ML16256A132

From kanterella
Jump to navigation Jump to search
09 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Appendix 1A
ML16256A132
Person / Time
Site: Waterford 
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A132 (11)


Text

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS 1A-1 ACB AIR CIRCUIT BREAKER ACCWS AUXILIARY COMPONENT COOLING WATER SYSTEM ACCW AUXILIARY COMPONENT COOLING WATER ACPI AUXILIARY CONTROL PANEL INSTRUMENTATION ADS AUTOMATIC DISPATCHING SYSTEM ADT AVERAGE DAILY TRAFFIC AGA AUTOMATIC GAS ANALYZER AH AIR HANDLING UNIT AHP ABOVE HEAD OF PASSES ALARA AS LOW AS REASONABLY ACHIEVABLE AMI AUTOMATIC - CEA - MOTION INHIBIT APD AMPLITUDE PROBABILITY DISTRIBUTION AP/SR ACTIVE TRIAXIAL PEAK SHOCK RECORDER ARRS AIRBORNE RADIOACTIVITY REMOVAL SYSTEM ASI AXIAL SHAPE INDEX ATWS ANTICIPATED TRANSIENTS WITHOUT SCRAM AWP AUTOMATIC - CEA - WITHDRAWAL PROHIBIT BAMT BORIC ACID MAKEUP TANKS BMS BORON MANAGEMENT SYSTEM BOC BEGINNING OF CYCLE BOL BEGINNING OF LIFE BOP BALANCE OF PLANT BWR BOILING WATER REACTOR CAMS CHEMICAL ADDITION METERING SYSTEM

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-2 CARS CONTAINMENT ATMOSPHERE RELEASE SYSTEM ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS ANSI AMERICAN NATIONAL STANDARDS INSTITUTE ASTM AMERICAN SOCIETY OF TESTING MATERIALS CCS CONTAINMENT COOLING SYSTEM CCWS COMPONENT COOLING WATER SYSTEM CEA CONTROL ELEMENT ASSEMBLY CEAC CEA CALCULATOR CEADS CONTROL ELEMENT ASSEMBLY DRIVE SYSTEM CEDM CONTROL ELEMENT DRIVE MECHANISM CEDMCS CONTROL ELEMENT DRIVE MECHANISM CONTROL SYSTEM CET CORE EXIT THERMOCOUPLE CF CONCENTRATION FACTOR CFWS CONDENSATE AND FEEDWATER SYSTEMS CGCS COMBUSTIBLE GAS CONTROL SYSTEM CHF CRITICAL HEAT FLUX CIAS CONTAINMENT ISOLATION ACTUATION SIGNAL CIS CONTAINMENT ISOLATION SYSTEM CIV CONTAIMENT ISOLATION VALVE(S)

COLSS CORE OPERATING LIMIT SUPERVISORY SYSTEM CPC CORE PROTECTION CALCULATORS CPIS CONTAINMENT PURGE ISOLATION SIGNAL CSAS CONTAINMENT SPRAY ACTUATION SIGNAL CSB CORE SUPPORT BARREL CSP CONDENSATE STORAGE POOL

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-3 Revision 15 (03/07)

CSS CONTAINMENT SPRAY SYSTEM C/U CONTROL UNIT CVAS CONTROLLED VENTILATION AREA SYSTEM CVCS CHEMICAL AND VOLUME CONTROL SYSTEM CVH CONTAINMENT VENT HEADER CWS CIRCULATING WATER SYSTEM DBA DESIGN BASIS ACCIDENT DBE DESIGN BASIS EARTHQUAKE DE DOUBLE ENDED DEH DIGITAL ELECTRO-HYDRAULIC DF DECONTAMINATION FACTOR

(DRN 06-623, R15)

DLR DOSIMETER OF LEGAL RECORD

(DRN 06-623, R15)

DNB DEPARTURE FROM NUCLEATE BOILING DNBR DEPARTURE FROM NUCLEATE BOILING RATIO DWS DEMINERALIZED WATER SYSTEM EAB EXCLUSION AREA BOUNDARY ECCS EMERGENCY CORE COOLING SYSTEM EFAS EMERGENCY FEEDWATER ACTUATION SIGNAL EFPD EFFECTIVE FULL POWER DAYS EFPY EFFECTIVE FULL POWER YEARS EFS EMERGENCY FEEDWATER SYSTEM

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-4 Revision 306 (05/12)

EFW EMERGENCY FEEDWATER SYSTEM EOC END OF CYCLE ESF ENGINEERED SAFETY FEATURES ESFAS ENGINEERED SAFETY FEATURES ACTUATION SYSTEM FHB FUEL HANDLING BUILDING FHBVS FUEL HANDLING BUILDING VENTILATION SYSTEM FMEA FAILURE MODES AND EFFECTS ANALYSIS FSAR FINAL SAFETY ANALYSIS REPORT FPS FUEL POOL SYSTEM FWCS FEEDWATER CONTROL SYSTEM GSH GAS SURGE HEADER GTA GAS TUNGSTEN ARC GWMS GASEOUS WASTE MANAGEMENT SYSTEM HEPA HIGH EFFICIENCY PARTICULATE AIR HP HIGH PRESSURE HPSI HIGH PRESSURE SAFETY INJECTION HRS HYDROGEN RECOMBINER SYSTEM HVAC HEATING VENTILATION, AND AIR CONDITIONING ICC INADEQUATE CORE COOLING ILRT INTEGRATED LEAK RATE TEST IPARMS IN PLANT AREA RADIATION MONITORING SYSTEM ISEG INDEPENDENT SAFETY ENGINEERING GROUP (EC-14275, R306)

ISFSI INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EC-14275, R306)

(DRN 00-576, R11)

ITR INDEPENDENT TECHNICAL REVIEW (DRN 00-576, R11)

JTG JOINT TEST GROUP

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-5 Revision 11 (5/01)

LDA LOAD DROP ANTICIPATION LMFW LOSS OF MAIN FEEDWATER LOCA LOSS OF COOLANT ACCIDENT LOCV LOSS OF CONDENSER VACUUM LOOP LOSS OF OFFSITE POWER LOOP LOUISIANA OFFSHORE OIL PORT LP LOW PRESSURE LPD LOCAL POWER DENSITY LPSI LOW PRESSURE SAFETY INJECTION LPZ LOW POPULATION ZONE LSE LEAD STARTUP ENGINEER LSSS LIMITING SAFETY SYSTEM SETTING LTC LONG TERM COOLING LTOP LOW TEMPERATURE OVERPRESSURE PROTECTION LWMS LIQUID WASTE MANAGEMENT SYSTEM MCC MOTOR CONTROL CENTER MCES MAIN CONDENSER EVACUATION SYSTEM MCR MAIN CONTROL ROOM MDP MOTOR DRIVEN PUMP MFIV MAIN FEEDWATER ISOLATION VALVE

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-6 Revision 11 (5/01)

MFWLB MAIN FEEDWATER LINE BREAK MFWS MAIN FEEDWATER SYSTEM MM MODIFIED MERCALLI MPC MAXIMUM PERMISSIBLE CONCENTRATION MR&T MISSISSIPPI RIVER & TRIBUTARIES MS MAIN STEAM SUPPLY SYSTEM MSIS MAIN STEAM ISOLATION SIGNAL MSIV MAIN STEAM ISOLATION VALVE MSL MEAN SEA LEVEL MSLB MAIN STEAM LINE BREAK MSR MAXIMUM STEAMING RATE MTC MODERATOR TEMPERATURE COEFFICIENT M&TE MEASURING & TEST EQUIPMENT M/TR MAGNETIC TAPE RECORDER MYBP MILLION YEARS BEFORE PRESENT NBS NATIONAL BUREAU OF STANDARDS NNS NON-NUCLEAR SAFETY NPIS NUCLEAR PLANT ISLAND STRUCTURE NPSH NET POSITIVE SUCTION HEAD NRC NUCLEAR REGULATORY COMMISSION NRR NUCLEAR REACTOR REGULATION NSSS NUCLEAR STEAM SUPPLY SYSTEM

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-7 Revision 12-C (07/03)

OBE OPERATING BASIS EARTHQUAKE OEEG OPERATIONAL ENGINEERING EXPERIENCE GROUP OPC OVERSPEED PROTECTION CONTROLLER OL OPERATING LICENSE

¨(DRN 03-657, R12-C)

OSRC ON-SITE SAFETY REVIEW COMMITTEE (DRN 03-657, R12-C)

P/A TRIAXIALPEAK ACCELEROGRAPH PABX PRIVATE AUTOMATIC BRANCH EXCHANGE PAMI POST-ACCIDENTMONITORING INSTRUMENTATION PCS PLANT COMPUTERSYSTEM PDF PROJECTDESIGN FLOOD PDIL POWER DEPENDENT INSERTION LIMIT PLCEA PART LENGTH CONTROL ELEMENT ASSEMBLY PMF PROBABLE MAXIMUM FLOOD PMH PROBABLE MAXIMUM HURRICANE PMP PROBABLE MAXIMUM PRECIPITATION PORC PLANT OPERATIONS REVIEW COMMITTEE PORV POWER OPERATED RELIEF VALVE PPS PLANT PROTECTION SYSTEM PP/SR PASSIVE TRIAXIALPEAK SHOCK RECORDER P/SA TRIAXIALPEAK SHOCK ANNUNCIATOR PSAR PRELIMINARY SAFETY ANALYSIS REPORT PSD POWER SPECTRAL DENSITY P/SR PLAYBACK UNIT STRIP RECORDER

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-8 Revision 11 (5/01)

PSS PRIMARY SAMPLING SYSTEM PSWS POTABLE AND SANITARY WATER SYSTEM PVMF PRECRITICAL VIBRATION MOAITORING PROGRAM PWR PRESSURIZED WATER REACTOR PWHT POST WELD HEAT TREATMENT PWSS PRIMARY WATER STORAGE SYSTEM PWTP PRIMARY WATER TREATMENT PLANT QA QUALITY ASSURANCE QAC QUALITY ASSURANCE COMMITTEE

 (DRN 99-1093)

QAI QUALITY ASSURANCE INSPECTION

 (DRN 99-1093)

QC QUALITY CONTROL QI QUALITY INSTRUCTION QP QUALITY PROCEDURE QR QUALITY REQUIREMENT QSPDS QUALIFIED SAFETY PARAMETER DISPLAY SYSTEM RAB REACTOR AUXILIARY BUILDING RAP RESTRAIAT ACTUATION PROGRAM RAS RECIRCULATION ACTUATION SIGNAL RCGVS REACTOR COOLANT GAS VENTING SYSTEM RCP REACTOR COOLANT PUMP RCPB REACTOR COOLANT PRESSURE BOUNDARY RCS REACTOR COOLANT SYSTEM RDT REACTOR DRAIN TANK

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-9 Revision 11 (5/01)

RMS RADIATION MONITORING SYSTEM RPCCP REACTOR POWER CUTBACK COATROL PANEL RPCM REACTOR POWER CUTBACK MODULE RPCS REACTOR POWER CUTBACK SYSTEM RPS REACTOR PROTECTIVE SYSTEM RRS REACTOR REGULATING SYSTEM RSPT REED SWITCH POSITION TRANSMITTER RTD RESISTANCE TEMPERATURE DETECTOR RTGB REACTOR TURBINE GENERATOR BOARD RTSG REACTOR TRIP SWITCHGEAR RV REACTOR VESSEL RLIS REFUELING LEVEL INDICATING SYSTEM RWLIS REFUELING WATER LEVEL INDICATING SYSTEM RWSP REFUELING WATER STORAGE POOL SA SPECTRAL ANALYSIS SAFDL SPECIFIED ACCEPTABLE FUEL DESIGN LIMITS SB STATION BLACKOUT SBS STEAM BYPASS SYSTEM SBCS STEAM BYPASS CONTROL SYSTEM SBVS SHIELD BUILDING VENTILATION SYSTEM SDCHX SHUTDOWN COOLING HEAT EXCHANGER SDCS SHUTDOWN COOLING SYSTEM SER SAFETY EVALUATION REPORT

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-10 Revision 11 (5/01)

SFP SPENT FUEL POOL SG STEAM GENERATOR SGBDS STEAM GENERATOR BLOWDOWN DEMINERALIZER SYSTEM SGBS STEAM GENERATOR BLOWDOWN SYSTEM SGTR STEAM GENERATOR TUBE RUPTURE SIAS SAFETY INJECTION ACTUATION SIGNAL SIS SAFETY INJECTION SYSTEM SISC SAFETY INJECTION SYSTEM COMPONENTS SIT SAFETY INJECTION TANK SMSA STANDARD METROPOLITAN STATISTICAL AREA SPCS STEAM AND POWER CONVERSION SYSTEM SPDS SAFETY PARAMETER DISPLAY SYSTEM SPS STANDARD PROJECT STORM SR SURVEILLANCE REQUIREMENT SRC SAFETY REVIEW COMMITTEE SRO SENIOR REACTOR OPERATOR SRSS SQUARE ROOT OF THE SUM OF THE SQUARES S/S SEISMIC SWITCH SS/CU SEISMIC SWITCH CONTROL UNIT SSE SAFE SHUTDOWN EARTHQUAKE SSS SECONDARY SAMPLING SYSTEM STA SHIFT TECHNICAL ADVISOR S/U STARTER UNIT

WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-11 Revision 11 (5/01)

SWANS SOLID WASTE MANAGEMENT SYSTEM T/A TRIAXIAL TIME-HISTORY ACCELEROGRAPH TB TURBINE BUILDING TCCWS TURBINE CLOSED COOLING WATER SYSTEM TCS TURBINE CONTROL SYSTEM TD THEORETICAL DENSITY TDP TURBINE DRIVEN PUMP TGSS TURBINE GLAND SEALING SYSTEM TLD THERMOLUMINESCENT DOSIMETER TSC TECHNICAL SUPPORT CENTER TSP TRISODIUM PHOSPHATE DODECAHYDRATE TSSV TURBINE STEAM SUPPLY VALVES UGS UPPER GUIDE STRUCTURE VCT VOLUME CONTROL TANK VGCH VENT GAS COLLECTION HEADER V&LPMS VIBRATION & LOOSE PARTS MONITORING SYSTEM WMS WASTE MANAGEMENT SYSTEM WSG WATERFORD 3 STARTUP GROUP YBP YEARS BEFORE PRESENT