| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Westcott, Daniel [Daniel.Westcott@pgnmail.com]Sent:Wednesday, April 04, 2012 12:46 PMTo:Lingam, SivaCc:Orenak, MichaelSubject:RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)Siva: Our clarifications are provided in red below. | | {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Westcott, Daniel [Daniel.Westcott@pgnmail.com]Sent:Wednesday, April 04, 2012 12:46 PMTo:Lingam, SivaCc:Orenak, Michael |
| Dan From: Lingam, Siva [mailto:Siva.Lingam@nrc.gov] Sent: Friday, March 30, 2012 10:42 AM To: Westcott, Daniel Cc: Orenak, Michael Subject: RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527) We need the following clarifications, and answers by e-mail are acceptable: 1. What are the valve types for the newly added ADV isolation valves and the replaced main turbine bypass control valves, i.e. MOV, AOV, check valve, gate valve, etc.? The ADVs are Air Operated angle globe control valves (AOVs). The ADV Isolation Valves are Manual Gate Valves installed upstream of the ADVs. The Turbine Bypass Valves are Air Operated, Globe, Control Valves. 2. In your RAI responses dated January 19, 2012 (3F0112-07), the enclosure failed to mention the high pressure injection system (HPI). We like CR-3 to confirm that HPI system was reviewed for IST program changes and describe any changes made. The HPI modification is authorized by Engineering Change 79352. The design changes the position of the throttle valves (MUV-590, MUV-591, MUV-592, MUV-593). Once the position of the valve is verified by flow test, the valve is welded into position. System accessibility, maintenance, repair, and ISI requirements will not be impacted as a result of this EC. We may need additional clarification later regarding the impact of the EPU on the MSIVs that was not described in your submittal. | | |
| From: Lingam, Siva Sent: Thursday, November 03, 2011 7:38 AM To: 'Westcott, Daniel' Subject: Crystal River, Unit 3 EPU LAR - RAIs from Component Performance & Testing Branch (CPTB) (TAC No. ME6527) 2Please note the following draft RAIs from the Component Performance & Testing Branch (CPTB) for the subject LAR. Official RAIs will follow after issuing acceptance letter. | | ==Subject:== |
| | RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)Siva: Our clarifications are provided in red below. |
| | Dan From: Lingam, Siva [mailto:Siva.Lingam@nrc.gov] Sent: Friday, March 30, 2012 10:42 AM To: Westcott, Daniel Cc: Orenak, Michael |
| | |
| | ==Subject:== |
| | RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527) We need the following clarifications, and answers by e-mail are acceptable: 1. What are the valve types for the newly added ADV isolation valves and the replaced main turbine bypass control valves, i.e. MOV, AOV, check valve, gate valve, etc.? The ADVs are Air Operated angle globe control valves (AOVs). The ADV Isolation Valves are Manual Gate Valves installed upstream of the ADVs. The Turbine Bypass Valves are Air Operated, Globe, Control Valves. 2. In your RAI responses dated January 19, 2012 (3F0112-07), the enclosure failed to mention the high pressure injection system (HPI). We like CR-3 to confirm that HPI system was reviewed for IST program changes and describe any changes made. The HPI modification is authorized by Engineering Change 79352. The design changes the position of the throttle valves (MUV-590, MUV-591, MUV-592, MUV-593). Once the position of the valve is verified by flow test, the valve is welded into position. System accessibility, maintenance, repair, and ISI requirements will not be impacted as a result of this EC. We may need additional clarification later regarding the impact of the EPU on the MSIVs that was not described in your submittal. |
| | From: Lingam, Siva Sent: Thursday, November 03, 2011 7:38 AM To: 'Westcott, Daniel' |
| | |
| | ==Subject:== |
| | Crystal River, Unit 3 EPU LAR - RAIs from Component Performance & Testing Branch (CPTB) (TAC No. ME6527) 2Please note the following draft RAIs from the Component Performance & Testing Branch (CPTB) for the subject LAR. Official RAIs will follow after issuing acceptance letter. |
|
| |
|
| RAI CPTB-1: On page 2.2.4-2, it is stated: "If not discussed below, no adverse impact was found to the pumps or valves." | | RAI CPTB-1: On page 2.2.4-2, it is stated: "If not discussed below, no adverse impact was found to the pumps or valves." |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report, 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re, 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip., 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C, 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250, ML11259A012, ML11300A226, ML11342A195, ML12031A032, ML12053A231, ML12107A068, ML12202A734, ML12205A357, ML12205A358, ML12240A119, ML12255A409, ML12262A385, ML12314A391, ML12314A392, ML12314A393, ML13032A540
|
MONTHYEAR3F0811-04, Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-03, Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-25025 August 2011 Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11259A0122011-09-14014 September 2011 NRR E-mail Capture - Clarification for August 25 Emcb RAI Acceptance Review Letter Project stage: Other ML11286A0922011-10-11011 October 2011 Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11300A2262011-10-25025 October 2011 Feedwater Line Break Overpressure Protection Analysis to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Update LAR and LAR Approval Schedule Project stage: Other 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 Project stage: Other 3F1211-05, Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-06, Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-10, Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-21021 December 2011 Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12030A2092012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11342A1952012-01-0606 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-safeguards Information Project stage: Other ML12024A3002012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Component Performance and Testing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-06, Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report2012-01-31031 January 2012 Corrections to the Extended Power Uprate LAR #309 Vendor Affidavit and Technical Report Project stage: Other ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12053A2312012-03-0202 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related Extended Power Uprate Technical Report Project stage: Other 3F0312-02, Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR2012-03-19019 March 2012 Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0312-01, Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-03-22022 March 2012 Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12031A0322012-03-26026 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) Project stage: Other 3F0412-05, Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0412-04, Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-07, Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-12012 April 2012 Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-06, Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-16016 April 2012 Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-09, Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-26026 April 2012 Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 Project stage: Other ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. Project stage: Other 3F0612-05, Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-06-18018 June 2012 Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. Project stage: Other ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs Project stage: Draft Other ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3562012-07-17017 July 2012 Supplement to the Extended Power Uprate License Amendment Request #309 Project stage: Supplement 3F0712-06, Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-17017 July 2012 Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0712-07, Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0712-08, Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12202A7342012-08-0101 August 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) Project stage: RAI ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0812-02, Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-08-21021 August 2012 Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 2012-03-26
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24191A4232024-07-0303 July 2024 RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan 2024-07-03
[Table view] |
Text
1NRR-PMDAPEm ResourceFrom:Westcott, Daniel [Daniel.Westcott@pgnmail.com]Sent:Wednesday, April 04, 2012 12:46 PMTo:Lingam, SivaCc:Orenak, Michael
Subject:
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)Siva: Our clarifications are provided in red below.
Dan From: Lingam, Siva [1] Sent: Friday, March 30, 2012 10:42 AM To: Westcott, Daniel Cc: Orenak, Michael
Subject:
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527) We need the following clarifications, and answers by e-mail are acceptable: 1. What are the valve types for the newly added ADV isolation valves and the replaced main turbine bypass control valves, i.e. MOV, AOV, check valve, gate valve, etc.? The ADVs are Air Operated angle globe control valves (AOVs). The ADV Isolation Valves are Manual Gate Valves installed upstream of the ADVs. The Turbine Bypass Valves are Air Operated, Globe, Control Valves. 2. In your RAI responses dated January 19, 2012 (3F0112-07), the enclosure failed to mention the high pressure injection system (HPI). We like CR-3 to confirm that HPI system was reviewed for IST program changes and describe any changes made. The HPI modification is authorized by Engineering Change 79352. The design changes the position of the throttle valves (MUV-590, MUV-591, MUV-592, MUV-593). Once the position of the valve is verified by flow test, the valve is welded into position. System accessibility, maintenance, repair, and ISI requirements will not be impacted as a result of this EC. We may need additional clarification later regarding the impact of the EPU on the MSIVs that was not described in your submittal.
From: Lingam, Siva Sent: Thursday, November 03, 2011 7:38 AM To: 'Westcott, Daniel'
Subject:
Crystal River, Unit 3 EPU LAR - RAIs from Component Performance & Testing Branch (CPTB) (TAC No. ME6527) 2Please note the following draft RAIs from the Component Performance & Testing Branch (CPTB) for the subject LAR. Official RAIs will follow after issuing acceptance letter.
RAI CPTB-1: On page 2.2.4-2, it is stated: "If not discussed below, no adverse impact was found to the pumps or valves."
This statement is very vague and does not describe the adequacy of the evaluation for extended power uprate (EPU) conditions for pumps and valves. Please list and describe each plant system and component that did not experience adverse impacts when reviewed for EPU conditions.
RAI CPTB-2: Please identify any modifications to your Appendix J program as a result of the EPU. RAI CPTB-3:
Please describe your air-operated valve (AOV) program and any modifications as a result of the EPU. RAI CPTB-4: On page 2.2.4-4, it is stated:
"Calculations reviewing the stroke times for MOVs predict that the stroke times will increase minimally, therefore the impact to stroke time is negligible"
This statement is unclear. Please better define "minimally" and "negligible" in this statement.
RAI CPTB-5: Please describe the lessons learned programs for MOVs and AOVs. RAI CPTB-6:
Throughout section 2.2.4, often it is stated at the end of the section that "Changes are reflected in the Inservice Testing Program." This statement is very vague. For each instance of a change to the Inservice Testing Program in this section, please provide a more detailed description of the change that will be instituted and how it impacts the IST program
RAI CPTB-7: The weak link component capability and maximum actuator capacities of the MOVs, post-EPU, are provided on Table 2.2.4-2 on page 2.2.4-6. For valves FWV-33 and FWV-36, please identify if analysis was performed to determine their susceptibility to a "hot short" since the weak link component capabilities are less than the maximum actuator capabilities. Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2) Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)
Location: O8-D5; Mail Stop: O8-G9a 3Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: NRR_PMDA Email Number: 328 Mail Envelope Properties (66C0930ED750B74E80B0F51A1F24D99A1A30AFA056)
Subject:
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527) Sent Date: 4/4/2012 12:46:23 PM Received Date: 4/4/2012 12:44:24 PM From: Westcott, Daniel Created By: Daniel.Westcott@pgnmail.com Recipients: "Orenak, Michael" <Michael.Orenak@nrc.gov> Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None Post Office: WN000074.oak.zone1.progress-energy.com Files Size Date & Time MESSAGE 4168 4/4/2012 12:44:24 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: