WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS1A-1ACBAIR CIRCUIT BREAKERACCWSAUXILIARY COMPONENT COOLING WATER SYSTEM ACCWAUXILIARY COMPONENT COOLING WATER ACPIAUXILIARY CONTROL PANEL INSTRUMENTATION ADSAUTOMATIC DISPATCHING SYSTEM ADTAVERAGE DAILY TRAFFIC AGAAUTOMATIC GAS ANALYZER AHAIR HANDLING UNIT AHPABOVE HEAD OF PASSES ALARAAS LOW AS REASONABLY ACHIEVABLE AMIAUTOMATIC - CEA - MOTION INHIBIT APDAMPLITUDE PROBABILITY DISTRIBUTION AP/SRACTIVE TRIAXIAL PEAK SHOCK RECORDER ARRSAIRBORNE RADIOACTIVITY REMOVAL SYSTEM ASIAXIAL SHAPE INDEX ATWSANTICIPATED TRANSIENTS WITHOUT SCRAM AWPAUTOMATIC - CEA - WITHDRAWAL PROHIBIT BAMTBORIC ACID MAKEUP TANKS BMSBORON MANAGEMENT SYSTEM BOCBEGINNING OF CYCLEBOLBEGINNING OF LIFE BOPBALANCE OF PLANTBWRBOILING WATER REACTORCAMSCHEMICAL ADDITION METERING SYSTEM WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-2CARSCONTAINMENT ATMOSPHERE RELEASE SYSTEMASMEAMERICAN SOCIETY OF MECHANICAL ENGINEERS ANSIAMERICAN NATIONAL STANDARDS INSTITUTE ASTMAMERICAN SOCIETY OF TESTING MATERIALS CCSCONTAINMENT COOLING SYSTEM CCWSCOMPONENT COOLING WATER SYSTEM CEACONTROL ELEMENT ASSEMBLY CEACCEA CALCULATOR CEADSCONTROL ELEMENT ASSEMBLY DRIVE SYSTEM CEDMCONTROL ELEMENT DRIVE MECHANISM CEDMCSCONTROL ELEMENT DRIVE MECHANISM CONTROL SYSTEM CETCORE EXIT THERMOCOUPLE CFCONCENTRATION FACTOR CFWSCONDENSATE AND FEEDWATER SYSTEMS CGCSCOMBUSTIBLE GAS CONTROL SYSTEM CHFCRITICAL HEAT FLUX CIASCONTAINMENT ISOLATION ACTUATION SIGNAL CISCONTAINMENT ISOLATION SYSTEM CIVCONTAIMENT ISOLATION VALVE(S)

COLSSCORE OPERATING LIMIT SUPERVISORY SYSTEMCPCCORE PROTECTION CALCULATORS CPISCONTAINMENT PURGE ISOLATION SIGNALCSASCONTAINMENT SPRAY ACTUATION SIGNALCSBCORE SUPPORT BARRELCSPCONDENSATE STORAGE POOL WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd) 1A-3 Revision 15 (03/07)

CSS CONTAINMENT SPRAY SYSTEM C/U CONTROL UNIT CVAS CONTROLLED VENTILATION AREA SYSTEM CVCS CHEMICAL AND VOLUME CONTROL SYSTEM CVH CONTAINMENT VENT HEADER CWS CIRCULATING WATER SYSTEM DBA DESIGN BASIS ACCIDENT DBE DESIGN BASIS EARTHQUAKE

DE DOUBLE ENDED DEH DIGITAL ELECTRO-HYDRAULIC

DF DECONTAMINATION FACTOR (DRN 06-623, R15) DLR DOSIMETER OF LEGAL RECORD (DRN 06-623, R15) DNB DEPARTURE FROM NUCLEATE BOILING DNBR DEPARTURE FROM NUCLEATE BOILING RATIO DWS DEMINERALIZED WATER SYSTEM EAB EXCLUSION AREA BOUNDARY ECCS EMERGENCY CORE COOLING SYSTEM EFAS EMERGENCY FEEDWATER ACTUATION SIGNAL EFPD EFFECTIVE FULL POWER DAYS EFPY EFFECTIVE FULL POWER YEARS EFS EMERGENCY FEEDWATER SYSTEM WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Cont'd) 1A-4 Revision 306 (05/12)

EFW EMERGENCY FEEDWATER SYSTEM EOC END OF CYCLE ESF ENGINEERED SAFETY FEATURES ESFAS ENGINEERED SAFETY FEATURES ACTUATION SYSTEM FHB FUEL HANDLING BUILDING FHBVS FUEL HANDLING BUILDING VENTILATION SYSTEM FMEA FAILURE MODES AND EFFECTS ANALYSIS FSAR FINAL SAFETY ANALYSIS REPORT FPS FUEL POOL SYSTEM FWCS FEEDWATER CONTROL SYSTEM GSH GAS SURGE HEADER GTA GAS TUNGSTEN ARC GWMS GASEOUS WASTE MANAGEMENT SYSTEM HEPA HIGH EFFICIENCY PARTICULATE AIR HP HIGH PRESSURE HPSI HIGH PRESSURE SAFETY INJECTION

HRS HYDROGEN RECOMBINER SYSTEM HVAC HEATING VENTILATION, AND AIR CONDITIONING

ICC INADEQUATE CORE COOLING ILRT INTEGRATED LEAK RATE TEST IPARMS IN PLANT AREA RADIATION MONITORING SYSTEM ISEG INDEPENDENT SAFETY ENGINEERING GROUP (EC-14275, R306) ISFSI INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EC-14275, R 306) (DRN 00-576, R11) ITR INDEPENDENT TECHNICAL REVIEW (DRN 00-576, R11)

JTG JOINT TEST GROUP WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-5Revision 11 (5/01)LDALOAD DROP ANTICIPATIONLMFWLOSS OF MAIN FEEDWATER LOCALOSS OF COOLANT ACCIDENT LOCVLOSS OF CONDENSER VACUUM LOOPLOSS OF OFFSITE POWER LOOPLOUISIANA OFFSHORE OIL PORT LPLOW PRESSURE LPDLOCAL POWER DENSITY LPSILOW PRESSURE SAFETY INJECTION LPZLOW POPULATION ZONE LSELEAD STARTUP ENGINEER LSSSLIMITING SAFETY SYSTEM SETTING LTCLONG TERM COOLING LTOPLOW TEMPERATURE OVERPRESSURE PROTECTION LWMSLIQUID WASTE MANAGEMENT SYSTEM MCCMOTOR CONTROL CENTER MCESMAIN CONDENSER EVACUATION SYSTEMMCRMAIN CONTROL ROOMMDPMOTOR DRIVEN PUMP MFIVMAIN FEEDWATER ISOLATION VALVE WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-6Revision 11 (5/01)MFWLBMAIN FEEDWATER LINE BREAKMFWSMAIN FEEDWATER SYSTEM MMMODIFIED MERCALLI MPCMAXIMUM PERMISSIBLE CONCENTRATION MR&TMISSISSIPPI RIVER & TRIBUTARIES MSMAIN STEAM SUPPLY SYSTEM MSISMAIN STEAM ISOLATION SIGNAL MSIVMAIN STEAM ISOLATION VALVE MSLMEAN SEA LEVEL MSLBMAIN STEAM LINE BREAK MSRMAXIMUM STEAMING RATE MTCMODERATOR TEMPERATURE COEFFICIENT M&TEMEASURING & TEST EQUIPMENT M/TRMAGNETIC TAPE RECORDER MYBPMILLION YEARS BEFORE PRESENT NBSNATIONAL BUREAU OF STANDARDS NNSNON-NUCLEAR SAFETYNPISNUCLEAR PLANT ISLAND STRUCTURENPSHNET POSITIVE SUCTION HEAD NRCNUCLEAR REGULATORY COMMISSION NRRNUCLEAR REACTOR REGULATIONNSSSNUCLEAR STEAM SUPPLY SYSTEM WSES-FSAR-UNIT-3 APPENDIX 1A FSAR ACRONYMS (Contd)1A-7Revision 12-C (07/03)OBEOPERATINGBASISEARTHQUAKE OEEG OPERATIONAL ENGINEERING EXPERIENCE GROUPOPCOVERSPEED PROTECTION CONTROLLEROLOPERATING LICENSE(DRN03-657,R12-C)OSRCON-SITE SAFETY REVIEW COMMITTEE(DRN03-657,R12-C)P/ATRIAXIAL PEAK ACCELEROGRAPH PABXPRIVATEAUTOMATICBRANCHEXCHANGE PAMIPOST-ACCIDENTMONITORINGINSTRUMENTATIONPCSPLANT COMPUTER SYSTEMPDFPROJECTDESIGNFLOODPDILPOWERDEPENDENTINSERTION LIMITPLCEAPART LENGTH CONTROLELEMENTASSEMBLYPMFPROBABLE MAXIMUM FLOODPMHPROBABLEMAXIMUMHURRICANEPMPPROBABLE MAXIMUM PRECIPITATION PORC PLANT OPERATIONS REVIEW COMMITTEE PORV POWER OPERATED RELIEF VALVEPPSPLANT PROTECTION SYSTEMPP/SRPASSIVE TRIAXIAL PEAK SHOCK RECORDER P/SA TRIAXIAL PEAKSHOCKANNUNCIATOR PSAR PRELIMINARYSAFETYANALYSIS REPORTPSDPOWER SPECTRAL DENSITY P/SR PLAYBACKUNITSTRIP RECORDER WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-8Revision 11 (5/01)PSSPRIMARY SAMPLING SYSTEMPSWSPOTABLE AND SANITARY WATER SYSTEM PVMFPRECRITICAL VIBRATION MOAITORING PROGRAM PWRPRESSURIZED WATER REACTOR PWHTPOST WELD HEAT TREATMENT PWSSPRIMARY WATER STORAGE SYSTEM PWTPPRIMARY WATER TREATMENT PLANT QAQUALITY ASSURANCE QACQUALITY ASSURANCE COMMITTEE(DRN 99-1093)QAIQUALITY ASSURANCE INSPECTION(DRN 99-1093)QCQUALITY CONTROLQIQUALITY INSTRUCTIONQPQUALITY PROCEDUREQRQUALITY REQUIREMENT QSPDSQUALIFIED SAFETY PARAMETER DISPLAY SYSTEM RABREACTOR AUXILIARY BUILDING RAPRESTRAIAT ACTUATION PROGRAM RASRECIRCULATION ACTUATION SIGNALRCGVSREACTOR COOLANT GAS VENTING SYSTEMRCPREACTOR COOLANT PUMP RCPBREACTOR COOLANT PRESSURE BOUNDARY RCSREACTOR COOLANT SYSTEM RDTREACTOR DRAIN TANK WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-9Revision 11 (5/01)RMSRADIATION MONITORING SYSTEMRPCCPREACTOR POWER CUTBACK COATROL PANEL RPCMREACTOR POWER CUTBACK MODULE RPCSREACTOR POWER CUTBACK SYSTEM RPSREACTOR PROTECTIVE SYSTEM RRSREACTOR REGULATING SYSTEM RSPTREED SWITCH POSITION TRANSMITTER RTDRESISTANCE TEMPERATURE DETECTOR RTGBREACTOR TURBINE GENERATOR BOARD RTSGREACTOR TRIP SWITCHGEAR RVREACTOR VESSEL RLISREFUELING LEVEL INDICATING SYSTEM RWLISREFUELING WATER LEVEL INDICATING SYSTEM RWSPREFUELING WATER STORAGE POOL SASPECTRAL ANALYSIS SAFDLSPECIFIED ACCEPTABLE FUEL DESIGN LIMITS SBSTATION BLACKOUT SBSSTEAM BYPASS SYSTEM SBCSSTEAM BYPASS CONTROL SYSTEM SBVSSHIELD BUILDING VENTILATION SYSTEMSDCHXSHUTDOWN COOLING HEAT EXCHANGER SDCSSHUTDOWN COOLING SYSTEMSERSAFETY EVALUATION REPORT WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-10Revision 11 (5/01)SFPSPENT FUEL POOLSGSTEAM GENERATOR SGBDSSTEAM GENERATOR BLOWDOWN DEMINERALIZER SYSTEM SGBSSTEAM GENERATOR BLOWDOWN SYSTEM SGTRSTEAM GENERATOR TUBE RUPTURE SIASSAFETY INJECTION ACTUATION SIGNAL SISSAFETY INJECTION SYSTEM SISCSAFETY INJECTION SYSTEM COMPONENTS SITSAFETY INJECTION TANK SMSASTANDARD METROPOLITAN STATISTICAL AREA SPCSSTEAM AND POWER CONVERSION SYSTEM SPDSSAFETY PARAMETER DISPLAY SYSTEM SPSSTANDARD PROJECT STORM SRSURVEILLANCE REQUIREMENT SRCSAFETY REVIEW COMMITTEE SROSENIOR REACTOR OPERATOR SRSSSQUARE ROOT OF THE SUM OF THE SQUARES S/SSEISMIC SWITCH SS/CUSEISMIC SWITCH CONTROL UNIT SSESAFE SHUTDOWN EARTHQUAKESSSSECONDARY SAMPLING SYSTEM STASHIFT TECHNICAL ADVISORS/USTARTER UNIT WSES-FSAR-UNIT-3APPENDIX 1AFSAR ACRONYMS (Contd)1A-11Revision 11 (5/01)SWANSSOLID WASTE MANAGEMENT SYSTEMT/ATRIAXIAL TIME-HISTORY ACCELEROGRAPH TBTURBINE BUILDING TCCWSTURBINE CLOSED COOLING WATER SYSTEM TCSTURBINE CONTROL SYSTEM TDTHEORETICAL DENSITY TDPTURBINE DRIVEN PUMP TGSSTURBINE GLAND SEALING SYSTEM TLDTHERMOLUMINESCENT DOSIMETER TSCTECHNICAL SUPPORT CENTER TSPTRISODIUM PHOSPHATE DODECAHYDRATE TSSVTURBINE STEAM SUPPLY VALVES UGSUPPER GUIDE STRUCTURE VCTVOLUME CONTROL TANK VGCHVENT GAS COLLECTION HEADER V&LPMSVIBRATION & LOOSE PARTS MONITORING SYSTEM WMSWASTE MANAGEMENT SYSTEM WSGWATERFORD 3 STARTUP GROUP YBPYEARS BEFORE PRESENT