEDURES FOR QUALIFYING ELECTRICAL 3.10-1 EQUIPMENT AND INSTRUMENTATION

3.10.3 METHODS AND PROCEDURES OF ANALYSIS OR TESTING OF 3.10-2 SUPPORTS OF ELECTRICAL EQUIPMENT AND INSTRUMENTATION

3.10.4 OPERATING LICENSE REVIEW 3.10-3

3.10 REFERENCES 3.10-5

3.10A CRITERIA FOR SEISMIC QUALIFICATION OF NON-NSSS SEISMIC 3.10A-1 CATEGORY I INSTRUMENT AND ELECTRICAL EQUIPMENT AND THEIR SUPPORTS 3.11 ENVIRONMENTAL DESIGN OF MECHANICAL AND ELECTRICAL 3.11-1 EQUIPMENT 3.11.1 EQUIPMENT IDENTIFICATION AND ENVIRONMENTAL CONDITIONS 3.11-1

3.11.2 QUALIFICATION TESTS AND ANALYSES 3.11-1

3.11.3 QUALIFICATION TESTS AND ANALYSES RESULTS 3.11-2

3.11.4 LOSS OF VENTILATION 3.11-2

3.11.5 ESTIMATED CHEMICAL AND RADIATION ENVIRONMENT 3.11-3

3.11 REFERENCE 3.11-4

WSES-FSAR-UNIT-3 3-viii DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS CHAPTER 3 LIST OF TABLES Table Title 3.2-1 CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS

3.2-2 EQUIPMENT CODE EXCEPTIONS TO REGULATORY GUIDE 1.26

3.3-1 WIND SPEEDS AND RESULTING STATIC PRESSURE LOADINGS

3.3-2 TORNADO WIND SPEEDS AND RESULTING STATIC PRESSURE LOADINGS

3.5-1 MISSILES OUTSIDE CONTAINMENT GENERATED BY HIGH ENERGY SYSTEMS

3.5-2 MISSILES OUTSIDE CONTAINMENT FROM FAILURE OF OVERSPEED PROTECTION

3.5-3 MISSILE PROTECTION - OUTSIDE CONTAINMENT TABULATION OF SAFETY RELATED STRUCTURES AND SYSTEMS

3.5-3a TABLE OF PROTECTED SAFETY RELATED HVAC AIR INTAKES & EXHAUSTS 3.5-4 POTENTIAL MISSILES INSIDE CONTAINMENT

3.5-5 PARAMETERS OF LOW PRESSURE WHEEL FRAGMENTS

3.5-6 PARAMETERS OF LOW PRESSURE TURBINE CYLINDER FRAGMENTS

3.5-7 SAFETY RELATED COMPONENTS LOCATED INSIDE REACTOR BUILDING AND BARRIERS 3.5-8 SAFETY RELATED EQUIPMENT IN RAB WING AREA AND BARRIERS

3.5-9a SAFETY RELATED EQUIPMENT LOCATED IN RAB AT FL. EL. +46 AND BARRIERS

3.5-9b SAFETY RELATED EQUIPMENT IN RAB @ EL. +21 AND BARRIERS

3.5-9c SAFETY RELATED EQUIPMENT IN RAB @ EL. -4.0' AND BARRIERS

3.5-9d SAFETY RELATED EQUIPMENT IN RAB AT EL. -35.0'

3.5-9e SAFETY RELATED EQUIPMENT IN RAB - CABLE TRAYS AND HVAC DUCTS 3.5-9f SAFETY RELATED EQUIPMENT IN FUEL HANDLING BUILDING AND BARRIERS

3.5-9g RESULTS OF PROBABILITY ANALYSIS FOR DESIGN OVERSPEED TURBINE FAILURE EVENT

3.5-9h RESULTS OF PROBABILITY ANALYSIS FOR DESTRUCTIVE OVERSPEED FAILURE EVENT

WSES-FSAR-UNIT-3 3-ix CHAPTER 3 LIST OF TABLES (Cont'd)

Table Title 3.5-10 POTENTIAL TORNADO MISSILES

3.5-11 TORNADO MISSILE CONCRETE BARRIER MINIMUM THICKNESS

3.5-12 ALLOWABLE DUCTILITY RATIOS FOR TORNADO IMPACT LOADS 3.5-13 STEEL BARRIERS

3.6-1 GUARD PIPE ASSEMBLY DESIGN CRITERIA

3.6-2 MATERIAL USED FOR PROCESS LINES WITHIN GUARD PIPE

3.6-3 TRUNNION WELDED ATTACHMENTS BETWEEN CONTAINMENT ISOLATION VALVES 3.6-4 SHEAR LUG WELDED ATTACHMENTS BETWEEN CONTAINMENT ISOLATION VALVES

3.6-5 CALCULATED STRESSES IHN ASME CODE CLASS 1 PIPING SYSTEMS

3.6A-1 STEAM GENERATOR BLOWDOWN SYSTEM - PIPE WHIP RESTRAINTS INSIDE CONTAINMENT

3.6A-2 REACTOR COOLANT SYSTEM DRAIN LINES - PIPE WHIP RESTRAINTS INSIDE CONTAINMENT

3.6A-3 SAFETY INJECTION SYSTEM - PIPE WHIP RESTRAINTS LOOP "2A" INSIDE CONTAINMENT

3.6A-4 CHEMICAL AND VOLUME CONTROL (LETDOWN) - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT

3.6A-5 CHEMICAL AND VOLUME CONTROL (CHARGING) - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT 3.6A-6 PRESSURIZER RELIEF SYSTEM - PIPE WHIP RESTRAINTS

3.6A-7 PRESSURIZER SPRAY SYSTEM - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT

3.6A-8 PRESSURIZER SURGE - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT

3.6A-9 SUMMARY OF DESIGN BASIS BREAKS

3.6A-10 SUMMARY OF DESIGN BASIS BREAKS

3.6A-11 SUMMARY OF DESIGN BASIS BREAKS

3.6A-12 SUMMARY OF DESIGN BASIS BREAKS

3.6A-13 MAIN STEAM - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT

WSES-FSAR-UNIT-3 3-x CHAPTER 3 LIST OF TABLES (Cont'd)

Table Title 3.6A-14 FEEDWATER - PIPE WHIP RESTRAINTS-INSIDE CONTAINMENT

3.6A-15 CVCS - CHARGING - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT 3.6A-16 CVCS LETDOWN - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT 3.6A-17 STEAM GENERATOR BLOWDOWN SYSTEM - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT

3.6A-18 PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES OPERATING CONDITIONS

3.6A-19 PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES PIPE RUPTURE CONDITION

3.6A-20 PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES OPERATING CONDITIONS

3.6A-21 PIPE STRESSES VS. ALLOWABLES AREA NEAR CONTAINMENT ISOLATION VALVES PIPE RUPTURE CONDITION

3.6A-22 SUMMARY OF DESIGN BASIS BREAKS

3.6A-23 SUMMARY OF DESIGN BASIS BREAKS

3.6A-24 SUMMARY OF DESIGN BASIS BREAKS

3.6A-25 SUMMARY OF DESIGN BASIS BREAKS

3.6A-26 MAINSTREAM - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT

3.6A-27 FEEDWATER - PIPE WHIP RESTRAINTS-OUTSIDE CONTAINMENT

3.7-1 DAMPING VALUES (PERCENT OF CRITICAL DAMPING)

3.7-2 SOIL SUPPORTED SEISMIC CATEGORY I STRUCTURES

3.7-3 INPUT DATA FOR SEISMIC ANALYSIS HORIZONTAL EXCITATIONS

3.7-4 INPUT DATA FOR SEISMIC ANALYSIS VERTICAL EXCITATIONS

3.7-5 NATURAL FREQUENCIES IN CYCLES PER SECOND (CPS)

3.7-6 COMPARISON OF STRUCTURAL RESPONSES FOR SEISMIC CATEGORY I STRUCTURES USING RESPONSE SPECTRA AND TIME HISTORY METHODS

WSES-FSAR-UNIT-3 3-xi CHAPTER 3 LIST OF TABLES (Cont'd)

Table Title 3.7-7 COMPARISON OF STRUCTURAL RESPONSES FOR SEISMIC CATEGORY I STRUCTURES USING RESPONSE SPECTRA AND TIME HISTORY METHODS

3.7-8 COMPARISON OF STRUCTURAL RESPONSES FOR SEISMIC CATEGORY I STRUCTURES USING RESPONSE SPECTRA AND TIME HISTORY METHODS

3.7-9 COMPARISON OF ACCELERATION FOR SEISMIC CATEGORY I STRUCTURES USING RESPONSE SPECTRA AND TIME HISTORY METHODS

3.7-10 COMPARISON OF ACCELERATION OF DYNAMIC ANALYSIS WITH AND WITHOUT TORSIONAL DEGREE OF FREEDOM

3.7-11 MAXIMUM DAMPING RATIONS USED IN ANALYSIS OF NSSS CATEGORY I STRUCTURES, SYSTEMS AND COMPONENTS

3.7-12 REACTOR COOLANT SYSTEM NATURAL FREQUENCY AND DOMINANT DEGREES OF FREEDOM

3.7-13 COMPARISON OF SEISMIC LOADS

3.7-14 MAXIMUM STRESS COMPARISON

3.7-15 DELETED

3.7-16 REACTOR INTERNALS NON-LINEAR HORIZONTAL SEISMIC MODEL NODE LOCATIONS 3.7-17 SEISMIC MONITORING SYSTEM COMPONENTS

3.7-18 COMPARISON OF MAXIMUM RESPONSES

3.7-19 COMPARISON OF MAXIMUM RESPONSES

3.7-20 COMPARISON OF MAXIMUM RESPONSES

3.7-21 LINES ANALYZED BY CHART METHOD

3.7A-1 EFFECT OF SHEAR MODULUS ON STRUCTURE RESPONSE

3.8-1 CONTAINMENT VESSEL PENETRATIONS - LOAD COMBINATIONS AND STRESS LIMITS

3.8-2 CONTAINMENT VESSEL LOAD COMBINATIONS

3.8-3 CONTAINMENT SHELL STRESSES AT JUNCTION OF COLUMN AND KNUCKLE 3.8-4 CONTAINMENT VESSEL TEMPERATURE GRADIENT

3.8-5 PENETRATION ANALYSIS

WSES-FSAR-UNIT-3 3-xii CHAPTER 3 LIST OF TABLES (Cont'd)

Table Title 3.8-6 ALLOWABLE STRESS

3.8-7 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 1

3.8-8 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 2

3.8-9 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 3

3.8-10 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 4

3.8-11 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 5

3.8-12 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 6

3.8-13 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 7

3.8-14 SUMMARY OF CONTAINMENT VESSEL STRESSES FOR LOAD CASE 10

3.8-15 ALLOWABLE BUCKLING STRESSES FOR CONTAINMENT VESSEL ELLIPSOIDAL HEAD

3.8-16 ALLOWABLE BUCKLING STRESSES FOR CONTAINMENT VESSEL ELLIPSOIDAL HEAD AT POST WELD HEAT TREATMENT

3.8-17 SUMMARY OF SHELL STRESSES IN KNUCKLE BETWEEN COLUMNS 3.8-18 SUMMARY OF SHELL STRESSES IN KNUCKLE AT COLUMNS

3.8-19 PHYSICAL PROPERTIES FOR MATERIALS TO BE USED FOR PRESSURE PARTS OR ATTACHMENT TO PRESSURE PARTS

3.8-20 MAJOR EQUIPMENT LOADS FOR CONTAINMENT INTERNAL STRUCTURE 3.8-21 CONTAINMENT INTERNAL CONCRETE STRUCTURE LOAD COMBINATIONS 3.8-22 CONTAINMENT INTERNAL STEEL STRUCTURE LOAD COMBINATIONS 3.8-23 COMPARISON OF MAX. DISPLACEMENT FIXMAT 2037 AND STARDYNE PROGRAMS

3.8-24 COMPARISON OF MAX. FORCE FIXMAT 2037 AND STARDYNE PROGRAMS

3.8-25 COMPARISON OF MAX. SHEAR FIXMAT 2037 AND STARDYNE PROGRAMS

3.8-26 COMPARISON OF MAX. MOMENT FIXMAT 2037 AND STARDYNE PROGRAMS

3.8-27 COMPARISON OF NATURAL FREQUENCIES FIXMAT 2037 AND NASTRAN PROGRAMS 3.8-28 COMPARISON OF ACCELERATIONS FIXMAT 2037 AND NASTRAN PROGRAMS

WSES-FSAR-UNIT-3 3-xiii CHAPTER 3 LIST OF TABLES (Cont'd)

Table Title 3.8-29 COMPARISON OF SHEAR FORCES FIXMAT 2037 AND NASTRAN PROGRAMS 3.8-30 COMPARISON OF BENDING MOMENTS FIXMAT 2037 AND NASTRAN PROGRAMS 3.8-31 REACTOR COOLANT PIPE STOP (STOP A)

3.8-32 COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF STRUCTURAL ELEMENTS OF CONCRETE INTERNAL STRUCTURE

3.8-33 COMPARISON OF MAXIMUM DESIGN AND ALLOWABLE STRESSES FOR REACTOR COOLANT PUMP SUPPORTS

3.8-34 COMPARISON OF MAXIMUM DESIGN AND ALLOWABLE STRESSES FOR UPPER STEAM GENERATOR SUPPORTS

3.8-35 STEAM GENERATOR SLIDING BASE SUPPORT STRESS COMPARISONS

3.8-36 REACTOR VESSEL SUPPORT

3.8-37 NSSS SUPPORT STEEL MATERIAL SUMMARY

3.8-38 SHIELD STRUCTURE LEAKAGE RATES

3.8-39 OTHER SEISMIC CATEGORY I STRUCTURES LOAD COMBINATIONS 3.8-40 COMPARISON OF CALCULATED DESIGNS LOADS AND ULTIMATE CAPACITY OF STRUCTURAL ELEMENTS OF SHIELD BUILDING

3.8-41 COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF STRUCTURAL ELEMENTS OF REACTOR AUXILIARY BUILDING

3.8-42 COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF STRUCTURAL ELEMENTS OF FUEL HANDLING BUILDING

3.8-43 COMPARISON OF CALCULATED DESIGN LOADS AND ULTIMATE CAPACITY OF THE COMMON MAT UNDER THE FOLLOWING STRUCTURAL ELEMENTS OF THE BUILDING 3.9-1 TRANSIENTS USED IN STRESS ANALYSIS OF CODE CLASS 1 COMPONENTS

3.9-2 SAFETY CLASS 1 NON-NSSS PIPING

3.9-3 TRANSIENTS AND OPERATIVE CONDITIONS FOR CODE CLASS 1 NON-NSSS PIPING

3.9-4 COMPARISON OF STRUCTURAL AND HYDRAULIC DESIGN PARAMETERS

3.9-5 LOADING COMBINATIONS FOR ASME CODE CLASS 1 COMPONENTS OTHER THAN VALVES

WSES-FSAR-UNIT-3 3-xiv CHAPTER 3 LIST OF TABLES (Cont'd)

Table Title 3.9-6 STRESS LIMITS FOR ASME CODE CLASS 1 COMPONENTS OTHER THAN VALVES

3.9-7 DESIGN LOADING COMBINATIONS AND STRESS LIMITS FOR ASME CODE CLASS 2 AND 3 PIPING

3.9-8 NSSS SUPPLIED ACTIVE VALVES AND PUMPS

3.9-9 NON-NSSS SUPPLIED ACTIVE VALVES AND PUMPS

3.9-10 CODE CLASS 1 AND 2 SAFETY RELIEF VALVES

3.9-11 PIPE STRESSES DUE TO SAFETY RELIEF VALVE LOADS

3.9-12 STRESS LIMITS FOR CEDM PRESSURE HOUSINGS

3.9-13 STRESS LIMITS FOR REACTOR INTERNALS

3.9-14 NSSS TANKS AND HEAT EXCHANGERS

3.9-15 NSSS PUMPS

3.9-16 PIPE BREAK LOAD CONSIDERATIONS FOR ACTIVE VALVES LOCATED IN HIGH ENERGY SYSTEMS

3.9-17 MSLB FLOW CONDITIONS AS APPLICABLE TO THE MSIV's

3.9-18 STRESS LIMITS AND LOADING COMBINATIONS FOR PIPE SUPPORTS

3.9-19 VIBRATION TESTING MODES

3.9-20 INSTRUMENTATION REQUIREMENTS FOR LEVEL 2 TEST

3.9-21 CLASS 1 STRESS RANGE VALUES

3.9C-1 SEISMIC QUALIFICATION REPORTS FOR NON-NSSS SUPPLIED ACTIVE VALVE OTHER THAN CHECK VALVES

3.9C-2 SEISMIC QUALIFICATION REPORTS FOR NON-NSSS SUPPLIED CLASS 1 CHECK VALVES 3.9C-3 SEISMIC QUALIFICATION REPORTS FOR NON-NSSS SUPPLIED ACTIVE CLASS 2 AND 3 CHECK VALVES

3.10-1 DELETED

3.11-1 ENVIRONMENTAL CONDITION SUMMARY

3.11-2 OPERABILITY REQUIREMENTS FOR EQUIPMENT REQUIRED TO FUNCTION DURING AND SUBSEQUENT TO ANY DESIGN BASIS ACCIDENT

3.11-3 SAFETY RELATED EQUIPMENT DESIGNED FOR NON-SEISMIC VIBRATION

WSES-FSAR-UNIT-3 3-xv Revision 11 (05/01) DESIGN OF STRUCTURES, COMPONENTS EQUIPMENT AND SYSTEMS CHAPTER 3 LIST OF FIGURES Figure Title 3.3-1 Wind Speeds and Resulting Static Pressures (Reactor Building - Dome)

3.3-2 Tornado Wind Speeds and Resulting Static Pressure Loadings - (Reactor Building - Dome)

3.3-3 Wind Speeds and Resulting Static Pressures (Reactor Building - Wall)

3.3-4 Tornado Wind Speeds and Resulting Static Pressures (Reactor Building - Wall) 3.4-1 Waterproofing and Water Stop Details For Seismic Category I Structures

3.4-2 Typical Flood Door

3.5-1 Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-2 Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-3 Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-4 Orientation of Turbine Missile Targets and Barriers Relative to Turbine Train 3.5-5 Properties of Low Pressure Turbine 90 Disc Quadrants 3.5-6 Arrangement and Identification of LP Turbine Discs

3.5-7 Typical LP Cylinder

3.5-8 Properties of Low Pressure Turbine Cylinder (Casing) Fragments

3.5-9 Display of Variables Used in the Turbine Missile Analysis 3.6-1 Pipe Whip Mathematical Model Main Steam Piping Inside Containment 3.6-2 Pipe Whip Mathematical Model Feedwater Lines Inside Containment 3.6-3 Pipe Whip Mathematical Model Main Steam Line A Outside Containment to Column "G"

3.6-4 Pipe Whip Mathematical Model Main Steam Line B Outside Containment to Column "G"

3.6-5 Pipe Whip Mathematical Model Feedwater Line A Outside Containment to Column "G"

WSES-FSAR-UNIT-3 3-xvi Revision 11 (05/01) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.6-6 Pipe Whip Mathematical Model Feedwater Line B Outside Containment to Column "G"

3.6-7 Piping Stress - Strain Characteristics

3.6-8 Restraint Impact

3.6-9 U-Bar Restraint

3.6-10 Collar Restraint

3.6-11 Plate - Type Restraint

3.6-12 Jet Divergence for Wet Steam and Saturated Water

3.6-13 Circumferential Break - Limited Separation 3.6-14 Jet Divergence for Dry Steam and Nonflashing Water

3.6-15 Containment Piping Penetration Assemblies Type I Load Combinations 3.6-16 Containment Piping Penetration Assemblies Type II Load Combinations 3.6-17 Containment Piping Penetration Assemblies Type III Load Combinations 3.6-18 Containment Piping Penetration Assemblies Types IV & V Load Combinations 3.6-19 Containment Piping Penetration Assemblies Type VI Load Combinations 3.6-20 Blowdown and Total Wave Forces

3.6-21 Friction Effect on Steady Blowdown Force

3.6A-1 Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints

3.6A-2 Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints

3.6A-3 Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints

3.6A-4 Reactor Building Blowdown System Breakpoints & Pipe Whip Restraints

3.6A-5 Reactor Building Reactor Coolant Piping Breakpoints & Pipe Whip Restraints

3.6A-6 Reactor Building Reactor Coolant Piping Breakpoints & Pipe Whip Restraints

WSES-FSAR-UNIT-3 3-xvii Revision 11 (05/01) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.6A-7 Reactor Building Reactor Coolant Piping Breakpoints & Pipe Whip Restraints

3.6A-8 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-9 Reactor Building-Safety Injection Piping-Break Points & Pipe Whip Restraints

3.6A-10 Reactor Building-Safety Injection Piping-Break Points & Pipe Whip Restraints

3.6A-11 Reactor Building-Safety Injection Piping System-Break Points & Pipe Whip Restraints

3.6A-12 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-13 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-14 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-15 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-16 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-17 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-18 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-19 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-20 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-21 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

3.6A-22 Reactor Building-Safety Injection System-Break Points & Pipe Whip Restraints

WSES-FSAR-UNIT-3 3-xviii Revision 11 (05/01) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.6A-23 Reactor Building - Safety Injection System-Break Points & Pipe Whip Restraints 3.6A-24 Reactor Building - Safety Injection Piping-Break Points & Pipe Whip Restraints 3.6A-25 Reactor Building - Safety Injection Piping-Break Points & Pipe Whip Restraints 3.6A-26 Reactor Building - Safety Injection System-Break Points & Pipe Whip Restraints 3.6A-27 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-28 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-29 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-30 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-31 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-32 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-33 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-34 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-35 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-36 Reactor Building - Chemical and Volume Control Piping - Break Points and Pipe Whip Restraints

3.6A-36a Reactor Coolant System Design Basis Pipe Breaks Types and Locations 3.6A-36b Reactor Coolant System Design Basis Pipe Breaks Types and Locations 3.6A-36c Reactor Building Chemical & Volume Control Piping Breakpoints & Pipe Whip Restraints

WSES-FSAR-UNIT-3 3-xix Revision 15 (03/07) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.6A-37 Reactor Building - Pressurizer Relief System - Break Points and Pipe Whip Restraints

3.6A-38 Reactor Building - Reactor Coolant Piping Pressurizer Spray Break Points & Pipe Whip Restraints

3.6A-38a Reactor Building - Reactor Coolant Piping Pressurizer Spray Break Points & Pipe Whip Restraints

3.6A-38b Reactor Building - Reactor Coolant Piping Pressurizer Spray Break Points & Pipe Whip Restraints

3.6A-38c Reactor Building Pressurizer Surge Piping Break Points & Pipe Whip Restraints 3.6A-38d Main Steam & Feedwater Piping Systems Selection of Postulated Break Locations Inside Containment

3.6A-38e Postulated Break Locations - Main Steam Piping Inside Containment (DRN 06-734, R15) 3.6A-38f Postulated Break Locations - Feedwater Piping Inside Containment (DRN 06-734, R15) 3.6A-39 Auxiliary Building Chemical and Volume Control Piping (Charging) Break Points and Pipe Whip Restraints

3.6A-40 Reactor Auxiliary Building Chemical and Volume Control Piping (Charging) Break Points and Pipe Whip Restraints

3.6A-41 Reactor Auxiliary Building Chemical and Volume Control Piping (Charging) Break Points and Pipe Whip Restraints

3.6A-41a Reactor Auxiliary Building Chemical & Volume Control Piping (Charging) Breakpoints & Pipe Whip Restraints

3.6A-42 Reactor Auxiliary Building Chemical and Volume Control Piping (Charging) Break Points and Pipe Whip Restraints

3.6A-43 Reactor Auxiliary Building Chemical and Volume Control Piping (Charging) Break Points and Pipe Whip Restraints

3.6A-43a Reactor Auxiliary Building - CVCS Charging System - Break Points and Pipe Whip Restraints

3.6A-43b Reactor Auxiliary Building - CVCS Charging System - Break Points and Pipe Whip Restraints

3.6A-44 Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown)

Break Points & Pipe Whip Restraints

WSES-FSAR-UNIT-3 3-xx CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.6A-45 Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints

3.6A-46 Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints

3.6A-47 Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints

3.6A-48 Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints

3.6A-49 Reactor Auxiliary Building - Chemical Volume Control Piping (Letdown) Break Points & Pipe Whip Restraints

3.6A-50 Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints

3.6A-51 Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints

3.6A-52 Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints

3.6A-53 Reactor Auxiliary Building Blowdown System Break Points & Pipe Whip Restraints

3.6A-54 Main Steam & Feedwater Piping Systems - Superpipe Region Combined Operating & Pipe Rupture Stresses Outside Containment

3.6A-54a Reactor Auxiliary Building - Main Steam and Feedwater - Break Exclusion Region

3.6A-54b Reactor Auxiliary Building - Main Steam and Feedwater - Break Exclusion Region

3.6A-55 Postulated Break Locations - Main Steam Break Outside Containment to "G" Row

3.6A-56 Postulated Break Locations - Main Feedwater Piping Outside Containment to "G" Row

3.6A-57 Main Steam & Feedwater Piping Systems Selection of Postulated Break Locations - Isolation Valves to "G" Row - Outside Containment 3.6A-58 CVCS Letdown (RAB)

3.6A-59 Blowdown, RLB (Steam Generator No. 1)

WSES-FSAR-UNIT-3 3-xxi CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.6A-60 Blowdown, RAB (Steam Generator No. 1)

3.6A-61 Blowdown, RAB (Steam Generator no. 2)

3.6A-62 CVCS Letdown (RCB)

3.6A-63 Blowdown, RLB (Steam Generator No. 2)

3.6A-64 CVCS Charging (RCB, Penetration to Regenerative Heat Exchanger) 3.6A-65 CVCS Charging (RAB)

3.6A-66 CVCS Charging (RAB, From Pump A)

3.6A-67 CVCS Charging (RAB, From Pumps B and A/B)

3.6C-1 Typical Piping Bend

3.6C-2 Typical Piping Bend With Adjacent Break

3.6C-3 Pipe Break Experimental System

3.6C-4 Relap Model of Experimental System

3.6C-5 Bend Force Comparisons With Test

3.6C-6 Typical Piping Straight Run With Control Volumes

3.6C-7 Typical Piping Straight Run With Break

3.6C-8 Cold Water Experimental Force Comparison

3.6C-9 Assumed Rupture Disk Opening

3.7-1 Horizontal Response Spectrum Design Basis Earthquake 2% Damping - Top of Pleistocene

3.7-2 Horizontal Response Spectrum Design Basis Earthquake 5% Damping - Top of Pleistocene

3.7-3 Horizontal Response Spectrum Operating Basis Earthquake 2% Damping - Top of Pleistocene

3.7-4 Horizontal Response Spectrum Operating Basis Earthquake 5% Damping - Top of Pleistocene

WSES-FSAR-UNIT-3 3-xxii CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.7-5 Vertical Response Spectrum Design Basis Earthquake 2% Damping - Top of Pleistocene

3.7-6 Vertical Response Spectrum Design Basis Earthquake 5% Damping - Top of Pleistocene

3.7-7 Vertical Response Spectrum Operating Basis Earthquake 2% Damping - Top of Pleistocene

3.7-8 Vertical Response Spectrum Operating Basis Earthquake 5% Damping - Top of Pleistocene

3.7-9 Mathematical Model For Seismic Analysis (Horizontal Excitations) 3.7-10 Mathematical Model for Seismic Analysis (Vertical Excitation) 3.7-11 Floor Spectra E-W SSE 1% Containment Vessel Elev. + 88 Ft. MSL 3.7-12 Floor Spectra E-W SSE 1% Internal Structure Elev. + 46 Ft. MSL 3.7-13 Floor Spectra E-W SSE 1% Fuel Handling Bldg. Elev. + 21 Ft. MSL 3.7-14 Floor Spectra E-W SSE 1% Reactor Aux. Bldg. Elev. + 21 Ft. MSL 3.7-15 Floor Spectra E-W SSE 1% Foundation Mat Elev. - 35 Ft. MSL

3.7-16 Floor Spectra Vertical SSE 1% Containment Vessel Elev. + 88 Ft. MSL 3.7-17 Floor Spectra Vertical SSE 1% Internal Structure Elev. + 46 Ft. MSL 3.7-18 Floor Spectra Vertical SSE 1% Reactor Aux. Bldg. Elev. + 21 Ft. MSL 3.7-19 Floor Spectra Vertical SSE 1% Fuel Handling Bldg. Elev. + 21 Ft. MSL 3.7-20 Floor Spectra Vertical SSE 1% Foundation Mat Elev. - 35 Ft. MSL 3.7-21 Reactor Building Mathematical Torsion Model 3.7-22 Stability Against Overturning For Seismic Category I Structures

3.7-23 Reactor Coolant System Seismic Analysis Model

3.7-24 Pressurizer Seismic Analysis Model

3.7-25 Surge Line Seismic Analysis Model

3.7-26 Seismic Protection Analysis Sample Problem No. 1

WSES-FSAR-UNIT-3 3-xxiii CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.7-27 Seismic Protection Analysis Sample Problem No. 2 (Sheet 1) 3.7-28 Seismic Protection Analysis Sample Problem No. 2 (Sheet 2) 3.7-29 Seismic Protection Analysis Sample Problem No. 3

3.7-30 Representative Node Locations Seismic Mathematical Model 3.7-31 Reactor Internals Linear Lateral Seismic Model

3.7-32 Reactor Internals Linear Vertical Seismic Model 3.7-33 Reactor Internals Nonlinear Lateral Seismic Model

3.7-34 Reactor Core Horizontal Nonlinear Seismic Model 3.7-35 Core - Support Barrel Upper Flange Finite - Element Model 3.7-36 Schematic Representation of the Theoretically Modeled 150 Inch CEDM 3.7A-1 Variation of Shear Modulus with Time (Level 19) 3.7A-2 Variation of Shear Modulus with Time (Level 13) 3.7A-3 Soil Shear Modulus Distribution During Safe Shutdown Earthquake 3.7A-4 Soil Shear Modulus During Safe Shutdown Earthquake

3.8-1 Seismic Category I Structural Layout

3.8-2 Reactor Building Containment Vessel

3.8-3 Reactor Containment Building Piping Penetrations 3.8-4 Reactor Containment Building Piping Penetrations 3.8-5 Reactor Containment Building Pipe Penetrations

3.8-6 Electrical Penetrations Penetration Outline Sheet 1 of 2 3.8-6 Electrical Penetrations Concrete Inserts Sheet 2 of 2 3.8-7 OBE Seismic Coefficients For Steel Containment Vessel 3.8-8 SSE Seismic Coefficients For Steel Containment Vessel

3.8-9 Combination of Latitudinal and Meridional Stresses For the Containment Vessel

WSES-FSAR-UNIT-3 3-xxiv Revision 11 (05/01) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.8-10 Formulas For Calculating Containment Vessel Stresses Resulting From Vertical Axial Forces

3.8-11 Formulas For Calculating Containment Vessel Stresses Resulting From Horizontal Axial Forces

3.8-12 Dimensions and Plate Sizes For Containment Vessel Bottom Head

3.8-13 Schematic of Column to Containment Shell Junction

3.8-14 Schematic of Containment Vessel Knuckle Section

3.8-15 Containment Vessel Bottom Elliptical Head: Computer Model

3.8-16 Load Development For Containment Vessel Personnel Lock

3.8-17 Model for CB&I Program 1027

3.8-18 Containment Penetration Model Used in CB&I Program 1036 M

3.8-19 Containment Penetration Model Used in CB&I Program 1392

3.8-20 Containment Penetration Model Used In CB&I Program 1392

3.8-21 Shell Model Showing Points of Stress Summary

3.8-22 Allowable Buckling Stresses For Unstiffened Hemispherical Head 3.8-23 Allowable Buckling Stresses For Cylindrical Vessel

3.8-24 Allowable Buckling Stress For SA-516 Grade 70 Material

3.8-25 Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 0 After a LOCA

3.8-26 Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 20 Min.

After a LOCA

3.8-27 Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 50 Min.

After a LOCA

3.8-28 Summary of Knuckle Stress Analysis in Ethafoam Zone at Time = 2 Hours After a LOCA

3.8-29 Post Weld Heat Treatment: Thermocouple and Furnace Arrangement (Elevation) 3.8-30 Post Weld Heat Treatment: Thermocouple and Furnace Arrangement (Plan)

WSES-FSAR-UNIT-3 3-xxv Revision 9 (12/97) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.8-31 Reactor Building Structural Layout

3.8-32 Reactor Primary Shield and Refueling Canal Masonry Sheet 1 of 2

3.8-32 Reactor Primary Shield and Refueling Canal Masonry Sheet 2 of 2

3.8-33 Reactor Primary Shield and Refueling Canal - Reinforcement Sheet 1 of 2

3.8-33 Reactor Primary Shield and Refueling Canal - Reinforcement Sheet 2 of 2

3.8-34 Reactor Building Reactor Vessel Support

3.8-35 Reactor Building Equipment Supports

3.8-36 Reactor Building Steam Generator Sliding Base

3.8-37 Reactor Building Reactor Coolant System Support

3.8-38 Reactor Building Reactor Coolant System Supports and Stops 3.8-39 Reactor Building Reactor Coolant System Supports and Stops 3.8-40 Shield Building Dome - Masonry

3.8-41 Shield Building Dome - Reinforcement (Typical)

3.8-42 Reactor Auxiliary Building Structural Layout

3.8-43 Fuel Handling Building Structural Layout

3.8-44 Shield Building Cylinder Development

3.8-45 Common Foundation Mat - Masonry (Typical)

3.8-46 Common Foundation Mat - Reinforcement (Typical)

3.9-47 Unacceptable and Acceptable Fusion Conditions 3.9-1 ASHSD Finite Element Model of the CSB System

3.9-2 Full Power DE Outlet Break Radial Pressure Difference Across Core Support Barrel 3.9-3 Full Power DE Inlet Break Radial Pressure Difference Across Core Support Barrel 3.9-4 Sammsor/Dynasor Finite Element Model of Core Support Barrel 3.9-5 DELETED

WSES-FSAR-UNIT-3 3-xxvi Revision 9 (12/97) CHAPTER 3 LIST OF FIGURES (Cont'd)

Figure Title 3.9-6 Detailed Vertical Internals Model

3.9-7 Detailed Horizontal Internals Mode

3.9-8 Reduced Internals Model

3.9-9 Reactor Vertical Arrangement

3.9-10 Maine Yankee Reactor Vertical Arrangement

3.9-11 Fort Calhoun - Unit 1 Reactor Vertical Arrangement

3.9-12 Closed System Arrangement for Safety Relief Valves

3.9-13 Control Element Drive Mechanism (Magnetic Jack)

3.9-14 Pressure Vessel, Core Support Barrel Snubber Assembly

3.9-15 Core Shroud Assembly

3.9-16 Upper Guide Structure Assembly

3.9-17 In-Core Instrument Support Assembly

3.9-18 In-Core Instrument Nozzle

3.9-19 Intentionally Deleted

3.9-20 General Flow Chart for Piping Vibration Testing

WSES-FSAR-UNIT-3 3-xxvii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 3 Section Cross References

Revision 12-B Section 3.2.1 ER-W3-1999-9544-001/DRN 03-291 Table 3.2-1 Sht 23 Table 3.2-1 Sht 26 Table 3.9-9 Sht 13

Section 3.6.2.1.3 ER-W3-2000-0563-000/DRN 00-0958 Section 3.6A.6.4.2.1

Revision 12-C Table 3.2-1 Sht 24 ER-W3-2003-0227-000/DRN 03-633 Table 3.2-1 Sht 25

Revision 13 Section 3.9.1.2 ER-W3-2000-1073-000/DRN 02-1196 Table 3.9C-30

Section 3.6A.6.4.2.1 ER-W3-2003-0271-000/DRN 03-774

Table 3.2-1 Sht 5 ER-W3-2000-0106-002/DRN 03-759 Table 3.2-1 Sht 6

Section 3.3.2.3 ER-W3-2002-0510-000/DRN 03-1823

Figure 3.9-18 ER-W3-2003-0135-000/DRN 03-1921

Revision 13-A Table 3.9-1 Sht 9 ER-W3-99-0557-00-00/DRN 99-868

Revision 13-B Table 3.9-9 Sht 8 ER-W3-2004-0143-000/DRN DRN 04-515 Table 3.9-9 Sht. 10 Table 3.9-9 Sht. 18 Table 3.9-9 Sht. 24

Revision 14 Section, 3.1.4 ER-W3-2001-1149-000/DRN 03-2056 Section, 3.6.1.2 Section, 3.6.2.1.1 Section, 3.6.2.1.1.1 Section, 3.6.2.1.1.2 Section, 3.6.2.3.1 Section, 3.6.2.5.1 Section, 3.6.3 Section, 3.6A.1.1.5.2 Section, 3.6A.6.3 Section, 3.7.3.14.2.1 Section, 3.7.3.14.2.2 Section, 3.7.3.14.2.3 Section, 3.7.3.14.2.5 Section, 3.9.1.2 Section, 3.9.1.5

WSES-FSAR-UNIT-3 3-xxviii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 3 Revision 14 Cont'd Section 3.9.2.5.1 ER-W3-2001-1149-000/DRN 03-2056 Section 3.9.2.5.1.1 Section 3.9.2.5.1.5 Section 3.9.2.5.2 Section 3.9.2.5.3 Section 3.9.3.4 Section 3.9.4.3 Section 3.9.5.1.1 Section 3.9.5.1.1.1 Section 3.9.5.1.1.3 Section 3.9.5.1.2 Section 3.9.5.1.4 Section 3.9.5.3.2 Section 3.9.5.4.1 Section 3.11.3 Reference, 3.6 Reference, 3.9 Table 3.6A-18 Table 3.6A-19 Table 3.6A-20 Table 3.6A-21 Table 3.9-1 sh 1-2 Table 3.9-12 Table 3.9-13 Table 3.9-21 Figure 3.6A-38d Figure 3.6A-54 Figure 3.6A-57 Figure 3.6A-58 Figure 3.6A-59 Figure 3.6A-60 Figure 3.6A-61 Figure 3.6A-62 Figure 3.6A-63 Figure 3.6A-64 Figure 3.6A-65 Figure 3.6A-66 Figure 3.6A-67 Appendix 3.9E

Section 3.6A.6.3 ER-W3-2001-1149-000/DRN 05-163 Section 3.11-3

Section 3.1.16 ER-W3-2002-0110-001/DRN 04-1095

Figure 3.9-17 ER-W3-2004-0137-000/DRN 04-1959 Figure 3.9-18

Figure 3.8.32 ER-W3-2004-0137-002/DRN 05-557

Section 3.2.1 ER-W3-2004-0276-001/DRN 05-127 Section 3.5.1 Section 3.5.1.4.1 Section 3.6.1.1 Table 3.11 sheets 1-8

Table 3.9-9 sheet 11 ER-W3-2004-0618-000/DRN 05-40

Table 3.9-9 sheet 3 ER-W3-2005-0273-000/DRN 05-1063 Table 3.9-9 sheet 10 Table 3.9-9 sheet 14 WSES-FSAR-UNIT-3 3-xxix Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 3 Revision 14 Cont'd Table 3.9-9 sheet 3 ER-W3-2005-0302-000/DRN 05-1133 Table 3.9-9 sheet 9 Table 3.9-9 sheet 16 Table 3.9-9 sheets 23-24

Table 3.11-1 page 8 ER-W3-2005-0500-000/DRN 05-1549

Revision 14-A Table 3.2-1 sheet 8 ER-W3-2004-0523-000/DRN 05-1572

Section 3.2.2 ER-W3-1998-0840-001/DRN 05-1637

Section 3.6A.6.4.1 ER-W3-2005-0033-000/DRN 05-1388

Section 3.8.3.3.1 ER-W3-2004-0331-000/DRN 05-1534

Table 3.9-9 sheet 6 ER-W3-2004-0523-000/DRN 05-1572

Table 3.9-10 sheet 1 ER-W3-2004-0523-000/DRN 05-1572

Table 3.11-1 sheet 2 ER-W3-2000-0334-000/DRN 04-1197 Table 3.11-1 sheet 3

Revision 14-B Section 3.6.1.2 ER-W3-2005-0442-000/DRN 06-291 Section 3.6A.6.4.2.2

Table 3.2-1 sh 8 ER-W3-2006-0178-000/DRN 06-499 Table 3.9-9 sh 6 Table 3.9-10 sh 1

Revision 15 Table 3.2-1 Sh. 8 ER-W3-2004-0523-000/DRN 05-1572 Table 3.9-9 Sh. 6 Table 3.9-10 Sh. 1

Table 3.9-1 Sh. 1 ER-W3-2006-0190-000/DRN 06-555

Table of Contents ER-W3-2006-0109-000/DRN 06-734 Figure 3.6-2 Table 3.6A-14 Figure 3.6A-38f

Section 3.5.1.3.7 ER-W3-2006-0164-000/DRN 06-758

References:

Section 3.5 Section 3.5.1.3.3

Section 3.6 ER-W3-2006-0258-000/DRN 06-803 Section 3.6.2.1.1.2 Section 3.6.2.1.1.3

Section 3.1.48 ER-W3-2006-0281-000/DRN 06-870 Table 3.2-1 Sh. 9 Table 3.2-1 Sh. 11 Table 3.2-1 Sh. 12 Table 3.2-1 Sh. 21 Table 3.2-1 Sh. 24 Table 3.2-1 Sh. 25 WSES-FSAR-UNIT-3 3-xxx Revision 304 (06/10) UPDATE REFERENCE LIST Chapter 3 Revision 15 Cont'd Table 3.9C-2 ER-W3-2006-0223-000/DRN 06-882

Table 3.6-5 Sh. 1 ER-W3-2006-0223-000/DRN 06-883 Table 3.6-5 Sh. 2 Table 3.6-5 Sh. 3 Table 3.6-5 Sh. 4 Table 3.6-5 Sh. 8

Table 3.2-1 Sh. 1 ER-W3-2006-0223-000/DRN 06-903 Table 3.2-1 Sh. 2 Table 3.2-1 Sh. 3 Table 3.2-1 Sh. 4 Table 3.2-1 Sh. 8 Table 3.2-1 Sh. 25

Section 3.6.2.3.4 ER-W3-2006-0223-000/DRN 06-913 Section 3.7.2.1.1.4 Section 3.7.3.1.1.2 Section 3.7.3.14.1.2

Table 3.9-1 Sh. 1 ER-W3-2006-0245-000/DRN 06-1001 Table 3.9-3

Table 3.9-9 Sh. 9 ER-W3-1999-0557-004/DRN 06-1183

Table 3.6A-3 Sh. 3 ER-W3-2007-0030-000/DRN 07-39 Figure 3.6A-16

Revision 301 Section 3.1.37 EC-5000082443 Section 3.1.38

Revision 302 Section 3.11.1 EC-658 Section 3.11.3

Table 3.9-9 Sh. 22 EC-935 Section 3.9.1.1.1 Section 3.9.1.2.1.22

Table 3.11-1 Sh. 3 EC-10297

Revision 304 Section 3.8.2.3 EC-706 EC-18219

Table 3.9-9 Sh. 22 EC-13981 Table 3.9C-2 Section 3.9.1.1.2

Table 3.9-9 Sh. 16 EC-18248

Section 3.7.2.6 EC-18996 Section 3.7.3.1.1.2

Table 3.9-9 Sh. 11 EC-19716 Table 3.9C-3 Sh. 1 WSES-FSAR-UNIT-3 3-xxxi Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 3

Section Cross References Revision 305 Table 3.2-1 Sheet 5 of 27 EC-4019

Section 3.6.1.2 EC-19087 Section 3.6.2.3.1 Section 3.6.2.5 Section 3.6.3 Section 3.6: References Section 3.6A Table 3.6A-8 Figure 3.6A-36a Figure 3.6A-36b Figure 3.6A-38c

Section 3.8.3.8 EC-26170 Section 3.8.4.8

Table 3.9-8 Sheet 2 of 2 EC-26496

Table 3.9-9 Sheet 22 of 24 EC-14765 Table 3.9C-1 Sheet 12 of 12

Section 3.4-1 EC-29230

Revision 306 Section 3.8.4.1.3 EC-14275

Section 3.6.2.3.4 EC-29816 Section 3.9.1.5.2

Revision 307 Section 3.7.3.14.2.5 EC-1020 Section 3.7.4.1 Section 3.9.1.2.2.1.3 Section 3.9.1.2.2.1.4 Section 3.9.1.2.2.1.9 Section 3.9.1.2.2.2.3 Section 3.9.5.1.4 Figure 3.9-9 Figure 3.9-18

Table 3.5-4 (Sh. 2 of 2) EC-2800 Section 3.7.3.14.2.2 Section 3.7.3.14.2.3 Section 3.7.3.14.2.5 Section 3.9.1.2.2.2.1 b Section 3.9.1.2.2.2.2 Section 3.9.1.2.2.2.3 Section 3.9.4.1.1.3 Section 3.9.4.2 Section 3.9.4.4.1.1 Section 3.9.4.4.1.2 Section 3.9.4.4.1.3 Section 3.9: References Table 3.9-12

Section 3.8.4.1.1 EC-8427 Figure 3.8-44

WSES-FSAR-UNIT-3 3-xxxii Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 3

Section Cross References Revision 307 (continued)

Section 3.6.2.5.1 EC-8433 Figure 3.8-37 Figure 3.8-38 Figure 3.8-39

Section 3.9.1.2.1.23 EC-8435 Section 3.9.1.2.2 Table 3.6A-1 Figure 3.6A-1 Figure 3.6A-3

Section 3.8.3.1.5 EC-8438 Figure 3.8-35 Figure 3.8-36

Table 3.6A-3 Sh. 1 of 5 EC-8439 Table 3.6A-3 Sh. 3 of 5 Table 3.6A-3 Sh. 4 of 5 Table 3.6A-3 Sh. 5 of 5 Table 3.6A-8 Figure 3.6A-8 Figure 3.6A-14 Figure 3.6A-21 Figure 3.6A-26 Figure 3.6A-38c Table 3.6-5 Sh. 5 of 10 Table 3.6-5 Sh. 7 of 10 Table 3.6-5 Sh. 8 of 10 Table 3.6-5 Sh. 9 of 10

Section 3.7.3.1.2.1 EC-8458 Section 3.7.3.1.2.2 Section 3.7.3.1.2.3 Section 3.7.3.1.3 Section 3.7.3.1.4 Table 3.7-12 Table 3.7-13 Figure 3.7-23 Figure 3.7-25 Section 3.7.3.14.2.2 Section 3.7.3.14.2.5 Section 3.7.4.1 Section 3.7: REFERENCES Section 3.9.1.1 Section 3.9.1.2.2.1.1 Section 3.9.1.2.2.1.2 Section 3.9.1.2.2.2.3 Section 3.9.1.2.2.2.4 Section 3.9.1.5.2 Section 3.9: REFERENCES Table 3.9-1 Table 3.9-3 Appendix 3.9E Section 3.9.1.2.2.1.34 Section 3.9.1.2.2.1.35

Section 3.9.1.2.2.3 EC-12610

Table 3.2-1 Sh. 2 of 27 EC-33471 Table 3.2-1 Sh. 26 of 27 WSES-FSAR-UNIT-3 3-xxxiii Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 3

Section Cross References Revision 307 (continued)

Figure 3.6A-20 EC-38445

Section 3.4.1 EC-41046

Table 3.9-9 Sh. 1 of 24 EC-41355 Table 3.9-9 Sh. 4 of 24 Table 3.9-9 Sh. 5 of 24 Table 3.9-9 Sh. 6 of 24 Table 3.9-9 Sh. 11 of 24 Table 3.9-9 Sh. 17 of 24

Table 3.8-37 Sh. 1 of 2 EC-41857

Table 3.2-1 Sh. 25 of 27 EC-44877

Revision 308 Section 3.5.3.2.1 EC 40242 Table 3.5-13

Section 3.8.3.2.3 LBDCR 14-018 Section 3.8.6.13 Section 3.8.4.1.1

Table 3.2-1 Sh. 13 of 27 LBDCR 13-016 Table 3.2-1 Sh. 23 of 27 LBDCR 13-016

Table 3.6a-26 EC 45581 Table 3.6a-27

WSES-FSAR-UNIT-3 4-i Revision 308 (11/14) REACTOR CHAPTER 4 TABLE OF CONTENTS Section Title Page

4.0 REACTOR 4.1-1

4.1 SUMMARY DESCRIPTION 4.1-1

4.1 REFERENCES

4.1-3

4.2 FUEL SYSTEM DESIGN 4.2-1

4.2.1 DESIGN BASES 4.2-1

4.2.2 DESCRIPTION AND DESIGN DRAWINGS 4.2-33 4.2.3 DESIGN EVALUATION 4.2-39

4.2.4 TESTING AND INSPECTION PLAN 4.2-63

4.2 REFERENCES

4.2-71

4.3 NUCLEAR DESIGN 4.3-1

4.3.1 DESIGN BASES 4.3-1

4.3-2 DESCRIPTION 4.3-3

4.3.3 ANALYTICAL METHODS 4.3-20

4.3.4 CHANGES 4.3-34

4.3 REFERENCES

4.3-35 (DRN 02-1538, R12;04-502, R13;05-508, R14; EC-30663, R307, LBDCR 14-008, R308) 4.3A FUEL CYCLE 20 4.3A-1 (DRN 02-1538, R12;04-502, R13;05-508, R14; EC-30663, R307, LBDCR 14-008, R308) 4.3A.1 GENERAL DESCRIPTION 4.3A-1 4.3A.2 FUEL SYSTEM DESIGN 4.3A-1

4.3A.3 NUCLEAR DESIGN 4.3A-5

4.3A.4 THERMAL - HYDRAULIC DESIGN 4.3A-7

4.3A.5 REACTOR PROTECTION AND MONITORING SYSTEM 4.3A-8

4.3A.6 REFERENCES TO APPENDIX 4.3A 4.3A-9 WSES-FSAR-UNIT-3 4-ii CHAPTER 4 TABLE OF CONTENTS (Cont'd)

Section Title Page

4.4 THERMAL AND HYDRAULIC DESIGN 4.4-1

4.4.1 DESIGN BASES 4.4-1

4.4.2 DESCRIPTION OF THERMAL AND HYDRAULIC 4.4-2 DESIGN OF THE REACTOR CORE

4.4.3 DESCRIPTION OF THE THERMAL AND HYDRAULIC 4.4-14 DESIGN OF THE REACTOR COOLANT SYSTEM (RCS) 4.4.4 EVALUATION 4.4-16

4.4.5 TESTING AND VERIFICATION 4.4-30

4.4.6 INSTRUMENTATION REQUIREMENTS 4.4-30

4.4 REFERENCES

4.4-34

4.5 REACTOR MATERIALS 4.5-1

4.5.1 CONTROL ELEMENT DRIVE STRUCTURAL MATERIALS 4.5-1

4.5.2 REACTOR INTERNALS MATERIALS 4.5-4

4.5 REFERENCES

4.5-12

4.6 FUNCTIONAL DESIGN OF REACTIVITY CONTROL SYSTEMS 4.6-1

4.6.1 INFORMATION FOR CONTROL ELEMENT ASSEMBLY DRIVE SYSTEM 4.6-1

4.6.2 EVALUATIONS OF THE CEADS 4.6-1

4.6.3 TESTING AND VERIFICATION OF THE CEADS 4.6-2

4.6.4 INFORMATION FOR COMBINED PERFORMANCE OF REACTIVITY SYSTEMS 4.6-2 4.6.5 EVALUATIONS OF COMBINED PERFORMANCE 4.6-2

4.6 REFERENCES

4.6-3 WSES-FSAR-UNIT-3 4-iii CHAPTER 4 LIST OF TABLES Table Title

4.1-1 ANALYSIS TECHNIQUES

4.2-1 MECHANICAL DESIGN PARAMETERS

4.2-2 TENSILE TEST RESULTS ON IRRADIATED SAXTON CORE III CLADDING 4.3-1 NUCLEAR DESIGN CHARACTERISTICS

4.3-2 INTENTIONALLY DELETED

4.3-3 COMPARISON OF CORE REACTIVITY COEFFICIENT WITH THOSE USED IN VARIOUS SAFETY ANALYSES

4.3-4 REACTIVITY COEFFICIENTS

4.3-5 WORTHS OF CEA GROUPS

4.3-6 CEA REACTIVITY ALLOWANCES 4.3-7 CALCULATED CEA WORTHS AND ALLOWANCES ()

4.3-8 COMPARISON OF RODDED AND UNRODDED PEAKING FACTORS FOR VARIOUS RODDED CONFIGURATIONS AT BOC AND EOC

4.3-9 CALCULATED VARIATION OF THE AXIAL STABILITY INDEX DURING THE FIRST CYCLE(a) 4.3-10 MAXIMUM FAST FLUX GREATER THAN 1 MeV (n/cm2sec) 4.3-11 CONTROL ELEMENT ASSEMBLY SHADOWING FACTORS 4.3-12 FUEL ROD DESCRIPTION

4.3-13 RESULTS OF ANALYSIS OF CRITICAL UO2 SYSTEMS 4.3-14 RESULTS OF ANALYSIS OF PuO2 -UO2 FUELED LATTICES 4.3-15 REACTION RATES

4.3-16 BEGINNING OF CYCLE, ZERO POWER UNRODDED CHARACTERISTICS 4.3-17 CONTROL ROD WORTH, BEGINNING OF CYCLE () HOT - ZERO POWER 4.3-18 COMPARISONS OF CALCULATED AND MEASURED CEA WORTHS () 4.3-19 AT-POWER ISOTHERMAL TEMPERATURE COEFFICIENTS WSES-FSAR-UNIT-3 4-iv Revision 308 (11/14) CHAPTER 4 LIST OF TABLES Table Title

4.3-20 POWER DISTRIBUTIONS SUMMARY OF CALCULATION AND MEASUREMENT UNCERTAINTIES

4.3-21 AXIAL XENON OSCILLATIONS

4.3-22 DENSIFICATION CHARACTERISTICS

4.3-23 RADIAL PIN POWER CENSUS (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-1 CYCLE 20 CORE LOADING (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-2 NOMINAL PHYSICS CHARACTERISTICS 4.3A-3 LIMITING VALUES OF REACTIVITY WORTHS AND ALLOWANCES FOR HOT FULL POWER STEAM LINE BREAK, END-OF-CYCLE (EOC)

4.3A-4 REACTIVITY WORTH OF CEA REGULATING GROUPS AT HOT FULL POWER, (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-5 CYCLE 20 THERMAL HYDRAULIC PARAMETERS AT FULL POWER (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.4-1 THERMAL AND HYDRAULIC PARAMETERS

4.4-2 COMPARISON OF THE DEPARTURE FROM NUCLEATE BOILING RATIOS COMPUTED WITH DIFFERENT CORRELATIONS

4.4-3 REACTOR COOLANT FLOWS IN BYPASS CHANNELS

4.4-4 REACTOR VESSEL BEST ESTIMATE PRESSURE LOSSES AND COOLANT TEMPERATURES

4.4-5 DESIGN STEADY STATE HYDRAULIC LOADS ON VESSEL INTERNALS AND FUEL ASSEMBLIES (a) 4.4-6 RCS VALVES AND PIPE FITTINGS

4.4-7 RCS DESIGN MINIMUM FLOWS

4.4-8 REACTOR COOLANT SYSTEM GEOMETRY

4.4-9 SAFETY INJECTION LINES LENGTHS

4.4-10 REACTOR COOLANT SYSTEM COMPONENT THERMAL AND HYDRAULIC DATA (a) 4.6-1 POSTULATED EVENTS REQUIRING OPERATION OF TWO OR MORE REACTIVITY CONTROL SYSTEMS WSES-FSAR-UNIT-3 4-v Revision 308 (11/14) CHAPTER 4 LIST OF FIGURES

Figure Title

4.1-1 REACTOR VERTICAL ARRANGEMENT

4.1-2 REACTOR CORE CROSS-SECTION

4.2-1 CIRCUMFERENTIAL STRAIN VS TEMPERATURE 4.2-2 DESIGN CURVE FOR CYCLIC STRAIN USAGE OF ZIRCALOY-4 AT 700F 4.2-3 FUEL ROD INTERNAL PRESSURE VARIATION WITH BURNUP AND POWER LEVEL MINIMUM PRESSURE ROD

4.2-4 FUEL ROD INTERNAL PRESSURE VARIATION WITH BURNUP AND POWER LEVEL MAXIMUM PRESSURE ROD (DRN 02-1477, R12) 4.2-5 CONTROL ELEMENT ASSEMBLY (DRN 02-1477, R12) (DRN 01-1103, R12) 4.2-6 FIGURE INTENTIONALLY DELETED 4.2-7 FIGURE INTENTIONALLY DELETED (DRN 01-1103, R12) 4.2-8 FUEL ASSEMBLY 4.2-9 FUEL SPACER GRID

4.2-10 FUEL ROD (DRN 02-1538, R12) 4.2-10A COMPARISON OF URANIA ROD ASSEMBLY FEATURES (DRN 02-1538, R12) (LBDCR 14-008, R308) 4.2-10B COMPARISON OF URANIA ROD ASSEMBLY FEATURES (LBDCR 14-008, R308) 4.2-11 BURNABLE POISON ROD (DRN 02-1538, R12; 06-1059, R15) 4.2-11A COMPARISON OF BURNABLE ABSORBER RODS (DRN 02-1538, R12; 06-1059, R15) (LBDCR 14-008, R308) 4.2-11B COMPARISON OF BURNABLE ABSORBER RODS (LBDCR 14-008, R308) 4.2-12 CONTROL ELEMENT ASSEMBLY LOCATIONS 4.3-1 FUEL MANAGEMENT PATTERN

4.3-2 PLANAR AVERAGE POWER DISTRIBUTION BOC, UNRODDED, FULL POWER, NO XENON

4.3-3 PLANAR AVERAGE POWER DISTRIBUTION BOC, UNRODDED FULL POWER, EQUILIBRIUM XENON

4.3-4 PLANAR AVERAGE POWER DISTRIBUTION EOC, FULL POWER, EQUILIBRIUM XENON 4.3-5 PLANAR AVERAGE POWER DISTRIBUTION BOC, BANK 6 FULL IN, FULL POWER, NO XENON WSES-FSAR-UNIT-3 4-vi Revision 9 (12/97) CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

4.3-6 PLANAR AVERAGE POWER DISTRIBUTION BOC, BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON

4.3-7 PLANAR AVERAGE POWER DISTRIBUTION EOC, BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON

4.3-8 PLANAR AVERAGE POWER DISTRIBUTION BOC, PART-LENGTH ROD AS IF FULL LENGTH, FULL POWER, NO XENON

4.3-9 PLANAR AVERAGE POWER DISTRIBUTION BOC PART LENGTH ROD AS IF FULL LENGTH, FULL POWER, EQUILIBRIUM XENON 4.3-10 PLANAR AVERAGE POWER DISTRIBUTION EOC PART LENGTH ROD AS IF FULL LENGTH, FULL POWER, EQUILIBRIUM XENON 4.3-11 PLANAR AVERAGE POWER DISTRIBUTION BOC, PART LENGTH ROD AS IF FULL LENGTH BANK 6 FULL IN, FULL POWER NO XENON 4.3-12 PLANAR AVERAGE POWER DISTRIBUTION EOC, PART LENGTH ROD AS IF FULL LENGTH BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON 4.3-13 PLANAR AVERAGE POWER DISTRIBUTION EOC, PART-LENGTH ROD AS IF FULL LENGTH BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON 4.3-14 AXIAL POWER DISTRIBUTION, BOC, UNRODDED 4.3-15 AXIAL POWER DISTRIBUTION, AT 3,000 MWD/MTU UNRODDED 4.3-16 AXIAL POWER DISTRIBUTION AT 6,000 MWD/MTU UNRODDED 4.3-17 AXIAL POWER DISTRIBUTION AT 9,000 MWD/MTU UNRODDED 4.3-18 AXIAL POWER DISTRIBUTION AT THE END OF THE FIRST CYCLE, UNRODDED

4.3-19 DELETED

4.3-20 DELETED

4.3-21 DELETED

4.3-22 DELETED

4.3-23 DELETED WSES-FSAR-UNIT-3 4-vii CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

4.3-24 DELETED

4.3-25 DAILY REACTOR POWER MANEUVERING NEAR BEGINNING OF CYCLE (100% TO 35% TO 100% POWER)

4.3-26 DAILY REACTOR POWER MANEUVERING NEAR END OF CYCLE (100% TO 35% TO 100% POWER)

4.3-27 DAILY REACTOR POWER MANEUVERING NEAR THE BEGINNING OF CYCLE (100% TO 50% TO 100% POWER)

4.3-28 DAILY REACTOR POWER MANEUVERING NEAR THE END OF CYCLE (100% TO 50% TO 100% POWER)

4.3-29 DAILY REACTOR POWER MANEUVERING NEAR THE BEGINNING OF CYCLE (2-HOUR RAMPS)

4.3-30 DAILY REACTOR POWER MANEUVERING NEAR THE END OF CYCLE (2-HOUR RAMPS) 4.3-31 FNQ VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 1 OF 3) 4.3-31 FNQ VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 2 OF 3) 4.3-31 FNQ VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 3 OF 3) 4.3-32 FNR VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 1 OF 3) 4.3-32 FNR VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 2 OF 3) 4.3-32 FNR VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 3 OF 3) 4.3-33 NORMALIZED POWER DISTRIBUTION WITHIN TYPICAL UNSHIMMED ASSEMBLY 4.3-34 FUEL TEMPERATURE COEFFICIENT VS EFFECTIVE FUEL TEMPERATURE 4.3-35 MODERATOR TEMPERATURE COEFFICIENT VS MODERATOR TEMPERATURE AT BOC 1 4.3-36 MODERATOR TEMPERATURE COEFFICIENT VS MODERATOR TEMPERATURE AT EOC 1 4.3-37 MODERATOR DENSITY COEFFICIENT VS DENSITY 4.3-38 FUEL TEMPERATURE CONTRIBUTION TO POWER COEFFICIENT AT EOC 4.3-39 CEA BANK IDENTIFICATION

4.3-40 TYPICAL POWER DEPENDENT CEA INSERTION LIMIT WSES-FSAR-UNIT-3 4-viii Revision 9 (12/97) CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

4.3-41 INTEGRAL WORTH VS WITHDRAWAL AT ZERO POWER, EOC CONDITIONS 4.3-42 INTEGRAL WORTH VS WITHDRAWAL AT FULL POWER EOC, EQUILIBRIUM XENON CONDITIONS

4.3-43 REACTIVITY DIFFERENCE BETWEEN FUNDAMENTAL AND EXCITED STATES OF A BARE CYLINDRICAL REACTOR

4.3-44 EXPECTED VARIATION OF THE AZIMUTHAL STABILITY INDEX 4.3-45 STABILITY INDEX 4.3-46 ROD SHADOWING EFFECT VS ROD POSITION FOR ROD INSERTION AND WITHDRAWAL TRANSIENTS AT PALISADES

4.3-47 TYPICAL THREE SUB CHANNEL ANNEALING

4.3-48 GEOMETRY LAYOUTS

4.3-49 COMPARISON OF MEASURED AND CALCULATED SHAPE ANNEALING CORRECTION FOR PALISADES

4.3-50 TYPICAL TEMPERATURE DEFECT VS REACTOR INLET TEMPERATURE 4.3-51 COMPARISON OF CALCULATED AND MEASURED PLUTONIUM TO URANIUM MASS RATION IN THE ASYMPTOTIC NEUTRON SPECTRUM FOR YANKEE 4.3-52 PLUTONIUM ISOTOPIC COMPOSITION VS FUEL DEPLETION IN THE ASYMPTOTIC SPECTRUM FOR YANKEE

4.3-53 CRITICAL BORON - REACTIVITY DEPLETION OF PALISADES

4.3-54 CRITICAL BORON FOR MAIN YANKEE

4.3-55 CRITICAL BORON FOR FORT CALHOUN 4.3-56 LIMITING INTEGRAL RADIAL PIN POWER DISTRIBUTION 4.3-57 A DIVERGENT AXIAL OSCILLATION IN AN EOC CORE WITH REDUCED POWER FEEDBACK (//) = 0.96 X 10-4KWFT 4.3-58 DAMPING COEFFICIENT VS REACTIVITY DIFFERENCE BETWEEN FUNDAMENTAL AND EXCITED STATE 4.3-59 LIMITING SINGLE GAP POWER PEAKING AND ASSOCIATED ROD LOCATION RELATIVE TO THE GAP LOCATION

4.3-60 AUGMENTATION FACTOR WSES-FSAR-UNIT-3 4-ix Revision 308 (11/14) CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title (LBDCR 14-008, R308) 4.3A-1 WATERFORD 3 - INTEGRAL BURNABLE POISON SHIM AND ENRICHMENT ZONING PATTERNS (LBDCR 14-008, R308) 4.3A-1A WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-1B WATERFORD 3 - FIGURE INTENTIONALLY DELETED (DRN 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-2 WATERFORD 3 - CYCLE 20 FUEL MANAGEMENT SCHEME (DRN 04-502, R13;05-508, R14) 4.3A-3 WATERFORD 3 - CYCLE 20 ASSEMBLY AVERAGE BURNUP (DRN 04-502, R13;05-508, R14; 06-1059, R15) 4.3A-3a WATERFORD 3 - CYCLE 20 BEGINNING OF CYCLE FROM SHORT ENDPOINT OF PREVIOUS CYCLE (BOCS) ASSEMBLY AVERAGE BURNUP

4.3A-3b WATERFORD 3 - CYCLE 20 END OF CYCLE FROM LONG ENDPOINT OF PREVIOUS CYCLE (EOCL) ASSEMBLY AVERAGE BURNUP (EC-30663, R307, LBDCR 14-008, R308) 4.3A-4 WATERFORD 3 - CEA BANK IDENTIFICATION 4.3A-5 WATERFORD 3 - IN-CORE INSTRUMENT ASSEMBLIES CORE LOCATIONS

4.3A-6 WATERFORD 3 - PDIL FOR REGULATING GROUPS (DRN 04-502, R13, LBDCR 14-008, R308) 4.3A-7 WATERFORD 3 - CEA GROUP P INSERTION LIMIT VS THERMAL POWER (DRN 05-508, R14; 06-1059, R15; EC-30663, R307) 4.3A-8 WATERFORD 3 - CYCLE 20 ASSEMBLY RELATIVE POWER DENSITY, BOC HFP, EQUILIBRIUM XENON, ARO

4.3A-9 WATERFORD 3 - CYCLE 20 ASSEMBLY RELATIVE POWER DENSITY MOC, HFP, EQUILIBRIUM XENON, ARO

4.3A-10 WATERFORD 3 - CYCLE 20 ASSEMBLY RELATIVE POWER DENSITY EOC, HFP, EQUILIBRIUM XENON, ARO (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308) 4.3A-11 WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-12 WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-13 WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-14 WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-15 WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-16 WATERFORD 3 - FIGURE INTENTIONALLY DELETED 4.3A-17 FUEL ROD AND LOWER END FITTING CHANGES 4.3A-18 FUEL ROD DESIGNS WSES-FSAR-UNIT-3 4-x Revision 308 (11/14) CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title (DRN 02-1538, R12) 4.3A-18a COMPARISON OF URANIA ROD ASSEMBLY FEATURES (DRN 02-1538, R12) (LBDRC 14-008, R308) 4.3A-18b COMPARISON OF URANIA ROD ASSEMBLY FEATURES 4.3A-19 POISON ROD DESIGNS (DRN 02-1538, R12; 06-1059, R15) 4.3A-19b COMPARISON OF BURNABLE ABSORBER RODS (DRN 02-1538, R12; 06-1059, R15, LBDCR 14-008, R308) 4.4-1 CORE WIDE PLANAR POWER DISTRIBUTION FOR SAMPLE DNB ANALYSIS 4.4-2 ROD RADIAL POWER FACTORS IN HOT ASSEMBLY FOR SAMPLE DNB ANALYSIS

4.4-3 TYPICAL AXIAL POWER DISTRIBUTIONS

4.4-4 AVERAGE VOID FRACTIONS AND QUALITIES AT THE EXIT OF DIFFERENT CORE REGIONS

4.4-5 AXIAL DISTRIBUTION OF VOID FRACTION AND QUALITY IN THE SUB CHANNEL ADJACENT TO THE ROD WITH MINIMUM DNBR 4.4-6 REACTOR VERTICAL ARRANGEMENT SHOWING BYPASS FLOW PATHS 4.4-7 ISOMETRIC VIEW OF THE REACTOR COOLANT SYSTEM

4.4-8 SAFETY INJECTION SYSTEM (SHEET 1 OF 4)

4.4-8 SAFETY INJECTION SYSTEM (SHEET 2 OF 4) (DRN 01-416) 4.4-8 SAFETY INJECTION SYSTEM (SHEET 3 OF 4) (DRN 01-416) 4.4-8 SAFETY INJECTION SYSTEM (SHEET 4 OF 4) 4.4-9 PRESSURE DROP PREDICTIONS FOR A 21-ROD BUNDLE

4.4-10 SENSITIVITY OF MINIMUM DNBR TO SMALL CHANGES IN REACTOR COOLANT CONDITIONS

4.4-11 VIBRATION AND LOOSE PARTS MONITORING SYSTEM SCHEMATIC 4.6-1 REACTOR VESSEL CLOSURE HEAD PLAN VIEW CEPM LAYOUT WSES-FSAR-UNIT-3 4-xi Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 12-B Section 4.3A.6 ER-W3-2000-1027/DRN 03-270

Revision 13 Section 4.2.1.2.1 ER-W3-2003-0678/DRN 03-1821

TOC Page 4-i ER-W3-2003-0654/DRN 04-502 TOC Page 4-iv TOC Page 4-ix Section 4.2.4.2.3.2 Table 4.2-1 Sht 3 Section 4.3A.1 Section 4.3A.2 Section 4.3A.3 Table 4.3A-1 Table 4.3A-5 Sht 1 Table 4.3A-5 Sht 2 Figure 4.3A-2 Figure 4.3A-3 Figure 4.3A-7 Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10

Revision 13-A Section 4.4.6.1 ER-W3-2003-0418-000/DRN 03-1689

Revision 14 Section 4.2.1 ER-W3-2001-1149-000/DRN 03-2058 Section 4.2.1.2.2.1 Section 4.2.1.2.5 Section 4.2.1.3.3 Section 4.2.1.3.3.1 Section 4.2.1.3.3.3 Section 4.2.3.1.2.3 Section 4.2.3.1.3 Section 4.3A.4.1 Section 4.3A.4.2 Section 4.4.1.1 Section 4.4.2.6.3 Section 4.5.2.4.2.3

Table 4.3A-5 Table 4.6-1

WSES-FSAR-UNIT-3 4-xii Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 14 Cont'd Section 4.2.1.2.4.4 ER-W3-2002-0110-001/DRN 04-1096 Section 4.2.1.2.7 Section 4.3.2.2.1 Section 4.4.1.3 Reference 4.4

Section 4.4.6.1 ER-W3-2003-0418-001/DRN 04-1780

Table Of Contents ER-W3-2004-0116-003/DRN 05-508 Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.3 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3

Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5

Figure 4.3A-2 Figure 4.3A-3 Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10

Revision 15 Section 4.3.3.1.1 ER-W3-2006-0281-000/DRN 06-871 Section 4.4.4.2.1 Section 4.4.6.1 Section 4.6.5

Section 4.2.1.1.5 ER-W3-2001-1023-000/DRN 06-895 Section 4.2.1.4.4 Section 4.2.4.1.2 Section 4.3.2.3.2 Section 4.3.3.1.2.1 Figure 4.3-57 Table 4.3-1 Sh. 1

Section 4.3.2.7.2 ER-W3-2006-0223-000/DRN 06-914

WSES-FSAR-UNIT-3 4-xiii Revision 302 (12/08) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 15 Cont'd Section 4.2.1.2.2.1 ER-W3-2004-0116-018/DRN 06-992 Table 4.2-1 Sh. 3

Table of Contents ER-W3-2005-0447-004/DRN 06-1059 Section 4.2.1.1.2 Section 4.2.1.2.1 Section 4.2.1.2.2.1 Section 4.2.1.2.2.2 Section 4.2.1.2.5 Section 4.2.1.2.5.1 Section 4.2.1.2.8 Section 4.2.1.3 Section 4.2.2.2 Section 4.2.2.3 Section 4.2.3.1.3 Section 4.2.3.1.4 Section 4.2.3.3.1 Section 4.2: References Table 4.2-1 Sh. 2 Figure 4.2-11A Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.1.2 Section 4.3A.2.3 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.3.3.3 Section 4.3: References Table 4.3A-1 thru Table 4.3A-5 Figure 4.3A-1 thru Figure 4.3A-3 Figure 4.3A-8 thru Figure 4.3A-10 Figure 4.3A-19a

Section 4.2.3.2.3 ER-W3-2004-0094-003/DRN 06-1141

Revision 302 Section 4.1 EC-9533 Figure 4.1.2a Section 4.2.1.1.2 Section 4.2.1.1.5 Section 4.2.1.1.7

WSES-FSAR-UNIT-3 4-xiv Revision 302 (12/08) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 302 Cont'd Section 4.2.1.1.8 Section 4.2.1.1.9 Section 4.2.1.2.1 Section 4.2.1.2.2.1 Section 4.2.1.2.2.2 Section 4.2.1.2.5 Section 4.2.1.2.6 Section 4.2.1.2.8 Section 4.2.2.1 Section 4.2.2.2 Section 4.2.2.3 Section 4.2.3.1.1 Section 4.2.3.1.3 Section 4.2.3.1.4 Section 4.2.3.2.3 Section 4.2.3.2.4.2 Section 4.2.3.2.7 Section 4.2.3.2.12 Section 4.2.4.1.1 Section 4.2.4.1.2 Section 4.2: References Table 4.2-1 Sh. 1 Table 4.2-1 Sh. 2 Table 4.2-1 Sh. 3 Figure 4.2-8a Figure 4.2-10B Figure 4.2-11B Section 4.3: References Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.1.2 Section 4.3A.2.3 Section 4.3A.2.4 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.3.3.1 Section 4.3A.3.3.2 Section 4.3A.3.3.3 Section 4.3A.4.1 Section 4.3A.4.2 Table 4.3A-1 Table 4.3A-2 Table 4.3A-3

WSES-FSAR-UNIT-3 4-xv Revision 304 (06/10) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 302 Cont'd Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 Figure 4.3A-18b Figure 4.3A-19b Section 4.4.1.1 Section 4.4.2.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.9.4 Section 4.4.4.1 Section 4.4: References

Revision 304 Section 4.5.2.1 EC-10453

Section 4.2.2.2 EC-13881 Section 4.3.2.2.2 Section 4.3A Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 Figure 4.3A-19b Section 4.4.2.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.2.2.2 Section 4.4.2.4 Section 4.4.2.6.3 Section 4.4.2.8 WSES-FSAR-UNIT-3 4-xvi Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 304 Cont'd Section 4.4.2.9.4 EC-13881 (Continued)

Section 4.4.4.1 Section 4.4.4.2.3 Section 4.4.4.5.2 Section 4.4: References

Figure 4.3A-5 EC-18688

Revision 305 Table 4.4-6 Sheet 2 of 3 EC-14765

Section 4.4.6.1 EC-26965

Revision 307 Section 4.1 EC-1020 Table 4.1-1 Sh. 1 of 3

Section 4.1 EC-2800 Table 4.1-1 Sh. 1 of 3 Table 4.3-1 Sh. 1 of 2 Section 4.5.1.1 Section 4.5.1.3 Section 4.5.1.3.2 Section 4.5.1.3.3 Section 4.5.1.4 Section 4.5.2.4.2.2 Section 4.5.2.4.2.4 Section 4.5.2.4.3 Figure 4.6-1

Table of Contents EC-30663 Section 4.2.1.1.7 Section 4.2.2.1 Section 4.3A Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Section 4.4.1.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.9.4 Section 4.4.4.1 WSES-FSAR-UNIT-3 4-xvii Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 4 Section Cross References Revision 307 (Continued)

Figure 4.3A-1 EC-30663 (Continued)

Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10

Revision 308 Table of Contents LBDRC 14-008 Section 4.3A Section 4.3A.1 Section 4.3A.2 Section 4.3A.2.3 Section 4.3A.2.4 Section 4.3A.2.5 Section 4.3A3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.6 Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10

WSES-FSAR-UNIT-3 5-i Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 TABLE OF CONTENTS Section Title Page5.0 REACTOR COOLANT SYSTEM AND CONNECTED 5.1-1 SYSTEMS5.1 SUMMARY DESCRIPTION 5.1-1 5.1.1 SCHEMATIC FLOW DIAGRAM 5.1-1 5.1.2 PIPING AND INSTRUMENT DIAGRAM 5.1-2 5.1.3 ELEVATION DRAWING 5.1-2 5.2 INTEGRITY OF REACTOR COOLANT PRESSURE 5.2-1 BOUNDARY5.2.1 COMPLIANCE WITH CODES AND CODE CASES 5.2-1 5.2.2 OVERPRESSURIZATION PROTECTION 5.2-4 5.2.3 REACTOR COOLANT PRESSURE BOUNDARY 5.2-6 MATERIALS 5.2.4 INSERVICE INSPECTION AND TESTING 5.2.15 OF REACTOR COOLANT PRESSURE BOUNDARY 5.2.5 DETECTION OF LEAKAGE THROUGH REACTOR 5.2-18 COOLANT PRESSURE BOUNDARY 5.

2.5 REFERENCES

5.2-27 (DRN 03-2059, R14) 5.2A WATERFORD-3 OVERPRESSURE PROTECTION REPORT 5.2A-1 5.2A.1 DELETED 5.2A.2 DELETED 5.2A.3 DELETED 5.2A DELETED (DRN 03-2059, R14)

WSES-FSAR-UNIT-3 5-ii CHAPTER 5 TABLE OF CONTENTS (Cont'd)

Section Title Page 5.2B LOW TEMPERATURE OVERPRESSURE PROTECTION 5.2B-1 DURING HEATUP, COOLDOWN, AND COLD SHUTDOWN 5.2B.1 SYSTEM DESCRIPTION 5.2B-1

5.2B.2 DESIGN CRITERIA 5.2B-1

5.2B.3 DESIGN AND ANALYSIS 5.2B-2

5.3 REACTOR VESSEL 5.3-1

5.3.1 REACTOR VESSEL MATERIALS 5.3-1

5.3.2 PRESSURE TEMPERATURE LIMITS 5.3-13

5.3.3 REACTOR VESSEL INTEGRITY 5.3-16

5.3 REFERENCES

5.3-19

5.4 COMPONENT AND SUBSYSTEM DESIGN 5.4-1 5.4.1 REACTOR COOLANT PUMPS 5.4-1

5.4.2 STEAM GENERATORS 5.4-10

5.4.3 REACTOR COOLANT PIPING 5.4-15

5.4.4 MAIN STEAM LINE FLOW RESTRICTIONS 5.4-17

5.4.5 MAIN STEAM LINE ISOLATION SYSTEM 5.4-17

5.4.6 REACTOR CORE ISOLATION COOLING SYSTEM 5.4-18

5.4.7 RESIDUAL HEAT REMOVAL SYSTEM 5.4-18

5.4.8 REACTOR WATER CLEANUP SYSTEM 5.4-18

5.4.9 MAIN STEAM LINE AND FEEDWATER PIPING 5.4-18 5.4.10 PRESSURIZER 5.4-18

5.4.11 QUENCH TANK (PRESSURIZER RELIEF TANK) 5.4-22

WSES-FSAR-UNIT-35-iiiCHAPTER 5TABLE OF CONTENTS (Cont'd)Section TitlePage5.4.12VALVES5.4-255.4.13SAFETY AND RELIEF VALVES5.4-265.4.14COMPONENTS SUPPORT5.4-275.4.15REACTOR COOLANT GAS VENTING SYSTEM5.4-30 5.4.16REFUELING WATER LEVEL INDICATING SYSTEM5.4-345.4.17REACTOR COOLANT SHUTDOWN LEVEL5.4-35MEASUREMENT SYSTEM (RCSLMS)5.4ADYNAMIC ANALYSIS FOR THE WATERFORD 3 REACTOR VESSEL5.4A-iSUPPORT LOADS UNDER LOCA CONDITIONS5.4A.1PURPOSE5.4A-15.4A.2CONCLUSION5.4A-15.4A.3BACKGROUND5.4A-15.4A.4MODELS5.4A-2 5.4A-5FORCING FUNCTIONS5.4A-3 5.4A-6RESULTS5.4A-35.4AREFERENCES WSES-FSAR-UNIT-3 5-iv Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 LIST OF TABLES Table Title5.1-1 Process Data Point Tabulation (DRN 05-930, R14)5.1-2 Parameters of Reactor Coolant System (DRN 05-930, R14)5.1-3 Nominal Reactor Coolant System Volumes 5.2-1 Codes and Addenda Applied to the Reactor Coolant Pressure Boundary 5.2-2 Applicable Code Cases 5.2-3 Reactor Coolant System Materials 5.2-4 Weld Materials for Reactor Coolant Pressure Boundary Components 5.2-5 Chemical Analyses of Plate Material in Waterford Unit 3 Reactor Vessel Beltline 5.2-6 Waterford Unit 3 Reactor Vessel Fracture Toughness Data 5.2-7 Waterford Unit 3 Piping Materials Fracture Toughness Data 5.2-8 Waterford 3 Pressurizer Materials Fracture Toughness Data 5.2-9 Waterford Unit 3 Steam Generator Materials Fracture Toughness Data 5.2-10 Reactor Coolant Leak Detection Sensitivity 5.2-11 ISI for Valves which form the Pressure Boundary of the RCS (DRN 03-2059, R14) 5.2A-1 Deleted (DRN 03-2059, R14) 5.3-1 Data Points used to Establish C-ERTNDT Shift Vs. Fluence and Percent Cv Upper Shelf Drop Vs. (Fluence) 1/2 Design Curves for A-533-B Reactor Vessel Materials 5.3-2 Literature References for Table 5.3-1 5.3-3 Summary of Surveillance Materials Testing 5.3-4 Total Quantity of Specimens 5.3-5 Type and Quantity of Specimens for Unirradiated Tests 5.3-6 Type and Quantity of Specimens for Irradiation Exposure and Irradiated Tests WSES-FSAR-UNIT-3 5-v Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 LIST OF TABLES (Cont'd) Table Title5.3-7 Candidate Materials for Neutron Threshold Detectors 5.3-8 Composition and Melting Points of Candidate Materials for Temperature Monitors 5.3-9 Type and Quantity of Specimens Contained in Each Irradiation Capsule Assembly 5.3-10 Capsule Assembly Removal Schedule 5.3-11 Waterford Unit 3 Reactor Vessel Closure Studs Data 5.3-12 Waterford Unit 3 Reactor Vessel Nuts and Washers Data 5.3-13 Waterford Unit 3 Reactor Vessel Materials (DRN 03-2059, R14) 5.3-14 Calculation of the Waterford Unit 3 RTPTS Values for 32 EFPY (DRN 03-2059, R14) 5.4-1 Reactor Coolant Pump Parameters 5.4-2 Steam Generator Parameters 5.4-3 Steam Generator Fabrication Testing 5.4-4 Reactor Coolant Piping Parameters 5.4-5 Reactor Coolant Piping Tests 5.4-6 Pressurizer Parameters 5.4-7 Pressurizer Tests 5.4-8 Quench Tank Parameters 5.4-9 Primary Safety Valve Parameters 5.4A-1 Results of LOCA Analysis of Reactor Vessel Supports 5.4A-2 Reactor Coolant System Model 5.4A-3 Pipe Break Summary 5.4A-4 Expanded Reactor Coolant System Model 350 in2 RV Inlet Nozzle Break 5.4A-5 Expanded Reactor Coolant System Model 600 in2 S.G. Inlet Nozzle Break WSES-FSAR-UNIT-35-viREACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURESFigure Title5.1-1REACTOR COOLANT SYSTEM ARRANGEMENT PLAN5.1-2REACTOR COOLANT SYSTEM ARRANGEMENT ELEVATION5.1-3FLOW DIAGRAM REACTOR COOLANT SYSTEM5.1-4FLOW DIAGRAM REACTOR COOLANT PUMP SEALS 5.2-1SECONDARY SYSTEM PRESSURE RELIEF5.2-2CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-15.2-3CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-2 5.2-4CHARPY TEST RESULTS INTERMEDIATE SHELL PLATE M-1003-35.2-5CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-15.2-6CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-2 5.2-7CHARPY TEST RESULTS UPPER SHELL PLATE M-1002-3 5.2-8CHARPY TEST RESULTS BOTTOM HEAD TORUS M-1007-15.2-9CHARPY TEST RESULTS BOTTOM HEAD DOME M-1008-15.2-10CHARPY TEST RESULTS CLOSURE HEAD TOURS M-1005-1 5.2-11CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-15.2-12CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-25.2-13CHARPY TEST RESULTS LOWER SHELL PLATE M-1004-3 5.2-14CHARPY TEST RESULTS CLOSURE HEAD DOME M-1006-1 5.2-15CHARPY TEST RESULTS CLOSURE HEAD FLANGE M-603-15.2-16CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-15.2-17CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-2 5.2-18CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-35.2-19CHARPY TEST RESULTS INLET NOZZLE SAFE END M-1013-4 WSES-FSAR-UNIT-3 5-vii Revision 14 (12/05)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5 LIST OF FIGURES (Cont'd) Figure Title5.2-20 CHARPY TEST RESULTS OUTLET NOZZLE SAFE END M-1012-1 5.2-21 CHARPY TEST RESULTS OUTLET NOZZLE SAFE END M-1012-2 5.2-22 CHARPY TEST RESULTS OUTLET NOZZLE FORGING M-1011-1 5.2-23 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-1 5.2-24 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-2 5.2-25 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-3 5.2-26 CHARPY TEST RESULTS INLET NOZZLE FORGING M-1010-4 5.2-27 CHARPY TEST RESULTS OUTLET NOZZLE FORGING M-1011-2 5.2-28 CHARPY TEST RESULTS VESSEL FLANGE M-1001-1 5.2-29 CHARPY V-NOTCH TESTS ENERGY ABSORBED VS TEMPERATURE 5.2-30 CHARPY V-NOTCH TESTS LATERAL EXPANSION VS TEMPERATURE (DRN 03-2059, R14) 5.2A-1 DELETED 5.2A-2 DELETED 5.2A-3 DELETED 5.2A-4 DELETED 5.2B-1 DELETED 5.2B-2 DELETED 5.2B-3 DELETED (DRN 03-2059, R14) 5.3-1 C-ERTNDT SHIFT CURVE A533-B PLATE AND WELD MATERIAL DATA GROUP ( 0.10WT%CU )

WSES-FSAR-UNIT-35-viiiRevision 11 (05/01)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURES (Cont'd)Figure Title5.3-2CHARPY TEST RESULTS BASE METAL PLATE M-1004-2 (RW)5.3-3CHARPY TEST RESULTS WELD METAL PLATE M-1004-1/M-1004-35.3-4CHARPY TESTS RESULTS HEAT AFFECTED ZONE METAL PLATE M-1004-25.3-5TYPICAL CHARPY SURVEILLANCE CAPSULE ASSEMBLY 5.3-6TYPICAL CHARPY IMPACT COMPARTMENT ASSEMBLY5.3-7TYPICAL TENSILE - MONITOR COMPARTMENT DETAIL5.3-8LOCATIONS OF SURVEILLANCE CAPSULE ASSEMBLIES 5.3-9REACTOR VESSEL FASTENERS CHARPY IMPACT ABSORBED ENERGY VS TEMPERATURE5.3-10REACTOR VESSEL FASTENERS LATERAL EXPANSION VS TEMPERATURE5.3-11REACTOR VESSEL 5.4-1REACTOR COOLANT PUMP OUTLINE 5.4-2REACTOR COOLANT PUMP AND SEAL5.4-3REACTOR COOLANT PUMP PERFORMANCE5.4-4ANTI-REVERSE ROTATION DEVICE 5.4-5STEAM GENERATOR5.4-6PRESSURIZER5.4-7PRESSURIZER LIQUID VOLUME PROGRAM 5.4-8TEMPERATURE CONTROL PROGRAM 5.4-9CONTROL ACTIONS RESULTING FROM HIGH OR LOW LEVEL ERROR SIGNALS5.4-10QUENCH TANK5.4-11PRIMARY SAFETY VALVE 5.4-12REACTOR COOLANT SYSTEM ARRANGEMENT AND SUPPORT POINTS WSES-FSAR-UNIT-35-ixRevision 11 (05/01)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURES (Cont'd)Figure Title5.4-13REACTOR VESSEL SUPPORTS5.4-14STEAM GENERATOR SUPPORTS5.4-15REACTOR COOLANT PUMP SUPPORTS5.4-16PRESSURIZER SUPPORTS 5.4-17REACTOR COOLANT SYSTEM VENTING SYSTEM5.4-18REFUELING WATER LEVEL INDICATING SYSTEM5.4-19REACTOR COOLANT SHUTDOWN LEVEL MEASUREMENT SYSTEM 5.4A-1RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL ARRANGEMENT5.4A-2RV ASYMMETRIC LOADS ANALYSIS PRIMARY COOLANT PIPE BREAK AT REACTOR INLETNOZZLE5.4A-3RV ASYMMETRIC LOADS ANALYSIS ASYMMETRIC HYDRAULIC LOADS INTERNAL TO THEVESSEL5.4A-4RV ASYMMETRIC LOADS ANALYSIS REACTOR CAVITY PRESSURE LOADS5.4A-5RV ASYMMETRIC LOADS ANALYSIS PIPE THRUST LOAD 5.4A-6RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL FORCES FOLLOWING LOCA 5.4A-7RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR COOLANT SYSTEM MODEL5.4A-8RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR INTERNALS MODEL5.4A-9RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR COOLANT SYSTEM 5.4A-10RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR INTERNALS5.4A-11RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONSSIMPLIFIED INTERNALS AND VESSEL5.4A-12RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONSDETAILED INTERNALS, SIMPLIFIED VESSEL WSES-FSAR-UNIT-35-xRevision 11 (05/01)REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMSCHAPTER 5LIST OF FIGURES (Cont'd)Figure Title5.4A-13RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL LOCA SUPPORTS5.4A-14RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT LOADS5.4A-15RV ASYMMETRIC LOADS ANALYSIS 350 SQ. IN. COLD LEG GUILLOTINEAT RV NOZZLE MAX. RV VERTICAL SUPPORT LOAD VS TIME (TYP)5.4A-16RV ASYMMETRIC LOADS ANALYSIS 350 SQ. IN. COLD LEG GUILLOTINEAT RV NOZZLE MAX. RV HORIZONTAL SUPPORT LOAD VS TIME WSES-FSAR-UNIT-3 5-xi Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 5

Section Cross References Revision 13 Figure 5.4-9 ER-W3-2003-0373-000/DRN 03-1006

Figure 5.1-3 ER-W3-1998-0617-000/DRN 03-1348

Table 5.2-3 Sht 4 ER-W3-2001-1211-000/DRN 03-1707

Section 5.4.3.2 ER-W3-2003-0404-000/DRN 03-1268

Section 5.4.3.2 ER-W3-2001-1211-002/DRN 04-292

Revision 13-A Table 5.3-9 ER-W3-2004-0376/DRN 04-1049 Table 5.3-10

Section 5.2.5.1.1 ER-W3-2004-0396-002/DRN 04-1221 Section 5.2.5.1.2 Section 5.2.5.2 Table 5.2-10 Sht 1

Revision 14 Table of Contents ER-W3-2001-1149-000/DRN 03-2059 Section 5.2.2.1 Section 5.2.2.2 Section 5.2.5.1.2 Section 5.2B.1 Section 5.2B.3 Section 5.3.1.4 Section 5.3.1.6 Section 5.3.2.1 Section 5.3.2.3 Section 5.4.1.3 Section 5.4.1.4.1.2 Section 5.4.1.4.2 Section 5.4.2.1 Section 5.4.2.2 Section 5.4.11.1 Section 5.4.14.1 Section 5.4.14.2.2 Section 5.4.14.2.3 Section 5.4.14.3 References 5.3 WSES-FSAR-UNIT-3 5-xii Revision 14-B (06/06)UPDATE REFERENCE LIST Chapter 5 Section Cross ReferencesRevision 14 Cont'dAppendix 5.2A ER-W3-2001-1149-000/DRN 03-2059 Cont'd Appendix 5.4A Table 5.1-1 Table 5.1-2 Table 5.2A-1 Table 5.3-10 Table 5.3-14 Table 5.4-1 sh 1 Table 5.4-2 Table 5.4-4 Figure 5.2A-1 Figure 5.2A-2 Figure 5.2A-3 Figure 5.2A-4 Figure 5.2B-2 Figure 5.2B-3 Figure 5.4-8 Section 5.4.11.1 ER-W3-2001-1149-000/DRN 05-316 Table of Contents ER-W3-2001-1149-000/DRN 05-930 Section 5.4.2.2 ER-W3-2002-0288-000/DRN 03-130 Section 5.4.3.2 ER-W3-2004-0122-000/DRN 05-892 Table 5.2-3 Table 5.4-6 sh 1 Figure 5.4-6 Section 5.4.1.3 ER-W3-2004-0276-000/DRN 05-150 Revision 14-ATable 5.2-3 sheet 1 ER-W3-2005-0441-000/DRN 05-1400 Table 5.2-3 sheet 2 Table 5.2-3 sheet 3 Table 5.2-3 sheet 4 Table 5.2-4 sheet 1 ER-W3-2005-0441-000/DRN 05-1400 Table 5.2-4 sheet 2 Section 5.4.1.4.1.1 ER-W3-2005-0436-000/DRN 05-1392 Revision 14-BSection 5.2.5.1.1 ER-W3-2006-0069-000/DRN 06-250 Section 5.4.2.2 ER-W3-2005-0442-000/DRN 06-290 WSES-FSAR-UNIT-3 5-xiii Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 5 Section Cross ReferencesRevision 15Section 5.4.3.1 ER-W3-2006-0190-000/DRN 06-546 Section 5.4.10.1 Table 5.2-2 Sh. 1 ER-W3-2006-0194-000/DRN 06-552 Table 5.2-2 Sh. 2 Table 5.2-2 Sh. 3 Table 5.2-3 Sh. 4 ER-W3-2006-0186-000/DRN 06-720 Section 5.3.2.1 ER-W3-2006-0223-000/DRN 06-842 Section 5.2.3.3.2.1 ER-W3-2006-0281-000/DRN 06-872 Section 5.2.4 Section 5.3.1.3 Table 5.4-9 Table 5.2-10 Sh. 1 ER-W3-2006-0282-000/DRN 06-885 Table 5.2-11 Sh. 1 ER-W3-2006-0223-000/DRN 06-897 Table 5.2-11 Sh. 2 Table 5.2-11 Sh. 4 Table 5.2-11 Sh. 5 Table 5.3-4 Table 5.3-5 Table 5.3-6 Table 5.4-6 Sh. 1 ER-W3-2006-0223-000/DRN 06-904 Table 5.4-6 Sh. 2 Section 5.2.3.4.1.1.1 ER-W3-2006-0223-000/DRN 06-911 Section 5.2.3.4.2.1 Table 5.2-3 Sh. 1 Table 5.2-3 Sh. 2 Section 5.3.1.3 Section 5.3.2.2 Section 5.2.2.4 ER-W3-2006-0245-000/DRN 06-1002 Section 5.4.2.1 ER-W3-2005-0447-004/DRN 06-1060 Table 5.4-2 Sh. 1 Table 5.4-2 Sh. 2 Figure 5.1-2 ER-W3-2007-0002-000/DRN 07-2 WSES-FSAR-UNIT-3 5-xiv Revision 305 (11/11) UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 301 Section 5.4.15.2.3 EC-5000080002

Section 5.2.4.2 EC-5000082400

Section 5.2.5 EC-5000082424 Section 5.2.5.6

Revision 302 Table 5.2-11 Sh. 1 EC-935 Table 5.2-11 Sh. 4

Table 5.2-4 Sh. 2 EC-1830

Section 5.4.1.2.1.3 EC-6256 Section 5.2.5.1.7 Figure 5.1-4

Revision 303 Table 5.2-2 Sh. 2 EC-14300

Revision 304 Figure 5.1-4 EC-18520 Section 5.4.1.2.1.3

Section 5.4.2.3.1.3 EC-18652

Revision 305 Table 5.2-11 Sheet 1 of 5 EC-14765 Table 5.2-11 Sheet 4 of 5

Section 5.2.5 EC-19087 Section 5.2.5.1.1 Section 5.2.5.1.10 Section 5.2.5.4 Section 5.2.5.5 Section 5.2.5: References Section 5.4.3.2

Section 5.4.1.3 EC-30077

WSES-FSAR-UNIT-3 5-xv Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 307 Section 5.2.1.1 EC-1020 Section 5.2.3.3.1 Section 5.2.3.3.2.1 Table 5.2-1 Sheet 1 of 2 Table 5.2.2 Sheet 1 of 3 Table 5.2.3 Sheet 1 of 4 Table 5.2.4 Sheet 2 of 2 Table 5.2-6 Sheet 1 of 2 Table 5.2.6 Sheet 2 of 2 Figure 5.2-10 Figure 5.2-14 Figure 5.2-15 Section 5.3.1.1 Section 5.3.1.5 Section 5.3.3 Section 5.3.3.3 Section 5.3.3.4 Section 5.3.3.5 Figure 5.3-11

Section 5.2.3.3.1 EC-2800 Section 5.2.3.4.1.1.1 Section 5.2.3.4.2.1 Table 5.2-1 Sheet 2 of 2 Table 5.2-2 Sheet 2 of 3 Table 5.2.3 Sheet 1 of 4 Table 5.2-4 Sheet 1 of 2 Table 5.2-4 Sheet 2 of 2

Section 5.4.14.2.2 EC-8438 Figure 5.4-12 Figure 5.4-14

Section 5.1 EC-8458 Table 5.1-1 Table 5.1-2 Table 5.1-3 Section 5.2.1.1 Table 5.2-1 Sheet 1 of 2 Table 5.2-3 Sheet 1 of 4 Table 5.2-3 Sheet 2 of 4 Table 5.2-9 Appendix 5.2A Appendix 5.2B Section 5.4.1.2.1.4 Section 5.4.1.3 Section 5.4.2.1 WSES-FSAR-UNIT-3 5-xvi Revision 308A (10/15) UPDATE REFERENCE LIST Chapter 5 Section Cross References Revision 307 (Continued)

Section 5.4.2.1 EC-8458 (Continued)

Section 5.4.2.2 Section 5.4.2.3.1.1 Section 5.4.2.3.1.4 Section 5.4.2.4.1 Section 5.4.4 Table 5.4-2 Sheet 1 of 2 Table 5.4-2 Sheet 2 of 2 Table 5.4-3 Table 5.4-4 Figure 5.4-5 Figure 5.4-8 Section 5.4.11.1

Section 5.4.1.3 EC-38245

Revision 308A Section 5.4 LBDCR 15-028 WSES-FSAR-UNIT-3 6-i ENGINEERED SAFETY FEATURES CHAPTER 6 TABLE OF CONTENTS Section Title Page 6.0 ENGINEERED-SAFETY FEATURES 6.0-1 6.1 ENGINEERED SAFETY FEATURE MATERIALS 6.1-1 6.1.1 METALLIC MATERIALS 6.1-1

6.1.2 ORGANIC MATERIALS 6.1-7

6.1.3 POST ACCIDENT CHEMISTRY 6.1-10 6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 CONTAINMENT FUNCTIONAL DESIGN 6.2-1 6.

2.1 REFERENCES

6.2-36

6.2.2 CONTAINMENT HEAT REMOVAL SYSTEMS 6.2-38 6.

2.2 REFERENCES

6.2-51

6.2.3 SECONDARY CONTAINMENT FUNCTIONAL DESIGN 6.2-51 6.2.4 CONTAINMENT ISOLATION SYSTEM 6.2-59

6.2.5 COMBUSTIBLE GAS CONTROL IN CONTAINMENT 6.2-66 6.

2.5 REFERENCES

6.2-82

6.2.6 CONTAINMENT LEAKAGE TESTING 6.2-83

6.2A WATEMPT-A COMPUTER CODE TO CALCULATE THE SHIELD BUILDING 6.2A-1 ANNULUS TRANSIENT 6.2A REFERENCES 6.2A-3

6.2B EBASCO MODIFICATIONS TO THE CONTEMPT - LT MOD 26 6.2B-1 COMPUTER MODE 6.2B REFERENCES 6.2B-9

6.2C DECLASSIFICATION OF FAN COOLER DUCTWORK: 6.2C-1 HEAT AND STEAM REMOVAL AND CONTAINMENT MIXING 6.2C REFERENCES 6.2C-7

WSES-FSAR-UNIT-3 6-ii Revision 14 (12/05) CHAPTER 6 TABLE OF CONTENTS (Cont'd)

Section Title Page 6.3 EMERGENCY CORE COOLING SYSTEM 6.3-1 6.3.1 DESIGN BASIS 6.3-1

6.3.2 SYSTEM DESIGN 6.3-4

6.3.3 PERFORMANCE EVALUATION 6.3-18

6.3.4 TESTS AND INSPECTIONS 6.3-29

6.3.5 INSTRUMENTATION REQUIREMENTS 6.3-20

6.3 REFERENCES

6.3-33

6.3 BIBLIOGRAPHY 6.3-34

6.4 HABITABILITY SYSTEMS 6.4-1 6.4.1 DESIGN BASES 6.4-1

6.4.2 SYSTEM DESIGN 6.4-2

6.4.3 SYSTEM OPERATIONAL PROCEDURES 6.4-5

6.4.4 DESIGN EVALUATION 6.4-7

6.4.5 TESTING AND INSPECTION 6.4-11

6.4.6 INSTRUMENTATION REQUIREMENTS 6.4-12 (DRN 05-1247, R14)

6.4 REFERENCES

6.4-13 (DRN 05-1247, R14) 6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5-1 6.5.1 ENGINEERED SAFETY FEATURE (ESF) FILTER SYSTEMS 6.5-1 6.5.2 CONTAINMENT SPRAY AS FISSION PRODUCT CLEANUP SYSTEM 6.5-10 6.5.3 FISSION PRODUCT CONTROL SYSTEMS 6.5-14 6.6 INSERVICE INSPECTION OF CLASS 2 AND 3 COMPONENTS 6.6-1 6.6.1 COMPONENTS SUBJECT TO EXAMINATION 6.6-1

6.6.2 ACCESSIBILITY 6.6-1

6.6.3 EXAMINATION TECHNIQUES AND PROCEDURES 6.6-1

WSES-FSAR-UNIT-3 6-iii CHAPTER 6 TABLE OF CONTENTS (Cont'd)

Section Title Page 6.6.4 INSPECTION INTERVALS 6.6-1

6.6.5 EXAMINATION CATEGORIES AND REQUIREMENTS 6.6-2

6.6.6 EVALUATION OF EXAMINATION RESULTS 6.6-2

6.6.7 SYSTEM PRESSURE TESTS 6.6-2

6.6.8 AUGMENTED INSERVICE INSPECTION TO PROTECT 6.6-2 AGAINST POSTULATED PIPING FAILURES

WSES-FSAR-UNIT-3 6-iv Revision 12 (10/02) ENGINEERED SAFETY FEATURES CHAPTER 6 LIST OF TABLES Table Title 6.1-1 PRINCIPAL ESF PRESSURE RETAINING MATERIALS

6.1-2 ENGINEERED SAFETY FEATURES STRUCTURAL MATERIALS THAT COULD BE EXPOSED TO CORE COOLING WATERS OR CONTAINMENT SPRAY

6.1-3 COATING MATERIALS IN THE CONTAINMENT

6.1-4 CONTAINMENT COATING MATERIALS ASSUMED TO FALL

6.1-5 UNQUALIFIED COATINGS SUBJECT TO JET IMPINGEMENT AND/OR CONTAINMENT SPRAY AND PURCHASED PRIOR TO THE ISSUANCE OF REGULATORY GUIDE 1.54, JUNE 1973

6.2-1 POSTULATED ACCIDENTS FOR CONTAINMENT DESIGN

6.2-2 CALCULATED VALUES FOR CONTAINMENT PARAMETERS

6.2-3 PRINCIPAL CONTAINMENT DESIGN PARAMETERS

6.2-4 SUMMARY OF CALCULATED CONTAINMENT PRESSURE AND TEMPERATURE

6.2-5 INITIAL CONDITIONS FOR LOCA CONTAINMENT PEAK PRESSURE-TEMPERATURE ANALYSIS

6.2-6 ENGINEERED SAFETY FEATURE SYSTEMS OPERATING ASSUMPTIONS FOR LOCA CONTAINMENT PEAK PRESSURE ANALYSIS

6.2-7 CONTAINMENT PASSIVE HEAT SINKS

6.2-8 SUMMARY OF PASSIVE HEAT SINKS USED IN THE CONTAINMENT ANALYSIS (DRN 01-230, R12) 6.2-9 DELETED (DRN 01-230, R12) 6.2-10 ACCIDENT CHRONOLOGIES

6.2-11 ASSUMPTIONS USED IN ANALYSIS OF INADVERTENT CONTAINMENT SPRAY SYSTEM ACTUATION

6.2-12 MASS AND ENERGY RELEASE DATA

6.2-13 MASS ENERGY RELEASE DATA

6.2-14 REACTOR CAVITY RELAP INPUT DATA

6.2-15 STEAM GENERATOR SUBCOMPARTMENT RELAY INPUT DATA

WSES-FSAR-UNIT-3 6-v Revision 12 (10/02) ENGINEERED SAFETY FEATURES CHAPTER 6 LIST OF TABLES (Cont'd)

Table Title 6.2-16 PRESSURIZER SUBCOMPARTMENT RELAY INPUT DATA

6.2-17 SUMMARY OF REACTOR COOLANT SYSTEM POSTULATED PIPE RUPTURES (DRN 01-230, R12) 6.2-18 DELETED (DRN 01-230, R12) 6.2-19 BLOWDOWN AND REFLOOD MASS AND ENERGY RELEASE DATA

6.2-20 INTENTIONALLY BLANK

6.2-21 DESIGN DATA FOR CONTAINMENT FAN COOLERS

6.2-22 DESIGN DATA FOR CONTAINMENT SPRAY SYSTEM COMPONENTS

6.2-23 CONTAINMENT HEAT REMOVAL SYSTEM DELAY TIMES (OFFSITE POWER AVAILABLE) 6.2-24 CONTAINMENT HEAT REMOVAL SYSTEM DELAY TIMES (LOSS OF OFFSITE POWER) 6.2-25 LOCATION AND QUANTITY OF MAJOR THERMAL INSULATION THERMAL INSULATION MATERIALS INSIDE CONTAINMENT

6.2-26 MATERIALS OF CONSTRUCTION FOR INSULATION USED INSIDE CONTAINMENT 6.2-27 FAILURE MODE AND EFFECTS ANALYSES CONTAINMENT HEAT REMOVAL SYSTEMS

6.2-28 DESIGN DATA FOR SHIELD BUILDING VENTILATION SYSTEM COMPONENTS

6.2-29 ADDITIONAL INFORMATION TO BE PROVIDED FOR DUAL - CONTAINMENT PLANTS

6.2-30 SHIELD BUILDING VENTILATION SYSTEM VALVE POSITIONS

6.2-31 FAILURE MODES AND EFFECT ANALYSIS - SHIELD BUILDING VENTILATION SYSTEM

6.2-32 CONTAINMENT PENETRATIONS AND ISOLATION VALVES

6.2-32a FLUID SYSTEM PIPING DRAWINGS FOR CONTAINMENT PENETRATIONS AND ISOLATION VALVES

6.2-33 DESIGN DATA FOR HYDROGEN ANALYZER SYSTEM

6.2-34 DESIGN DATA FOR HYDROGEN RECOMBINER SYSTEM

6.2-35 DESIGN DATA FOR CONTAINMENT ATMOSPHERE RELEASE SYSTEM COMPONENTS

6.2-36 PARAMETERS FOR ANALYSIS OF HYDROGEN GENERATION AND CONTROL

WSES-FSAR-UNIT-3 6-vi Revision 14 (12/05) ENGINEERED SAFETY FEATURES CHAPTER 6 LIST OF TABLES (Cont'd)

Table Title 6.2-37 CONTAINMENT ZINC AND ALUMINUM INVENTORY 6.2-38 FAILURE MODE AND EFFECTS ANALYSIS - HYDROGEN ANALYZER SYSTEM

6.2-39 FAILURE MODE AND EFFECTS ANALYSIS - HYDROGEN RECOMBINER

6.2-40 FAILURE MODE AND EFFECTS ANALYSIS - CARS

6.2-41 ELECTRICAL PENETRATION AND ASSEMBLIES

6.2-42 HATCHES AND AIR LOCKS

6.2-43 PENETRATIONS NOT REQUIRING TYPE C LEAK TESTING

6.2-44 CONTAINMENT ISOLATION VALVE WITH APPLIED TEST PRESSURE IN OPPOSITE DIRECTION

6.2-45 TYPICAL COMPONENTS CALCULATED AND QUALIFICATION TEMPERATURES

6.3-1 FAILURE MODE AND EFFECTS ANALYSIS SAFETY INJECTION SYSTEM

6.3-2 SAFETY INJECTION SYSTEM COMPONENTS PARAMETERS

6.3-3 POST-LOCA INSTRUMENTATION

6.3-4 SAFETY INJECTION SYSTEM PROCESS FLOW DATA

6.3-5 LONG TERM COOLING INSTRUMENTATION 6.3-5a CORE AND SYSTEM PARAMETERS USED IN THE LTC ANALYSIS (DRN 00-0550;05-255, R13-B; 05-1247, R14) 6.3-6 HIGH PRESSURE SAFETY INJECTION PUMP MINIMUM DELIVERED FLOW TO THE RCS FOR A SMALL BREAK LOCA 6.3-6a DELETED (DRN 05-255, R13-B; 05-1247, R14) 6.3-7 DELETED (DRN 00-0550) 6.4-1 SUMMARY OF MAIN CONTROL ROOM HEAT RATE CALCULATIONS 6.4-2 SUMMARY SHEET FOR MAIN CONTROL ROOM AIR CONDITIONING SYSTEM

6.4-3 CONTROL ROOM AIR CONDITIONING SYSTEM DAMPER AND ISOLATION VALVE POSITIONS

6.4-4 GASES AND VAPORS DETECTABLE BY BROAD RANGE GAS DETECTION SYSTEM

6.4-5 DELETED

WSES-FSAR-UNIT-3 6-vii Revision 14 (12/05) ENGINEERED SAFETY FEATURES CHAPTER 6 LIST OF TABLES (Cont'd)

Table Title 6.5-1 COMPARISON OF ESF AIR FILTRATION SYSTEMS WITH (REGULATORY POSITIONS OF REGULATORY GUIDE 1.52) (6/73)

6.5-2 CVAS OPERATING VALVE SCHEDULE

6.5-3 CONTROLLED VENTILATION AREA SYSTEM FAILURE MODES AND EFFECTS ANALYSIS (DRN 05-1247, R14) 6.5-4 DELETED (DRN 05-1247, R14) 6.5-5 SECONDARY CONTAINMENT OPERATION FOLLOWING A DESIGN BASIS ACCIDENT 6.5-6 CONTROLLED VENTILATION AREAS SYSTEM DESIGN BASIS DELAY TIMES (LOSS OF OFFSITE POWER)

WSES-FSAR-UNIT-3 6-viii Revision 14 (12/05) ENGINEERED SAFETY FEATURES CHAPTER 6 LIST OF FIGURES Figure Title 6.1-1 DELETED (DRN 01-230, R12) 6.2-1 DELETED (DRN 05-1247, R14) 6.2-1a DELETED 6.2-1b DELETED

6.2-1c DELETED

6.2-1d DELETED 6.2-1e DELETED 6.2-1f DELETED

6.2-1g DELETED

6.2-1h DELETED

6.2-1i DELETED 6.2-1j DELETED 6.2-1k DELETED

6.2-1l DELETED

6.2.1m CONTAINMENT PRESSURE - 19.24 FT2 Hot Leg Break / Peak Containment Pressure 6.2.1n CONTAINMENT VAPOR AND SUMP TEMPERATURE - 19.24 FT2 Hot Leg Break 6.2.1o NOT USED

6.2.1p CONTAINMENT PRESSURE - 9.82 FT2 Discharge Leg Break / Peak Cont. Pressure at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6.2.1q CONTAINMENT VAPOR AND SUMP TEMPERATURE - 9.82 FT2 Discharge Leg Break 6.2.1r CONTAINMENT PRESSURE - 7.88 FT2 MSLB HFP - Failure of one Train of Containment Heat Removal System / Peak Pressure Case 6.2.1s CONTAINMENT TEMPERATURE - 7.88 FT2 MSLB HFP - Failure of one Train of Containment Heat Removal System / EQ Case (DRN 05-1247, R14) 6.2-2 DELETED 6.2-3 DELETED 6.2-4 DELETED 6.2-4a DELETED 6.2.5 DELETED 6.2-6 DELETED (DRN 01-230, R12)

WSES-FSAR-UNIT-3 6-ix Revision 304 (06/10) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title (DRN 03-2060, R14) 6.2-6a DELETED (DRN 03-2060, R14) 6.2.7a DELETED

6.2-7b DELETED (DRN 01-230, R12) 6.2-7c DELETED 6.2-7d DELETED

6.2.7e DELETED

6.2-7f DELETED

6.2-8 FIGURE NUMBER NOT USED

6.2-8a DELETED

6.2-8b DELETED 6.2-8c DELETED

6.2-9 DELETED 6.2-10 FIGURE NUMBER NOT USED 6.2-10a DELETED

6.2-10b DELETED

6.2-10c DELETED (DRN 01-230, R12) 6.2-11 DELETED 6.2-12 FIGURE NUMBER NOT USED (DRN 05-1247, R14) 6.2-12a CONTAINMENT FAN COOLER PERFORMANCE (DRN 05-1247, R14) (EC-706, R304) 6.2-12b DELETED (EC-706, R304) 6.2-13 PRESSURE DIFFERENTIAL ACROSS SHIELD BUILDING FOLLOWING INADVERTENT SPRAY ACTUATION (SHEET 1 OF 2)

6.2-13 PRESSURE DIFFERENTIAL ACROSS SHIELD BUILDING FOLLOWING INADVERTENT SPRAY ACTUATION (SHEET 2 OF 2) 6.2-13a DELETED 6.2-13b DELETED (DRN 01-230, R12) 6.2-13c DELETED 6.2-13d DELETED (DRN 01-230, R12) 6.2-13e GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL WSES-FSAR-UNIT-3 6-x Revision 12 (10/02) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title 6.2-13f GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13g GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13h GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13i GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-13j GENERAL ARRANGEMENTS REACTOR BUILDING SUBCOMPARTMENT MODEL 6.2-14 REACTOR CAVITY SUBCOMPARTMENT MODEL

6.2-15 REACTOR CAVITY SUBCOMPARTMENT MODEL

6.2-16 STEAM GENERATOR SUBCOMPARTMENT MODEL

6.2-17 STEAM GENERATOR SUBCOMPARTMENT MODEL

6.2-18 STEAM GENERATOR SUBCOMPARTMENT MODEL

6.2-19 PRESSURIZER SUBCOMPARTMENT MODEL

6.2-20 CEFLASH - 4A REACTOR COOLANT SYSTEM NODAL MODEL (LEGEND FOLLOWS) 6.2-20a LEGEND FOR FIGURE 6.2-20

6.2-20b CEFLASH-4A FEEDWATER LINE BREAK NODAL MODEL

6.2-20c CEFLASH-4A FEEDWATER LINE NODAL MODEL DESCRIPTION 6.2-21 REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21a REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21b REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21c REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21d REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21e REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21f REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21g REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-21h REACTOR CAVITY PRESSURE 100 IN2 HOT LEG GUILL BREAK IN VOL. 1 6.2-22 REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 WSES-FSAR-UNIT-3 6-xi Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title 6.2-22a REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22b REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22c REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22d REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22e REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22f REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22g REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 6.2-22h REACTOR CAVITY PRESSURE 350 IN2 DISCHARGE LEG GUILL BREAK IN VOL. 2 (DRN 05-1247, R14) 6.2-23 STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN VOL. 15

6.2-23a STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN VOL. 15

6.2-23b STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN VOL. 15

6.2-23c STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK VOL. 15

6.2-23d STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN VOL. 15

6.2-23e STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN VOL. 15

6.2-23f STEAM GENERATOR SUBCOMPARTMENT PRESSURE 600 IN2 HOT LEG CIRCUM BREAK IN VOL. 15

6.2-24 STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-24a STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-24b STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-24c STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-24d STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-24e STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15 (DRN 05-1247, R14)

WSES-FSAR-UNIT-3 6-xii Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-1247, R14) 6.2-24f STEAM GENERATOR SUBCOMPARTMENT PRESSURE 430 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25 STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25a STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25b STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25c STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25d STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25e STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-25f STEAM GENERATOR SUBCOMPARTMENT PRESSURE 592 IN2 SUCTION LEG CIRC. BREAK IN VOL. 15

6.2-26 STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-26a STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-26b STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-26c STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-26d STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-26e STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-26f STEAM GENERATOR SUBCOMPARTMENT PRESSURE 532 IN2 SUCTION LEG SLOT BREAK IN VOL. 15

6.2-27 STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15

6.2-27a STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15

6.2-27b STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15 (DRN 05-1247, R14)

WSES-FSAR-UNIT-3 6-xiii Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-1247, R14) 6.2-27c STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15

6.2-27d STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15

6.2-27e STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15

6.2-27f STEAM GENERATOR SUBCOMPARTMENT PRESSURE 480 IN2 DISCHARGE LEG CIRCUM. IN VOL. 15 (DRN 05-1247, R14) 6.2-27g STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 FEEDWATER CIRCUM. BREAK IN VOL. 22

6.2-27h STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 FEEDWATER CIRCUM. BREAK IN VOL. 22

6.2-27i STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 FEEDWATER CIRCUM. BREAK IN VOL. 22

6.2-27j STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 FEEDWATER CIRCUM. BREAK IN VOL. 22

6.2-27k STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 FEEDWATER CIRCUM. BREAK IN VOL. 22

6.2-27l STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 FEEDWATER CIRCUM. BREAK IN VOL. 22

6.2-27m STEAM GENERATOR SUBCOMPARTMENT PRESSURE VS TIME FOR A 2.88 FT2 CIRCUM. BREAK IN VOL. 22

6.2-28 FIGURE NUMBER NOT USED

6.2-28a PRESSURIZER SURGE LINE BREAK IN VOL. 1

6.2-28b PRESSURIZER SURGE LINE BREAK IN VOL. 1

6.2-28c PRESSURIZER SURGE LINE BREAK IN VOL. 1

6.2-28d PRESSURIZER SURGE LINE BREAK IN VOL. 1

6.2-28e PRESSURIZER SURGE LINE BREAK IN VOL. 1

6.2-28f PRESSURIZER SURGE LINE BREAK IN VOL. 1 6.2-28g PRESSURIZER SURGE LINE BREAK IN VOL. 1

6.2-29 FIGURE NUMBER NOT USED

6.2-29a PRESSURIZER SAFETY RELIEF LINE BREAK IN VOL. 3 6.2-29b PRESSURIZER SAFETY RELIEF LINE BREAK IN VOL. 3 WSES-FSAR-UNIT-3 6-xiv Revision 15 (03/07) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title 6.2-29c PRESSURIZER SPRAY LINE DE GUILL BREAK IN VOL. 3

6.2-29d PRESSURIZER SPRAY LINE DE GUILL BREAK IN VOL. 3 (DRN 06-1061, R15) 6.2-30a 0.6 x DE SLOT BREAK IN PUMP DISCHARGE LEG - FAN COOLER HEAT REMOVAL CAPACITY (DRN 06-1061, R15) 6.2-30a1 DELETED (DRN 06-1061, R15) 6.2-30b 0.6 x DOUBLE ENDED SLOT BREAK IN PUMP DISCHARGE LEG EFFECTIVE SPRAY AND SPILLAGE TO CONTAINMENT

6.2-30c 0.6 x DOUBLE ENDED SLOT BREAK IN PUMP DISCHARGE LEG CONDENSING HEAT TRANSFER COEFFICIENT FOR STATIC HEAT SINKS (DRN 06-1061, R15) 6.2-31 FIGURE NUMBER NOT USED (DRN 06-1061, R15) 6.2-31a 0.6 x DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG MINIMUM CONTAINMENT PRESSURE

6.2-31b 0.6 x DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG CONTAINMENT TEMPERATURE 6.2-31c 0.6 x DE GUILLOTINE BREAK IN PUMP DISCHARGE LEG SUMP TEMPERATURE (DRN 06-1061, R15) 6.2-32 FIGURE NUMBER NOT USED

6.2-32a VELOCITY VS. TIME FOR NODE (29, 25)

  • 6.2-32b SAFETY RELATED COMPONENT HEAT SINK MODELS

6.2-32c HEAT TRANSFER COEFFICIENT VS. TIME FOR 102% POWER MSLB WITH ONE COOLING TRAIN FAILURE

6.2-32d SOLA MODEL OF CONTAINMENT TIME = 0.00 SEC.

6.2-32e SOLA VELOCITY PROFILE TIME = 0.05 SEC.

6.2-32f SOLA VELOCITY PROFILE TIME = 0.50 SEC.

6.2-32g SOLA VELOCITY PROFILE TIME = 1.00 SEC.

6.2-32h SOLA VELOCITY PROFILE TIME = 1.45 SEC.

6.2-32i HEAT STRUCTURE MODEL FOR FAN COOLER MOTOR

6.2-32j EQUIPMENT QUALIFICATION SURFACE VELOCITIES

6.2-33 FIGURE NUMBER NOT USED

6.2-33a EQUIPMENT TEMP. VS. TIME FOLLOWING 102% POWER MSLB WITH ONE COOLING TRAIN FAILURE

6.2-34 DELETED

WSES-FSAR-UNIT-3 6-xv Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title 6.2-34a COMPONENT DIAGRAMS (DRN 01-417) 6.2-35 DESIGN DATA FOR CONTAINMENT ATMOSPHERE RELEASE SYSTEM COMPONENTS (DRN 01-417) 6.2-36 HVAC - REACTOR BUILDING

6.2-37 HVAC - REACTOR BUILDING - SECTIONS

6.2-38 HVAC - REACTOR BUILDING

6.2-39 HVAC - REACTOR BUILDING

6.2-40 CONTAINMENT SPRAY PUMP CHARACTERISTICS

6.2-41 CONTAINMENT SPRAY PATTERNS - LOOP "A" PLAN

6.2-42 CONTAINMENT SPRAY PATTERNS - LOOP "B" - PLAN

6.2-43 CONTAINMENT SPRAY PATTERNS - LOOP "A" - ELEVATION

6.2-44 CONTAINMENT SPRAY PATTERNS - LOOP "B" - ELEVATION

6.2-45 SIS SUMP AND SCREEN DETAILS

6.2-45a GRATING CAGE DESIGN AS TESTED

6.2-46 CONTAINMENT PRESSURE FOR SHIELD BUILDING ANNULUS TRANSIENT FOLLOWING A 9.82 FT2 DESLS 6.2-47 FIGURE NUMBER NOT USED

6.2-47a SHIELD BUILDING ANNULUS PRESSURE FOLLOWING A 9.82 FT2 DESLS 6.2-47b SHIELD BUILDING ANNULUS PRESSURE FOLLOWING A 9.82 FT2 DESLS 6.2-47c SBVS FAN FLOW CHARACTERISTICS VERSUS ANNULUS P 6.2-48 CONTAINMENT AND SHIELD BUILDING ANNULUS TEMPERATURE FOLLOWING A 9.82 FT2 DESLS 6.2-49 CONTAINMENT VESSEL SURFACE TEMPERATURE AS A FUNCTION OF TIME 6.2-49a SHIELD BUILDING INTERIOR SURFACE TEMPERATURE AS A FUNCTION OF TIME

6.2-50 CONTAINMENT VESSEL TEMPERATURE GRADIENT AS A FUNCTION OF DISTANCE AND TIME

6.2-51 SBVS FAN PERFORMANCE CURVES

6.2-52 HYDROGEN ANALYZER SYSTEM FLOW DIAGRAM

6.2-53 COMBUSTIBLE GAS CONTROL SYSTEM HYDROGEN RECOMBINER SUBSYSTEM SCHEMATIC FLOW DIAGRAM

6.2-54 POST-LOCA HYDROGEN AS A FUNCTION OF TIME WSES-FSAR-UNIT-3 6-xvi Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title 6.2-54a DELETED

6.2-54b DELETED

6.2-55 ZINC CORROSION RATE FOLLOWING A LOCA 6.2-55a ALUMINUM CORROSION RATE FOLLOWING A LOCA 6.2-55b ASSUMED HYDROGEN GENERATION RATE DUE TO PAINT FOLLOWING A LOCA

6.2-55c LONG-TERM CONTAINMENT TEMP. TRANSIENT USED IN POST-LOCA HYDROGEN GENERATION ANALYSIS

6.2-56 FAN COOLERS AH-1 (3A-SA) AND AH-1 (3B-SB) PEAK PRESSURE TRANSIENT FOLLOWING A LOCA

6.2-57 FAN COOLERS AH-1 (3C-SA) AND AH-1 (3D-SB) PEAK PRESSURE TRANSIENT FOLLOWING A LOCA

6.2-58 DUCT WORK PEAK PRESSURE TRANSIENT FOLLOWING A LOCA 6.2-59 DELETED

6.2-60 DELETED

6.2-61 DELETED

6.2-62 DELETED

6.2-63 DELETED

6.2-64 DELETED

6.2-65 CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 1 OF 4

6.2-66 CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 2 OF 4

6.2-67 CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 3 OF 4

6.2-68 CONTAINMENT ISOLATION VALVE TEST ARRANGEMENT SCHEMATIC-SHEET 4 OF 4

6.2-69 GENERAL ARRANGEMENT 2'-6" X 6'-6" PERSONNEL LOCK 6.2-70 2'-6" X 6'-6" PERSONNEL LOCK INT & EXT DOOR DETAILS

6.2-71 PERSONNEL LOCK DOOR TIE-DOWN ASSEMBLY

6.2B-1 TEMP. GRADIENT IN GASEOUS AND LIQUID BOUNDARY LAYERS DURING HEAT SINK SURFACE CONDENSATION

6.2B-2 SPRAY EFFICIENCY VS. STEAM/AIR RATIO (DRN 01-417) 6.3-1 FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 1 OF (DRN 01-417) 6.3-1 FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 2 OF 4 WSES-FSAR-UNIT-3 6-xvii Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title 6.3-1 FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 3 OF 4

6.3-1 FLOW DIAGRAM SAFETY INJECTION SYSTEM SHEET 4 OF 4

6.3-2 LPSI PUMP CHARACTERISTICS

6.3-2a LPSI PUMP CHARACTERISTICS PUMP NO. 037225

6.3-2b LPSI PUMP CHARACTERISTICS PUMP NO. 37256

6.3-3 HPSI PUMP CHARACTERISTICS

6.3-3a HPSI PUMP CHARACTERISTICS PUMP NO. 0672174

6.3-3b HPSI PUMP CHARACTERISTICS PUMP NO. 0672175

6.3-3c HPSI PUMP CHARACTERISTICS PUMP NO. 0672176

6.3-4 FLOW DIAGRAM - SAFETY INJECTION SYS. INJECTION MODE

6.3-5 FLOW DIAGRAM - SAFETY INJECTION SYS. SHORT TERM RECIRCULATION

6.3-6 FLOW DIAGRAM - SAFETY INJECTION SYS. LONG TERM RECIRCULATION (LARGE BREAKS)

6.3-7 FLOW DIAGRAM - SAFETY INJECTION SYS. LONG TERM RECIRCULATION (SMALL BREAKS) 6.3-8 FLOW DIAGRAM - SAFETY INJECTION SYS. SHUTDOWN COOLING MODE

6.3-9 LONG TERM COOLING PLAN

6.3-10 CORE FLUSH BY HOT SIDE INJECTION FOR 9.8 FT2 COLD LEG BREAK 6.3-11 INNER VESSEL BORIC ACID CONCENTRATION VS. TIME

6.3-12 RCS REFILL TIME VS. BREAK AREA

6.3-13 OVERLAP OF ACCEPTABLE LTC PROCEDURES IN TERMS OF COLD LEG BREAK SIZE

6.3-14 RCS PRESSURE AT DECISION POINT VS. BREAK AREA

6.4-1 CONTROL ROOM AIR CONDITIONING SYSTEM NORMAL OPERATING MODE 6.4-2 CONTROL ROOM AIR CONDITIONING SYSTEM EMERGENCY OPERATING MODE (HIGH RADIATION) 6.4-3 CONTROL ROOM AIR CONDITIONING SYSTEM EMERGENCY OPERATING MODE (TOXIC GAS) 6.4-4 MAIN CONTROL ROOM BREATHING AIR SYSTEM

6.5-1 AN ARRANGEMENT DIAGRAM OF INSTRUMENTATION AND TESTING NOZZLES

6.5-2 FIGURE NUMBER NOT USED

WSES-FSAR-UNIT-3 6-xviii Revision 14 (12/05) CHAPTER 6 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-1247, R14) 6.5-2a DELETED

6.5-2b DELETED

6.5-3 DELETED (DRN 05-1247, R14) 6.5-4 HVAC - REACTOR BUILDING WSES-FSAR-UNIT-3 6-xix Revision 13-A (09/04) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 12-B Table 6.2-32a Sht 2 ER-W3-2003-0132-000/DRN 03-274

Figure 6.4-1 ER-W3-1065-000/DRN 02-1612 Figure 6.4-2 Figure 6.4-3

Revision 13 Section 6.2.6.4 ER-W3-2002-0102-000/DRN 02-385 Table 6.4-4 ER-W3-2000-0948-000/DRN 02-1386

Table 6.3-1 Sht 16 ER-W3-2002-0335-000/DRN 02-1896 Figure 6.3-1 Sht 4

Table 6.2-32 Sht 29 ER-W3-2002-0585-000/DRN 03-169 Table 6.2-32 Sht 30

Table 6.2-32 Sht 47 ER-W3-2002-0283-002/DRN 03-1014 Table 6.2-32 Sht 48 Table 6.2-43 Sht 2

Section 6.2.2.2 ER-W3-2000-0912-001/DRN 03-1355 Table 6.2-25 Sh 1 ER-W3-2003-0687-000/DRN 03-1838 Table 6.2-25 Sht 2 Table 6.2-25 Sht 3 Table 6.2-26

Section 6.3.3.1 ER-2003-0117-000/DRN 03-1943 Revision 13-A Table 6.2-32 Sht 47 ER-W3-2002-0227-000/DRN 03-1543 Table 6.2-32 Sht 48 Table 6.2-44 Section 6.2.4.3.1

Table 6.2-32 Sht 62 ER-W3-2004-0419-000/DRN 04-1139 Table 6.2-32 Sht 63 Table 6.2-32 Sht 64 Table 6.2-32 Sht 65 Table 6.2-32 Sht 78 Table 6.2-32 Sht 79

Table 6.2-32 Sht 49 ER-W3-2004-0396-002/DRN 04-1220 WSES-FSAR-UNIT-3 6-xx Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 6 Section Cross References

Revision 13-B Section 6.2.1.1.1 ER-W3-2004-271/DRN 04-631 Section 6.2.1.3.7 Section 6.3.2.9.8 Section 6.3.3.1 Section 6.3.3.3 Section 6.3.3.3.1 Section 6.3.3.3.2 Section 6.3.3.4 Table 6.2-32 Sht. 85 Table 6.3-6 Table 6.3-6a

Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2060 Section 6.1.1.2 Section 6.2.1.1.1 Section 6.2.1.1.3 Section 6.2.1.2.3 Section 6.2.1.3.1 Section 6.2.1.3.6 Section 6.2.1.4 Section 6.2.1.4.1 Section 6.2.1.4.2 Section 6.2.1.4.3 Section 6.2.1.5.1 Section 6.2.1.5.2 Section 6.2.1.5.3 Section 6.2.1.5.3.2 Section 6.2.1.5.3.4 Section 6.2.1.5.3.6 Section 6.2.1.5.4 Section 6.2.2.2.2.1 Section 6.2.3.3.1 Section 6.2.4.1 Section 6.3.1.4.2 Section 6.3.2.9.8 Section 6.3.3.1 Section 6.3.3.2.1 Section 6.3.3.2.2 Section 6.3.3.2.3 Section 6.3.3.4.2 Section 6.3.3.5 Reference 6.2.1 Reference 6.2.2

WSES-FSAR-UNIT-3 6-xxi Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 6 Section Cross References

Revision 14 Cont'd Table 6.2-1 sh 1 ER-W3-2001-1149-000/DRN 03-2060 Cont'd Table 6.2-3 Table 6.2-4 Table 6.2-5 Table 6.2-6 sh 2 Table 6.2-7 sh 2-3 Table 6.2-7 sh 5 Table 6.2-10 sh 1-2 Table 6.2-12 sh 16-18 Table 6.2-12 sh 19-22 Table 6.2.12G Table 6.2-12-13 sh 3-6 Table 6.2-13C sh 1-2 Table 6.2-19 sh 1-2 Table 6.2-23 Table 6.2-24 Table 6.2-32 sh 1 Table 6.2-32 sh 4 Table 6.2-32 sh 7 Table 6.2-32 sh 9 Table 6.2-32 sh 85 Table 6.3-2 Table 6.3-5 Table 6.3-5A Table 6.3-6 Figure 6.2-1A Figure 6.2-1B Figure 6.2-1C Figure 6.2-1D Figure 6.2-1E Figure 6.2-1F Figure 6.2-1G Figure 6.2-1H Figure 6.2-1I Figure 6.2-1J Figure 6.2-1K Figure 6.2-1L Figure 6.2-1M Figure 6.2-1N Figure 6.2-1O Figure 6.2-1P Figure 6.2-1Q Figure 6.2-1R Figure 6.2-1S Figure 6.2.6A Figure 6.2-12a Figure 6.2-22a Figure 6.2-23a-f Figure 6.2-24 Figure 6.2-24a-f Figure 6.2-25 Figure 6.2-25a-f WSES-FSAR-UNIT-3 6-xxii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 14 Cont'd Figure 6.2-26 ER-W3-2001-1149-000/DRN 03-2060 Cont'd Figure 6.2-26a-f Figure 6.2-27 Figure 6.2-27a-f Figure 6.2-30a Figure 6.2-56 Figure 6.3-9 Figure 6.3-10 Figure 6.3-12 Figure 6.3-13 Figure 6.3-14

Section 6.3.3.1 ER-W3-2001-1149-000/DRN 05-196 Table 6.3-1 sh 7 Table 6.3-17 sh 13 Table 6.3-1 sh 17

Section 6.3.3.4.1 ER-W3-2001-1149-000/DRN 05-315 Section 6.3.3.4.2 Section 6.3.3.4.4 Reference 6.3 Table 6.3-11

Section 6.3.3.1 ER-W3-2001-1149-001/DRN 05-545 Section 6.3.3.3 Section 6.3.3.3.1 Section 6.3.3.3.2 Section 6.3.3.3.3 Section 6.3.3.3.4 Table 6.3-6 Table 6.3-6a Figure 6.2-30b Figure 6.2-31A-C

Section 6.2.2.2.2 ER-W3-2001-1149-007/DRN 05-12 Table of Contents ER-W3-2001-1149-013/DRN 05-1247 Appendix 6.2A Table 6.2-1 sh 2 Table 6.2-12 sh 15

Section 6.0 ER-W3-2004-0276-000/DRN 04-705 Section 6.1.3 Section 6.2.1.1.1 Section 6.2.3.1 Section 6.2.3.3.3 Section 6.2.4.2.3 Section 6.4.1 Section 6.4.2.2 Section 6.4.2.3 Section 6.4.2.4 Section 6.4.3.3 Section 6.4.4.1 WSES-FSAR-UNIT-3 6-xxiii Revision 14-A (03/06) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 14 Cont'd Section 6.5.1 ER-W3-2004-0276-000/DRN 04-705 Cont'd Section 6.5.1.1 Section 6.5.1.2.1.2 Section 6.5.1.2.2 Section 6.5.1.3 Section 6.5.2.1 Section 6.5.2.2 Section 6.5.2.3 Section 6.5.2.6 Section 6.5.3.1 Reference 6.4 Table 6.4-1 Table 6.4-2 Table 6.5-1 sh 1 Table 6.5-4 Table 6.5-5 Figure 6.5-2a-b Figure 6.5-3

Section 6.2.1.1.3 ER-W3-2004-0276-002/DRN 05-1004 Table 6.2-2 page 1-2 ER-W3-2004-0478-000/DRN 04-1422 Table 6.2-15 sh 1-2

Table 6.2-32 sh 2 ER-W3-2004-0618-000/DRN 05-41 Table 6.2-32 sh 5 Table 6.2-32 sh 8-12 Table 6.2-32 sh 59 Table 6.2-32 sh 77

Section 6.2.6.1 ER-W3-2005-0012-000/DRN 05-75 Section 6.2.3.1 ER-W3-2005-0145-000/DRN 05-785 Section 6.2.3.2.2 Section 6.2.3.3.1 Appendix 6.2A

Section 6.5.2.2 ER-W3-2005-0328-000/DRN 05-1138 Table 6.2-3 ER-W3-2005-0500-000/DRN 05-1550 Revision 14-A Section 6.2.1.1.3 ER-W3-2005-0546-000/DRN 05-1769 Section 6.3.3.5 ER-W3-2006-0057-000/DRN 06-230 WSES-FSAR-UNIT-3 6-xxiv Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 14-B Section 6.0 ER-W3-2004-0373-001/DRN 05-1135 Section 6.2.5.1 Section 6.2.5.2.2 Section 6.2.5.3 Section 6.2.5.4 Section 6.2.5

Figure 6.2-38 ER-W3-2006-0108-000/DRN 06-326 Revision 15 Section 6.1.2.4 ER-W3-2003-0394-001/DRN 06-1026 Section 6.2.2.2.2.1 Section 6.2.2.3.2 Section 6.2.2.3.2.1 Table 6.2-22 Sh. 1 Figure 6.2-45 Section 6.3.2.2.2.3

Figure 6.4-1 ER-W3-2003-0485-000/DRN 05-1062 Figure 6.4-2 Figure 6.4-3

Section 6.2.2.3.2.1 ER-W3-2005-0395-000/DRN 05-1332 Table 6.2-22 Sh. 1 Section 6.3.2.2.2.3

Table 6.3-6 ER-W3-2005-0447-002/DRN 05-1457

Table of Contents ER-W3-2005-0447-004/DRN 06-1061 Section 6.2.1.5.3 Section 6.2.1.5.3.1 Section 6.2.1.5.4 Table 6.2-7 Sh. 3 Table 6.2-19 Sh. 1 Table 6.2-19 Sh. 2 Table 6.2-19 Sh. 3 Figure 6.2-30A Figure 6.2-30B Figure 6.2-30c Figure 6.2-31A Figure 6.2-31B Figure 6.2-31C Section 6.3.3.1 Section 6.3.3.3.1 Section 6.3.3.3.2 Section 6.3.3.3.3 Section 6.3.3.4.1 Section 6.3.3.4.4 Section 6.3.3.5 Table 6.3-5A Figure 6.3-9 thru Figure 6.3-14

WSES-FSAR-UNIT-3 6-xxv Revision 302 (12/08) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 301 Section 6.4.6.1 EC-5000081434 Section 6.5.1.6

Section 6.4.4.2 EC-5000082258

Section 6.2.3.3.2 EC-5000082406 Table 6.2-28 Sh. 3 EC-5000081471 Section 6.4.2.2 Section 6.4.3.3 Table 6.4-1 Table 6.4-2 Section 6.5.3.2

Revision 302 Section 6.3.3.5 EC-935 Table 6.2-32 Sh. 47 Table 6.2-32 Sh. 48

Section 6.1.2.4 EC-999 Section 6.2.2.1 Section 6.2.2.2.2.1 Section 6.3.1.4

Section 6.2.2.2.2.1 EC-1002 Section 6.2.2.3.2.1 Table 6.2-22 Sh. 1 Section 6.3.2.2.2.3

Section 6.6.8 EC-2013

Section 6.4.4.2 EC-5435

Section 6.2.5.2 EC-6494 Table 6.2-34 Table 6.2-36 Table 6.2-37 Table 6.2-39 Figure 6.2-53 Figure 6.2-54 Figure 6.2-55 Figure 6.2-55a Figure 6.2-55b Figure 6.2-55c

Section 6.2.1.5.3 EC-9533 Section 6.2.1.5.3.1 Section 6.2.1.5.3.2 Section 6.2.1.5.4 Section 6.2.1: References Table 6.2-19 Sh. 1

WSES-FSAR-UNIT-3 6-xxvi Revision 306 (05/12) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 302 (Continued)

Table 6.2-19 Sh. 2 Table 6.2-19 Sh. 3 Figure 6.2-30A Figure 6.2-30B Figure 6.2-30c Figure 6.2-31A Figure 6.2-31B Figure 6.2-31C Section 6.3.3.1 Section 6.3: References Table 6.3-2 Sh. 2

Revision 303 Table 6.2-32 Sh. 45 EC-14945

Revision 304 Table of Contents EC-706 Section 6.2.1.1.3 Table 6.2-2 Pg. 2 Table 6.2-3 Table 6.2-11 Sh. 1 Table 6.2-11 Sh. 2 Figure 6.2-12b (Deleted)

Figure 6.2-13 Sh. 1 Figure 6.2-13 Sh. 2 Table 6.2-1 Sh. 3

Revision 305 Table 6.2-32 Sheet 47 of 85 EC-14765 Table 6.2-32 Sheet 48 of 85 Table 6.3-1 Sheet 5 of 17

Section 6.2 EC-19087 Table 6.2-1 Sheet 3 of 3 Table 6.2.2 Sheet 1 of 2

Section 6.3.2.8 EC-26496 Table 6.3-1 Sheet 1 of 17

Revision 306 Section 6.2.1.2.1 EC-29816 Table 6.2-1 Sheet 2 Table 6.2-1 Sheet 3

Section 6.3.3.4.4 EC-35592 Table 6.3-5A WSES-FSAR-UNIT-3 6-xxvii Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 307 Table 6.2-26 EC-1020

Section 6.1.1.1.1 EC-2800

Section 6.2.2.2.2.2 EC-8437 Table 6.2.25 Sheet 1 of 3 Table 6.2-26

Section 6.2.1.1.1 EC-8458 Section 6.2.1.1.3 Section 6.2.1.3 Section 6.2.1.3.7 Section 6.2.1.3.8 Section 6.2.1.4 Section 6.2.1.4.2 Section 6.2.1.4.3 Section 6.2.1.5.3 Section 6.2.1.5.4 Section 6.2.1 References Table 6.2.1 Sheet 1 of 3 Table 6.2.2 Sheet 1 of 2 Table 6.2.3 Table 6.2-4 Table 6.2-5 Table 6.2-6 Sheet 1 of 2 Table 6.2-7 Sheet 3 of 5 Table 6.2-7 Sheet 4 of 5 Table 6.2-8 Sheet 1 of 2 Table 6.2-8 Sheet 2 of 2 Table 6.2-10 Sheet 1 of 2 Table 6.2-10 Sheet 2 of 2 Table 6.2-12 Sheet 1 of 24 Table 6.2-12 Sheet 2 of 24 Table 6.2-12 Sheet 6 of 24 thru Table 6.2-12 Sheet 13 of 24 Table 6.2-12 Sheet 15 of 24 thru Table 6.2-12 Sheet 24 of 24 Table 6.2-19 Sheet 1 of 3 thru Table 6.2-19 Sheet 3 of 3 Figure 6.2-1m Figure 6.2-1n Figure 6.2-1p Figure 6.2-1q Figure 6.2-1r Figure 6.2-1s Figure 6.2-30B Figure 6.2-31A Figure 6.2-31B Figure 6.2-31C Section 6.3.3.1 Section 6.3.3.3.3 Section 6.3.3.3.4 Section 6.3.3.4.4 WSES-FSAR-UNIT-3 6-xxviii Revision 308A (10/15) UPDATE REFERENCE LIST Chapter 6 Section Cross References Revision 307 (Continued Table 6.3-5A EC-8458 (Continued)

Table 6.3-6

Section 6.2.2.3.2.1 EC-25199 Table 6.2-22 Sheet 1 of 3 Section 6.3.2.2.2.3

Section 6.3.3.8 EC-30976

Section 6.2.2.2.1 EC-40195 Table 6.2-21 Sheet 1 of 2

Section 6.2.2.4.1 EC-40281 Table 6.2-21 Sheet 1 of 2

Section 6.3.2.2.2.3 EC-40296

Revision 308 Section 6.3.2.2.1 EC 45607 Section 6.3.2.5.1 Section 6.3.2.9.6 Section 6.3.2.9.7

Revision 308A Section 6.2.5.2.1 LBDCR 15-030 WSES-FSAR-UNIT-3 7-i Revision 10 (10/99) INSTRUMENTATION AND CONTROLS CHAPTER 7 TABLE OF CONTENTS Section Title Page

7.0 INSTRUMENTATION AND CONTROLS 7.1-1

7.1 INTRODUCTION

7.1-1 7.1.1 IDENTIFICATION OF SAFETY RELATED SYSTEMS 7.1-1

7.1.2 IDENTIFICATION OF SAFETY CRITERIA 7.1-5

7.2 REACTOR PROTECTIVE SYSTEM 7.2-1 7.2.1 DESCRIPTION 7.2-1

7.2.2 ANALYSIS 7.2-22

7.3 ENGINEERED SAFETY FEATURES SYSTEMS 7.3-1 7.3.1 DESCRIPTION 7.3-1

7.3.2 ANALYSIS 7.3-25

7.4 SYSTEMS REQUIRED FOR SAFE SHUTDOWN 7.4-1 7.4.1 DESCRIPTION 7.4-1

7.4.2 ANALYSIS 7.4-7

7.5 SAFETY RELATED DISPLAY INSTRUMENTATION 7.5-1 7.5.1 DESCRIPTION 7.5-1

7.5.2 ANALYSIS 7.5-8

7.5A PLANT MONITORING COMPUTER 7.5A-I 7.6 ALL OTHER INSTRUMENTATION SYSTEMS REQUIRED FOR SAFETY 7.6-1 7.6.1 DESCRIPTION 7.6-1

7.6.2 ANALYSIS 7.6-5

7.7 CONTROL SYSTEMS NOT REQUIRED FOR SAFETY 7.7-1 7.7.1 DESCRIPTION 7.7-1

WSES-FSAR-UNIT-3 7-ii Revision 10 (10/99) CHAPTER 7 TABLE OF CONTENTS (Cont'd)

Section Title Page

7.7.2 DESIGN COMPARISON 7.7-19

7.7.3 ANALYSIS 7.7-19

7.7 REFERENCES

7.7-19 7.7A PLANT SAFETY PARAMETER DISPLAY SYSTEM (SPDS) 7.7A-i 7.7A.1 DESCRIPTION 7.7A-i

7.8 ATWS MITIGATION SYSTEMS 7.8-1 7.

8.1 INTRODUCTION

7.8-1

7.8.2 DESIGN BASIS 7.8-1

7.8.3 SYSTEM DESCRIPTION 7.8-1

7.8.4 SAFETY EVALUATION 7.8-3

7.8.5 INSPECTION AND TESTING REQUIREMENTS 7.8-3

WSES-FSAR-UNIT-3 7-iii Revision 14 (12/05) CHAPTER 7 INSTRUMENTATION AND CONTROLS LIST OF TABLES Table Title

7.2-1 REACTOR PROTECTIVE SYSTEM BYPASSES

7.2-2 REACTOR PROTECTIVE SYSTEM MONITORED PLANT VARIABLE RANGES

7.2-3 REACTOR PROTECTIVE SYSTEM SENSORS

7.2-4 REACTOR PROTECTIVE SYSTEM DESIGN MARGINS

7.2-5 PLANT PROTECTION SYSTEM FAILURE MODE AND EFFECTS ANALYSIS (DRN 03-2061, R14) 7.2-6 DELETED (DRN 03-2061, R14) 7.3-1 DESIGN BASIS EVENTS REQUIRING ESF SYSTEM ACTION

7.3-2 ESFAS SENSORS AND SETPOINTS

7.3-3 ESFAS BYPASSES

7.3-4 AUXILIARY SUPPORTING SYSTEMS REQUIREMENTS

7.3-5 COMPONENTS ACTUATED ON SIAS

7.3-6 COMPONENTS ACTUATED ON RAS

7.3-7 COMPONENTS ACTUATED ON CSAS

7.3-8 COMPONENTS ACTUATED ON CIAS

7.3-9 COMPONENTS ACTUATED ON MSIS

7.3-10 COMPONENTS ACTUATED ON EFAS

7.3-11 MONITORED VARIABLES REQUIRED FOR ESF SYSTEM PROTECTIVE ACTION

7.3-12 DRAWING COMPARISON (DRN 03-2061, R14) 7.3-13 DELETED (DRN 03-2061, R14) 7.4-1 INDICATORS ON AUXILIARY CONTROL PANEL LCP-43 7.4-2 SDCS SUCTION LINE VALVES ACTION ON LOSS OF POWER SUPPLY

7.4-3 CONTROL STATIONS ON AUXILIARY CONTROL PANEL LCP-43 7.5-1 SAFETY RELATED PANEL MOUNTED DISPLAY INSTRUMENTATION

7.5-2 DELETED

WSES-FSAR-UNIT-3 7-iv LIST OF TABLES (Cont'd) Table Title

7.5-3 ACCIDENT MONITORING INSTRUMENTATION

7.7-1 COLSS MONITORED PLANT VARIABLES WSES-FSAR-UNIT-3 7-v Revision 10 (10/99) CHAPTER 7 INSTRUMENTATION AND CONTROLS LIST OF FIGURES Figure Title

7.1-1 SIMPLIFIED PPS CABINET LAYOUT (REAR VIEW) 7.1-2 TYPICAL PPS BAY LAYOUT

7.1-3 AUXILIARY RELAY CABINET A (FRONT VIEW) 7.2-1 TYPICAL MEASUREMENT CHANNEL FUNCTIONAL DIAGRAM (PRESSURIZER PRESSURE) 7.2-2 REED SWITCH POSITION TRANSMITTER CABLE ASSEMBLIES

7.2-3 CEA POSITION SIGNALS WITHIN REACTOR PROTECTION SYSTEM 7.2-4 CEA POSITION SYSTEMS BLOCK DIAGRAM

7.2-5 EXCORE NEUTRON FLUX MONITORING SYSTEM 7.2-6 CORE PROTECTION CALCULATOR SYSTEM BLOCK DIAGRAM

7.2-7 PLANT PROTECTION SYSTEM SIMPLIFIED FUNCTIONAL DIAGRAM

7.2-8 TYPICAL TRIP CHANNEL BYPASS

7.2-9 BASIC PPS TESTING SYSTEM (SHOWN FOR REACTOR PROTECTION SYSTEM)

7.2-10 PLANT PROTECTION SYSTEM INTERFACE LOGIC DIAGRAM

7.2-11 PPS BYPASS AND BLOCK SCHEMATIC

7.2-11a PPS BYPASS AND BLOCK SCHEMATIC

7.2-12 PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM

7.2-13 PPS 2/4 LOGIC MATRIX SCHEMATIC

7.2-14 RPS TRIP PATH

7.2-15 TYPICAL RAS-MSIS-EFAS TRIP PATH CIRCUIT

7.2-16 CSAS-SIAS-CIAS TRIP PATH CIRCUITS

7.2-17 ESFAS ACTUATION RELAY CABINET SCHEMATIC DIAGRAM FOR TYPICAL ACTUATION SIGNAL

7.2-18 ESFAS AUXILIARY RELAY CABINET SIMPLIFIED FUNCTIONAL DIAGRAM FOR MSIS AND EFAS

WSES-FSAR-UNIT-3 7-vi Revision 10 (10/99) CHAPTER 7 LIST OF FIGURES (Cont'd)

Figure Title

7.2-19 CHANNEL POWER DISTRIBUTION

7.2-20 PPS CALIBRATION AND TEST PANEL SCHEMATIC

7.3-1 PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM (SHEETS 1 OF 3)

7.3-1 PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM (SHEETS 2 OF 3)

7.3-1 PLANT PROTECTION SYSTEM FUNCTIONAL DIAGRAM (SHEETS 3 OF 3)

7.3-2 SAFETY INJECTION ACTUATION SYSTEM LOGIC DIAGRAM

7.3-3 CONTAINMENT ISOLATION ACTUATION SYSTEM LOGIC DIAGRAM

7.3-4 CONTAINMENT SPRAY AND SAFETY INJECTION SUMP RECIRCULATION ACTUATION SYSTEMS LOGIC DIAGRAM

7.3-5 NSSS ESFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM FOR A TYPICAL ACTUATION SIGNAL

7.3-6 TYPICAL NSSS ENGINEERED SAFETY FEATURES ACTUATION FUNCTIONAL DIAGRAM

7.3-7 MAIN STEAM ISOLATION ACTUATION SYSTEM LOGIC DIAGRAM

7.3-8 NSSS ESFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM MSIS INITIATION CIRCUIT

7.3-9 EMERGENCY FEEDWATER ACTUATION SYSTEM LOGIC DIAGRAM

7.3-10 NSSS EFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM FOR EFAS-1 (EFAS-2) INITIATION CIRCUIT

7.3-11 SHIELD BUILDING VENTILATION SYSTEM-INSTRUMENT SCHEMATIC

7.3-12 EMERGENCY FEEDWATER PARAMETERS

7.3-13 EFAS/MSIS INTERFACE LOGIC DIAGRAM

7.4-1 SHUTDOWN COOLING SYSTEM SUCTION LINE VALVES INTERLOCKS BLOCK DIAGRAM 7.4-2 GENERAL ARRANGEMENT OF THE AUXILIARY CONTROL PANEL LCP-43 7.5-1 LOCAL INSTRUMENT RACKS OR CABINETS CONCEPTUAL LAYOUT 7.5-2 INSTRUMENT CABINET C-1A (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT)

WSES-FSAR-UNIT-3 7-vii Revision 11 (05/01) CHAPTER 7 LIST OF FIGURES (Cont'd)

Figure Title

7.5-3 INSTRUMENT CABINET C-1B (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT)

7.5-4 INSTRUMENT CABINET C-1C (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT) 7.5-5 INSTRUMENT CABINET C-1D (LOCATION EL + 21'-0 MSL INSIDE CONTAINMENT) 7.5-6 INSTRUMENT CABINET C-27A (LOCATION EL -35'-0 MSL INSIDE CONTAINMENT) 7.5-7 INSTRUMENT CABINET C-27B (LOCATION EL -35'-0 MSL REACTOR AUX BLD'G) 7.5-8 DELETED

7.5A-1 DELETED

7.5A-2 DELETED

7.5A-3 REMOTE MULTIPLEXER SITE

7.5A-4 DELETED

7.5A-5 LOCATION OF CRT DISPLAYS ON THE MAIN CONTROL BOARD

7.7-1 REACTOR REGULATING SYS. 1 AND 2 MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL)

7.7-2 CEDMCS-RPS INTERFACE BLOCK DIAGRAM

7.7-3 PRESSURIZER PRESSURE CONTROL MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL)

7.7-4 PRESSURIZER LEVEL CONTROL MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL) 7.7-5 FEEDWATER CONTROL SYSTEM 1 MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL) 7.7-6 FEEDWATER CONTROL SYSTEM 2 MEASUREMENT CHANNEL BLOCK DIAGRAM (TYPICAL) 7.7-7 STEAM BYPASS CONTROL SYSTEM SIMPLIFIED BLOCK DIAGRAM 7.7-8 FUNCTIONAL DIAGRAM OF THE CORE OPERATING LIMIT SUPERVISORY SYSTEM 7.7-9 REACTOR POWER CUTBACK SYSTEM SIMPLIFIED BLOCK DIAGRAM

7.7-10 INTENTIONALLY DELETED

7.8-1 DIVERSE REACTOR TRIP SCHEMATIC

7.8-2 DIVERSITY BETWEEN THE EXISTING REACTOR TRIP SYSTEM AND THE DIVERSE REACTOR TRIP SYSTEM/DIVERSE TURBINE TRIP

7.8-3 DIVERSE EMERGENCY FEEDWATER ACTUATION SYSTEM (DEFAS) SYSTEM

7.8-4 DIVERSITY BETWEEN THE EXISTING EFW SYSTEM AND THE DIVERSE EFW SYSTEM

7.8-5 ATWS POWER SUPPLY INTERFACE WSES-FSAR-UNIT-3 7-viii Revision 13-B (01/05) UPDATE REFERENCE LIST Chapter 7 Section Cross References

Revision 12-B Section 7.2.1.1.1.12 ER-W3-2000-0249-000/DRN 03-7 Table 7.5-3 Sht. 15 ER-W3-2002-0352-002/DRN 02-1634

Revision 12-C Table 7.5-3 Sht. 20 ER-W3-2003-0296-000/DRN 03-839

Revision 13 Appendix 7.5A ER-W3-2002-0560-000/DRN 03-287 Table 7.5-3 Sht 1 ER-W3-1999-0372-000/DRN 03-517 Table 7.5-3 Sht 32 Table 7.5-3 Sht 33 Table 7.5-3 Sht 34

Section 7.4.1.3 ER-W3-2003-0505-000/DRN 03-1275 Table 7.5-3 Sht 26 ER-W3-2003-0508-000/DRN 03-1276 Table 7.5-3 Sht 27 Table 7.5-3 Sht 28 Table 7.5-3 Sht 29

Section 7.7.1.7 ER-W3-2003-0585-000/DRN 03-1609 Table 7.3-13 Sht 2 ER-W3-2002-0585-000/DRN 03-1617

Section 7.7.1.7 ER-W3-2003-0681-000/DRN 03-1873 Table 7.5-3 Sht 4 Table 7.5-3 Sht 38 Table 7.7-1

Section 7.7.1.4.1 ER-W3-2003-0755-000/DRN 03-2155 Section 7.4.2.5

Revision 13-A Section 7.5.2.7.1.1 ER-W3-2004-0382-000/DRN 04-991 Table 7.5-3 Sht 21 Table 7.5-3 Sht 37

Revision 13-B Section 7.7.1.5.3.2 ER-W3-2004-0767-001/DRN 04-934 WSES-FSAR-UNIT-3 7-ix Revision 14-B (06/06) UPDATE REFERENCE LIST Chapter 7 Section Cross References Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2061 Section 7.2.1.1.2.4 Section 7.2.1.2 Section 7.2.2.2.1 Section 7.2.2.2.4 Section 7.2.2.3.3 Section 7.3 Section 7.3.1.1.1.9.6 Section 7.3.1.2.1 Section 7.3.2.1.3 Section 7.4.1.2 Section 7.4.2.1 Reference 7.7 Table 7.2-2 Table 7.2-6 Table 7.3-2 Table 7.3-13

Section 7.2.1.1.1.3 ER-W3-2002-0110-001/DRN 04-1097 Section 7.2.2.2 Section 7.2.2.2.3 Section 7.7.1.5.3.3

Section 7.2.1.1.1.13 ER-W3-2003-0055-000/DRN 04-384 Section 7.2.1.1.5 Table 7.2-1

Table 7.5-3 sh 21 ER-W3-2003-0055-000/DRN 04-744 Table 7.5-3 sh 38 Table 7.7-1

Section 7.2.1.1.1.8 ER-W3-2003-0353-000/DRN 05-130 Section 7.7.1.5.5.3.3 Table 7.2-4 Table 7.3-2

Section 7.5.2.7.1.1 ER-W3-2004-0276-000/DRN 04-1967 Table 7.5-3 sh 33

Figure 7.3-12 ER-W3-2005-0019-000/DRN 05-408 Revision 14-A Section 7.7.1.4.3 ER-W3-2005-0436-000/DRN 05-1393 Revision 14-B Section 7.3.1.1.9 ER-W3-2004-0373-001/DRN 05-1382 Section 7.5.2.7.1.1 Table 7.5-3 sh 16

WSES-FSAR-UNIT-3 7-x Revision 305 (11/11) UPDATE REFERENCE LIST Chapter 7 Section Cross References Revision 15 Table 7.3-2 ER-W3-2006-0282-000/DRN 06-884 Table 7.5-3 Sh. 7 Table 7.5-3 Sh. 16 Table 7.5-3 Sh. 30

Table 7.5-3 Sh. 8 ER-W3-2006-0223-000/DRN 06-909

Section 7.3.1.1.6.2 ER-W3-2007-0010-000/DRN 07-43 Revision 301 Section 7.7.1.4.1 EC-1037

Table 7.5-3 Sh. 33 EC-2768 Table 7.5-3 Sh. 34

Revision 302 Section 7.6.1.1.1 EC-935 Table 7.4-2 Figure 7.4-1

Revision 303 Table 7.5-3 Sh. 33 EC-12583 Table 7.5-3 Sh. 34

Revision 304 Section 7.2.1.1.1.4 EC-13881 Section 7.7.1.5.3.5

Section 7.7.1.1.1 EC-18522

Section 7.7.1.7 EC-18688 Table 7.7-1 Table 7.5-3 Sh. 3

Revision 305 Section 7.4.1.3 EC-14765 Section 7.6.1.1.1 Section 7.6.2.1 Table 7.4-2 Table 7.4-3 Sheet 3 of 11 Table 7.4-3 Sheet 6 of 11 Table 7.5-3 Sheet 13 of 40

Section 7.2.1.1.5 EC-22790

Section 7.6.2.1 EC-23616 WSES-FSAR-UNIT-3 7-xi Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 7 Section Cross References Revision 306 Table 7.5-1 (Sheet 2 of 27) EC-12329 Table 7.5-1 (Sheet 7 of 27)

Table 7.5-1 (Sheet 16 of 27)

Table 7.5-1 (Sheet 22 of 27)

Table 7.5-1 (Sheet 23 of 27)

Revision 307 Section 7.1.1.7 EC-2800 Appendix 7.5A

Table 7.2-2 EC-8460 Table 7.2-4 Table 7.3-2 Figure 7.3-12 Table 7.5-3 Sheet 37 of 40 Table 7.5-3 Sheet 38 of 40 Section 7.7 References

Section 7.3.1.1.6.1 EC-33720 Appendix 7.5A EC-36174

Section 7.3.1.1.6.1 EC-41355 Section 7.4.1.2 Section 7.4.2.3

Revision 308 Table 7.5-3 Sh. 1 of 40 EC 46532

WSES-FSAR-UNIT-3 8-i CHAPTER 8 ELECTRIC POWER TABLE OF CONTENTS Section Title Page 8.0 ELECTRIC POWER 8.1-1

8.1 INTRODUCTION

8.1-1 8.1.1 UTILITY GRID DESCRIPTION 8.1-1

8.1.2 OFFSITE POWER SYSTEM 8.1-1

8.1.3 ONSITE POWER SYSTEM 8.1-1

8.1.4 DESIGN BASES 8.1-3

8.1A STATION BLACKOUT EVALUATION 8.1A-1

8.2 OFFSITE POWER SYSTEM 8.2-1 8.2.1 DESCRIPTION 8.2-1

8.2.2 ANALYSIS 8.2-9

8.3 ONSITE POWER SYSTEMS 8.3-1 8.3.1 AC POWER SYSTEMS 8.3-1

8.3.2 DC POWER SYSTEM 8.3-42

8.3.3 FIRE PROTECTION FOR CABLE SYSTEMS 8.3-49

WSES-FSAR-UNIT-3 8-ii CHAPTER 8 ELECTRIC POWER LIST OF TABLES Table Title 8.1-1 SAFETY-RELATED EQUIPMENT IDENTIFICATION

8.1-2 AUXILIARY LOADING

8.1-3 FSAR CROSS-REFERENCE OF DISCUSSION OF SRP ACCEPTANCE CRITERIA FOR ELECTRIC POWER

8.2-1 POWER TRANSFORMER RATINGS

8.2-2 ISOLATED PHASE BUS RATINGS

8.2-3 MAIN GENERATOR RATINGS

8.2-4 SWITCHGEAR RATINGS

8.2-5 RATINGS OF LOW VOLTAGE EQUIPMENT

8.3-1 DIESEL GENERATOR LOADING SEQUENCE

8.3-2 RATINGS OF CLASS 1E ELECTRICAL DISTRIBUTION EQUIPMENT

8.3-3 BATTERY 3A-S LOADING (SAFETY RELATED DIVISION A DC LOADS)

8.3-4 BATTERY 3B-S LOADING (SAFETY RELATED DIVISION B DC LOADS)

8.3-5 BATTERY 3AB-S LOADING (SAFETY RELATED DIVISION AB LOADING)

8.3-6 4.16 KV ENGINEERED SAFETY FEATURES SYSTEM SINGLE FAILURE ANALYSIS 8.3-7 480 V ENGINEERED SAFETY FEATURES SYSTEM SINGLE FAILURE ANALYSIS

8.3-8 208Y/120 V AC SYSTEM SINGLE FAILURE ANALYSIS

8.3-9 120 V UNINTERRUPTIBLE VITAL AC SYSTEM SINGLE FAILURE ANALYSIS 8.3-10 125 V DC ENGINEERED SAFETY FEATURE SYSTEM SINGLE FAILURE ANALYSIS

8.3-11 SINGLE FAILURE ANALYSIS OF TRANSFER TO PREFERRED POWER SOURCE UPON UNIT TRIP

8.3-12 EQUIPMENT IDENTIFICATION

WSES-FSAR-UNIT-3 8-iii Revision 11 (05/01) CHAPTER 8 LIST OF TABLES (Cont'd)

Table Title 8.3-13 DESIGN BASIS OF ONSITE POWER SOURCE UNDERVOLTAGE PROTECTION

8.3-14 SEQUENCE OF EVENTS UNDER DEGRADED VOLTAGE CONDITIONS 8.3-15 INFORMATION CIRCUIT ANALYSIS

8.3-16 INFORMATION CIRCUITS FAILURE ANALYSIS FOR ANNUNCIATOR SYSTEMS

8.3-17 INFORMATION CIRCUITS FAILURE ANALYSIS FOR COMPUTER SYSTEM

8.3-18 USERS OF GROUND SYSTEM DESIGN COMPUTER PROGRAM

8.3-19 VITAL SUPPORTING SYSTEMS FOR CLASS 1E EQUIPMENT

8.3-20 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATIONS (CEP) (DRN E9900733, R11) 8.3-21 INFORMATION CIRCUITS FAILURE ANALYSIS FOR ISOLATION PANEL (POWER SUPPLIES WITH LOW VOLTAGE OUTPUT, (DRN E9900733, R11)

WSES-FSAR-UNIT-3 8-iv Revision 14-A (03/06) CHAPTER 8 ELECTRIC POWER LIST OF FIGURES Figure Title (DRN 05-1767, R14-A) 8.1-1 SYSTEM MAP - ENTERGY LOUISIANA, LLC (DRN 05-1767, R14-A) 8.1-2 THE ENTERGY ELECTRIC SYSTEM MAP (DRN 99-0733, R11) 8.1-2a SOUTHERN/METRO DISTRICTS AND LP&L INDUSTRIAL CORRIDOR (DRN 99-0733, R11) 8.1-3 SOUTHWEST POWER POOL 8.1-4 PREFERRED POWER SYSTEM SWITCHYARD ONE LINE DIAGRAM (SHEET 1 OF 2) 8.1-4 PREFERRED POWER SYSTEM SWITCHYARD ONE LINE DIAGRAM (SHEET 2 OF 2) 8.1-5 PREFERRED POWER SYSTEM SWITCHING STATION ONE LINE DIAGRAM (DRN 01-418, R11) 8.1-6 PREFERRED POWER SYSTEM MAIN ONE LINE DIAGRAM (DRN 01-418, R11) 8.1-7 ONSITE POWER SYSTEM MAIN ONE LINE DIAGRAM (DRN 01-418, R11) 8.1-8 ONSITE POWER SYSTEM 125V DC & 120V AC ONE LINE DIAGRAM (DRN 01-418. R11) 8.1-9 SYSTEM SAB TRANSFER ONE LINE DIAGRAM 8.2-1 TRANSMISSION LINE SYSTEM

8.2-2 230 KV OVERHEAD LINES FALLING RADIUS & CLEARANCES 8.2-3 BUS TRANSFER FROM UNIT AUXILIARY TO STARTUP TRANSFORMERS UPON LOSS OF MAIN GENERATOR

8.2-4 WATERFORD 230 KV SWITCHYARD BY A NO. 5 PROFILES

8.2-5 WATERFORD PROPERTY CROSSOVER OF 230 KV AND 115 KV LINES (DRN 99-0733, R11) 8.3-1 ONSITE POWER SYSTEM DIESEL GENERATOR LOGIC DIAGRAM (DRN 99-0733, R11) 8.3-2 BATTERY 3A-S LOADING CYCLE 8.3-2a BATTERY 3A-S LOADING CYCLE

8.3-3 BATTERY 3B-S LOADING CYCLE

8.3-3a BATTERY 3B-S LOADING CYCLE

8.3-4 BATTERY 3AB-S LOADING CYCLE

8.3-4a BATTERY 3AB-S LOADING CYCLE

8.3-5 CLASS 1E 4160 VOLT BUS UNDERVOLTAGE DETECTION SCHEME FOR 3A3-S, 3AB3-S BUSES

WSES-FSAR-UNIT-3 8-v Revision 11 (05/01) CHAPTER 8 LIST OF FIGURES (Cont'd)

Figure Title 8.3-6 CLASS 1E 4160 VOLT BUS UNDERVOLTAGE DETECTION SCHEME FOR 3B3-S BUS

8.3-7 6.9 KV CONTAINMENT PENETRATIONS-125V DC CONTROL POWER FOR RCP MOTOR FEEDER BREAKERS

8.3-8 4.0KV MOTOR & 4.16KV BUS 3A3-S AND 3AB-S OVERCURRENT PROTECTION CRITERIA

8.3-9 480V MOTOR & STATION SERVICE TRANSFORMER OVERCURRENT PROTECTION CRITERIA

8.3-10 480V MCC FEEDERS OVERCURRENT PROTECTION CRITERIA

8.3-11 480V MCC COMBINATION MOTOR CONTROLLERS-MOTOR OVERCURRENT PROTECTION CRITERIA

8.3-12 INFORMATION CIRCUITS, TYPICAL CABLE ROUTING OF ANNUNCIATOR CIRCUITS 8.3-13 TYPICAL ANNUNCIATOR LOGIC CABINET AND CABLES LISTING

8.3-14 TYPICAL MULTIPLEXOR CABINET AND CABLES LISTING (DRN E9900733, R11) 8.3-15 TYPICAL ROUTING FROM A SOLENOID VALVE TO CP-19 (DRN E9900733, R11) 8.3-16 TYPICAL ROUTING FROM A MOTOR CONTROL CENTER TO A MULTIPLEXOR 8.3-17 INFORMATION CIRCUITS, ANNUNCIATOR LOGIC CABINET (CP-19)WIRING DIAGRAM (PARTIAL)

8.3-18 INFORMATION CIRCUITS, ANNUNCIATOR LOGIC CABINET ARRANGEMENT

8.3-19 TIME-CURRENT CHARACTERISTICS OF FIELD CONTACT, FUSE & CABLE FOR MAXIMUM CREDIBLE FAULT AT CP-19

8.3-20 INFORMATION CIRCUITS - TYPICAL CABLE ROUTING OF COMPUTER MULTIPLEXOR CIRCUITS

8.3-21 INFORMATION CIRCUITS MULTIPLEXORS WIRING DIAGRAM (PARTIAL) 8.3-22 INFORMATION CIRCUITS - TYPICAL MULTIPLEXOR CABINET ARRANGEMENT 8.3-23 INFORMATION CIRCUITS - COMPUTER MULTIPLEXOR/ANNUNCIATOR LOGIC CABINET ARRANGEMENT

8.3-24 INFORMATION CIRCUITS - COMPUTER MULTIPLEXOR AND ANNUNCIATOR COMMON FIELD CONTACTS 8.3-25 DELETED

8.3-25a EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE UPON LOCA OR MSLB WITH LOSS OF OFFSITE POWER WSES-FSAR-UNIT-3 8-vi Revision 11 (05/01) CHAPTER 8 LIST OF FIGURES (Cont'd)

Figure Title 8.3-25b EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON LOCA OR MSLB WITH LOSS OF OFFSITE POWER (SHEET 1 OF 2)

8.3-25b EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON LOCA OR MSLB WITH LOSS OF OFFSITE POWER (SHEET 2 OF 2)

8.3-26 DELETED

8.3-26a EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE UPON SHUTDOWN WITH LOSS OF OFFSITE POWER

8.3-26b EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON SHUTDOWN WITH LOSS OF OFFSITE POWER (SHEET 1 OF 2)

8.326b EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE UPON SHUTDOWN WITH LOSS OF OFFSITE POWER (SHEET 2 OF 2)

8.3-27 DELETED

8.3-27a EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU 1d DURING LOCA OR MSLB WITH LOOP

8.3-27b EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU 1d DURING LOCA OR MSLB WITH LOOP

8.3-27c EMERGENCY DIESEL GENERATOR "A" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU 1d DURING SHUTDOWN WITH LOOP SUPPORTS

8.3-27d EMERGENCY DIESEL GENERATOR "B" LOADING SEQUENCE FOR LOAD BLOCKS 1a THRU 1d DURING LOOP

8.3-28 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION - 1500 MCM/6.9 KV 8.3-29 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION - 500 MCM/480V 8.3-30 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION - 250 MCM/480V 8.3-31 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION NO. 2/0, 4&8 AWG SIZE CONDUCTORS, @ 480 VOLT

8.3-32 BACKUP PROTECTION FOR CONTAINMENT ELECTRICAL PENETRATION NO. 14 AWG CONDUCTOR, @ 120 VOLT

8.3-33 EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS

8.3-34 SPECIFIC SEPARATION CRITERIA FOR PROCESS INSTRUMENTATION CABINETS

8.3-35 SAMPLE OF INTERNAL WIRING FOR PROCESS INSTRUMENTATION CABINETS

8.3-36 SEQUENCER CIRCUIT

8.3-37 UNDERVOLTAGE RELAY CRITERIA-TEST CURVE FOR RELAYS 27-1, 2, 3 WSES-FSAR-UNIT-3 8-vii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 8 Section Cross References Revision 12-B Table 8.1-1 Sht 1 ER-W3-1998-1220-00/DRN E99-150

Table 8.2-1 ER-W3-2000-0297-003/DRN 03-2

Revision 13 Section 8.2.1.3 ER-W3-2002-0595-000/DRN 03-1484 Section 8.2.1.6.3 Section 8.2.1.6.5 Figure 8.2-3

Figure 8.1.5 ER-W3-2002-0595-000/DRN 03-1725 Figure 8.3-2A ER-W3-2003-0761-000/DRN 03-213 Figure 8.3-3A

Revision 13-A Table 8.3-1 ER-W3-2004-0298-000/DRN 04-673 Figure 8.3-25a Sht 1 Figure 8.3-25a Sht 2 Figure 8.3-25b Sht 1 Figure 8.3-25b Sht 2 Figure 8.3-26a Sht 1 Figure 8.3-26a Sht 2 Figure 8.3-26b Sht 1 Figure 8.3-26b Sht 2 Figure 8.3-27a Figure 8.3-27b Figure 8.3-27c Figure 8.3-27d

Revision 14 Section 8.2.1.2 ER-W3-2001-1149-000/DRN 05-838 Section 8.2.1.6.3 Section 8.2.2.1 Table 8.3-1 sht 18 Table 8.3-1 shts 1-11 Table 8.3-1 sht 13 Table 8.3-1 shts 15-20 Figure 8.3.25a sht 2 Figure 8.3.25b sht 1 Figure 8.3.26-a sht 1 Figure 8.3-26b sht 1 Figure 8.3-27a Figure 8.3-27b Figure 8.3-27c Figure 8.3-27d WSES-FSAR-UNIT-3 8-viii Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 8 Section Cross References Revision 14 Cont'd Section 8.2.13 ER-W3-2002-0595-000/DRN 03-1496 Figure 8.1-5 ER-W3-2002-0595-000/DRN 03-1731 Section 8.2.1.4.1 ER-W3-2002-0595-000/DRN 04-535 Figure 8.1-5

Table 8.2-3 ER-W3-2002-0602-000/DRN 04-5

Table 8.2-1 ER-W3-2004-0008-000/DRN 04-1116

Table 8.2-1 ER-W3-2004-0009-000/DRN 04-1832

Table 8.3-1 sh 8 ER-W3-2004-0122-000/DRN 04-1551 Table 8.3-1 sh 17 Table 8.3-1 sh 20 Table 8.1-2 sh 2 Figure 8.3-33

Table 8.3-1 sh 18 ER-W3-2004-0122-000/DRN 05-980 Table 8.3-1 sh 20 Figure 8.1-2 sh 4 Figure 8.3-1 sh 8 Figure 8.3-1 sh 18 Figure 8.3-33

Appendix 8.1A-3 ER-W3-2004-0520-000/DRN 04-1680 Revision 14-A Table of Contents ER-W3-2005-0548-000/DRN 05-1767 Section 8.1.1 Section 8.1.4.1 Section 8.1.4.3 Section 8.2.2.1

Revision 14-B Appendix 8.1A ER-W3-2006-0118-000/DRN 06-339 Revision 15 Section 8.3.1.1.2.13 ER-W3-2001-1026-000/DRN 06-709 Table 8.3-10 Table 8.3-2 Sh. 3 Table 8.3-2 Sh. 4

WSES-FSAR-UNIT-3 8-ix Revision 305 (11/11) UPDATE REFERENCE LIST Chapter 8 Section Cross References Revision 301 Table 8.3-1 EC-5000082353 Figure 8.3.25a Sh. 1 Figure 8.3.25a Sh. 2 Figure 8.3.25b Sh. 1 Figure 8.3.25b Sh. 2 Figure 8.3-26a Sh. 1 Figure 8.3-26a Sh. 2 Figure 8.3.26b Sh. 1 Figure 8.3-26b Sh. 2 Figure 8.3.27a Figure 8.3.27b Figure 8.3.27c Figure 8.3.27d

Section 8.3.2.1.1 EC-5000082399 Figure 8.3-4 Figure 8.3-4A

Section 8.3.1.1.1 EC-774

Table 8.3-16 Sh. 1 EC-5000082263 Table 8.3-16 Sh. 2 Figure 8.3-17 Figure 8.3-19

Revision 302 Table 8.1-1 Sh. 1 EC-935

Section 8.3.2.1.1 EC-7960 Table 8.3-2 Sh. 3

Revision 304 Table 8.1-2 Sh. 1 EC-19206 Table 8.1-2 Sh. 2 Table 8.1-2 Sh. 3 Table 8.1-2 Sh. 4

Revision 305 Table 8.3-1 EC-26817 Figure 8.3-25a Sheet 1 Figure 8.3-25a Sheet 2 Figure 8.3-25b Sheet 1 Figure 8.3-25b Sheet 2 Figure 8.3-26a Sheet 1 Figure 8.3-26a Sheet 2 Figure 8.3-26b Sheet 1 Figure 8.3-26b Sheet 2 Figure 8.3-27a Figure 8.3-27b Figure 8.3-27c Figure 8.3-27d WSES-FSAR-UNIT-3 8-x Revision 308A (10/15) UPDATE REFERENCE LIST Chapter 8 Section Cross References Revision 307 Table 8.3-21 Sheet 1 of 2 EC-38908 Table 8.3-21 Sheet 2 of 2

Revision 308 Section 8.1.4.3 LBDCR 14-010 Section 8.3.1.2.4 Section 8.3.1.2.20 Table 8.1-3 Sh. 1 of 7 Table 8.1-3 Sh. 5 of 7

Section 8.3.1.1.2 LBDCR 14-009

Revision 308A Figure 8.3-31 LBDCR 15-022

Figure 8.3-33 LBDCR 15-002

WSES-FSAR-UNIT-3 9-i Revision 306 (05/12) CHAPTER 9 AUXILIARY SYSTEMS TABLE OF CONTENTS Section Title Page 9.0 AUXILIARY SYSTEMS 9.1-1 9.1 FUEL STORAGE AND HANDLING 9.1-1 9.1.1 NEW FUEL STORAGE 9.1-1 (EC-14275, R306) 9.1.2 SPENT FUEL STORAGE IN THE FUEL HANDLING AND 9.1-4 CONTAINMENT BUILDINGS (EC-14275, R306) 9.1.3 FUEL POOL SYSTEM (SPENT FUEL POOL COOLING AND 9.1-8 CLEANUP SYSTEM)

9.1.4 FUEL HANDLING SYSTEM 9.1-15 (EC-14275, R306) 9.1.5 SPENT FUEL DRY CASK STORAGE 9.1-40 (EC-14275, R306) 9.2 WATER SYSTEMS 9.2-1 9.2.1 STATION SERVICE WATER SYSTEM 9.2-1

9.2.2 COOLING SYSTEM FOR REACTOR AUXILIARIES 9.2-1

9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM 9.2-6 (DRN 00-691, R11-A) 9.2.4 POTABLE AND SANITARY WATER SYSTEM 9.2-11

9.2.5 ULTIMATE HEAT SINK 9.2-12

9.2.6 CONDENSATE STORAGE FACILITIES 9.2-18 (DRN 00-691, R11-A) 9.2.7 TURBINE CLOSED COOLING WATER SYSTEM 9.2-20 (DRN 00-691, R11-A) 9.2.8 PRIMARY WATER STORAGE FACILITIES 9.2-22 (DRN 00-691, R11-A) 9.2.9 ESSENTIAL SERVICES CHILLED WATER SYSTEM 9.2-24

9.3 PROCESS AUXILIARIES 9.3-1 9.3.1 COMPRESSED AIR SYSTEM 9.3-1 (DRN 00-691, R11-A) 9.3.2 PROCESS SAMPLING SYSTEM 9.3-3 (DRN 00-691, R11-A) 9.3.3 EQUIPMENT AND FLOOR DRAINAGE SYSTEMS 9.3-8 (DRN 00-691, R11-A) 9.3.4 CHEMICAL AND VOLUME CONTROL SYSTEM 9.3-15 9.3.5 STANDBY LIQUID CONTROL SYSTEM (BWRs) 9.3-38 (DRN 00-691, R11-A)

WSES-FSAR-UNIT-3 9-ii Revision 11-A (02/02) CHAPTER 9 TABLE OF CONTENTS (Cont'd)

Section Title Page (DRN 00-691, R11-A) 9.3.6 SHUTDOWN COOLING SYSTEM (RESIDUAL HEAT REMOVAL 9.3-38 SYSTEM)

9.3.7 HYDROGEN SYSTEM 9.3-51

9.3.8 POST ACCIDENT SAMPLING SYSTEM 9.3-53

9.3.9 NITROGEN SYSTEM 9.3-57

9.3 REFERENCES

9.3-60 (DRN 00-691, R11-A) 9.4 AIR CONDITIONING, HEATING, COOLING AND VENTILATION 9.4-1 SYSTEMS 9.4.1 CONTROL ROOM AIR CONDITIONING SYSTEM 9.4-1 9.4.2 FUEL HANDLING BUILDING VENTILATION SYSTEM 9.4-4

9.4.3 REACTOR AUXILIARY BUILDING VENTILATION SYSTEM 9.4-8 (DRN 00-691, R11-A) 9.4.4 TURBINE BUILDING VENTILATION SYSTEM 9.4-24

9.4.5 REACTOR BUILDING VENTILATION SYSTEM 9.4-25

9.5 OTHER AUXILIARY SYSTEMS 9.5-1 (DRN 00-691, R11-A) 9.5.1 FIRE PROTECTION SYSTEM 9.5-1

9.5.2 COMMUNICATION SYSTEMS 9.5-246

9.5.3 LIGHTING SYSTEMS 9.5-251

9.5.4 DIESEL GENERATOR FUEL OIL STORAGE AND TRANSFER 9.5-252 SYSTEMS

9.5.5 DIESEL GENERATOR JACKET WATER COOLING SYSTEM 9.5-255

9.5.6 DIESEL ENGINE STARTING SYSTEM 9.5-258

9.5.7 DIESEL GENERATOR LUBRICATION SYSTEM 9.5-260

9.5.8 DIESEL GENERATOR COMBUSTION AIR INTAKE AND EXHAUST 9.5-263 SYSTEM

WSES-FSAR-UNIT-3 9-iii Revision 15 (03/07) CHAPTER 9 AUXILIARY SYSTEMS LIST OF TABLES Table Title 9.1-1 Fuel Pool System Process Flow Data

9.1-2 Refueling and Spent Fuel Pool Water Chemistry

9.1-3 Principal Components Design Data Summary

9.1-4 Failure Mode and Effects Analysis Fuel Pool System

9.1-5 Major Tools and Servicing Equipment Required for Refueling Functions 9.1-6 Reactor Building Crane Data

9.1-7 FHB Building Crane Data (Cask Crane)

(DRN 99-0971) 9.1-8 Fuel Assembly Parameters used in Criticality Analysis (DRN 99-0971) 9.2-1 Design Data for the Component Cooling Water System and Auxiliary Component Cooling Water System Components

9.2-2 CCWS and ACCWS Temperature and Flow Control Description 9.2-3 Heat Removal and Water Requirements for the CCWS

9.2-4 Failure Modes and Effects Analysis for the CCWS and ACCWS Post LOCA 9.2-5 CCWS and ACCWS Instrument Application 9.2-6 Design Data for PWTP Components (DRN 06-873, R15) 9.2-7 DELETED (DRN 06-873, R15) 9.2-8 Principal Cooling Tower Components Dry Cooling Towers (DRN 00-691, R11-A) 9.2-9 Estimated Wet-Dry Cooling Tower Heat Dissipation for all Operations 9.2-10 Water Requirements for Wet Cooling Towers Post LOCA Essential Loads (DRN 00-691, R11-A) 9.2-11 Cooling Tower Instrument Application 9.2-12 Design Data for Condensate Storage System 9.2-13 Design Data for Turbine Closed Cooling Water System Components

9.2-14 Turbine Plant Operating Flow Rates and Calculated Heat Loads WSES-FSAR-UNIT-3 9-iv Revision 11-A (02/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF TABLES (Cont'd)

Table Title 9.2-15 Design Data for Primary Water Storage System

9.2-16 Safety Related and Nonsafety Related Air Handling Units 9.2-17 Essential Services Chilled Water System Failure Mode and Effects Analysis (DRN 00-691, R11-A) 9.3-1a Safety Class Valves with Air Accumulators (DRN 00-691, R11-A) 9.3-1b Safety Class Valves with Nitrogen Accumulators

9.3-2 Design Data for Compressed Air System Components

9.3-3 Primary Sample Points

9.3-4 Secondary Sample Points

9.3-5 Sub-system Construction Materials

9.3-6 Decontamination Areas

9.3-7 Reactor Coolant and Reactor Makeup Water Chemistry

9.3-8 CVCS Design Transients (DRN 00-691, R11-A) 9.3-9 Principal Component Design Data Summary (DRN 00-691, R11-A) 9.3-10 DELETED

9.3-11 Chemical and Volume Control System Process Parameters

9.3-12 Schedule of Waste Generation 9.3-13 Chemical and Volume Control System Process Flow Data

9.3-14 CVCS Component Diesel Loading

9.3-15 Chemical and Volume Control System (Boron Addition Portion) Failure Mode and Effects Analysis

9.3-16 Shutdown Cooling System (SDCS) Failure Mode and Effects Analysis 9.3-17 Shutdown Cooling Heat Exchanger Data

9.3-18 Shutdown Cooling System Valves Design Pressures and Temperatures

WSES-FSAR-UNIT-3 9-v Revision 11-A (02/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF TABLES (Cont'd)

Table Title 9.3-19 DELETED

9.3-20 Required Valve Actuations Accomplished from the Main Control Room 9.3-21 Design and Materials Data for Bulk Gas Storage Tubes

(DRN 00-703, R11-A) 9.3-21A Design and Materials Data for Essential Air Accumulators (DRN 00-703, R11-A) 9.3-22 Shutdown Cooling System Relief Valve Parameters

9.4-1 Design Space Temperatures and Humidities for Normal Plant Operation 9.4-2 Design Data for Control Room Air Conditioning System Components 9.4-3 Control Room Air Conditioning System Failure Modes and Effects Analysis

9.4-4 Design Data for Fuel Handling Building Ventilation System

9.4-5 F.H.B. Ventilation System Failure Modes and Effects Analysis 9.4-6 Design Data for Reactor Auxiliary Building Normal Ventilation System

9.4-7 Design Data for Personnel Decontamination Area Ventilation System 9.4-8 Design Data for Emergency Diesel Generator Ventilation System 9.4-9 Design Data for RAB H&V Room Ventilation System

9.4-10 Design Data for RAB Cable Vault and Switchgear Areas Ventilation System

9.4-11 RAB Cable Vault and Switchgear Areas Ventilation System Failure Modes and Effects Analysis

9.4-12 Design Data for RAB Hot Machine Shop and Decontamination Area Ventilation System

9.4-13 Design Data for RAB Air Conditioning System

9.4-14 Design Data for Controlled Ventilation Area Systems (CVAS) Fan Coolers 9.4-15 Design Data for Turbine Building Ventilation System

WSES-FSAR-UNIT-3 9-vi Revision 11-A (02/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF TABLES (Cont'd)

Table Title 9.4-16 Design Data for Airborne Radioactivity Removal System

9.4-17 Design Data for Containment Atmosphere Purge System 9.4-18 Design Data for Reactor Cavity Cooling System

9.4-19 Design Data for Control Element Drive Mechanism (CEDM) Cooling System 9.4-20 Design Data for Annulus Negative Pressure System (ANPS)

9.4-21 Comparison of Normal Ventilation System Air Cleaning Unit with Regulatory Guide 1.140 (March 1978)

9.5-1 Design Data - Diesel Generator Fuel Oil Storage and Transfer System 9.5-2 Diesel Generator Fuel Oil Storage and Transfer Systems Failure Mode and Effects Analysis

9.5-3 Design Parameters for Diesel Generator Jacket Cooling Water System 9.5-4 Design Data - Diesel Engine Starting System Components (DRN 00-691, R11-A) 9.5-5 Design Parameters for Diesel Generator Lube Oil System Components (DRN 00-691, R11-A) 9.5-6 Summary of Onsite Communication System Capabilities and Noise Consideration During Transients and/or Accidents 9.5.1-1 Tabulation of Doors which are Located Within Fire Walls 9.5.1-2 Fire Protection System Failure Mode and Effects Analysis 9.5.1-3 Fire Areas/Zones (DRN 00-691, R11-A) 9.5.1-4 Minimum Equipment Requirement for Safe Plant Shutdown Following a Cable Vault and Control Room Fire (DRN 00-691, R11-A)

WSES-FSAR-UNIT-3 9-vii Revision 11-A (02/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF FIGURES Figure Title (DRN 00-691, R11-A) 9.1-1 New Fuel Storage Racks (DRN 00-691, R11-A) 9.1-2 Spent Fuel Pit Liner (Sheet 1 of 2)

9.1-2 Spent Fuel Pit Liner (Sheet 2 of 2) (DRN 00-691, R11-A) 9.1-3 Plan Arrangement of Spent Fuel Pool Storage Racks (Sheet 1 of 3) (DRN 00-691, R11-A) 9.1-3 Rack Assembly - Type 64-1 thru 64-12 (Sheet 2 of 3)

9.1-3 Rack Assembly - Type 80-1 thru 80-4 (Sheet 3 of 3) (DRN 01-419) 9.1-4 Flow Diagram Fuel Pool System (DRN 01-419) 9.1-5 Fuel Handling Equipment Arrangement (Typical) 9.1-6 Dual-Masted Refueling Machine

9.1-7 Fuel Handling Tools

9.1-8 Reactor Vessel Head Lift Rig

9.1-9 Core Support Barrel Lift Rig

9.1-10 Upper Guide Structure Lift Rig

9.1-11 Spent fuel Handling Machine

9.1-12 New Fuel Elevator

9.1-13 Underwater TV System

9.1-14 Deleted

9.1-15 Deleted

9.1-16 Hydraulic Power Unit

9.1-17 Refueling Pool Seals

9.1-18 Fuel Handling Building Crane Clearance Diagram (Plan) 9.1-19 Fuel Handling Building Cane Clearance Diagram (Section) 9.1-20 Reactor Building - Reactor Bridge Crane Clearance

9.1-21 Spent Fuel Pool Cooling System - Thermal Performance for Maximum Heat Load 9.1.22 Spent Fuel Pool Cooling System - Thermal Performance for Normal Head Load WSES-FSAR-UNIT-3 9-viii Revision 11 (05/01) CHAPTER 9 AUXILIARY SYSTEMS LIST OF FIGURES (Cont'd)

Figure Title 9.2-1 Flow Diagram - Component Closed Cooling Water System (Sheet 1 of 6) 9.2-1 Flow Diagram - Component Closed Cooling Water System (Sheet 2 of 6) 9.2-1 Flow Diagram - Component Closed Cooling Water System (Sheet 3 of 6) (DRN 01-419) 9.2-1 Flow Diagram - Component Closed Cooling Water System (Sheet 4 of 6) (DRN 01-419) 9.2-1 Flow Diagram - Component Closed Cooling Water System (Sheet 5 of 6) (DRN 01-419) 9.2-1 Flow Diagram - Component Closed Cooling Water System (Sheet 6 of 6) (DRN 01-419) 9.2-2 Flow Diagram - Primary Water, Condensate Storage and Makeup Demineralizer (Sheet 1 of 3)

9.2-2 Flow Diagram - Primary Water, Condensate Storage and Makeup Demineralizer (Sheet 2 of 3)

9.2-2 Flow Diagram - Primary Water, Condensate Storage and Makeup Demineralizer (Sheet 3 of 3)

9.2-3 DELETED (3 SHEETS)

9.2-4 Heat Load Dissipation of Ultimate Heat Sink After LOCA 9.2-4a Wet Cooling Tower Integrated Heat Load Curve After LOCA 9.2-5 Heat Removal Capacity of Dry Cooling Tower vs. Dry Bulb Temperature 9.2-5a Ultimate Heat Sink Design Basis Meteorological Conditions 9.2-6 Simplified Flow Diagram of Wet and Dry Cooling Towers

9.2-7 Turbine Building Closed Cooling Water System (Sheet 1 of 2) 9.2-7 Turbine Building Closed Cooling Water System (Sheet 2 of 2) 9.2-8 Essential Services Chilled Water System (Sheet 1 of 3) 9.2-8 Essential Services Chilled Water System (Sheet 2 of 3) (DRN 01-419) 9.2-8 Essential Services Chilled Water System ( Sheet 3 of 3) (DRN 01-419) 9.2-9 Flow Diagram - Potable Water System

WSES-FSAR-UNIT-3 9-ix Revision 11-A (02/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF FIGURES (Cont'd) Figure Title 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 1 of 9) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 2 of 9) (DRN 01-419) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 3 of 9) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 4 of 9) (DRN 01-419) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 5 of 9) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 6 of 9) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 7 of 9) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 8 of 9) 9.3-1 Flow Diagram - Service and Instrument Air Systems (Sheet 9 of 9) 9.3-2 Flow Diagram Sampling System (Sheet 1 of 6) 9.3-2 Flow Diagram Sampling System (Sheet 2 of 6) (DRN 01-419) 9.3-2 Flow Diagram Sampling System (Sheet 3 of 6) (DRN 01-419) (DRN 00-691, R11-A) 9.3-2 Flow Diagram Post Accident Sampling System (Sheet 4 of 6) (DRN 00-691, R11-A) 9.3-2 Flow Diagram Waste Gas Analyzer System (Sheet 5 of 6) 9.3-2 Flow Diagram Sampling System (Sheet 6 of 6) (DRN 01-419) 9.3-3 Flow Diagram - Sump Pump Systems Turbine Building and Yard (Sheet 1 of 3) (DRN 01-419) 9.3-3 Flow Diagram - Sump Pump Systems Reactor Auxiliary Building (Sheet 2 of 3) 9.3-3 Flow Diagram - Sump Pump Systems Reactor Building, Fuel Handling Building, Cooling Tower Area and Intake Structure (Sheet 3 of 3)

9.3-4 Reactor, Turbine and Fuel Handling Building Drainage Systems

9.3-5 Reactor Auxiliary Building Drainage Systems (DRN 01-419) 9.3-6 Flow Diagram Chemical and Volume Control System (Sheet 1 of 3) (DRN 01-419) 9.3-6 Flow Diagram Chemical and Volume Control System (Sheet 2 of 3) 9.3-6 Flow Diagram Chemical and Volume Control System (Sheet 3 of 3) 9.3-7 Normal Cooldown All System Components Operating WSES-FSAR-UNIT-3 9-x Revision 11-B (06/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF FIGURES (Cont'd)

Figure Title 9.3-8 Limited Cooldown One LPSI Pump and One SDHX Operating 9.3-8A Cooldown Without A-C Coolant Temperatures In Loop B (Atmospheric Dump Valve And Main Steam Cross-Connect Unavailable) (DRN 00-691, R11-A) 9.3-8B Cooldown Without A-C Coolant Temperatures In Loop A (Atmospheric Dump Valve Operable) (DRN 00-691, R11-A) 9.3-9 Hydrogen Storage System

9.3-10 SDCS Relief Valves

9.3-11 Post Accident Sampling System (DRN 01-1335, R11-B 9.4-1 Flow Diagram - Control Room Air Conditioning System (Sheet 1 of 2) 9.4-1 Flow Diagram - Control Room Air Conditioning System (Sheet 2 of 2) (DRN 01-1335, R11-B) 9.4-2 Fuel Handling Building Ventilation System

9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 1 of 9) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 2 of 9) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 3 of 9) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 4 of 9) (DRN 01-419) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 5 of 9) (DRN 01-419) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 6 of 9) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 7 of 9) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 8 of 9) 9.4-3 Reactor Auxiliary Building Ventilation Systems (Sheet 9 of 9) 9.4-4 RAB Cable Vault and Switchgear Areas Ventilation System 9.4-5 RAB Hot Machine Shop and Decontamination Area Ventilation System (DRN 01-419) 9.4-6 Turbine Building Ventilation Systems (DRN 01-419) 9.4-7 Reactor Building Ventilation Systems WSES-FSAR-UNIT-3 9-xi Revision 11-B (06/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF FIGURES (Cont'd)

Figure Title 9.5-1 Telephone Communication System Diagram (Sheet 1 of 4) 9.5-1 Telephone Communication System Diagram (Sheet 2 of 4) (DRN 01-419) 9.5-1 Telephone Communication System Diagram (Sheet 3 of 4) (DRN 01-419) 9.5-1 Telephone Communication System Diagram (Sheet 4 of 4) 9.5-2 Paging Communication System Diagram (Sheet 1 of 2) 9.5-2 Paging Communication System Diagram (Sheet 2 of 2) 9.5-3 Diesel Generator Fuel Oil Storage and Transfer System 9.5-3a Emergency Diesel Miscellaneous Piping

9.5-4 Diesel Engine Jacket Water Cooling System Schematic

9.5-5 Diesel Engine Starting System Schematic 9.5-6 Diesel Generator Lubrication System 9.5-7 Diesel Generator Combustion Air Intakes and Exhausts 9.5-8 Emergency Communication System Diagram - (Magneto/Sound Powered System) 9.5.1-1 Flow Diagram - Fire, Makeup and Domestic Water (Sheet 1 of 3) 9.5.1-1 Flow Diagram - Fire, Makeup and Domestic Water (Sheet 2 of 3) 9.5.1-1 Flow Diagram - Fire, Makeup and Domestic Water (Sheet 3 fo 3) (DRN 01-419) 9.5.1-2 Fire Protection Cooling Towers - Plan (DRN 01-419) 9.5.1-3 Fire Protection Reactor Auxiliary Building Plan EL -35.00' 9.5.1-4 Fire Protection Reactor Auxiliary Building Plan EL -4.00' 9.5.1-5 Fire Protection Reactor Auxiliary Building Plan EL +21.00' 9.5.1-6 Fire Protection Reactor Auxiliary Building Plan EL +46.00' (DRN 00-691, R11-A) 9.5.1-7 Fire Protection Reactor Auxiliary Building Section Sheet 1 (DRN 00-691, R11-A)

WSES-FSAR-UNIT-3 9-xii Revision 11-B (06/02) CHAPTER 9 AUXILIARY SYSTEMS LIST OF FIGURES (Cont'd) Figure Title 9.5.1-8 Fire Protection Reactor Auxiliary Building Sections Sheet 2 9.5.1-9 Fire Protection Reactor Auxiliary Building Sections 3 Sheet 3 (DRN 00-691, R11-A) 9.5.1-10 Fire Protection Reactor Auxiliary Building Sections Sheet 4 (DRN 00-691, R11-A) 9.5.1-11 Fire Protection Fuel Handling Building - Plans

9.5.1-12 Fire Protection Fuel Handling Building - Sections 9.5.1-13 Fire Protection Reactor Building - Plan EL -35.00' EL -4.00' (DRN 01-419) 9.5.1-14 Fire Protection Reactor Building - Plan EL +21.00' (DRN 01-419) 9.5.1-15 Fire Protection Reactor Building - Plan EL +46.00' 9.5.1-16 Fire Protection Turbine Building Ground Floor Plan EL 15.00' 9.5.1-17 Fire Protection Turbine Building Mezz. Floor Plan EL +40.00' 9.5.1-18 Fire Protection Turbine Building Operating Floor Plan EL +67.00' 9.5.1-19 Fire Protection Turbine Building Sections "B-B" and "C-C" 9.5.1-20 Fire Protection Turbine Building Section "A-A" 9.5.1-21 Fire Protection Auxiliary Building Plan EL +35.00' WSES-FSAR-UNIT-3 9-xiii Revision 13 (04/04) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 12-B Section 9.3.3.2.2.4 ER-W3-2002-0663-001/DRN 03-213 Section 9.2.9.3 ER-W3-2000-0563-000/DRN 02-1623 Table 9.3-13 Sh 4 ER-W3-2003-0132-000/DRN 03-275

Table 9.5.1-1 Sh 1 ER-W3-2002-0469-000/DRN 02-1351 Figure 9.5.1-16 Figure 9.5.1-17 Figure 9.5.1-20

Figure 9.4-3 Sh 8 ER-W3-2001-1065-000/DRN 02-1534

Revision 12-C Section 9.5.1.2.2 ER-W3-2003-0220-000/DRN 03-578 Section 9.5.1.3.1

Section 9.5.4.1 ER-W3-2003-0227-000/DRN 03-635 Section 9.5.4.2 Section 9.5.5.3 Section 9.5.6.2 Section 9.5.6.3 Section 9.5.7.2 Section 9.5.7.3 Table 9.5-1 Sht 1 Table 9.5-1 Sht 3 Table 9.5-2 Sht 1 Table 9.5-2 Sht 2 Table 9.5-3 Table 9.5-4 Sht 1 Table 9.5-4 Sht 2 Table 9.5-5 Sht 2

Revision 13 Figure 9.5-1 Sht 2 ER-W3-2000-0147-001/DRN 02-147

Table 9.2-1 Sht 5 ER-W3-2000-1073-000/DRN 02-1197

Section 9.3.4.3.2 ER-W3-2000-0106-002/DRN 03-760 Section 9.5.1.2.2 ER-W3-2001-1024-009/DRN 03-993 Section 9.5.1.3.2

Section 9.1.4.2.2.6 ER-W3-2002-0430-000/DRN 03-1341 WSES-FSAR-UNIT-3 9-xiv Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 13 Table 9.3-15 Sht 40 ER-W3-2003-0502-001/DRN 03-2021 Table 9.3-15 Sht 42

Figure 9.4.4 ER-W3-2003-0170-000/DRN 04-249 Revision 13-A Figure 9.3-1 Sht 6 ER-W3-2004-128/DRN 04-992 Figure 9.3-1 Sht 9

Revision 13-B Table 9.1-3 Sht. 5 ER-W3-2004-0205/DRN 04-487

Figure 9.1-5 ER-W3-2004-0377/DRN 04-1069

Table 9.2-12 Sht.2 ER-W3-2003-0489-000/DRN 04-92

Figure 9.3-2 Sht. 1 ER-W3-2001-0377-000/DRN 02-1052

Figure 9.5-1 Sht. 2 ER-W3-2003-0769-002/DRN 04-1393 Figure 9.5-2 Sht. 2

Revision 14 Section 9.1.4.2.2.13 ER-W3-2001-0305-001/DRN 02-176 Section 9.1.4.2.3.3 Table 9.1-5 sh 1 Figure 9.1-5 Figure 9.1-17

WSES-FSAR-UNIT-3 9-xv Revision 14-A (03/06) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 14 Cont'd Section 9.1.3.3 ER-W3-2001-1149-000/DRN 03-2063 Section 9.2.5.2 Section 9.2.5.3.2 Section 9.3-4.22 Section 9.3.6.1.2 Section 9.3.6.2.1 Section 9.3.6.2.2 Section 9.3.6.3.1 Section 9.3.6.3.3 Section 9.3.6.3.4 Table 9.1-3 sh 6-8 Table 9.2-3 sh 1-2 Table 9.2-9 Table 9.2-10 Table 9.3-11 Table 9.3-17 sh 1-2 Figure 9.3-7 Figure 9.3-8 Figure 9.3-8A Figure 9.3-8B

Table 9.3-4 shts 1-3 ER-W3-2001-1149-000/DRN 05-251 Section 9.1.3.1 ER-W3-2001-1149-000/DRN 05-968 Section 9.3.8.3 ER-W3-2004-0276-000/DRN 04-977 Section 9.4.1.1

Figure 9.5-3a ER-W3-2004-0324-000/DRN 04-1816 Section 9.2.5.3.3 ER-W3-2004-0615-000/DRN 05-446 Table 9.2.9

Section 9.2.5.3.3 ER-W3-2004-0615-001/DRN 05-1668 Section 9.3.4.2.1.2 ER-W3-2005-0056-000/DRN 05-332 Table 9.4-10 sh 1 ER-W3-2005-0065-000/DRN 05-365

Figure 9.4-3 ER-W3-2005-0070-000/DRN 05-519 Section 9.4.5.8.1 ER-W3-2005-0145-000/DRN 05-787 Revision 14-A Section 9.1 ER-W3-2005-0396-000/DRN 05-1365 Table 9.1-8 sheet 1

Table 9.2-4 sheet 1 ER-W3-2004-0523-000/DRN 05-1663 Table 9.2-4 sheet 2

Figure 9.3-1 sheet 9 ER-W3-2003-0409-000/DRN 05-1434 Section 9.4.5.6.1 ER-W3-2004-0331-000/DRN 05-1480 Table 9.4-1 sheet 2 WSES-FSAR-UNIT-3 9-xvi Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 14-B Section 9.2.5.3.2 ER-W3-2005-0465-000/DRN 05-1652 Table 9.2-1 sh 1 Table 9.2-1 sh 2 Table 9.2-1 sh 3 Table 9.2-3 sh 1 Table 9.2-3 sh 2 Table 9.2-9 Table 9.2-10 Figure 9.2-4 Figure 9.2-4A Figure 9.2-5A

Section 9.5.2.3 ER-W3-2005-0096-000/DRN 06-233 Figure 9.5-1 sh 2 Figure 9.5-2 sh 2

Figure 9.5-4 ER-W3-2005-0442-000/DRN 06-281 Table 9.2-4 sh 1 ER-W3-2006-0178-000/DRN 06-500

Revision 15 Section 9.4.3.5.2.3 ER-W3-2003-0735-000/DRN 03-1988 Table 9.2-5 Sh. 1

Table 9.2-4 ER-W3-2004-0523-000/DRN 05-1663

Section 9.1.4.2.2.15 ER-W3-2006-0223-000/DRN 06-843 Table 9.1-3 Sh. 1 Table 9.1-3 Sh. 2 Table 9.1-3 Sh. 3 Table 9.1-3 Sh. 4 Table 9.1-3 Sh. 7 Table 9.1-6 Sh. 1 Table 9.1-6 Sh. 2 Section 9.2.9.2.4 Table 9.2-1 Sh. 4 Table 9.3-9 Sh. 6 Table 9.3-4 Sh. 1 Table 9.3-4 Sh. 2 Table 9.3-4 Sh. 3 Table 9.3-9 Sh. 1 Section 9.4.1.2.1 Section 9.4.1.3 Table 9.4-9 Sh. 1 Table 9.4-16 Sh. 1 Table 9.5-4 Sh. 1

Table of Contents ER-W3-2006-0281-000/DRN 06-873 Section 9.5.1.3.2 ER-W3-2006-0284-000/DRN 06-874 Table 9.5.1-3 Sh. 3 Table 9.5.1-2 Sh. 1

Section 9.3.6.5 ER-W3-2006-0282-000/DRN 06-886 WSES-FSAR-UNIT-3 9-xvii Revision 302 (12/08) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 15 (Cont'd)

Table 9.2-3 Sh. 1 ER-W3-2006-0223-000/DRN 06-898 Table 9.2-3 Sh. 2 Section 9.4.1.3 Section 9.4.5.2.2 Section 9.3.6.2.1

Table 9.3-3 ER-W3-2006-0223-000/DRN 06-901

Section 9.2.4.5 ER-W3-2006-0223-000/DRN 06-910 Section 9.3.4.2.1.4 ER-W3-2004-0094-003/DRN 06-1142 Table 9.3-7

Table 9.5-1 Sh. 1 ER-W3-2006-0397-000/DRN 06-1167

Revision 301 Section 9.5.1.2.3 EC-5000081435 Section 9.5.1.3.1 Section 9.5.1.3.2 Table 9.5.1-3 Sh. 1 Figure 9.5.1-8

Section 9.1.4.2.1.1 EC-5000082257 Section 9.1.4.2.1.2

Section 9.5.6.2 EC-5000082405 Table 9.5-4 Sh. 1 Figure 9.5-5

Section 9.1.1.3 EC-5000082411 Section 9.1.2.3 Section 9.1: References

Section 9.3.3.2.2.1 EC-2097 Section 9.4.5.2.3 EC-5000082470 Table 9.4-2 Sh. 4

Revision 302 Section 9.3.6.2.1 EC-935 Section 9.3.6.3.1 Table 9.3-1a

Table 9.4-2 Sh. 1 EC-2188 Table 9.4-2 Sh. 3 Table 9.4-10 Sh. 1 Table 9.4-10 Sh. 2 Table 9.4-14 Sh. 1 Table 9.4-14 Sh. 2 Table 9.4-14 Sh. 3 Table 9.4-14 Sh. 4 Table 9.4-14 Sh. 5

WSES-FSAR-UNIT-3 9-xviii Revision 304 (06/10) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 302 (Continued)

Table 9.4-14 Sh. 6 Table 9.4-14 Sh. 7

Section 9.5.1.3.1 EC-4606

Section 9.5.1.1.3 EC-9506 Section 9.5.1.3.2

Revision 303 Section 9.2.4.2 EC-530 Section 9.2.5 Section 9.2.5.3.2 Section 9.2.5.3.3 Table 9.2-9

Section 9.1.2.1 EC-8884 Section 9.1: References

Section 9.1.4.2.2.16 EC-11204 Section 9.3.4.2.1.2 EC-14241 Section 9.3.4.2.1.5

Revision 304 Section 9.3.4 EC-13560 Table 9.3-9 Sh. 2

Section 9.5.1.3.2 EC-18551

Section 9.5.1.3.2 EC-18667 Figure 9.5.1-8 Figure 9.5.1-9

Section 9.1.1.1 EC-18742 Section 9.1.1.2 Section 9.1.1.3 Section 9.1.2.1 Section 9.1.2.2 Section 9.1.2.3 Section 9.1.2.4.1 Section 9.1.2.4.2 Section 9.1.2.4.3 Section 9.1: References Table 9.1-2 Table 9.1-8 Sh. 1 Table 9.1-8 Sh. 2

Section 9.5.1.3.2 EC-18843

Section 9.1.2.3 EC-22227 WSES-FSAR-UNIT-3 9-xix Revision 305 (11/11) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 305 Section 9.3.4.1.1 EC-4019 Section 9.3.4.2.1.2 Section 9.3.4.2.1.4 Section 9.3.4.2.2 Table 9.3-13 Sheet 3 of 4 Table 9.3-15 Sheet 46 of 60 Table 9.3-7

Section 9.3.6.2.1 EC-14765 Section 9.3.6.2.2 Section 9.3.6.2.3 Table 9.3-20 Sheet 1 of 2

Section 9.1.3.1 EC-8477 Section 9.1.3.2.1 Section 9.1: References Table 9.1-1 Table 9.2-2 Sheet 1 of 3 Table 9.2-3 Sheet 1 of 2 Table 9.2-3 Sheet 2 of 2 Table 9.2-9 Figure 9.1-21 Figure 9.1-22

Section 9.1.4.1.3 EC-14270 Section 9.1.4.2.2.14 Section 9.1.4.2.3.2 Section 9.1.4.3.1 Table 9.1-7 Figure 9.1-18 Figure 9.1-19

Section 9.5.1.3.2 EC-18305

Section 9.5.3.2 EC-23470

Section 9.5.1.3.2 EC-23997

Section 9.5.1.3.1 EC-25884 Section 9.5.1.3.2

Table 9.2-1 Sheet 4 of 5 EC-26241 Table 9.5-1 Sheet 3 of 3 Table 9.5-4 Sheet 2 of 2

Section 9.1.2.2 EC-28458 EC-30504

Section 9.5.6.2 EC-31660 WSES-FSAR-UNIT-3 9-xx Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 306 Table of Contents EC-14275 Section 9.1.2 Section 9.1.2.1 Section 9.1.2.2 Section 9.1.4.1.3 Section 9.1.4.2.1 Section 9.1.4.2.2.14 Section 9.1.4.2.3.2 Section 9.1.4.3.1 Section 9.1.5 Section 9.1: References Figure 9.1-3 Sheet 1 Figure 9.1-19

Section 9.5.1.3.2 EC-15965 Section 9.4.3.4.1 EC-17580 Section 9.4.3.4.2 Section 9.4.3.4.2.1 Table 9.4-1 Sheet 1 Figure 9.4-5

Section 9.5.1.3.2 EC-19062

Section 9.2.5.2 EC-32877

Section 9.1.4.1.2 EC-35729 Section 9.1.4.4

Revision 307 Figure 9.3-1 Sheet 6 EC-8435

Section 9.3.4.1.1 EC-8458 Section 9.3.4.1.2 Table 9.3-11 Section 9.3.6.1 Section 9.3.6.1.2 Section 9.3.6.3.2 Section 9.3.6.3.3

Section 9.2.5.3.2 EC-8465 Table 9.2-3 Sheet 1 of 2 Table 9.2-3 Sheet 2 of 2 Table 9.2-9 Table 9.2-10 Table 9.3-4 Sheet 1 of 3 thru Table 9.3-4 Sheet 3 of 3 Figure 9.2-4 Figure 9.2-4A Figure 9.2-5a Figure 9.3-8A Figure 9.3-8B

WSES-FSAR-UNIT-3 9-xxi Revision 308A (10/15) UPDATE REFERENCE LIST Chapter 9 Section Cross References Revision 307 (Continued)

Section 9.2.2.2.1 EC-30976 Table 9.2-2 Sheet 2 of 3 Section 9.3.6.2.1 Section 9.3.6.2.2 Section 9.3.6.3.1 Section 9.3.6.3.2 Table 9.3-16 Sheet 7 of 11

Section 9.4.5.7.1 EC-33471

Section 9.2.5.3.1 EC-38632

Section 9.3.9.2.1 EC-41095

Section 9.3.1.1 EC-41355 Section 9.3.6.3.3 Section 9.3.9.1 Section 9.3.9.3 Table 9.2-4 Sheet 2 of 2

Section 9.5.2.2.1 EC-43424

Section 9.1.4.1.3 EC-44151

Revision 308 Section 9.2.5.3.3 LBDCR 13-018 Section 9.4.3.3.2 LBDCR 14-011 Section 9.5.1.2.2 EC 35260

Section 9.5.1.6.4 LBDCR 13-015 Section 9.5.1.3.2 LBDCR 14-020 Table 9.5-4 Sh. 1 of 2 EC 43474

Revision 308A Section 9.3 LBDCR 15-028 WSES-FSAR-UNIT-3 10-i CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM TABLE OF CONTENTS Section Title Page 10.0 STEAM AND POWER CONVERSION SYSTEM 10.1-1 10.1 SUMMARY DESCRIPTION 10.1-1 10.2 TURBINE GENERATOR 10.2-1 10.2.1 DESIGN BASES 10.2-1

10.2.2 DESCRIPTION 10.2-1

10.2.3 TURBINE DISK INTEGRITY 10.2-7

10.2.4 EVALUATION 10.2-15

10.2 REFERENCES

10.2-15

10.3 MAIN STEAM SUPPLY SYSTEM 10.3-1 10.3.1 DESIGN BASES 10.3-1

10.3.2 DESCRIPTION 10.3-2

10.3.3 EVALUATION 10.3-4

10.3.4 INSPECTION AND TESTING REQUIREMENTS 10.3-5

10.3.5 WATER CHEMISTRY 10.3-5

10.3.6 STEAM AND FEEDWATER SYSTEM 10.3-8

10.3 REFERENCES

10.3-9

10.4 OTHER FEATURES OF STEAM AND POWER CONVERSION SYSTEM 10.4-1 10.4.1 MAIN CONDENSER 10.4-1

10.4.2 MAIN CONDENSER EVACUATION SYSTEM 10.4-4

10.4.3 TURBINE GLAND SEALING SYSTEM 10.4-6

10.4.4 STEAM BYPASS SYSTEM 10.4-7

WSES-FSAR-UNIT-3 10-ii CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM TABLE OF CONTENTS (Cont'd)

Section Title Page 10.4.5 CIRCULATING WATER SYSTEM 10.4-9

10.4.6 CONDENSATE CLEAN-UP SYSTEM 10.4-12

10.4.7 CONDENSATE AND FEEDWATER SYSTEMS 10.4-16

10.4.8 STEAM GENERATOR BLOWDOWN SYSTEM 10.4-22

10.4.9 EMERGENCY FEEDWATER SYSTEM 10.4-28

10.4.10 CHEMICAL FEED SYSTEM 10.4-36 10.4.9A EMERGENCY FEEDWATER SYSTEM RELIABILITY ANALYSIS 10.4.9B-i

WSES-FSAR-UNIT-3 10-iii Revision 11 (05/01) CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM LIST OF TABLES Table Title 10.2-1 EXTRACTION STEAM VALVE ARRANGEMENTS FOR TURBINE OVERSPEED PROTECTION

10.2-2 TURBINE OVERSPEED PROTECTION DEVICES

10.2-3 LOW PRESSURE TURBINE MATERIALS

10.3-1 MAIN STEAM SUPPLY SYSTEM MAIN STEAM LINE SAFETY VALVES

10.3-2 STEAM GENERATOR BLOWDOWN CHEMISTRY LIMITS

10.3-3 FEEDWATER OPERATING CHEMISTRY LIMITS

10.3-4 DELETED

10.3-5 BRANCH CONNECTIONS BETWEEN MSIV'S AND TURBINE STOP VALVES

10.3-6 DELETED

10.3-7 DELETED

10.3-8 DELETED

10.3-9 DELETED

10.4-1 MAIN CONDENSER PERFORMANCE AND DATA

10.4-2 CIRCULATING WATER SYSTEM COMPONENT DATA

10.4-3 CONDENSATE PUMP DATA

10.4-4 HEATER DRAIN PUMP DATA

10.4-5 STEAM GENERATOR FEEDWATER PUMP DATA

10.4-5a AUXILIARY FEEDWATER PUMP DATA

10.4-6 FEEDWATER HEATER DATA

10.4-7 STEAM GENERATOR BLOWDOWN TANK AND PUMP DATA

10.4-8 STEAM GENERATOR BLOWDOWN HEAT EXCHANGERS DATA (DRN 99-2262, R11) 10.4-9 DELETED (DRN 99-2262, R11) 10.4-10 REGENERATIVE WASTE TANK PUMP AND PUMP DATA (DRN 99-2262, R11) 10.4-11 DEMINERALIZER COMPONENT DESIGN DATA (DRN 99-2262, R11)

WSES-FSAR-UNIT-3 10-iv CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM LIST OF TABLES (Cont'd)

Table Title 10.4-11a BLOWDOWN BOOSTER PUMP

10.4-12 EMERGENCY FEEDWATER SYSTEM COMPONENT DESIGN DATA

10.4-13 CONDENSATE STORAGE POOL CHEMICAL COMPOSITION

10.4-14 EMERGENCY FEEDWATER SYSTEM FAILURE MODE AND EFFECTS ANALYSIS

10.4-15 EMERGENCY FEEDWATER SYSTEM INSTRUMENTATION APPLICATION

10.4-16 CONDENSATE DEMINERALIZER EFFLUENT WATER QUALITY

10.4-17 CONDENSATE CLEAN-UP DESIGN DATA

10.4.9A-1 EVALUATION OF THE WATERFORD SES UNIT NO. 3 EMERGENCY FEEDWATER SYSTEM VERSUS THE REQUIREMENTS OF STANDARD REVIEW PLAN (SRP) 10.4.9 AND BRANCH TECHNICAL POSITION (BTP) ASB 10-1

10.4.9A-2 EVALUATION OF THE WATERFORD SES UNIT NO. 3 EMERGENCY FEEDWATER SYSTEM VERSUS THE NRC EFW SHORT AND LONG TERM RECOMMENDATIONS

10.4.9A-3 COMPARISON OF WATERFORD EFW SYSTEM WITH NRC EFW SYSTEM FLOW REQUIREMENTS

10.4.9B-1 COMPONENT LIST MANUAL VALVES

10.4.9B-2 EFS FAILURE MODES AND EFFECTS ANALYSIS

10.4.9B-3 MINIMAL CUT SETS - CASE 1

10.4.9B-4 MINIMAL CUT SETS - CASE 2

10.4.9B-5 DELETED

10.4.9B-6 BASIC EVENT CAUSES AND PROBABILITIES

10.4.9B-7 EFS VALVES SUBJECT TO ASME SECTION XI TESTING

10.4.9B-8 SUMMARY OF TEST AND MAINTENANCE CONTRIBUTIONS TO COMPONENT AVAILABILITY 10.4.9B-9 DOMINANT CUT SETS - CASE 1

10.4.9B-10 DOMINANT CUT SETS - CASE 2

10.4.9B-11 DOMINANT CUT SETS - CASE 3

WSES-FSAR-UNIT-3 10-v Revision 14 (12/05) CHAPTER 10 (DRN 04-719, R14) STEAM AND POWER CONVERSION SYSTEM (DRN 04-719, R14) LIST OF FIGURES Figure Title 10.2-1 STEAM PRESSURE VARIATION WITH POWER

10.2-2 HEAT BALANCE MAXIMUM GUARANTEED

10.2-3 HEAT BALANCE MAX CALCULATED (NOT GUARANTEED)

10.2-4 FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 1 OF 4)

10.2-4 FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 2 OF 4)

10.2-4 FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 3 OF 4)

10.2-4 FLOW DIAGRAM MAIN & EXTRACTION STEAM SYSTEMS (SHEET 4 OF 4)

10.2-5 TURBINE OVERSPEED PROTECTION ELECTRO-HYDRAULIC SYSTEM

10.2-6 DIGITAL ELECTRO-HYDRAULIC (DEH) CONTROL SYSTEM

10.2-7 TURBINE HIGH-PRESSURE ELEMENT (DRN 04-719, R14) 10.2-8 DELETED (DRN 04-719, R14) 10.2-9 OVERSPEED PROTECTION CONTROLLER

10.3-1 MAIN STEAM ISOLATION VALVE

10.3-2 LOCATIONS OF PROCESS SAMPLE POINTS

10.4-1 FLOW DIAGRAM CIRCULATING, SERVICE & INTAKE COOLING WATER SYSTEMS (SHEET 1 OF 2) (DRN 01-420) 10.4-1 FLOW DIAGRAM CIRCULATING, SERVICE & INTAKE COOLING WATER SYSTEMS (SHEET 2 OF 2)

10.4-2 FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 1 OF 6) (DRN 01-420) 10.4-2 FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 2 OF 6) 10.4-2 FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 3 OF 6) 10.4-2 FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 4 OF 6)

WSES-FSAR-UNIT-3 10-vi Revision 12-C (07/03) CHAPTER 10 TEAM AND POWER CONVERSION SYSTEM LIST OF FIGURES Figure Title 10.4-2 FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 5 OF 6) 10.4-2 FLOW DIAGRAM-FEEDWATER CONDENSATE & AIR EVACUATION SYSTEM (SHEET 6 OF 6) (DRN 03-683, R12-C) 10.4-3 FLOW DIAGRAM TURBINE BUILDING MISCELLANEOUS SYSTEMS (SHEET 1 OF 2) 10.4-3 FLOW DIAGRAM TURBINE BUILDING MISCELLANEOUS SYSTEMS (SHEET 2 OF 2) (DRN 03-683, R12-C) (DRN 01-420, R11) 10.4-4 FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 1 OF 4) (DRN 01-420, R11) 10.4-4 FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 2 OF 4)

10.4-4 FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 3 OF 4)

10.4-4 FLOW DIAGRAM HEATER DRAIN & VENT SYSTEMS (SHEET 4 OF 4)

10.4-5 FLOW DIAGRAM STEAM GENERATOR BLOWDOWN SYSTEM (SHEET 1 OF 2)

10.4-5 FLOW DIAGRAM STEAM GENERATOR BLOWDOWN SYSTEM (SHEET 2 OF 2)

10.4-6 EMERGENCY FEEDWATER SYSTEM

10.4-7 DELETED

10.4-8 BACKWASH TREATMENT SYSTEM FLOW DIAGRAM

10.4-9 CONDENSATE POLISHER SYSTEM FLOW DIAGRAM

10.4.9A-1 DELETED

10.4.9B-1 WSES-3 SIMPLIFIED EFS FLOW DIAGRAM (APPENDIX 10.4.9A) 10.4.9B-2 EFS FAULT TREE, CASE 1 - LMFW (APPENDIX 10.4.9A) 10.4.9B-3 EFS FAULT TREE, CASE 2 - LMFW/LOOP (APPENDIX 10.4.9A) 10.4.9B-4 EFS FAULT TREE, CASE 3 - LMFW/SB (APPENDIX 10.4.9A)

WSES-FSAR-UNIT-3 10-vii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 10 Section Cross References Revision 12-B 10.4.2.5 ER-W3-2002-0663-001/DRN 03-214

Revision 12-C Figure 10.2-6 ER-W3-2001-0274-000/DRN 03-556 Figure 10.4-3 Sht 1 ER-W3-2003-0255-000/DRN 03-683 Figure 10.4-3 Sht 2

Revision 13 Section 10.4.7.3 ER-W3-2002-0288-002/DRN 03-1888 Section 10.3.1 ER-W3-2003-0755-001/DRN 03-2157 Section 10.4.1

Revision 13-A Figure 10.2-6 Sht. 2 ER-W3-2003-0142-000/DRN 04-987 Figure 10.2-6 Sht. 3

Section 10.4.5.3 ER-W3-2004-0265-000/DRN 04-616 Revision 14 Section 10.3.1 ER-W3-2001-1149-000/DRN 03-2064 Section 10.3.3 Section 10.4.1.1 Section 10.4.1.2 Section 10.4.1.3 Section 10.4.2.2 Section 10.4.4.1 Section 10.4.4.2 Section 10.4.6.1 Section 10.4.7.1 Section 10.4.7.2 Section 10.4.8 Table 10.4-1 Table 10.4-6 Table 10.4-17 sh 1 Figure 10.2-1 Figure 10.2-2 Figure 10.2-3 sh 1

Table 10.4.9A-3 shts 2-3 ER-W3-2001-1149-000/DRN 05-544 WSES-FSAR-UNIT-3 10-viii Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 10 Section Cross References Revision 14 Cont'd Table Of Contents ER-W3-2003-0053-000/DRN 04-719 Section 10.2.1 Section 10.2.2.2.1 Section 10.2.3.1.1 Section 10.2.3.3 Section 10.2.3.5 Reference 10.2 Figure 10.2-7 Figure 10.2-8

Section 10.2.4 ER-W3-2003-0053-000/DRN 05-861 Table 10.4-1 ER-W3-2004-0007-000/DRN 04-1702

Section 10.4.9.1.a ER-W3-2004-0276-002/DRN 05-870 Section 10.4.7.3 ER-W3-2004-0602-000/DRN 05-235 Section 10.4.9.3.2 ER-W3-2004-0615-000/DRN 05-447 Section 10.4.8.2 ER-W3-2004-0618-000/DRN 05-151 Section 10.4.8.3

Section 10.4.6.2.1 ER-W3-2005-0126-000/DRN 05-565 Figure 10.2-4 sh 3 ER-W3-2005-0500-00/DRN 05-1559

Revision 14-A Section 10.4.5.3 ER-W3-2005-0054-000/DRN 05-1425 Revision 14-B Figure 10.4-1 sh 1 ER-W3-2006-0172-000/DRN 06-502

Revision 15 Section 10.2.3.6 ER-W3-2006-0164-000/DRN 06-722 Section 10.2.3.7

Section 10.2.2.1 ER-W3-2006-0047-000/DRN 06-812 Section 10.4.9.2 ER-W3-2006-0223-000/DRN 06-841 Table 10.4-2 Sh. 1 Table 10.4-4 Table 10.4-7 Sh. 2 Table 10.4-8 Table 10.4-11a

Table 10.4.9A-1 Sh. 1 ER-W3-2006-0223-000/DRN 06-907 Section 10.4.9.3.6 ER-W3-2007-0010-000/DRN 07-28 WSES-FSAR-UNIT-3 10-ix Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 10 Section Cross References Revision 303 Section 10.4.9.1 EC-530 Section 10.4.9.2 Section 10.4.9.3.2

Revision 304 Figure 10.4-6 EC-3926 Table 10.4.9B-1 Sh. 3 Table 10.4-9B-2 Sh. 6 Table 10.4-9B-2 Sh. 7 Table 10.4.9B-2 Sh. 8 Table 10.4.9B-2 Sh. 9 Figure 10.4.9B-1

Table 10.4-12 EC-19372

Revision 305 Section 10.3.6.2 EC-29980

Revision 306 Section 10.4.10.2 EC-34060 Section 10.4.10.5 Section 10.4.9B.3.2 Section 10.4.9B.5.1.1

Section 10.4.5.5 EC-34124

Section 10.4.5.2 EC-34828 Figure 10.4-1 Sheet 1 of 2

Revision 307 Section 10.2.2.1 EC-8465 Section 10.3.5.1 Table 10.3-5 Sh. 2 of 2 Section 10.4.7.1 Section 10.4.7.3 Table 10.4-1 Table 10.4-6 Figure 10.2-1 Figure 10.2-2 Figure 10.2-3 Sh. 1 Figure 10.2-3 Sh. 2 Figure 10.2-3A Figure 10.2-3B Figure 10.2-3C Figure 10.2-3D Figure 10.2-3E Figure 10.3-2 WSES-FSAR-UNIT-3 10-x Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 10 Section Cross References Revision 307 (Continued)

Appendix 10.4.9B EC-33720 Table 10.4-9B-1 Table 10.4-9B-2 Table 10.4-9B-3 Table 10.4-9B-4 Table 10.4-9B-5 Table 10.4-9B-6 Table 10.4-9B-7 Table 10.4-9B-8 Table 10.4-9B-9 Table 10.4-9B-10 Table 10.4-9B-11 Section 10.4.9.2

Section 10.4.9.2 EC-40342

Section 10.3.1 EC-41355 Section 10.4.9.3.1 Table 10.4-14 Table 10.4.9A-1 Sh. 2 of 7 Table 10.4.9A-2 Sh. 8 of 11

Table 10.4.9A-1 Sh. 4 of 7 EC-42115 Table 10.4.9A-1 Sh. 5 of 7

Revision 308 Table 10.4-3 EC 47045

WSES-FSAR-UINT-3 11-i Revision 14 (12/05) CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS Section Title Page (DRN 03-2065, R14) 11.0 RADIOACTIVE WASTE MANAGEMENT

11.1 SOURCE TERMS 11.1-1 (DRN 03-2065, R14) 11.1.1 DESIGN BASIS SOURCE TERMS 11.1-1

11.1.2 DEPOSITED CORROSION PRODUCTS 11.1-3 11.1.3 NEUTRON ACTIVATION PRODUCTS 11.1-6

11.1.4 TRITIUM PRODUCTION IN REACTOR COOLANT 11.1-7

11.1.5 TRITIUM CONCENTRATION AND RELEASES 11.1-8

11.1.6 SPENT FUEL POOL FISSION PRODUCT AND CORROSION 11.1-9 PRODUCT ACTIVITIES

11.1.7 LEAKAGE SOURCES 11.1-10

11.1.8 STEAM GENERATOR ACTIVITY MODEL 11.1-10

11.1 REFERENCES

11.1-12

11.1A APPENDIX - DERIVATION OF RESIDENCE TIMES 11.1A-1 11.1A.1 CIRCULATING CRUD 11.1A-1

11.1A.2 DEPOSITED CRUD 11.1A-3

11.2 LIQUID WASTE MANAGEMENT SYSTEM 11.2-1 11.2.1 DESIGN BASES 11.2-1

11.2.2 SYSTEM DESCRIPTION 11.2-5

11.2.3 RADIOACTIVE RELEASES 11.2-8

11.3 GASEOUS WASTE MANAGEMENT SYSTEMS 11.3-1 11.3.1 DESIGN BASES 11.3-1

11.3.2 SYSTEM DESCRIPTION 11.3-4

11.3.3 RADIOACTIVE RELEASES 11.3-5

11.4 SOLID WASTE MANAGEMENT SYSTEM 11.4-1

WSES-FSAR-UINT-3 11-ii CHAPTER 11 TABLE OF CONTENTS (Cont'd)

Section Title Page 11.4.1 DESIGN BASES 11.4-1

11.4.2 SWMS DESCRIPTION 11.4-2

11.4.3 IN-PLANT SOLIDIFICATION SYSTEM DESCRIPTION 11.4-2 11.4.4 VENDOR SOLIDIFICATION SYSTEM 11.4-3 11.4.5 SPENT RESIN HANDLING SYSTEM DESCRIPTION 11.4-4

11.4.6 RADIOACTIVE FILTER HANDLING 11.4-8

11.4.7 DRY ACTIVE WASTE HANDLING 11.4-8

11.4.8 SOLIDIFICATION BUILDING 11.4-9 11.4.9 COMPACTOR BUILDING 11.4-9 11.4.10 STORAGE FACILITIES 11.4-10

11.4.11 RADIOACTIVE MATERIAL PACKAGING 11.4-12

11.4.12 RADIOACTIVE MATERIAL SHIPPING 11.4-13 11.5 PROCESS AND EFFLUENT RADIOLOGICAL MONITORING AND 11.5-1 SAMPLING SYSTEMS 11.5.1 DESIGN BASES 11.5-1

11.5.2 SYSTEM DESCRIPTION 11.5-3

11.5.3 EFFLUENT RADIOLOGICAL MONITORING SYSTEM 11.5-15

11.5.4 PROCESS MONITORING AND SAMPLING 11.5-17

WSES-FSAR-UINT-3 11-iii Revision 14 (12/05) CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT LIST OF TABLES Table Title 11.1-1 Basis for Reactor Coolant Radioisotope Concentrations 11.1-2 Maximum Reactor Coolant Radioisotope Concentration One Percent Failed Fuel, No Continuous Gas Stripping of Volume Control Tank

11.1-3 Average Reactor Coolant Radioisotope Concentration (No Gas Stripping) (DRN 03-2065, R14) 11.1-4 DELETED (DRN 03-2065, R14) 11.1-5 Measured Radioactive Crud Activity (dpm/mg-crud) 11.1-6 Activation Rates

11.1-7 System Parameters

11.1-8 Average and Maximum Residence Times, Days (DRN 03-2065, R14) 11.1-9 Activation Rates 11.1-10 Long-lived Crud Activity

11.1-11 Reactor Coolant Circulating Crud Activity (DRN 03-2065, R14) 11.1-12 Equilibrium Crud Film Thickness 11.1-13 Tritium Activation Reactions

11.1-14 Parameters Used in Tritium Production Determination

11.1-15 Tritium Production In Reactor Coolant

11.1-16 Tritium Production and Release at Operating PWRs 11.1-17 Fission and Corrosion Product Activities In the Spent Fuel Pool (Ci/gram) 11.1-18 Equipment Leakage Assumptions

11.1-19 Basis for Design Basis Activities For the Steam Generator 11.1-20 Steam Generator Liquid Activities (Design Basis) 11.2-1 BMS Equipment Description

11.2-2 WMS Equipment Description

WSES-FSAR-UINT-3 11-iv Revision 14 (12/05) CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT LIST OF TABLES (Cont'd)

Table Title 11.2-3 Sources, Volumes, and Activities for BMS Liquid Influents

11.2-4 Sources, Volumes, and Activities of WMS Liquid Influents (DRN 05-1248, R14) 11.2-5 Deleted (DRN 05-1248, R14) 11.2-6 BMS Equipment Decontamination Factors 11.2-7 WMS Equipment Decontamination Factors 11.2-8 FPS Equipment Decontamination Factors 11.2-9 Boron Management System Process Data

11.2-10 Waste Management System Process Flow Point Data 11.2-11 Source Terms (No Gas Stripping) Liquid Effluents

11.2-12 Principal Parameters and Conditions Used In Radiological Effluent Evaluations 11.2-13 Fraction of Effluent Concentration (EC) Averaged Over One Year 11.2-14 Aquatic Exposure Pathways (mrem/yr)

11.3-1 GWMS Equipment Description

11.3-2 Sources To The Vent Gas Collection Header

11.3-3 Sources and Volumes To The Gas Surge Tank

11.3-4 Activities of Sources To The GSH During Normal Operations Including Anticipated Operational Occurrences (Ci/yr) 11.3-5 Source Terms (No Continuous Gas Stripping of Volume Control Tank) Noble Gases and Iodines

11.3-6 Source Terms (No Continuous Gas Stripping of Volume Control Tank) Particulates

11.3-7 Maximum Individual Doses From Terrestrial Pathways (No Continuous Gas Stripping of Volume Control Tank) 11.3-8 Average Annual Airborne Radionuclide Concentrations (Ci/cc)

WSES-FSAR-UINT-3 11-v Revision 308 (11/14) CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT LIST OF TABLES (Cont'd)

Table Title 11.3-9 Filtration Provision

11.3-9a HVAC Radioactive Release Point Data

11.3-10 Gaseous Waste Management System Process Data 11.4-1 Solid Waste Management System Component Summary Data 11.4-2 Solid Waste Management Process Data

11.4-3 Solid Waste Management Storage Capacity 11.4-4 Quantities of Input During Normal Operations Including Anticipated Operational Occurrences to Solid Waste Management System 11.4-5 Quantities of Output During Normal Operations Including Anticipated Operational Occurrences From Solid Waste Management System 11.4-6 Deleted

11.4-7 Annual Activities (Curies/Year) of Spent Resin Input to the Spent Resin Tank During Normal Operations Including Anticipated Operational Occurrences 11.4-8 Annual Activities (Curies/Year) of Spent Filter Cartridges Input to the Solid Waste Management System During Normal Operations Including Anticipated Operational Occurrences

11.4-9 Basis for Activities Provided in Tables 11.4-6 Through 11.4-8 11.4-10 Comparison of Waterford 3 Design Criteria With Regulatory Guide 1.143, "Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in Light-Water-Cooled Nuclear Power Plants," October 1979, and Branch Technical Position ETSB 11-3, "Design Guidance for Solid Radioactive Waste Management Systems Installed in Light-Water- Cooled Nuclear Power Reactor Plants."

11.4-11 Anticipated Waste for Storage in the Low Level Radwaste Facility (LBDCR 14-007, R308) 11.4-12 Original Steam Generator Storage Facility Radioactive Isotope Inventory (LBDCR 14-007, R308) 11.5-1 Process and Effluent Radiation Monitors 11.5-2 Primary Sample Points

11.5-3 Secondary Sample Points

11.5-4 Local Samples WSES-FSAR-UINT-3 11-vi Revision 307 (07/13) CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT LIST OF FIGURES Figure Title 11.2-1 Flow Diagram Boron Management System (Sheet 1 of 3) 11.2-1 Flow Diagram Boron Management System (Sheet 2 of 3) 11.2-1 Flow Diagram Boron Management System (Sheet 3 of 3) 11.2-2 Flow Diagram Waste Management System (Sheets 1 of 5) 11.2-2 Flow Diagram Waste Management System (Sheets 2 of 5) 11.2-2 Flow Diagram Waste Management System (Sheets 3 of 5) 11.2-2 Flow Diagram Waste Management System (Sheets 4 of 5) 11.2-2 Flow Diagram Waste Management System (Sheets 5 of 5) 11.3-1 Flow Diagram Gaseous Waste Management System 11.3-2 Flow Diagram Gaseous Waste Management System Waste Gas Compressor 11.4-1 Portable Solidification System Site Plan - Location 11.4-2 Solidification Building Plan View EL. +21 West Side RAB (DRN 02-221, R11-A) 11.4-3 DELETED 11.4-4 DELETED (DRN 02-221, R11-A) 11.4-5 Spent Resin Transfer System

11.4-6 Flow Diagram Solid Waste Management System 11.4-7 Interim Onsite Radwaste Storage Containers Laydown Location (LBDCR 13-009, R307) 11.4-8 SK-A-001, Low Level Radwaste Facility (LBDCR 13-009, R307) (DRN 99-2361, R11) 11.5-1 Three Stage Airborne Monitor (DRN 99-2361, R11)

WSES-FSAR-UINT-3 11-vii Revision 14 (12/05) UPDATE REFERENCE LIST Chapter 11 Section Cross References

Revision 12-B 11.5.2.4.9 ER-W3-2002-0663-001/DRN 03-215 Table 11.5-4 Sht 1 ER-W3-29003-0132-000/DRN 03-276

Revision 13 Figure 11.2-1 Sht 1 ER-W3-2004-0123-000/DRN 04-350 Figure 11.2-1 Sht 2 Figure 11.2-1 Sht 3

Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2065 Section 11.0 Section 11.1.1.1 Section 11.1.1.2 Section 11.1.2 Section 11.1.3.1 Section 11.1.3.2 Section 11.1.4.1 Section 11.1.4.2 Section 11.1.5 Section 11.1.7 Section 11.1.8 Section 11.2.1.4 Section 11.2.3 Section 11.3.1 Section 11.4.5.2 Section 11.4.10.4 Section 11.5.2.4.1.7 Reference 11.1 Table 11.1-1 Table 11.1-2 Table 11.1-3 sh 1-2 Table 11.1-4 Table 11.1-5 Table 11.1-6 Table 11.1-7 Table 11.1-8 Table 11.1-9 Table 11.1-10 Table 11.1-11 Table 11.1-13 Table 11.1-14 Table 11.1-15 Table 11.1-16 Table 11.1-17 Table 11.1-19 Table 11.1-20

WSES-FSAR-UINT-3 11-viii Revision 306 (05/12) UPDATE REFERENCE LIST Chapter 11 Section Cross References

Revision 14 Cont'd Table 11.2-4 ER-W3-2001-1149-000/DRN 03-2065 (Cont'd) Table 11.2-5 Table 11.2-11 sh 1-2 Table 11.2-12 Table 11.2-12 sh 1 Table 11.2-13 Table 11.2-14 sh 1-2 Table 11.3-4 Table 11.3-5 Table 11.3-6 Table 11.3-7 sh 1-2 Table 11.3-8 Table 11.4-1 Table 11.4-7 Table 11.4-9 Figure 11.2-2 sh 1 Figure 11.2-2 sh 2

Table of Contents ER-W3-2001-1149-013/DRN 05-1248 Table 11.5-1 sh 1 ER-W3-2005-0107-000/DRN 05-1038

Table 11.5-1 sh 1-3 ER-W3-2005-0131-000/DRN 05-575 Revision 15 Section 11.2.2.1 ER-W3-2006-0034-000/DRN 06-537 Table 11.2-9 Sh. 2 Section 11.2.1.5

Table 11.2-2 Sh. 2 ER-W3-2004-0112-000/DRN 06-558

Section 11.5.2.1.6.3 ER-W3-2005-0471-000/DRN 06-1028 Revision 301 Table 11.5-1 Sh. 2 EC-1629

Revision 302 Figure 11.3-2 EC-5854

Revision 306 Section 11.5.2.1.1 EC-12329 WSES-FSAR-UINT-3 11-ix Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 11 Section Cross References Revision 307 Table 11.1-19 EC-8458 Table 11.2-12 Sheet 1 of 3

Section 11.3-1 EC-37911

Table of Contents LBDCR 13-009 Section 11.4.10.5 Table 11.4-11 Sheet 1 of 7 thru Table 11.4-11 Sheet 7 of 7 Figure 11.4-8 Section 11.4.10.6 LBDCR 13-010

Revision 308 Table of Contents LBDCR 14-007 Section 11.4.10.7 Section 11.4.10.8 Table 11.4-12 Sh. 1 of 2 Table 11.4-12 Sh. 2 of 2

Section 11.2.1 EC 47424 Section 11.3.1

WSES-FSAR-UNIT-3 12-i CHAPTER 12 RADIATION PROTECTION TABLE OF CONTENTS Section Title Page 12.0 RADIATION PROTECTION 12.1-1

12.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES 12.1-1 ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA) 12.1.1 POLICY CONSIDERATIONS 12.1-1

12.1.2 DESIGN CONSIDERATIONS 12.1-1

12.1.3 OPERATIONAL CONSIDERATIONS 12.1-9

12.1.4 DECOMMISSIONING CONSIDERATIONS 12.1-10

12.2 RADIATION SOURCES 12.2-1 12.2.1 CONTAINED SOURCES 12.2-1 12.2.2 AIRBORNE RADIOACTIVE MATERIAL SOURCES 12.2-5

12.2 REFERENCES

12.2-9

12.3 RADIATION PROTECTION DESIGN FEATURES 12.3-1 12.3.1 FACILITY DESIGN FEATURES 12.3-1

12.3.2 SHIELDING 12.3-12

12.3.3 VENTILATION 12.3-19

12.3.4 AREA RADIATION AND AIRBORNE RADIOACTIVITY 12.3-21 MONITORING INSTRUMENTATION

12.3 REFERENCES

12.3-32

12.3A TMI SHIELDING STUDY 12.3A-1 12.3A.1 INTRODUCTION 12.3A-1

12.3A.2 SOURCE TERMS 12.3A-1

12.3A.3 ANALYZED SYSTEMS AND AREA DOSE RATES 12.3A-3

12.3A REFERENCES

WSES-FSAR-UNIT-3 12-ii CHAPTER 12 TABLE OF CONTENTS (Cont'd)

Section Title Page 12.4 DOSE ASSESSMENT 12.4-1

12.4.1 ANTICIPATED DOSE RATES 12.4-1

12.4.2 ESTIMATES OF PLANT PERSONNEL EXPOSURES (DIRECT) 12.4-1

12.4 REFERENCES

12.4-6

12.5 HEALTH PHYSICS PROGRAM 12.5-1 12.5.1 ORGANIZATION 12.5-1

12.5.2 EQUIPMENT, INSTRUMENTATION, AND FACILITIES 12.5-3 12.5.3 PROCEDURES 12.5-6

WSES-FSAR-UNIT-3 12-iii Revision 308 (11/14) CHAPTER 12 LIST OF TABLES Table Title 12.2-1 Neutron Fluxes Outside the Reactor Pressure Vessel

12.2-2 Neutron Leakage Rate from Axial Regions of the Reactor Vessel 12.2-3 Gamma Fluxes at Full Power Operation

12.2-4 Reactor Coolant System Sources (Gamma Spectra) at Shutdown 12.2-5 Reactor Coolant System Sources (Material Activation Spectra) at Shutdown 12.2-6 Pressurizer Steam Section Activity

12.2-7 Maximum Activity Inventory in CVCS Components (Curies)

12.2-8 Maximum Activity Inventory in BMS Components (Curies)

12.2-9 Maximum Activity Inventory in FPS Components

12.2-10 Maximum and Expected Activity Inventory in SIS Components (Curies) 12.2-11 Maximum Activity Inventory in WMS Components (Curies) (DRN 03-2066, R14) 12.2-12 LOCA Core Inventory (Curies/MWt) 12.2-12a Core Inventory for Steaming Events (Curies) (DRN 03-2066, R14) 12.2-13 Fission Product Gamma Source in Containment Building (Mev/sec) 12.2-14 Assumptions and Parameters used to Calculate Airborne Concentrations 12.2-15 Average Airborne C/MPC in Reactor Auxiliary Building, Turbine Building, Containment and Fuel Handling Building (DRN 02-110, R12) 12.2-15a Average Airborne C/DAC in Reactor Auxiliary Building, Turbine Building, Containment, and Fuel Handling Building (DRN 02-110, R12) 12.2-16 Reactor Auxiliary Building Room by Room C/MPC and Whole Body Dose Commitment Values (DRN 02-110, R12) 12.2-16a Reactor Auxiliary Building Room by Room C/DAC and Dose Commitment Values (DRN 02-110, R12) (DRN 03-2066, R14) 12.2-17 18-Group Gamma-Ray Source Strengths per Fuel Assembly 3 Days after Shutdown (DRN 03-2066, R14) (LBDCR 14-007, R308) 12.2-18 Waterford 3 Original Steam Generator Storage Facility Radioactive Isotope Inventory (LBDCR 14-007, R308) 12.3-1 Allowable Dose Rates 12.3-2 Area Radiation Monitors

12.3-3 Airborne Radiation Monitors

12.3-4 Neutron Streaming Dose Rates in Containment WSES-FSAR-UNIT-3 12-iv Revision 14 (12/05) CHAPTER 12 LIST OF TABLES (Cont'd)

Table Title (DRN 03-2066, R14) 12.3A-1 TMI Source Term for Shielding Evaluation (DRN 03-2066, R14) 12.3A-2 SIS Sump Water Total Source Strengths

12.3A-3 SIS Sump Water Noble Gas Source Strength Ratios

12.3A-4 SIS Sump Water Halogen Source Strength Ratios

12.3A-5 SIS Sump Water All Others Source Strength Ratios 12.3A-6 Containment Gaseous Total Source Strengths 12.3A-7 Containment Plateout Total Source Strengths 12.3A-8 System Containing Radioactive Material

12.3A-9 Areas Requiring Accessibility Following An Accident

12.4-1a Estimate of Personnel Exposure (Man-Rem)

12.4-1b Estimate of Personnel Exposure During Maintenance (Man-Rem) 12.4-2 Data from Operating PWR Plants

12.4-3 Yearly Averages and Grand Average for Number of Personnel and Man-Rem Doses for Operating PWR Plants

12.4-4 Distribution Man-Rem Doses for Various Functions

12.5-1 Counting Room Instrumentation 12.5-2 Portable Radiological Survey Instrumentation 12.5-3 Personnel Monitoring Instrumentation 12.5-4 Health Physics Equipment

WSES-FSAR-UNIT-3 12-v CHAPTER 12 RADIATION PROTECTION LIST OF FIGURES Figure Title 12.1-1 Radiation Doses from Various Decommissioning Activities

12.1-2 Radiation Doses from Decommissioning

12.3-1 Radiation Zones Reactor Auxiliary Building Plan EL(+)46.00' 12.3-1a Radiation Zones Reactor Auxiliary Building Plan EL(+)21.00' 12.3-1b Radiation Zones Reactor Auxiliary Building Plan EL(-)4.00' 12.3-2 Radiation Zones Reactor Auxiliary Building Plan EL(-)35.00' 12.3-2a Radiation Zones Reactor Auxiliary Building Section (Sheet 1) 12.3-2b Radiation Zones Reactor Auxiliary Building Section (Sheet 2) 12.3-3 Radiation Zones Reactor Auxiliary Building Section (Sheet 3) 12.3-3a Radiation Zones Reactor Auxiliary Building Plan & Sections (Sheet 4) 12.3-3b Radiation Zones Fuel Handling Building Plans

12.3-4 Radiation Zones Fuel Handling Building Sections

12.3-4a Radiation Zones Reactor Building Plan EL(+)46.00'

12.3-4b Radiation Zones Reactor Building Plan EL(+)21.00'

12.3-5 Radiation Zones Reactor Building Plan EL(-)4.00' 12.3-5a Radiation Zones Reactor Building Plan EL(-)35.00' 12.3-5b Radiation Zones Reactor Building Section (Sheet 1) 12.3-6 Radiation Zones Reactor Building Sections (Sheet 2) 12.3-6a Radiation Zones Reactor Building Section (Sheet 3) 12.3-6b Radiation Zones Turbine Building Operating Floor - Plan 12.3-7 Radiation Zones Turbine Building Mezzanine Floor - Plan

12.3-7a Radiation Zones Turbine Building Ground Floor - Plan

12.3-7b Radiation Zones Turbine Building Section

WSES-FSAR-UNIT-3 12-vi Revision 307 (07/13) CHAPTER 12 RADIATION PROTECTION LIST OF FIGURES (Cont'd)

Figure Title 12.3-8 Radiation Zones Turbine Building Sections (LBDCR 13-010, R307) 12.3-8a Radiation Zones Original Steam Generator Storage Facility (LBDCR 13-010, R307) 12.3-9 Reactor Auxiliary Building Normal Ventilation System Ductwork Plan View 12.3-10 Reactor Auxiliary Building Normal Ventilation System Ductwork Section View 12.3-11 Radiation Monitoring System Block Diagram

12.3-12 Intentionally Deleted (DRN 99-2362, R11) 12.3-13 Intentionally Deleted (DRN 99-2362, R11) 12.3-14 Main Control Room Radiation Monitors

12.3-15 Containment Atmosphere Particulate, Iodine & Gas Radiation Monitor 12.3A-1 Shielding and Iodine Study Plot Plan

12.3A-2 Shielding and Iodine Reactor Building Plan EL-4.00' and 35.00'

12.3A-3 Shielding and Iodine Study Reactor Building Plan EL 21.00'

12.3A-4 Shielding and Iodine Study Reactor Auxiliary Building Plan EL-35.00' 12.3A-5 Shielding and Iodine Study Reactor Auxiliary Building Plan EL-4.00' 12.3A-6 Shielding and Iodine Study Reactor Auxiliary Building Plan EL 7.00' 12.3A-7 Shielding and Iodine Study Reactor Auxiliary Building Plan EL +21.00' 12.3A-8 Shielding and Iodine Study Reactor Auxiliary Building Plan El +46.00' WSES-FSAR-UNIT-3 12-vii Revision 14-B (06/06) UPDATE REFERENCE LIST Chapter 12 Section Cross References Revision 12-B Table 12.3A-9 ER-W3-1999-1044/DRN 03-114

Revision 13 Section 12.1.2 ER-W3-2002-0621-000/DRN 03-1135 Section 12.1.3 Section 12.4.2.1 Section 12.5.3.7.2 Section 12.5.1

Section 12.5.2.1 ER-W3-2002-0621-000/DRN 03-1429 Revision 14 Table Of Contents ER-W3-2001-1149-000/DRN 03-2066 Section 12.1.4 Section 12.2.1.4 Section 12.2.1.5 Section 12.2.1.9 Section 12.3-14 Section 12.3.1.8 Section 12.3.24 Section 12.3.3.1 Section 12.3A.2 Section 12.3A.3.1 Section 12.3A.3.10 Reference 12.3A Table 12.2-12 Table 12.2-12a Table 12.2-17 Table 12.3-1 Table 12.3A-1

Section 12.3A-1 ER-W3-2001-1149-013/DRN 05-1249 Section 12.3.2.1 ER-W3-2004-0276-001/DRN 05-144 Section 12.3A.2 Section 12.3A.3.8 Table 12.3A-9 sh-2 Figure 12.3A-2 Figure 12.3A-3 Figure 12.3A-7 Figure 12.3A-8

Table 12.2-3 ER-W3-2005-0083-000/DRN 05-455 Table 12.2-15a sh 1-2 Table 12.2-16a sh 1-4

Revision 14-B Section 12.3.1.4 ER-W3-2005-0418-000/DRN 06-319 WSES-FSAR-UNIT-3 12-viii Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 12 Section Cross References Revision 15 Section 12.5.2.2.3 ER-W3-2006-0210-000/DRN 06-625 Section 12.5.3.7.1

Section 12.3.4.2.3.1 ER-W3-2005-0471-000/DRN 06-1029 Revision 301 Section 12.3A.1 EC-5000082374 Section 12.3A.3 Section 12.3A.3.1 Table 12.3A-9 Sh. 1 Revision 303 Section 12.5.2.2.3 EC-14865 Section 12.5.3.7.1 Table 12.5-3 Revision 305 Table 12.2-16 Sheet 3 of 4 EC-4019 Table 12.2.16a Sheet 3 of 4

Section 12.5.1.3 EC-27665 Section 12.5.2 Section 12.5.3 Table 12.5-1 Table 12.5-2 Table 12.5-3 Table 12.5-4

Revision 306 Section 12.3.4.1.3 EC-12329 Section 12.3.1.4 EC-14275 Section 12.3.1.9 Section 12.5.3.2.4

Revision 307 Section 12.3A.3.2 EC-30976 Table 12.3A-9 Sheet 1 of 2

Section 12.5.1.1 LBDCR 13-005

Section 12.2.1.10 LBDCR 13-009 Table 12.2-11 Sheet 1 of 6 thru Table 12.2-11 Sheet 6 of 6 Table 12.3-1 Table of Contents LBDCR 13-010 Section 12.3.2.2 Section 12.2.1.11 Figure 12.3-8a Table 12.3-1 WSES-FSAR-UNIT-3 12-ix Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 12 Section Cross References Revision 308 Table of Contents LBDCR 14-007 Table 12.2-12 Sh. 1 of 2 Table 12.2-12 Sh. 2 of 2

Section 12.2.1.12 LBDCR 13-020 Section 12.2.2

WSES-FSAR-UNIT-3 13-i Revision 308 (11/14) CHAPTER 13 ORGANIZATIONAL STRUCTURE TABLE OF CONTENTS

Section Title Page (LBDCR 13-015, R308) 13.1 ORGANIZATION AND RESPONSIBILITY 13.1-1 13.1.1 ORGANIZATIONAL ARRANGEMENT 13.1-1 (DRN 01-462, R11-A) 13.1.2 FACILITY STAFF QUALIFICATIONS 13.1-1 (DRN 01-462, R11-A; LBDCR 13-015, R308) 13.2 TRAINING 13.2-1 (LBDCR 13-015, R308) 13.2.1 DELETED (DRN 01-462, R11-A) 13.2.2 DELETED 13.2.3 DELETED (DRN 01-462, R11-A) 13.3 WRITTEN PROCEDURES 13.3-1 13.4 RECORDS 13.4-1

13.4.1 DELETED

13.4.2 DELETED

13.4.3 DELETED

13.5 REVIEW AND AUDIT OF OPERATIONS 13.5-1 13.5.1 ON-SITE SAFETY REVIEW COMMITTEE (OSRC) 13.5-1 13.5.2 SAFETY REVIEW COMMITTEE (SRC) 13.5-1 13.6 PLANT SECURITY 13.6-1

13.7 EMERGENCY PREPAREDNESS 13.7-1

13.7.1 EMERGENCY PLAN 13.7-1

13.7.2 EMERGENCY RESPONSE FACILITIES 13.7-1 (LBDCR 13-015, R308)

WSES-FSAR-UNIT-3 13-ii CHAPTER 13 ORGANIZATIONAL STRUCTURE LIST OF APPENDICES Appendix Title Page 13A DELETED 13A-1

WSES-FSAR-UNIT-3 13-iii Revision 308 (11/14) CHAPTER 13 ORGANIZATIONAL STRUCTURE LIST OF TABLES

Tables Title 13.1-1 DELETED (DRN 01-462, R11-A; LBDCR 13-015, R308) 13.1-2 DELETED 13.1-3 DELETED (DRN 01-462, R11-A; LBDCR 13-015, R308)

WSES-FSAR-UNIT-3 13-iv Revision 308 (11/14) CHAPTER 13 ORGANIZATIONAL STRUCTURE LIST OF FIGURES

Figure Title (LBDCR 13-015, R308 13.1-1 WATERFORD 3 MANAGEMENT STRUCTURE 13.1-2 WATERFORD 3 OPERATIONS MANAGEMENT STRUCTURE

13.1-3 WATERFORD 3 SITE PROJECTS AND MAINTENANCE SERVICES MANAGEMENT STRUCTURE (EC-31856, R306) 13.1-4 DELETED (EC-31856, R306) 13.1-5 DELETED

13.1-6 DELETED

13.1-7 DELETED

13.1-8 DELETED (LBDCR 13-015, R308) 13.1-9 DELETED

13.1-10 DELETED (DRN 04-979, R14; LBDCR 13-015, R308) 13.1-11 DELETED (DRN 04-979, R14; LBDCR 13-015, R308)

WSES-FSAR-UNIT-3 13-v Revision 303 (06/09) UPDATE REFERENCE LIST Chapter 13 Section Cross References Revision 12-C Section 13.1.2.2 ER-W3-2003-0249-000/DRN 03-658 Section 13.1.2.3 Section 13.5.1.2 Section 13.5.1.3 Table 13.1-2

Revision 13 Section 13.1.2.5.2 ER-W3-2003-0369-000/DRN 03.1136 Table 13.1-2

Revision 13-A Section 13.5.1.3 ER-W3-2003-0492-000/DRN 03-1228 Revision 14 Table Of Contents ER-W3-2004-0364-000/DRN 04-979 Section 13.1.1.1.3 Section 13.1.1.2 Section 13.1.1.2.4 Section 13.1.1.2.4.1 Section 13.1.1.2.4.2 Section 13.1.1.2.5 Section 13.1.1.2.7 Section 13.1.2.1 Section 13.1.2.3 Section 13.1.2.5 Section 13.1.2.6 Section 13.1.2.7 Section 13.1.2.8 Table 13.1-2 Table 13.1-3 sh 1 Figure 13.1-2 Figure 13.1-3 Figure 13.1-4 Figure 13.1-5 Figure 13.1-6 Figure 13.1-7 Figure 13.1-11

Revision 303 Section 13.1.1 EC-14568 Section 13.1.1.1 Section 13.1.1.1.1 Section 13.1.1.1.1.1 Section 13.1.1.1.3 Section 13.1.1.1.5 Section 13.1.1.2 Section 13.1.1.2.2 Section 13.1.1.2.2.3 WSES-FSAR-UNIT-3 13-vi Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 13 Section Cross References Revision 303 (Continued)

Section 13.1.1.2.4.1 EC-14568 Section 13.1.1.2.5 Section 13.1.1.2.6 Section 13.1.1.2.6.1 Section 13.1.2.1 Section 13.1.2.3 Figure 13.1-1 Figure 13.1-2 Figure 13.1-3 Figure 13.1-4 Figure 13.1-5 Figure 13.1-6 Figure 13.1-7 Figure 13.1-8

Figure 13.1-11 EC-15541

Revision 305 Table 13.1-3 EC-27124 Section 13.1.1.2.4 Section 13.1.1.2.4.1

Revision 306 Table of Contents EC-31856 Section 13.1.1 Section 13.1.2 Table 13.1-2 Table 13.1-3 Figure 13.1-1 Figure 13.1-2 Figure 13.1-3 Figure 13.1-4 Figure 13.1-5 Figure 13.1-6 Figure 13.1-7 Figure 13.1-8 Figure 13.1-11

Revision 307 Section 13.1.2.1 LBDCR 13-005 Table 13.1-2 Section 13.2 Section 13.2.2.3

Revision 308 Table of Contents LBDCR 13-015 Section 13.1 Section 13.1.1 Section 13.1.2 WSES-FSAR-UNIT-3 13-vii Revision 308 (11/14) UPDATE REFERENCE LIST Chapter 13 Section Cross References Revision 308 (Continued)

Section 13.2 LBDCR 13-015 Section 13.3 Section 13.4 Section 13.5 Section 13.5.1 Section 13.5.2 Section 13.5.3 Section 13.6 Section 13.7 Section 13.7.1 Section 13.7.2

WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM14-iTABLE OF CONTENTSSectionTitlePage14.0INITIAL TEST PROGRAM14.2-114.1SPECIFIC INFORMATION TO BE INCLUDED IN PSAR14.2-114.2SPECIFIC INFORMATION TO BE INCLUDED IN FSAR14.2-114.2.1SUMMARY OF TEST PROGRAM AND OBJECTIVES14.2-114.2.2ORGANIZATION AND STAFFING14.2-314.2.3TEST PROCEDURES14.2-1714.2.4CONDUCT OF TEST PROGRAM14.2-19 14.2.5REVIEW, EVALUATION, AND APPROVAL OF TEST RESULTS14.2-2014.2.6TEST RECORDS14.2-2114.2.7COMPARISON OF TEST PROGRAM WITH REGULATORY GUIDES 14.2-21AND IEEE STANDARDS14.2.8UTILIZATION OF REACTOR OPERATING AND TESTING14.2-26EXPERIENCES IN DEVELOPMENT OF TEST PROGRAM14.2.9TRIAL USE OF PLANT PROCEDURES14.2-26 14.2.10INITIAL FUEL LOADING AND INITIAL CRITICALITY14.2-27 14.2.11TEST PROGRAM SCHEDULE14.2-3114.2.12INDIVIDUAL TEST DESCRIPTION14.2-31 WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM14-iiLIST OF TABLESTableTitle14.2-1PHASE II TESTS14.2-2PHASE III TESTS 14.2-3PHASE II TEST FORMAT14.2-4PHASE III TEST FORMAT14.2-5POWER ASCENSION TESTING SEQUENCE WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM14-iiiLIST OF FIGURESFigureTitle14.2-1WATERFORD STARTUP GROUP 14.2-2NUCLEAR OPERATIONS FUNCTIONAL ORGANIZATION CHART14.2-3JOINT TEST GROUP14.2-4PHASE III ORGANIZATIONAL CHART WSES-FSAR-UNIT-3 14-iv Revision 306 (05/12) UPDATE REFERENCE LIST Chapter 14 Section Cross References Revision 14-A Section 14.2.12.3.32.4 ER-W3-2004-0331-000/DRN 05-1545 Revision 305 Section 14.2.12.2.18.3 EC-14270 Revision 306 Section 14.2.10.1 EC-12329

Section 14.2.12.2.68.3 EC-34060 WSES-FSAR-UNIT-315-iRevision 11-A (02/02)CHAPTER 15ACCIDENT ANALYSESTABLE OF CONTENTSSectionTitlePage15.0TRANSIENT ANALYSES15.0-1(DRN 00-592)15.0.1IDENTIFICATION OF CAUSES AND FREQUENCY CLASSIFICATION15.0-1(DRN 00-592)15.0.2SYSTEMS OPERATION15.0-215.0.3CORE AND SYSTEM PERFORMANCE15.0-315.0.4BARRIER PERFORMANCE15.0-915.0.5RADIOLOGICAL CONSEQUENCES15.0-9

15.0REFERENCES

15.0-1115.1INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.1-1(TURBINE PLANT)15.1.1MODERATE FREQUENCY INCIDENTS15.1-115.1.2INFREQUENT INCIDENTS15.1-1115.1.3LIMITING FAULTS15.1-18

15.1REFERENCES

15.1-3515.2DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.2-1(TURBINE PLANT)15.2.1MODERATE FREQUENCY INCIDENTS15.2-115.2.2INFREQUENT INCIDENTS15.2-815.2.3LIMITING FAULTS15.2-14

15.2REFERENCES

15.2-2115.3DECREASE IN REACTOR COOLANT FLOW RATE15.3-115.3.1MODERATE FREQUENCY INCIDENTS15.3-115.3.2INFREQUENT INCIDENTS15.3-215.3.3LIMITING FAULTS15.3-5 WSES-FSAR-UNIT-315-iiCHAPTER 15TABLE OF CONTENTS (Contd)SectionTitlePage

15.3REFERENCES

15.3-13 15.4REACTIVITY AND POWER DISTRIBUTION ANOMALIES15.4-115.4.1MODERATE FREQUENCY INCIDENTS15.4-1 15.4.2INFREQUENT EVENTS15.4-21 15.4.3LIMITING FAULTS15.4-21

15.4REFERENCES

15.4-3515.5INCREASE IN REACTOR COOLANT SYSTEM INVENTORY15.5-115.5.1MODERATE FREQUENCY INCIDENTS15.5-115.5.2INFREQUENT INCIDENTS15.5-4 15.5.3LIMITING FAULTS15.5-5 15.6DECREASE IN REACTOR COOLANT SYSTEM INVENTORY15.6-115.6.1MODERATE FREQUENCY INCIDENTS15.6-1 15.6.2INFREQUENT INCIDENTS15.6-115.6.3LIMITING FAULTS15.6-1

15.6REFERENCES

15.6-26 15.7RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT15.7-115.7.1MODERATE FREQUENCY INCIDENTS15.7-115.7.2INFREQUENT INCIDENTS15.7-115.7.3LIMITING FAULTS15.7-1

15.7REFERENCES

15.7-1015.8ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS)15.8-115.9MISCELLANEOUS15.9.1MODERATE FREQUENCY INCIDENTS WSES-FSAR-UNIT-3 15-iii Revision 14 (12/05)CHAPTER 15 TABLE OF CONTENTS (Cont'd) Section Title PageAPPENDIX 15A SUPPLEMENTAL INFORMATION FOR CHAPTER 15 15A-1 IN RESPONSE TO WATERFORD SES - 3 SER (NUREG-0787) OPEN ITEMS 8 THROUGH 11 APPENDIX 15B CONTAINMENT LEAKAGE AND DOSE CALCULATION 15B-1 MODELS (DRN 05-543, R14)APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 15C-1 IN RESPONSE TO WATERFORD SES - 3 SER (NUREG-0787) SUPPLEMENT NO. 1 CONFIRMATORY ITEMS 15.3.1 AND 15.3.2 (DELETED) APPENDIX 15D SUPPLEMENTAL CYCLE SPECIFIC EVENT ANALYSES 15D-1 (DELETED) (DRN 05-543, R14)

WSES-FSAR-UNIT-315-ivRevision 12 (10/02)CHAPTER 15LIST OF EVENTS15.1INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.1.1.1Decrease in Feedwater Temperature15.1.1.2Increase in Feedwater Flow15.1.1.3Increase in Main Steam Flow15.1.1.4Inadvertent Opening of S.G.A. Dump. Valve or S.G. Safety Valve15.1.2.1Decrease in Feedwater Temperature with Single Active Failure(SAF)*15.1.2.2Increase in Feedwater Flow with SAF*15.1.2.3Increase in Main Steam Flow with SAF*15.1.2.4Inadvertent Opening of S.G. ADV's or Safety Valves with SAF*15.1.3.1Steam System Piping Failures Post Trip Return - To-Power(DRN 02-1479)15.1.3.2Steam System Piping Failures Inside and Outside Containment -Modes 3 and 4 with all CEAs on the Bottom(DRN 02-1479)15.1.3.3Steam System Piping Failure: Pre-Trip Power Excursion Analysis15.2DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM15.2.1.1Loss of External Load15.2.1.2Turbine Trip15.2.1.3Loss of Condenser Vacuum15.2.1.4Loss of Normal AC Power15.2.2.1Loss of External Load with SAF*15.2.2.2Turbine Trip with SAF*15.2.2.3Loss of Condenser Vacuum with SAF*15.2.2.4Loss of Normal AC Power with SAF*15.2.2.5Loss of Normal Feedwater Flow15.2.3.1Feedwater System Pipe Breaks WSES-FSAR-UNIT-315-vRevision 12 (10/02)CHAPTER 15LIST OF EVENTS (Cont'd)15.2.3.2Loss of Normal Feedwater Flow with SAF* in the Steam Bypass System15.3DECREASE IN REACTOR COOLANT FLOW RATE15.3.1.1Partial Loss of Forced Reactor Coolant Flow15.3.2.1Total Loss of Forced Reactor Coolant Flow15.3.2.2Partial Loss of Forced Reactor Coolant Flow with SAF*15.3.3.1Single Reactor Coolant Pump Shaft Seizure/Sheared Shaft15.3.3.2Single reactor Coolant Pump Shaft Seizure with Stuck OpenSecondary Safety Valve15.4REACTIVITY AND POWER DISTRIBUTION ANOMALIES15.4.1.1Uncontrolled CEA Withdrawal from Subcritical Conditions15.4.1.2Uncontrolled CEA Withdrawal from Low Power Conditions15.4.1.3Uncontrolled CEA Withdrawal at Power15.4.1.4CEAMisoperation15.4.1.5CVCS Malfunction (Inadvertent Boron Dilution)(DRN 02-1479)15.4.1.6Start of an Inactive Reactor Coolant System Pump - Modes3, 4 or 5 with all CEAs on the Bottom15.4.1.7Uncontrolled CEA Withdrawal from a Subcritical Condition -Modes 3, 4, or 5 with all CEAs on the Bottom(DRN 02-1479)15.4.2NOT APPLICABLE15.4.3.1Inadvertent Loading of a Fuel Assembly into the Improper Position15.4.3.2CEA Ejection15.5INCREASE IN REACTOR COOLANT INVENTORY15.5.1.1CVCS Malfunction15.5.1.2Inadvertent Operation of the ECCS during Power Operation15.5.2.1CVCS Malfunction with Component SAF*

WSES-FSAR-UNIT-3 15-vi Revision 14 (12/05) CHAPTER 15 LIST OF EVENTS (Cont'd)

15.6 DECREASE IN REACTOR COOLANT INVENTORY 15.6.1 NOT APPLICABLE

15.6.2 NOT APPLICABLE

15.6.3.1 Primary Sample or Instrument Line Break 15.6.3.2 Steam Generator Tube Rupture 15.6.3.3 LOCA 15.6.3.4 Inadvertent Opening of Pressurizer Safety Valve 15.7 RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT 15.7.1 NOT APPLICABLE

15.7.2 NOT APPLICABLE (DRN 04-704, R14) 15.7.3.1 Deleted 15.7.3.2 Deleted (DRN 04-704, R14) 15.7.3.3 Postulated Radioactive Releases due to Liquid Containing Tank Failures 15.7.3.4 Design Basis Fuel Handling Accident 15.7.3.5 Spent Fuel Cask Drop Accidents 15.9 MISCELLANEOUS 15.9.1.1 Asymmetric Steam Generator Transient

  • (SAF) incident with a concurrent single failure of an active component.

WSES-FSAR-UNIT-3 15-vii Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES Table Title 15.0-1 Chapter 15 Subsection Designation

15.0-2 Chapter 15 Initiating Events (DRN 05-543, R14) 15.0-3 Reactor Protective System Trips Used In The Safety Analysis 15.0-4 Chapter 15 Initial Conditions

15.1-1 Sequence of Events for an Increase in Main Steam Flow

15.1-2 Assumptions for the Increased Main Steam Flow Event

15.1-3 Sequence of Events for the Inadvertent Opening of a Steam Generator Atmospheric Dump Valve

15.1-4 Assumptions for the Inadvertent Opening of a Steam Generator Atmospheric Dump Valve (DRN 05-543, R14) 15.1-5 Mass Release - Inadvertent Opening of Steam Generator Atmospheric Dump Valve (DRN 04-704, R14) 15.1-6 Deleted 15.1-7 Deleted (DRN 04-704, R14) (DRN 05-543, R14) 15.1-8 Sequence of Events for the Increased Main Steam Flow in Combination with a Loss of Offsite Power (Typical NSSS Response)

15.1-8A Sequence of Events for the Increased Main Steam Flow In Combination with a Loss of Offsite Power (worst DNB Performance Case)

15.1-8B Initial Conditions for the Increased Main Steam Flow in Combination with a Loss of Offsite Power

15.1-8C Sequence of Events for the HFP IOADV with LOOP Event

15.1-8D Assumption Table for the HFP IOADV with LOOP Event (DRN 05-543, R14) 15.1-9 Mass Release - Inadvertent Opening of Steam Generator Atmospheric Dump Valve With Concurrent Loss of Offsite Power

15.1-10 Parameters Used in Evaluating the Radiological Consequences of a Postulated Inadvertent Opening of a Steam Generator Atmospheric Dump Valve With Concurrent Loss of Offsite Power

15.1-11 Radiological Consequences Due to a Postulated Inadvertent Opening of a Steam Generator Atmospheric Dump Valve With Concurrent Loss of Offsite Power

WSES-FSAR-UNIT-3 15-viii Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd)

Table Title (DRN 05-543, R14) 15.1-12 Sequence of Events For the Return to Power Steam Line Break Hot Full Power, Loss of Offsite Power, Inside Containment

15.1-13 Sequence of Events For the Return to Power Steam Line Break Hot Full Power, no Loss of Offsite Power, Inside Containment

15.1-14 DELETED

15.1-14A Sequence of Events for the Return to Power Steam Line Break Hot Zero Power, Loss of Offsite Power, Inside Containment

15.1-14B Sequence of Events for the Return to Power Steam Line Break Hot Zero Power, no Loss of Offsite Power, Inside Containment

15.1-15 Assumptions For the Return to Power Steam Line Break Hot Full Power, Loss of Offsite Power, Inside Containment

15.1-15A Assumptions for the Return to Power Steam Line Break Hot Full Power, no Loss of Offsite Power, Inside Containment

15.1-16 Assumptions For the Return to Power Steam Line Break Hot Zero Power, Loss of Offsite Power, Inside Containment

15.1-16A Assumptions for the Return to Power Steam Line Break Hot Zero Power, no Loss of Offsite Power, Inside Containment

15.1-17 Parameters Used in Evaluating the Radiological Consequences of a Main Steam Line Break Accident

15.1-18 Zero Power Steam Line Break Secondary System Mass Releases (DRN 05-543, R14) 15.1-19 Zero Power Steam Line Break Steam Generator Liquid Volume Fractions and Emergency Feedwater Flowrate to the Intact Steam Generator

15.1-20 Radiological Consequences Due to a Postulated Main Steam Line Break

15.1-21 Assumption for Large Steam Line Breaks During Mode 3 Operation With and Without Concurrent Loss of Offsite Power (DRN 05-543, R14) 15.1-22 Sequence of Events for a Large Steam Line Break* During Mode 3 Operation With Concurrent Loss of Offsite Power

15.1-23 Reactor Protection System Trips and Transient Effects Considered for Pretrip Power Excursion Main Steam System Piping Failures 15.1-24 Sequence of Events for the Steam System Piping Failure Event Outside Containment Pretrip Power Excursion With Loss of Offsite Power (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-ix Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd)

Table Title (DRN 05-543, R14) 15.1-24A Sequence of Events for the Steam System Piping Failure Event Inside Containment Pretrip Power Excursion with Loss of Offsite Power (DRN 05-543, R14) 15.1-25 Key Parameters Assumed for the Steam Piping Failures Event Inside Containment Pre-Trip Power Excursions

15.1-26 Key Parameters Assumed for the Steam Piping Failures Event Outside Containment Pre-Trip Power Excursions (DRN 04-704, R14) 15.1-27 Parameters Used in Evaluating the Radiological Consequences of a Postulated Increased Main Steam Flow Event with a Concurrent Loss of Offsite Power

15.1-28 Radiological Consequences Due to a Postulated Increased Main Steam Flow Event with a Concurrent Loss of Offsite Power (DRN 04-704, R14) 15.2-1 Sequence of Events For the Loss of Condenser Vacuum (DRN 05-543, R14) 15.2-2 Deleted 15.2-3 Deleted

15.2-4 Deleted

15.2-4a Deleted

15.2-5 Deleted (DRN 05-543, R14) 15.2-6 Sequence of Events For the Loss of Normal Feedwater 15.2-7 Assumptions For the Loss of Normal Feedwater Analysis (DRN 02-1713, R12-B;05-543, R14) 15.2-8 Sequence of Events For the Large Feedwater System Pipe Break (DRN 05-543, R14) 15.2-9 Assumptions For the Large Feedwater System Pipe Break (DRN 05-543, R14) 15.2-9a Assumptions For the Limiting Small Feedwater System Pipe Break (DRN 05-543, R14) 15.2-9b Sequence of Events for the Limiting Small Feedwater System Pipe Break (DRN 02-1713, R12-B) (DRN 05-543, R14) 15.2-10 Sequence of Events For the Loss of Feedwater Flow With Active Failure in the Steam Bypass System (DRN 04-704, R14) 15.2-11 Parameters Used in Evaluating the Radiological Consequences of a Feedwater Line Break

15.2-12 Radiological Consequences of a Design Basis Feedwater Line Break (DRN 04-704, R14)

WSES-FSAR-UNIT-3 15-x Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd)

Table Title 15.2-13 Assumptions for the Loss of Feedwater Flow with Active Failure in the Steam Bypass System

15.3-1 Sequence of Events For the Total Loss of Forced Reactor Coolant Flow (DRN 05-543, R14) 15.3-2 Assumed Initial Conditions For the Total Loss of Forced Reactor Coolant Flow (DRN 05-543, R14) 15.3-3 Sequence of Events For the RCP Sheared Shaft Event with a Loss of AC Power at Time of Trip (DRN 05-543, R14) (DRN 00-119, R11) 15.3-4 Assumed Initial Conditions For the Single Reactor Coolant Pump Shaft Seizure With Loss of Offsite Power (Barrier Performance) (DRN 00-119, R11) (DRN 00-119. R11;05-543, R14) 15.3-4a Deleted (DRN 00-119, R11;05-543, R14) 15.3-4b Deleted (DRN 00-119, R11) 15.3-5 Deleted (DRN 00-119, R11) 15.3-5a Deleted (DRN 00-119, R11) 15.3-6 Deleted (DRN 00-119, R11) (DRN 05-543, R14) 15.3-7 Assumed Initial Conditions for the RCP Event with a Loss of AC Power at Time of Trip (DRN 05-543, R14) 15.4-1 Sequence of Events For the Uncontrolled CEA Withdrawal From Subcritical Power Conditions (DRN 05-543, R14) 15.4-2 Assumptions For the Uncontrolled CEA Withdrawal from Subcritical Conditions 15.4-3 Sequence of Events For the Uncontrolled CEA Withdrawal at Hot Zero Power 15.4-4 Assumptions For the Uncontrolled CEA Withdrawal at HZP 15.4-5 Deleted 15.4-6 Deleted 15.4-7 Sequence of Events For CEA Withdrawal at Power 15.4-8 Assumptions For CEA Withdrawal at Power WSES-FSAR-UNIT-3 15-xi Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd)

Table Title (DRN 02-1479, R12) 15.4-9 Assumptions For the CEA Drop Event (DRN 05-543, R14) 15.4-10 Deleted

15.4-11 Deleted

15.4-12 Deleted (DRN 05-543, R14) 15.4-13 Sequence of Events For the CEA Drop Event (DRN 05-543, R14) 15.4-14 Deleted

15.4-15 Deleted

15.4-16 Deleted (DRN 02-1479, R12) 15.4-17 Assumptions for the Mode 5 Partially Drained Inadvertent Boron Dilution Analysis (DRN 03-1610, R13) 15.4-18 Deleted (DRN 03-1610, R13) (DRN 03-1610, R13) 15.4-18(a) Deleted 15.4-18(b) Deleted (DRN 03-1610, R13) (DRN 05-543, R14) 15.4-19 CEA Ejection Sequence of Events (Full Power) 15.4-20 Deleted

15.4-21 Deleted

15.4-22 Deleted

15.4-23 Assumptions For the CEA Ejection Full Power 15.4-24 Assumptions For the CEA Ejection Peak RCS Pressure Case 15.4-25 Deleted 15.4-26 Deleted 15.4-27 CEA Ejection Peak RCS Pressures Sequence of Events WSES-FSAR-UNIT-3 15-xii Revision 15 (03/07) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd)

Table Title (DRN 06-1062, R15) 15.4-28 CEA Ejection Results (Full Power) (DRN 06-1062, R15) 15.4-29 Deleted 15.4-30 Deleted (DRN 05-543, R14) (DRN 00-119, R11) 15.4-31 Parameters Used in Evaluating the Radiological Consequences of a CEA Ejection Accident (DRN 05-543, R14) 15.4-32 Deleted (DRN 05-543, R14) 15.4-33 Radiological Consequences of a Postulated CEA Ejection Accident (DRN 00-119, R11) (DRN 00-119, R11;05-543, R14) 15.4-34 Deleted 15.4-35 Deleted

15.4-36 Deleted (DRN 00-119, R11) (DRN 03-1610, R13) 15.4-37 Maximum Difference in Measured Symmetric Instrument Power for Representative Worst Case Undetectable Misload During Power Ascension Testing

15.4-38 Maximum Power Peaking Factors Occurring for Representative Worst Case Undetectable Misload (DRN 03-1610, R13) 15.5-1 Assumptions For the CVCS Malfunction Analysis

15.5-2 Sequence of Events For the CVCS Malfunction Event (DRN 01-301, R10) 15.6-1 Sequence of Events For a Letdown Line Break Outside Containment (DRN 01-301, R10) 15.6-2 Assumptions For Letdown Line Break Outside Containment

15.6-3 Parameters Used in Evaluating the Radiological Consequences of a Letdown Line Rupture

15.6-4 Radiological Consequences of a Letdown Line Rupture in the Reactor Auxiliary Building (DRN 05-1201, R14) 15.6-5 Deleted. (DRN 05-1201, R14)

WSES-FSAR-UNIT-3 15-xiii Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd) Table Title (DRN 05-1201, R14) 15.6-6 Deleted (DRN 05-1201, R14) 15.6-7 Deleted

15.6-8 Deleted (DRN 05-1201, R14) 15.6-9 Deleted 15.6-10 Deleted (DRN 05-1201, R14) 15.6-11 Intentionally Deleted

15.6-12 Time Sequence of Important Events for Large LOCA (Seconds After Break) (DRN 00-0551, R10) 15.6-12a Sequence of Events for Small Break LOCA (Time, Seconds After Break) (DRN 00-0551, R10) (DRN 05-543, R14) 15.6-13 General System Parameters and Initial Conditions (Large Break LOCA Spectrum Analysis) (DRN 05-543, R14) (DRN 00-0551, R10) 15.6-13a General System Parameters and Initial Conditions (For the Small Break LOCA ECCS Performance Analysis (DRN 00-0551, R10) (DRN 05-543, R14) 15.6-13b Deleted (DRN 05-543, R14) (DRN 00-0551, R10) 15.6-13c General System Parameters and Initial Conditions (For the Inadvertent Opening of a Pressurizer Safety Valve) (DRN 00-0551, R10) (DRN 05-543, R14) 15.6-14 Peak Clad Temperatures and Oxidation Percentages For the Large Break Analysis (DRN 05-543, R14) (DRN 00-0551, R10) 15.6-14a Peak Cladding Temperatures and Oxidation Percentages for Small Breaks (DRN 00-0551, R10) 15.6-15 Large Break Spectrum

15.6-16 Variables Plotted as a Function of Time for Each Large Break in the Spectrum

WSES-FSAR-UNIT-3 15-xiv Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd) Table Title 15.6-16a Variables Plotted as a Function of Time for Each Small Break

15.6-17 Additional Variables Plotted as a Function of Time For the Cycle 2 Worst Large Break

15.6-18 Parameters Used in Evaluating the Radiological Consequences of a Loss-of-Coolant Accident (DRN 05-1551, R14) 15.6-18a Parameters Used in Evaluating the Radiological Consequences of a Small Break Loss-of-Coolant Accident 15.6-18b Radiological Consequences of a Small Break Loss-of-Coolant Accident (DRN 05-1551, R14) 15.6-19 Leakage Sources From ESF Systems to Reactor Auxiliary Building (DRN 05-1551, R14) 15.6-20 Deleted (DRN 05-1551, R14) 15.6-21 Sequence of Events for an Inadvertent Opening of a Pressurizer Safety Valve

15.6-22 Variable Plotted as a Function of Time for an Inadvertent Opening of a Pressurizer Safety Valve

15.6-23 Results of LOCA Analysis for an Inadvertent Opening of a Pressurizer Safety Valve (DRN 05-543, R14) 15.6-24 Sequence of Events Steam Generator Tube Rupture With LOOP 15.6-25 Assumptions for 3716 MWt SGTR with LOOP (DRN 05-543, R14) 15.6-26 Assumptions Steam Generator Tube Rupture With a Loss of Offsite Power (Radiological Consequences Case)

15.6-27 Integrated Parameter Values Steam Generator Tube Rupture With a Loss of Offsite Power (Radiological Consequences Case)

15.6-28 Radiological Consequences Steam Generator Tube Rupture With a Loss of Offsite Power (Radiological Consequences Case)

15.7-1 Assumptions For Waste Gas Decay Tank Release Accident

15.7-2 Radiological Releases and Exposures as a Result of a Waste Gas Decay Release Accident 15.7-3 Assumptions for Liquid Tank Rupture (Release to Atmosphere)

WSES-FSAR-UNIT-3 15-xv Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSES LIST OF TABLES (Cont'd) Table Title 15.7-4 Maximum Isotopic Inventories in Equipment Classified as Non-Safety, Non-Seismic (Curies) Waste Management System

15.7-5 Radiological Exposures as a result of Liquid Waste System Failure

15.7-6 Parameters Used in Evaluating the Radiological Consequences of a Fuel Handling Accident

15.7-7 Radiological Consequences of a Postulated Fuel Handling Accident in the Fuel Handling Building

15.7-8 Information Needed to Evaluate Containment Isolation Capability During Refueling Accident (DRN 05-543, R14) 15.9-1 Sequence of Events For the ASGT 15.9-2 Assumptions for the ASGT Event (DRN 05-543, R14) 15A.1-1 Summary Significant Differences Between CESEC-III and CESERC-I 15A.1-2 Comparison of Results Steam-Generator Tube rupture With LOP (DRN 04-704, R14) 15B-3 Effective Dose Equivalent Weighting Factors (ICRP30) 15B-4 Powers 10% Natural Deposition Model (DRN 04-704, R14) 15A.1-3 Comparison of Results Full Power Steam Line Break, Inside Containment, With Loss of Offsite Power, HPSI Pump Failure, Automatic Actuation of Auxiliary Feedwater

15A.2-1 Affected Steam Generator Liquid Inventory at Low Level Trip

15B-1 Isotope Properties

15B-2 ICRP 30 Isotope Properties

15C.1-1 Assumptions for the Analysis of the Limiting Small Feedwater System Pipe Break

15C.1-2 Assumptions For the Reanalysis of the Limiting Small Feedwater System Pipe Break

15C.1-3 Sequence of Events for the Reanalysis of the Limiting Small Feedwater System Pipe Break 15D.1-1 Deleted 15D.1-2 Deleted (DRN 05-1201, R14) 15D.2-1 Deleted 15D.2-2 Deleted (DRN 05-1201, R14)

WSES-FSAR-UNIT-3 15-xvi Revision 14 (12/05) CHAPTER 15 ACCIDENT ANALYSIS LIST OF FIGURES Figure Title (DRN 05-543, R14) 15.0-1 Deleted (DRN 05-543, R14) 15.1-1 Increased Main Steam Flow Core Power vs. Time (DRN 05-543, R14) 15.1-2 Increased Main Steam Flow Core Average Heat Flux vs. Time 15.1-3 Increased Main Steam Flow Reactor Coolant System Pressure vs. Time

15.1-4 Increased Main Steam Flow Minimum DNBR vs. Time

15.1-5 Increased Main Steam Flow Reactor Coolant System Temperatures vs. Time

15.1-6 Increased Main Steam Flow Pressurizer Level vs. Time (DRN 05-543, R14) 15.1-7 Increased Main Steam Flow Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.1-8 Increased Main Steam Flow Total Steam Flow vs. Time (DRN 05-543, R14) 15.1-9 Increased Main Steam Flow Feedwater Flow vs. Time

15.1-10 Increased Main Steam Flow Feedwater Enthalpy vs. Time (DRN 05-543, R14) 15.1-11 Increased Main Steam Flow Steam Generator Liquid Mass vs. Time (DRN 05-543, R14) 15.1-12 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Power vs.

Time

15.1-13 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Core Heat Flux vs.

Time

15.1-14 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve RCS Pressure vs.

Time

15.1-15 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Reactor Coolant Temperature vs. Time

15.1-16 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Pressurizer Water Volume vs Time 15.1-17 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Pressure vs. Time 15.1-18 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Total Main Steam Flow vs. Time 15.1-19 Inadvertent Opening of a Steam Generator Atmospheric Dump Valve Steam Generator Fluid Mass vs. Time WSES-FSAR-UNIT-3 15-xvii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd) Figure Title (DRN 05-543, R14) 15.1-19A Inadvertent Opening of a Steam Generator Atmospheric Dump Valve DNBR vs. Time 15.1-20 Increased Main Steam Flow with Concurrent Single Failure Core Power vs. Time (Typical NSSS Response)

15.1-21 Increased Steam Flow with Concurrent Single Failure Core Heat Flux vs. Time (Typical NSSS Response)

15.1-22 Increased Main Steam Flow with Concurrent Single Failure RCS Pressure vs. Time (Typical NSSS Response) (DRN 05-543, R14) 15.1-23 Increased Main Steam Flow with Concurrent Single Failure Minimum Hot Channel DNBR vs. Time (DRN 05-543, R14) 15.1-24 Increased Main Steam Flow with Concurrent Single Failure Reactor Coolant Temperatures vs. Time (Typical NSSS Response)

15.1-25 Increased Main Steam Flow with Concurrent Single Failure Pressurizer Liquid Volume vs. Time (Typical NSSS Response)

15.1-26 Increased Main Steam Flow with Concurrent Single Failure Steam Generator Pressure vs. Time (Typical NSSS Response)

15.1-27 Increased Main Steam Flow with Concurrent Single Failure Main Steam Flow vs. Time (Typical NSSS Response)

15.1-28 Increased Main Steam Flow with Concurrent Single Failure Feedwater Flow vs. Time (Typical NSSS Response)

15.1-29 Increased Main Steam Flow with Concurrent Single Failure Feedwater Enthalpy vs. Time (Typical NSSS Response)

15.1-30 Increased Main Steam Flow with Concurrent Single Failure Steam Generator Liquid Mass vs. Time (Typical NSSS Response)

15.1-31 Deleted

15.1-31a Increased Main Steam Flow with Concurrent Single Failure Total Integrated Safety Valve Flow vs. Time (Typical NSSS Response)

15.1-32 Increased Main Steam Flow with Concurrent Single Failure Core Flow vs. Time (Typical NSSS Response)

15.1-32a HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Core Power vs. Time

15.1-32b HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Core Heat Flux vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xviii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.1-32c HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power RCS Pressure vs. Time

15.1-32d HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Minimum Hot Channel DNBR vs. Time

15.1-32e HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Reactor Coolant Temperatures vs. Time

15.1-32f HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Pressurizer Liquid Volume vs. Time

15.1-32g HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Steam Generator Pressure vs. Time

15.1-32h HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Main Steam Flow vs. Time

15.1-32i HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Feedwater Flow vs. Time

15.1-32j HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Feedwater Enthalpy vs. Time

15.1-32k HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Steam Generator Liquid Mass vs. Time

15.1-32l HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Total Integrated Safety Valve Flow vs. Time

15.1-32m HFP Inadvertent Opening of an Atmospheric Dump Valve with a Concurrent Loss of AC Power Core Flow vs. Time

15.1-33 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Power vs. Time

15.1-34 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Core Heat Flux vs. Time

15.1-35 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Pressure vs. Time

15.1-36 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Coolant System Temperatures vs. Time

15.1-37 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power, Steam Generator Pressure vs. Time

15.1-38 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactivity vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xix Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.1-38a Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Pressurizer Level vs. Time

15.1-38b Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Flow vs. Time

15.1-38c Return-to-Power Steam Line Break Inside Containment, Hot Full Power SLB, Loss of Offsite Power Feedwater Flow vs. Time

15.1-38d Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Steam Generator Mass vs. Time

15.1-38e Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time

15.1-38f Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power Reactor Vessel vs. Time

15.1-38g Return-to-Power Steam Line Break Inside Containment, Hot Full Power, Loss of Offsite Power DNBR vs. Time (DRN 05-543, R14) 15.1-39 Deleted

15.1-40 Deleted

15.1-41 Deleted

15.1-42 Deleted

15.1-43 Deleted

15.1-44 Deleted

15.1-45 Deleted

15.1-46 Deleted (DRN 05-543, R14) 15.1-47 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Core Power vs. Time 15.1-48 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Core Heat Flux vs. Time 15.1-49 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Pressurizer Pressure vs. Time 15.1-50 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xx Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.1-51 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactor Coolant System Temperature vs. Time 15.1-52 Deleted

15.1-53 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Steam Generator Pressure vs. Time 15.1-54 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Steam Flow vs. Time 15.1-55 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Feedwater Flow vs. Time 15.1-56 Deleted

15.1-57 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Steam Generator Mass vs. Time 15.1-58 Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactivity vs. Time 15.1-58a Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Pressurizer Level vs. Time

15-1-58b Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time 15-1-58c Return-to-Power Steam Line Break Inside Containment, Hot Full Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time 15.1-59 Deleted

15.1-60 Deleted

15.1-61 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Core Power vs. Time 15.1-62 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Core Heat Flux vs. Time 15.1-63 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Pressurizer Pressure vs. Time 15.1-64 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactor Coolant System Temperature vs. Time 15.1-65 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Pressurizer Level vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxi Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.1-66 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Steam Generator Pressure vs. Time 15.1-67 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Steam Flow vs. Time 15.1-68 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Feedwater Flow vs. Time 15.1-69 Deleted

15.1-70 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Steam Generator Mass vs. Time 15.1-71 Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactivity vs. Time 15.1-72 Deleted

15.1-72a Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Integrated Safety Injection Flow vs. Time 15.1-72b Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power Reactor Vessel Level vs. Time 15.1-72c Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, Loss of Offsite Power DNBR vs. Time 15.1-72d Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Power vs. Time 15.1-72e Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Core Heat Flux vs. Time 15.1-72f Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Pressure vs. Time 15.1-72g Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Coolant System Temperatures vs. Time 15.1-72h Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Pressure vs. Time 15.1-72i Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactivity vs. Time 15.1-72j Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Pressurizer Level vs. Time 15.1-72k Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Flow vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.1-72l Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Feedwater Flow vs. Time 15.1-72m Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Steam Generator Mass vs. Time 15.1-72n Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Integrated Safety Injection Flow vs. Time 15.1-72o Return-to-Power Steam Line Break Inside Containment, Hot Zero Power, No Loss of Offsite Power Reactor Vessel Upper Head Level vs. Time 15.1-73 Deleted

15.1-74 Deleted

15.1-75 Deleted (DRN 03-220, R12-B) 15.1-75a Deleted (DRN 03-220, R12-B;05-543, R14) 15.1-76 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Core Power vs.

Time

15.1-77 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Reactor Coolant System Pressure vs. Time

15.1-78 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Reactor Coolant Temperature vs. Time

15.1-79 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Pressurizer Water Volume vs. Time

15.1-80 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Steam Generator Pressure vs. Time 15.1-81 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Steam Mass Release From Break vs. Time 15.1-82 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Feedwater Flow vs. Time

15.1-83 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Feedwater Enthalpy vs. Time

15.1-84 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Steam Generator Liquid Inventory vs. Time

15.1-85 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Reactivity vs. Time WSES-FSAR-UNIT-3 15-xxiii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.1-86 Main Steam Line Break Modes 3 & 4 With Loss of AC Power Integrated Steam Mass Release From Break vs. Time (DRN 05-543, R14) 15.1-87 Inside Containment Steam Line Break, Pre-Trip Power Excursion Core Power vs. Time 15.1-88 Inside Containment Steam Line Break, Pre-Trip Power Excursion Core Heat Flux vs.

Time

15.1-89 Inside Containment Steam Line Break, Pre-Trip Power Excursion Reactor Coolant System Temperatures vs. Time 15.1-90 Inside Containment Steam Line Break, Pre-Trip Power Excursion Reactor Coolant System Pressure vs. Time

15.1-91 Inside Containment Steam Line Break, Pre-Trip Power Excursion Reactivity vs. Time

15.1-92 Inside Containment Steam Line Break, Pre-Trip Power Excursion Steam Generator Pressure vs. Time

15.1-93 Inside Containment Steam Line Break, Pre-Trip Power Excursion DNBR vs. Time

15.1-94 Inside Containment Steam Line Break, Pre-Trip Power Excursion Steam Generator Level vs. Time

15.2-1 Loss of Condenser Vacuum Core Power vs. Time (DRN 05-543, R14) 15.2-2 Loss of Condenser Vacuum Core Average Heat Flux vs. Time

15.2-3 Loss of Condenser Vacuum Pressurizer Pressure vs. Time (DRN 05-543, R14) 15.2-3a Loss of Condenser Vacuum RCS Pressure vs. Time (DRN 05-543, R14) 15.2-4 Loss of Condenser Vacuum Minimum DNBR vs. Time (DRN 05-543, R14) 15.2-5 Loss of Condenser Vacuum Core Coolant Temperatures vs. Time (DRN 05-543, R14) 15.2-6 Loss of Condenser Vacuum Pressurizer Water Volume vs. Time (DRN 05-543, R14) 15.2-7 Loss of Condenser Vacuum SG Pressure vs. Time 15.2-8 Loss of Condenser Vacuum Total Steam Flowrate per SG vs. Time

15.2-9 Loss of Condenser Vacuum Feedwater Flowrate per SG vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxiv Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.2-10 Loss of Condenser Vacuum Feedwater Enthalpy vs. Time

15.2-11 Loss of Condenser Vacuum Secondary Liquid Mass vs. Time (DRN 05-543, R14) 15.2-12 Loss of Condenser Vacuum Primary Safety Valve Flowrate vs. Time 15.2-13 Loss of Condenser Vacuum SG Safety Valve Flowrate vs. Time

15.2-14 Deleted

15.2-15 Deleted

15.2-16 Deleted

15.2-17 Deleted

15.2-18 Deleted

15.2-19 Deleted

15.2-20 Deleted

15.2-21 Deleted

15.2-22 Deleted

15.2-23 Deleted

15.2-24 Deleted

15.2-25 Deleted

15.2-25a Deleted

15.2-25b Deleted

15.2-25c Deleted

15.2-25d Deleted

15.2-25e Deleted 15.2-25f Deleted 15.2-25g Deleted 15.2-25h Deleted

15.2-25i Deleted

15.2-25j Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxv Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.2-26 Loss of Normal Feedwater Flow Core Power vs. Time (DRN 05-543, R14) 15.2-27 Loss of Normal Feedwater Flow Core Heat Flux vs. Time 15.2-28 Loss of Normal Feedwater Flow Reactor Coolant System Pressure vs. Time

15.2-29 Loss of Normal Feedwater Flow Reactor Coolant System Temperatures vs. Time (DRN 05-543, R14) 15.2-30 Loss of Normal Feedwater Flow Pressurizer Water Volume vs. Time

15.2-31 Loss of Normal Feedwater Flow Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.2-32 Loss of Normal Feedwater Flow Secondary Steam Flowrate vs. Time 15.2-33 Loss of Normal Feedwater Flow Feedwater Flowrate per Steam Generator vs.

Time (DRN 05-543, R14) 15.2-34 Loss of Normal Feedwater Flow Feedwater Enthalpy vs. Time

15.2-35 Loss of Normal Feedwater Flow Secondary Liquid Mass vs. Time (DRN 05-543, R14) 15.2-36 Loss of Normal Feedwater Flow Safety Valve Flowrate per Steam Generator vs. Time

15.2-36a Loss of Normal Feedwater Flow Minimum DNBR vs. Time (DRN 02-1713, R12-B) 15.2-37 Feedwater System Pipe Break (Large) Core Power vs. Time 15.2-38 Feedwater System Pipe Break (Large) Core Heat Flux vs. Time

15.2-39 Feedwater System Pipe Break (Large) RCS Pressure vs. Time

15.2-40 Feedwater System Pipe Break (Large) Minimum DNBR vs. Time

15.2-41 Feedwater System Pipe Break (Large) RCS Temperature vs. Time

15.2-42 Feedwater System Pipe Break (Large) Pressurizer Water Volume vs. Time

15.2-43 Feedwater System Pipe Break (Large) SG Pressure vs. Time

15.2-44 Feedwater System Pipe Break (Large) Steam Flowrate vs. Time 15.2-45 Feedwater System Pipe Break (Large) Feedwater Flow (Intact Side) vs. Time 15.2-46 Feedwater System Pipe Break (Large) Feedwater Enthalpy (Intact Side) vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxvi Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.2-47 Feedwater System Pipe Break (Large) SG Liquid Mass vs. Time 15.2-48 Feedwater System Pipe Break (Large) Core Flow (Fraction) vs. Time

15.2-49 Feedwater System Pipe Break P (Large) ressurizer Safety Valve Flowrate vs.

Time

15.2-50 Feedwater System Pipe Break (Large) Secondary Safety Valve Flowrate vs.

Time

15.2-51 Feedwater System Pipe Break (Large) Rupture Discharge FLowrate

15.2-52 Feedwater System Pipe Break (Large) SG Water Level vs. Time (DRN 02-1713, R12-B) 15.2-52a Feedwater System Pipe Break (Large) Rupture Discharge Enthalpy vs. Time (DRN 02-1713, R12-B) 15.2-53 Feedwater System Pipe Break (Large) Reactivity vs. Time 15.2-53a Deleted

15.2-53a1 Feedwater System Pipe Break (Large) RCS Pressure vs. Break Size

15.2-53a2 Feedwater System Pipe Break (Small) RCS Pressure vs. Break Size

15.2-53b Feedwater System Pipe Break (Small) RCS Pressure vs. Time

15.2-53c Feedwater System Pipe Break (Small) SG Pressure vs. Time

15.2-53d Feedwater System Pipe Break (Small) Pressurizer Water Volume vs. Time (DRN 02-1713, R12-B) 15.2-53e Feedwater System Pipe Break (Small) Core Power vs. Time

15.2-53f Feedwater System Pipe Break (Small) Core Heat Flux vs. Time

15.2-53g Feedwater System Pipe Break (Small) RCS Temperature vs. Time

15.2-53h Feedwater System Pipe Break (Small) Core Flow (Fraction) vs. Time

15.2-53i Feedwater System Pipe Break (Small) Steam Flowrate vs. Time

15.2-53j Feedwater System Pipe Break (Small) Feedwater Flow (Intact Side) vs. Time

15.2-53k Feedwater System Pipe Break (Small) Feedwater Enthalpy (Intact Side) vs. Time 15.2-53l Feedwater System Pipe Break (Small) SG Liquid Mass vs. Time 15.2-53m Feedwater System Pipe Break (Small) SG Water Level vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxvii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.2-53n Feedwater System Pipe Break (Small) Pressurizer Safety Valve Flowrate vs. Time 15.2-53o Feedwater System Pipe Break (Small) Secondary Safety Valve Flowrate vs. Time

15.2-53p Feedwater System Pipe Break (Small) Reactivity vs. Time

15.2-53q Feedwater System Pipe Break (Small) Rupture Discharge Flowrate vs. Time

15.2-53r Feedwater System Pipe Break (Small) Rupture Discharge Enthalpy vs. Time

15.2-53s Feedwater System Pipe Break (Small) Minimum DNBR vs. Time

15.2-54 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Core Power vs. Time

15.2-55 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Core Heat Flux vs.

Time

15.2-56 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Pressurizer Pressure vs. Time

15.2-57 Loss of Normal Feedwater Flow with an Active Failure in the SBCS RCS Temperature vs. Time

15.2-58 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Pressurizer Water Volume vs. Time

15.2-59 Loss of Normal Feedwater Flow with an Active Failure in the SBCS SG Pressure vs.

Time

15.2-60 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Secondary Steam Flowrate vs. Time

15.2-61 Loss of Normal Feedwater Flow with an Active Failure in the SBCS EFW Flowrate per SG vs. Time

15.2-62 Loss of Normal Feedwater Flow with an Active Failure in the SBCS EFW Enthalpy vs.

Time

15.2-63 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Secondary Liquid Mass vs. Time

15.2-64 Deleted

15.2-65 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Minimum DNBR vs.

Time

15.3-1 Total Loss of Forced Reactor Coolant Flow Core Power vs. Time 15.3-2 Total Loss of Forced Reactor Coolant Flow Core Heat Flux vs. Time 15.3.3 Total Loss of Forced Reactor Coolant Flow Pressurizer Pressure vs. Time (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxviii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.3-4 Total Loss of Forced Reactor Coolant Flow Minimum Hot Channel DNBR vs. Time 15.3-5 Total Loss of Forced Reactor Coolant Flow Reactor Coolant Temperatures vs. Time

15.3-6 Total Loss of Forced Reactor Coolant Flow Core Flow vs. Time

15.3-7 Deleted (DRN 05-543, R14) 15.3-8 Total Loss of Forced Reactor Coolant Flow Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.3-9 Total Loss of Forced Reactor Coolant Flow Integrated Steam Generator Safety Valve Flow vs. Time

15.3-10 Total Loss of Forced Reactor Coolant Flow Pressurizer Liquid Volume vs. Time (DRN 05-543, R14) 15.3-11 Sheared Shaft With Loss of Offsite Power Core Power vs. Time

15.3-12 Sheared Shaft with Loss of Offsite Power Core Heat Flux vs. Time (DRN 05-543, R14) 15.3-13 Sheared Shaft With Loss of Offsite Power RCS Temperatures vs. Time 15.3-14 Sheared Shaft With Loss of Offsite Power RCS Pressure vs. Time (DRN 05-543, R14) 15.3-15 Sheared Shaft With Loss of Offsite Power Reactivity vs. Time

15.3-16 Sheared Shaft With Loss of Offsite Power Steam Generator Pressure vs. Time

15.3-17 Sheared Shaft With Loss of Offsite Power Pressurizer Liquid Volume vs. Time (DRN 05-543, R14) 15.3-18 Sheared Shaft With Loss of Offsite Power Reactor Coolant System Flows vs. Time

15.3-18a Sheared Shaft with Loss of Offsite Power Minimum Hot Channel DNBR vs. Time (DRN 05-543, R14) 15.3-19 Deleted 15.3-20 Deleted 15.3-21 Deleted 15.3-22 Deleted

15.3-23 Deleted

WSES-FSAR-UNIT-3 15-xxix Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.3-24 Deleted

15.3-25 Deleted

15.3-26 Deleted

15.3-27 Deleted

15.3-28 Deleted

15.3-29 Deleted

15.3-30 Deleted

15.3-31 Deleted (DRN 05-543, R14) 15.3-32 Deleted (DRN 05-543, R14) 15.4-1 CEA Withdrawal From Subcritical Core Power vs. Time

15.4-2 CEA Withdrawal from Subcritical Core Heat Flux vs. Time

15.4-3 CEA Withdrawal from Subcritical Reactor Coolant System Temperatures vs. Time

15.4-4 CEA Withdrawal from Subcritical Reactor Coolant System Pressure vs. Time

15.4-5 CEA Withdrawal from Subcritical Steam Generator Pressure vs. Time

15.4-6 CEA Withdrawal from Subcritical Reactivity vs. Time

15.4-7 CEA Withdrawal from Subcritical Peak Linear Heat Rate vs. Time 15.4-8 CEA Withdrawal at Low Power Core Power vs. Time 15.4-9 CEA Withdrawal at Low Power Core Heat Flux vs. Time

15.4-10 CEA Withdrawal at Low Power Reactor Coolant System Temperatures vs. Time

15.4-11 CEA Withdrawal at Low Power Reactor Coolant System Pressure vs. Time

15.4-11a CEA Withdrawal at Low Power Steam Generator Pressure vs. Time

15.4-11b CEA Withdrawal at Low Power Reactivity vs. Time

WSES-FSAR-UNIT-3 15-xxx Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.4-12 Deleted 15.4-13 Deleted

15.4-14 Deleted

15.4-15 Deleted

15.4-16 Deleted

15.4-17 Deleted

15.4-18 Deleted

15.4-19 Deleted

15.4-20 Deleted

15.4-21 Deleted

15.4-22 Deleted

15.4-23 Deleted

15.4-24 Deleted

15.4-25 CEA Withdrawal at Power Core Heat Flux vs. Time (DRN 05-543, R14) 15.4-26 CEA Withdrawal at Power Peak Linear Heat Generation Rate vs. Time

15.4-27 CEA Withdrawal at Power Reactor Coolant System Pressure vs. Time

15.4-28 CEA Withdrawal at Power Core Power vs. Time

15.4-29 CEA Withdrawal at Power Minimum DNBR vs. Time

15.4-30 CEA Withdrawal at Power Reactor Coolant Temperature vs. Time

15.4-31 CEA Withdrawal at Power Pressurizer Water Volume vs. Time

15.4-32 CEA Withdrawal at Power Steam Generator Pressure vs. Time

15.4-33 CEA Withdrawal at Power Steam Flow vs. Time

15.4-34 CEA Withdrawal at Power Feedwater Flow vs. Time

15.4-35 CEA Withdrawal at Power Feedwater Enthalpy vs. Time WSES-FSAR-UNIT-3 15-xxxi Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.4-36 CEA Withdrawal at Power Steam Generator Liquid Mass vs. Time

15.4-37 CEA Withdrawal at Power Secondary Safety Valve Flow vs. Time (DRN 02-1479, R12) 15.4-38 CEA Misoperation Single CEA Drop Core Power vs. Time (DRN 05-543, R14) 15.4-39 CEA Misoperation Single CEA Drop Core Average Heat Flux vs. Time (DRN 05-543, R14) 15.4-40 CEA Misoperation Single CEA Drop Reactivities vs. Time

15.4-41 CEA Misoperation Single CEA Drop RCS Temperatures vs. time (DRN 05-543, R14) 15.4-42 CEA Misoperation Single CEA Drop System Pressure vs. Time (DRN 05-543, R14) 15.4-43 CEA Misoperation Single CEA Drop Steam Generator Pressure vs. Time

15.4-44 CEA Misoperation Single CEA Drop Pressurizer Level vs.

Time

15.4-45 Deleted

15.4-46 Deleted

15.4-47 Deleted

15.4-48 Deleted

15.4-49 Deleted 15.4-50 Deleted 15.4-51 Deleted

15.4-52 Deleted

15.4-53 Deleted

15.4-54 Deleted

15.4-55 Deleted (DRN 02-1479, R12)

WSES-FSAR-UNIT-3 15-xxxii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 02-1479, R12) 15.4-56 Deleted 15.4-57 Deleted (DRN 02-1479, R12) 15.4-58 Deleted (DRN 02-1479, R12;05-543, R14) 15.4-59 Deleted (DRN 05-543, R14) 15.4-60 Deleted

15.4-61 Deleted (DRN 02-1479, R12) (DRN 03-1610, R13) 15.4-62 Deleted 15.4-63 Deleted

15.4-64 Deleted

15.4-65 Deleted

15.4-65a Deleted

15.4-65b Deleted (DRN 03-1610, R13) (DRN 05-543, R14) 15.4-66 Deleted 15.4-67 HFP Ejection Core Power vs. Time

15.4-68 HFP Ejection Peak Core Power vs. Time

15.4-69 HFP Ejection Core Heat Flux vs. Time

15.4-70 HFP Ejection Peak Core Heat Flux vs. Time

15.4-71 HFP Ejection Hot & Average Channel Fuel & Clad Temperatures vs. Time

15.4-72 HFP Ejection Reactivity Components vs. Time

15.4-73 CEA Ejection RCS Pressure vs. Time for Peak RCS Pressure

15.4-74 Deleted

15.4-75 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxxiii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.4-76 Deleted 15.4-77 Deleted

15.4-78 Deleted

15.4-79 Deleted

15.4-80 Deleted

15.4-81 Deleted

15.4-82 Deleted

15.4-83 Deleted

15.4-84 Deleted

15.4-85 Deleted (DRN 05-543, R14) 15.4-86 Deleted (DRN 05-543, R14) 15.4-87 Deleted 15.4-88 Deleted

15.4-89 Deleted

15.4-90 Deleted

15.4-91 Deleted

15.4-92 Deleted

15.4-92a Deleted

15.4-93 Deleted 15.4-94 Deleted

15.4-95 Deleted 15.4-96 Deleted

15.4-97 Deleted (DRN 05-543, R14) (DRN 03-1610, R13) 15.4-98 Locations of Incore Neutron Detectors 15.4-99 Power Distribution for Representative Worst Case Undetectable Misload (DRN 03-1610, R13)

WSES-FSAR-UNIT-3 15-xxxiv Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.5-1 CVCS Malfunction Core Power vs. Time

15.5-2 CVCS Malfunction Core Average Heat Flux vs. Time

15.5-3 CVCS Malfunction Coolant System Pressure vs. Time

15.5-4 CVCS Malfunction Core Coolant Temperatures vs. Time

15.5-5 CVCS Malfunction Reactivity vs. Time

15.5-6 CVCS Malfunction Pressurizer Steam Volume vs. Time

15.5-7 CVCS Malfunction Steam Generator Pressure vs. Time (DRN 05-543, R14) 15.6-1 Deleted 15.6-2 Deleted

15.6-3 Deleted

15.6-4 Deleted

15.6-5 Deleted

15.6-6 Deleted

15.6-7 Deleted

15.6-8 Deleted

15.6-9 Deleted 15.6-10 Deleted 15.6-11 Deleted

15.6-12 Deleted

15.6-13 Deleted

15.6-14 Deleted

15.6-15 Deleted

15.6-16 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxxv Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.6-17 Deleted 15.6-18 Deleted

15.6-19 Deleted

15.6-20 Deleted

15.6-21 Deleted

15.6-22 Deleted

15.6-23 Deleted

15.6-24 Deleted

15.6-25 Deleted

15.6-26 Deleted

15.6-27 Deleted

15.6-28 Deleted

15.6-29 Deleted

15.6-30 Deleted

15.6-31 Deleted (DRN 05-543, R14) 15.6-32 Deleted

15.6-33 Deleted

15.6-34 Deleted

15.6-35 Deleted

WSES-FSAR-UNIT-3 15-xxxvi Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.6-35A SGTR with LOOP Core Power vs. Time 15.6-35B SGTR with LOOP Core Heat

15.6-35C Deleted

15.6-35D SGTR with LOOP RCS Pressure vs. Time

15.6-35E Deleted

15.6-35F SGTR with LOOP RCS Temperature vs. Time

15.6-35G Deleted

15.6-35H SGTR with LOOP Pressurizer Water Volume vs. Time

15.6-35I SGTR with LOOP RCS Inventory vs. Time

15.6-35J Deleted

15.6-35K SGTR with LOOP SG Pressure vs. Time

15.6-35L SGTR with LOOP Feedwater Flowrate per SG vs. Time

15.6-35M Deleted

15.6-35N SGTR with LOOP Primary to Secondary Leak Rate vs. Time

15.6-35O Deleted

15.6-35P SGTR with LOOP SG Liquid Mass vs. Time

15.6-35Q SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time

15.6-35R SGTR with LOOP Integrated Primary to Secondary Leak Flow vs. Time

15.6-36 Deleted

15.6-37 Deleted

15.6-38 Deleted

15.6-39 Deleted

15.6-40 Deleted

15.6-41 Deleted 15.6-42 Deleted 15.6-43 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxxvii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.6-44 Deleted 15.6-45 Deleted

15.6-46 Deleted

15.6-47 Deleted

15.6-48 Deleted

15.6-49 Deleted

15.6-50 Deleted

15.6-51 Deleted

15.6-52 Deleted

15.6-53 Deleted

15.6-54 Deleted

15.6-55 Deleted

15.6-56 Deleted

15.6-57 Deleted

15.6-58 Deleted

15.6-59 Deleted

15.6-60 Deleted

15.6-61 Deleted

15.6-62 Deleted (DRN 05-543, R14) 15.6-63 Deleted

15.6-64 Deleted

15.6-65 Deleted

15.6-66 Deleted

15.6-67 Deleted

WSES-FSAR-UNIT-3 15-xxxviii Revision 14 (12/05) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15.6-68 Deleted

15.6-69 Deleted

15.6-70 Deleted

15.6-71 Deleted

15.6-72 Deleted

15.6-73 Deleted

15.6-74 Deleted

15.6-75 Deleted

15.6-76 Deleted

15.6-77 Deleted

15.6-78 Deleted

15.6-79 Deleted

15.6-80 Deleted

15.6-81 Deleted

15.6-82 Deleted

15.6-83 Deleted

15.6-84 Deleted

15.6-85 Deleted

15.6-86 Deleted

15.6-87 Deleted

15.6-88 Deleted

15.6-89 Deleted

15.6-90 Deleted

15.6-91 Deleted (DRN 05-543, R14) 15.6-92 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xxxix Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.6-93 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center Hot Assembly Node

15.6-94 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate

15.6-95 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot)

15.6-96 Deleted

15.6-97 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Quality 15.6-98 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure

15.6-99 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood

15.6-100 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature

15.6-101 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power

15.6-102 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node

15.6-103 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate

15.6-104 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flowrate (Above and Below Hot Spot)

15.6-105 Deleted

15.6-106 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality

15.6-107 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure

15.6-108 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood

15.6-109 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature (DRN 06-1062, R15) 15.6-109a Deleted 15.6-109b Deleted (DRN 05-543, R14; 06-1062, R15 WSES-FSAR-UNIT-3 15-xl Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14; 06-1062, R15 15.6-109c Deleted 15.6-109d Deleted

15.6-109e Deleted

15.6-109f Deleted

15.6-109g Deleted

15.6-109h Deleted

15.6-109i Deleted

15.6-109j Deleted

15.6-109k Deleted (DRN 06-1062, R15) 15.6-109l Deleted

15.6-110 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power

15.6-111 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure Center Hot Assembly Node

15.6-112 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate

15.6-113 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flowrate (Above and Below Hot Spot)

15.6-114 Deleted

15.6-115 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality 15.6-116 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure

15.6-117 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood

15.6-118 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xli Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 06-1062, R15) 15.6-118a Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Mid Annulus Flow Rate 15.6-118b Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Quality Above and Below Core 15.6-118c Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Core Pressure Drop 15.6-118d Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs 15.6-118e Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Water Level in Downcomer During Reflood 15.6-118f Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Hot Spot Gap Conductance 15.6-118g Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Maximum Local cladding Oxidation Percentage 15.6-118h Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot 15.6-118i Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Hot Spot Heat Transfer Coefficient 15.6-118j Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Hot Pin Pressure

15.6-118k Large Break LOCA ECCS Performance Analysis, 0.6 DEG/PD Break Core Bulk Channel Flow Rate (DRN 06-1062, R15) 15.6-119 Deleted 15.6-120 Deleted

15.6-121 Deleted

15.6-122 Deleted

15.6-123 Deleted

15.6-124 Deleted

15.6-125 Deleted

15.6-126 Deleted 15.6-127 Deleted WSES-FSAR-UNIT-3 15-xlii Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 06-1062, R15) 15.6-127a Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Core Power 15.6-127b Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Pressure in Center Hot Assembly Node 15.6-127c Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Leak Flow Rate

15.6-127d Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) 15.6-127e Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Hot Assembly Quality 15.6-127f Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Containment Pressure 15.6-127g Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Mass Added to Core During Reflood 15.6-127h Large Break LOCA ECCS Performance Analysis, 0.4 DEG/PD Break Peak Cladding Temperature (DRN 06-1062, R15) (DRN 05-543, R14) 15.6-128 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature versus Break Area (DRN 05-543, R14) (DRN 00-0551) 15.6-129 Deleted 15.6-130 Deleted

15.6-131 Deleted

15.6-132 Deleted

15.6-133 Deleted

15.6-134 Deleted

15.6-135 Deleted 15.6-136 Deleted 15.6-137 Deleted

15.6-138 Deleted

15.6-139 Deleted

15.6-140 Deleted (DRN 00-0551)

WSES-FSAR-UNIT-3 15-xliii Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 00-0551) 15.6-141 Deleted 15.6-142 Deleted

15.6-143 Deleted

15.6-144 Deleted

15.6-145 Deleted

15.6-146 Deleted

15.6-147 Deleted

15.6-148 Deleted

15.6-149 Deleted

15.6-150 Deleted

16.6-151 Deleted

15.6-152 Deleted (DRN 00-0551) (DRN 05-543, R14) 15.6-153 Deleted 15.6-154 Deleted

15.6-155 Deleted

15.6-156 Deleted (DRN 00-0551) 15.6-157 Deleted (DRN 00-0551) 15.6-158 Deleted 15.6-159 Deleted (DRN 00-0551) 15.6-160 Deleted (DRN 05-543, R14) 15.6-161 Deleted

15.6-162 Deleted

15.6-163 Deleted

15.6-164 Deleted

15.6-165 Deleted

15.6-166 Deleted (DRN 00-0551)

WSES-FSAR-UNIT-3 15-xliv Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 00-0551) 15.6-167 Deleted 15.6-168 Deleted (DRN 00-0551) (DRN 05-543, R14) 15.6-169 Deleted 15.6-170 Deleted

15.6-171 Deleted

15.6-172 Deleted (DRN 00-0551) 15.6-173 Deleted (DRN 00-0551) 15.6-174 Deleted

15.6-175 Deleted (DRN 00-0551) 15.6-176 Deleted (DRN 05-543, R14) 15.6-177 Peak Cladding Temperature vs. Break Size for the Small Break LOCA Analysis

15.6-178 Inadvertent Opening of a Pressurizer Safety Valve Normalized Total Core Power (DRN 00-0551) 15.6-179 Inadvertent Opening of a Pressurizer Safety Valve Inner Vessel Pressure

15.6-180 Inadvertent Opening of a Pressurizer Safety Valve Leak Flow Rate

15.6-181 Inadvertent Opening of a Pressurizer Safety Valve Inner Vessel Inlet Flow Rate

15.6-182 Inadvertent Opening of a Pressurizer Safety Valve Inner Vessel Two-Phase Mixture Height

15.6-183 Inadvertent Opening of a Pressurizer Safety Valve Heat Transfer Coefficient at Hot Spot

15.6-184 Inadvertent Opening of a Pressurizer Safety Valve Coolant Temperature at Hot Spot 15.6-185 Inadvertent Opening of a Pressurizer Safety Valve Clad Surface Temperature at Hot Spot (DRN 05-543, R14) 15.6-186 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xlv Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15.6-187 Deleted 15.6-188 Deleted

15.6-189 Deleted

15.6-190 Deleted

15.6-191 Deleted

15.6-192 Deleted

15.6-193 Deleted

15.6-194 Deleted

15.6-195 Deleted

15.6-196 Deleted

15.6-197 Deleted

15.6-198 Deleted

15.6-199 Deleted

15.6-200 Deleted

15.6-201 Deleted

15.6-202 Deleted

15.6-203 Deleted

15.6-204 Deleted

15.6-205 Deleted (DRN 00-0551; 06-1062, R15) 15.6-206 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Core Power

15.6-207 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Pressure

15.6-208 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Break Flow Rate

15.6-209 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Inlet Flow Rate (DRN 00-0551;05-543, R14; 06-1062, R15)

WSES-FSAR-UNIT-3 15-xlvi Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 00-0551;05-543, R14; 06-1062, R15) 15.6-210 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Two-Phase Mixture Level

15.6-211 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Heat Transfer Coefficient at Hot Spot

15.6-212 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Coolant Temperature at Hot Spot

15.6-213 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.06 ft2/PD Break Cladding Temperature at Hot Spot

15.6-214 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Core Power

15.6-215 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Pressure

15.6-216 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Break Flow Rate

15.6-217 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Inlet Flowrate

15.6-218 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Two-Phase Mixture Level

15.6-219 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Heat Transfer Coefficient at Hot Spot

15.6-220 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Coolant Temperature at Hot Spot

15.6-221 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.05 ft2/PD Break Cladding Temperature at Hot Spot (DRN 00-0551; 06-1062, R15) (DRN 05-256, R13-B) 15.6-222 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Core Power

15.6-223 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Inner Vessel Pressure

15.6-224 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Break Flowrate

15.6-225 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Inner Vessel Inlet Flowrate

15.6-226 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Inner Vessel Two-Phase Mixture Level (DRN 05-256, R13-B;05-543, R14)

WSES-FSAR-UNIT-3 15-xlvii Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-256, R13-B;05-543, R14) 15.6-227 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Heat Transfer Coefficient at Hot Spot

15.6-228 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Coolant Temperature at Hot Spot

15.6-229 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Cladding Temperature at Hot Spot (DRN 05-256, R13-B) 15.6-230 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam Generator No. 1 Pressure

15.6-231 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam Generator No. 2 Pressure

15.6-232 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam Generator No. 1 Secondary Flowrate

15.6-233 Waterford-3 Small Break LOCA ECCS Performance Analysis 0.055 ft2/PD Break Steam Generator No. 2 Secondary Flowrate

15.9-1 Asymmetric Steam Generator Transient Core Power vs. Time

15.9-2 Asymmetric Steam Generator TransientCore Average Heat Flux vs. Time

15.9-3 Asymmetric Steam Generator Transient RCS Temperatures vs. Time

15.9-4 Asymmetric Steam Generator Transient System Pressure vs. Time

15.9-5 Asymmetric Steam Generator Transient Steam Generator Pressure vs. Time

15.9-6 Asymmetric Steam Generator Transient DNBR vs. Time (DRN 05-543, R14) 15A.1-1 Steam Generator Tube Rupture With a Concurrent Loss of Normal AC Power RCS Pressure vs. Time

15A.1-2 Steam Generator Tube Rupture With LOP Reactor Vessel Liquid Volume vs. Time 15A.1-3 Full Power Steam Line Break, IC LOP, HPSI Pump Failure, Stuck CEA, Automatic Actuation of AFW Reactor Coolant System Pressure vs. Time 15A.1-4 Full Power Steam Line Break, IC, LOP, HPSI Pump Failure, Stuck CEA, Automatic Actuation of AFW Reactor Vessel Liquid Volume vs. Time

15A.2-1 Steam Generator Heat Transfer Characteristics

15A.2-2 Discharge Enthalpy vs. Steam Generator Liquid Inventory

15A.2-3 Steam Generators

WSES-FSAR-UNIT-3 15-xlviii Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title 15A.2-4 Maximum RCS Pressure vs. Break Area

15A.3-1 Full Power Main Steam Line Break Maximum Post-Trip Reactivity vs.

Time of Loss of Offsite Power

15A.3-2 Full Power Main Steam Line Break Minimum Post-Trip DNBR vs. Time of Loss of Offsite Power

15A.4-1 Minimum DNBR vs. Time Increased Main Steam Flow With Loss of Offsite Power

15B-1 Containment Leakage Dose Model (DRN 05-543, R14) 15C.1-1 Deleted 15C.1-2 Deleted

15C.1-3 Deleted

15C.1-4 Deleted

15C.1-5 Deleted (DRN 05-543, R14) 15C.1-6 Deleted

15C.1-7 Deleted

15C.1-8 Deleted

15C.1-9 Deleted

15D.1-1 Deleted

15D.1-2 Deleted

15D.1-3 Deleted 15D.1-4 Deleted 15D.1-5 Deleted

15D.1-6 Deleted

15D.1-7 Deleted (DRN 05-543, R14) 15D.2-1 Deleted 15D.2-2 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-xlix Revision 15 (03/07) CHAPTER 15 LIST OF FIGURES (Cont'd)

Figure Title (DRN 05-543, R14) 15D.2-3 Deleted 15D.2-4 Deleted

15D.2-5 Deleted

15D.2-6 Deleted

15D.2-7 Deleted (DRN 05-543, R14)

WSES-FSAR-UNIT-3 15-l Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 12-B 15-ix ER-W3-2002-0603-009/DRN 02-1713 15-xxii 15-xxiii 15.2.3.1 Table 15.2-8 Sh 1 & 2 Table 15.2-9 Table 15.2-9a Table 15.2-9b Sh 1 & 2 Figure 15.2-37 thru 15.2-53d Appendix 15C (all)

15-xix ER-W3-2003-0059-000/DRN 03-220 15.6.3.1 Table 15.6-1 Table 15.6-2 Table 15.6-3 Table 15.6-4 Figure 15.1-75a Figure 15.6-1

15.6.3.1 ER-W3-2002-0628-000/DRN 02-1742

15.6.3.2.3.4 ER-W3-2001-0424-000/DRN 03-99

Revision 12-C Section 15.7.3.4.1 ER-W3-2002-0319-000/DRN 03-179

Revision 13 Table 15.6-13a Sht 1 ER-W3-2003-0117-000/DRN 03-1964 Table 15.6-13a Sht 2 Table 15.6-13b

TOC Page 15-xi ER-W3-2003-0585-000/DRN 03-1610 TOC Page 15-xii TOC Page 15-xiii TOC Page 15-xxvii TOC Page 15-xxix Section 15.4.3.1.1.1 WSES-FSAR-UNIT-3 15-li Revision 15 (03/07) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 13 Section 15.4.3.1.1.2 Section 15.4.3.1.2.1 Table 15.4-18 ER-W3-2003-0585-000/DRN 03-1610 Table 15.4-18a Table 15.4-18b Table 15.4-37 Table 15.4-38 Table 15.4-62 Table 15.4-63 Table 15.4-64 Table 15.4-65a Table 15.4-65b Table 15.4-98 Table 15.4-99

Section 15.0.3.1.12 ER-W3-2003-0654-000/DRN 04-524 Section 15.1.2.4.2

Revision 13-B Section 15.6.3.3.3.2 ER-W3-2004-271/DRN 04-632 Section 15.6.3.3.3.2.1 Section 15.6.3.3.3.2.3 Section 15.6 Table 15.6-12a Table 15.6-13a Sht. 1 Table 15.6-13a Sht. 2 Table 15.6-14a Figure 15.6-222 Figure 15.6-223 Figure 15.6-224 Figure 15.6-225 Figure 15.6-226 Figure 15.6-227 Figure 15.6-228 Figure 15.6-229 WSES-FSAR-UNIT-3 15-lii Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 15 Section Cross ReferencesRevision 14Sections, Tables and Figures ER-W3-2001-1149-000 DRN 05-543 ER-W3-2001-1149-000 DRN 05-560 ER-W3-2001-1149-007 DRN 05-13 ER-W3-2001-1149-014 DRN 05-1201 ER-W3-2002-0110-001 DRN 04-1098 ER-W3-2004-0276-000 DRN 04-704 ER-W3-2004-0276-002 DRN 05-645 ER-W3-2005-0019-000 DRN 05-359 ER-W3-2005-0145-000 DRN 05-791 ER-W3-2005-0500-000 DRN 05-1551 Revision 15Table of Contents ER-W3-2005-0447-004/DRN 06-1062 Section 15.0 Table 15.0-4 Section 15.1.1.3.1 Section 15.1.1.4.1 Section 15.1.2.3.1 Section 15.1.2.4.1 Section 15.1.3.1.1 Section 15.1.3.2.1 Section 15.1.3.3.1 Section 15.2.1.3.1 Section 15.2.2.5.1 Section 15.2.3.1 Section 15.2.3.2.1 Section 15.3.2.1.1 Section 15.3.3.1.1 Section 15.4.1.1.1 Section 15.4.1.2.1 Section 15.4.1.3.1 Section 15.4.1.4.1 Section 15.4.1.5.1 Section 15.4.1.6.1 Section 15.4.1.7.1 Section 15.4.3.2.1 Section 15.4.3.2.3 Table 15.4-19 Table 15.4-23 Table 15.4-28 WSES-FSAR-UNIT-3 15-liii Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 15 Section Cross ReferencesRevision 15 (Contd)Figure 15.4-67 ER-W3-2005-0447-004/DRN 06-1062 (Continued) Figure 15.4-68 Figure 15.4-69 Figure 15.4-70 Figure 15.4-71 Figure 15.4-72 Section 15.5.1.1 Section 15.5.2.1.1 Section 15.6.3.1.1 Section 15.6.3.2.1.1 Section 15.6.3.2.1.4 Section 15.6.3.3.3.1.1 Section 15.6.3.3.3.1.3 Section 15.6.3.3.3.2.1 Section 15.6.3.3.3.2.3 Section 15.6: References Table 15.6-12 Table 15.6-12a Table 15.6-13 Table 15.6-13a Sh. 1 Table 15.6-13a Sh. 2 Table 15.6-14 Table 15.6-14a Figure 15.6-92 Figure 15.6-93 Figure 15.6-94 Figure 15.6-95 Figure 15.6-97 Figure 15.6-98 Figure 15.6-99 Figure 15.6-100 Figure 15.6-101 Figure 15.6-102 Figure 15.6-103 Figure 15.6-104 Figure 15.6-106 Figure 15.6-107 Figure 15.6-108 Figure 15.6-109 Figure 15.6-109a Figure 15.6-109b WSES-FSAR-UNIT-3 15-liv Revision 15 (03/07)UPDATE REFERENCE LIST Chapter 15 Section Cross ReferencesRevision 15 (Contd)Figure 15.6-109c ER-W3-2005-0447-004/DRN 06-1062 (Continued) Figure 15.6-109d Figure 15.6-109e Figure 15.6-109f Figure 15.6-109g Figure 15.6-109h Figure 15.6-109i Figure 15.6-109j Figure 15.6-109k Figure 15.6-110 Figure 15.6-111 Figure 15.6-112 Figure 15.6-113 Figure 15.6-115 Figure 15.6-116 Figure 15.6-117 Figure 15.6-118 Figure 15.6-118a Figure 15.6-118b Figure 15.6-118c Figure 15.6-118d Figure 15.6-118e Figure 15.6-118f Figure 15.6-118g Figure 15.6-118h Figure 15.6-118i Figure 15.6-118j Figure 15.6-118k Figure 15.6-127a Figure 15.6-127b Figure 15.6-127c Figure 15.6-127d Figure 15.6-127e Figure 15.6-127f Figure 15.6-127g Figure 15.6-127h Figure 15.6-128 Figure 15.6-177 Figure 15.6-206 Figure 15.6-207 Figure 15.6-208 WSES-FSAR-UNIT-3 15-lv Revision 301 (09/07) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 15 (Contd)

Figure 15.6-209 ER-W3-2005-0447-004/DRN 06-1062 (Continued) Figure 15.6-210 Figure 15.6-211 Figure 15.6-212 Figure 15.6-213 Figure 15.6-214 Figure 15.6-215 Figure 15.6-216 Figure 15.6-217 Figure 15.6-218 Figure 15.6-219 Figure 15.6-220 Figure 15.6-221 Figure 15.6-222 Figure 15.6-223 Figure 15.6-224 Figure 15.6-225 Figure 15.6-226 Figure 15.6-227 Figure 15.6-228 Figure 15.6-229 Figure 15.6-230 Figure 15.6-231 Figure 15.6-232 Figure 15.6-233 Section 15.9.1.1.1 Table 15.9-2 Revision 301 Section 15.1.2.3.5.1 EC-5000081470 Section 15.1.2.3.5.2 Section 15.1.2.4.5.2 Section 15.1.3.3.5.1.2 Table 15.1-10 Sh. 1 Table 15.1-10 Sh. 2 Table 15.1-17 Sh. 1 Table 15.1-17 Sh. 2 Table 15.1-27 Sh. 1 Table 15.1-27 Sh. 2 WSES-FSAR-UNIT-3 15-lvi Revision 301 (09/07) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 301 (Contd)

Section 15.2.3.1.3.1.5.2 EC-5000081470 (Contd) Table 15.2-11 Sh. 1 Table 15.2-11 Sh. 2 Section 15.3.3.1.4.2 Section 15.3.3.1.4.3 Section 15.3.3.1.5 Table 15.3-4 Sh. 1 Section 15.4.3.2.5.1.2 Section 15.4.3.2.5.1.4 Table 15.4-31 Sh. 1 Table 15.4-31 Sh. 2 Section 15.6.3.1.5.1 Section 15.6.3.1.5.1.2 Section 15.6.3.1.5.1.5 Section 15.6.3.1.5.2 Section 15.6.3.3.5.1.1 Section 15.6.3.3.5.1.2 Section 15.6.3.3.6 Table 15.6-3 Sh. 1 Table 15.6-18 Sh. 2 Table 15.6-18 Sh. 3 Table 15.6-18A Sh. 1 Table 15.6-18A Sh. 2 Section 15.7.3.4.2.1 Section 15.7.3.4.5.1 Table 15.7-6 Sh. 1 Table 15.7.6 Sh. 2 Section 15B.1.1.1 Section 15B.1.2 Section 15B.1.3 Section 15B.1.4 Section 15B.3.1 Section 15B.4: References Section 15.6.3.3.6 EC-3277 Section 15B.1.3 Section 15B.1.4

WSES-FSAR-UNIT-3 15-lvii Revision 304 (06/10) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 302 Section 15.6.3.3.3.1 EC-9533 Section 15.6.3.3.3.1.1 Section 15.6.3.3.3.1.2 Section 15.6.3.3.3.1.3 Section 15.6.3.3.3.2.1 Section 15.6.3.3.3.2.3 Section 15.6: References Table 15.6-12 Table 15.6-12a Table 15.6-13 Table 15.6-13a Sh. 1 Table 15.6-14 Table 15.6-14a Table 15.6-15 Figures 15.6-92 thru 15.6-128 Figures 15.6-129 thru 15.6-176 Figure 15.6-177 Figure 15.6-206 thru 15.6-233 Section 15.0 Section 15.1.3.1.3.1 Section 15.1.3.1.3.2 Section 15.1.3.1.3.3 Table 15.1-13 Revision 304 Section 15.0 EC-13881 Section 15.0.3.1.1 Section 15.0.3.1.11 Section 15.0.3.3.2 Section 15.0.3.3.3 Section 15.0.5 Section 15.0: References Table 15.0-1 Table 15.0-2 Sh. 1 Table 15.0-2 Sh. 2 Table 15.0-3 Section 15.1.1.3.3.1 Section 15.1.1.3.3.3 Section 15.1.1.4.3.3 Section 15.1.2.3.3.3 WSES-FSAR-UNIT-3 15-lviii Revision 304 (06/10)UPDATE REFERENCE LIST Chapter 15 Section Cross ReferencesRevision 304 (Contd)Section 15.1.2.4.3.1 EC-13881 (Continued) Section 15.1.2.4.3.3 Section 15.1.3.3.3.1 Section 15.1.3.3.3.3 Table 15.1-1 Table 15.1-8 Table 15.1-8A Table 15.1-8C Table 15.1-24 Table 15.1-24A Figure 15.1-4 Figure 15.1-19a Figure 15.1-23 Figure 15.1.32d Figure 15.1-93 Section 15.2.1.2.1 Section 15.2.1.3.2 Section 15.2.1.3.3.1 Section 15.2.1.3.3.3 Section 15.2.2.5.3.1 Section 15.2.2.5.3.3 Section 15.2.3.1.3.1.1 Section 15.2.3.1.3.1.3 Figure 15.2-4 Figure 15.2-36a Figure 15.2-40 Figure 15.2-53s Figure 15.2-65 Section 15.3.2.1.2 Section 15.3.3.1.3.3 Table 15.3-1 Table 15.3-3 Table 15.3-7 Figure 15.3-4 Figure 15.3-18a Section 15.4.1.1.3 Section 15.4.1.2.3 Section 15.4.1.3.3 Section 15.4.1.4.2.1 Section 15.4.1.4.2.2 Table 15.4-1 Table 15.4-3 WSES-FSAR-UNIT-3 15-lix Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 304 (Cont'd)

Table 15.4-7 EC-13881 (Continued)

Table 15.4-13 Figure 15.4-7a Figure 15.4-11d Figure 15.4-29 Figure 15.4-44b Section 15.5.1.1.3 Section 15.5.1.1.4 Section 15.5.2.1.2 Section 15.5.2.1.3 Table 15.5-1 Table 15.5-2 Section 15.6.3.1.3.3 Section 15.6.3.2.1.2 Section 15.6.3.2.1.3 Figure 15.6-1d Figure 15.6-35S Table 15.9-1 Figure 15.9-6

Figure 15.4-98 EC-18668

Revision 305 Section 15.7.3.4.1 EC-28875 Section 15.7.3.5.1 EC-30504 Revision 306 Section 15.7.3.4.1 EC-14275 Section 15.7.3.5.1

Section 15.6.3.2.1.2 EC-34230 Section 15.6.3.2.1.3 Table 15.6-24

Revision 307 Section 15.0 EC-8458 Section 15.0.3.1 Section 15.0.3.1.4 Section 15.0.3.3.3 Section 15.0.5 Section 15.0 References Table 15.0-2 Sheet 1 of 2 Table 15.0-3 Table 15.0-4 Section 15.1.1.3.1 Section 15.1.1.4.1 Section 15.1.2.3.1 Section 15.1.2.4.1 Section 15.1.2.4.3.1 WSES-FSAR-UNIT-3 15-lx Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 307 (Continued)

Section 15.1.2.4.5.2 EC-8458 (Continued) Section 15.1.3.1.1 Section 15.1.3.1.3.2 Section 15.1.3.1.3.3 Table 15.1-12 Table 15.1-13 Table 15.1-14A Table 15.1-14B Table 15.1-15 Table 15.1-15A Table 15.1-16 Table 15.1-16A Figure 15.1-33 Figure 15.1-34 Figure 15.1-35 Figure 15.1-36 Figure 15.1-37 Figure 15.1-38 Figure 15.1-38a thru Figure 15.1-38g Figure 15.1-47 Figure 15.1-48 Figure 15.1-49 Figure 15.1-51 Figure 15.1-53 Figure 15.1-54 Figure 15.1-55 Figure 15.1-57 Figure 15.1-58 Figure 15.1-58a Figure 15.1-58b Figure 15.1-58c Figure 15.1-61 thru Figure 15.1-68 Figure 15.1-70 Figure 15.1-71 Figure 15.1-72a thru Figure 15.1-72o Section 15.1.3.2.1 Section 15.1.3.2.3.2 Section 15.1.3.2.3.3 Table 15.1-21 Table 15.1-22 Section 15.1.3.3.1 Section 15.1.3.3.2 Section 15.1.3.3.3.2 Section 15.1.3.3.3.3 Table 15.1-24 Table 15.1-24a Table 15.1-25 Table 15.1-26 Figure 15.1-87 thru Figure 15.1-94 WSES-FSAR-UNIT-3 15-lxi Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 307 (Continued)

Section 15.2.1.3.1 EC-8458 (Continued) Section 15.2.1.3.3.2 Section 15.2.1.3.3.3 Section 15.2.1.4.2 Section 15.2.2.5.1 Section 15.2.2.5.3.3 Section 15.2.3.1 Section 15.2.3.1.2 Section 15.2.3.1.3.1.3 Section 15.2.3.1.4.1 Section 15.2.3.1.4.3.1 Section 15.2.3.1.4.4 Section 15.2.3.2.1 Section 15.2.3.2.3.2 Section 15.2 References Table 15.2-1 Table 15.2-2 Table 15.2-6 Table 15.2-7 Table 15.2-8 Table 15.2-9 Table 15.2-9a Table 15.2-9b Table 15.2-10 Table 15.2-13 Figure 15.2-1 thru Figure 15.2-3 Figure 15.2-3a Figure 15.2-4 thru Figure 15.2-13 Figure 15.2-26 thru Figure 15.2-36 Figure 15.2-36a Figure 15.2-37 thru Figure 15.2-52 Figure 15.2-52a Figure 15.2-53 Figure 15.2-53a.1 Figure 15.2-53a.2 Figure 15.2-53b thru Figure 15.2-53s Figure 15.2-54 thru Figure 15.2-63 Figure 15.2-65 Section 15.3.2.1.1 Section 15.3.3.1.1 Section 15.4.1.1.1 Section 15.4.1.2.1 Section 15.4.1.3.1 Section 15.4.1.4.1 Section 15.4.1.5.1 Section 15.4.1.6.1 Section 15.4.1.7.1 Section 15.4.3.2.1 Section 15.5.1.1 WSES-FSAR-UNIT-3 15-lxii Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 307 (Continued)

Section 15.5.2.1.1 EC-8458 (Continued) Section 15.6.3.1.2 Section 15.6.3.2.1.1 Section 15.6.3.3.3.1 Section 15.6.3.3.3.1.3 Section 15.6.3.3.3.2.1 Section 15.6.3.3.3.2.3 Table 15.6-12 Table 15.6-12a Table 15.6-13 Table 15.6-13a Sheet 1 of 2 Table 15.6-14 Table 15.6-14a Figure 15.6-92 thru Figure 15.6-100 Figure 15-6-100a thru Figure 15.6-100k Figure 15.6-101 thru Figure 15.6-127 Figure 15.6-127a thru Figure 15.6-127h Figure 15.6-128 thru Figure 15.6-177 Figure 15.6-206 thru Figure 15.6-241 Section 15.9.1.1.1 Section 15.9.1.1.3.3 Table 15.9-1 Table 15.9-2 Figure 15.9-1 thru Figure 15.9-6

Section 15.7.3.4.2.1 EC-38571 Section 15.7.3.4.2.2 Section 15.7.3.4.5.1 Section 15.7.3.4.6 Table 15.7-6 Sheet 1 of 2

Section 15.1.2.3.5.1 EC-40444 Section 15.1.2.3.5.2 Section 15.1.2.4.5.2 Section 15.1.3.3.4 Section 15.1.3.3.5.1.1 Section 15.1.3.3.5.1.2 Table 15.1-10 Sheet 1 of 2 Table 15.1-17 Sheet 2 of 3 Table 15.1-27 Sheet 1 of 2 Section 15.2.3.1.3.1.5.1.1 Table 15.2-11 Sheet 1 of 2 Section 15.3.3.1.4.2 Table 15.3-4 Sheet 1 of 2 Section 15.4.3.2.5.1.1 Section 15.4.3.2.5.1.2 WSES-FSAR-UNIT-3 15-lxiii Revision 307 (07/13) UPDATE REFERENCE LIST Chapter 15 Section Cross References Revision 307 (Continued)

Table 15.4-31 Sheet 1 of 2 EC-40444 (Continued) Section 15.6.3.2.1.2 Section 15.6.3.3.6 Table 15.6-3 Sheet 1 of 2 Table 15.6-18A Sheet 1 of 3 Table 15.6-26 Sheet 1 of 2

WSES-FSAR-UNIT-317-iCHAPTER 17QUALITY ASSURANCETABLE OF CONTENTSSectionTitlePage17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-317.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTIONThis section is not applicable to FSAR.

WSES-FSAR-UNIT-317.2-117.2QUALITY ASSURANCE DURING OPERATIONSThis section is covered in a separate Quality Assurance Program Manual which has beensubmitted to the NRC.