Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR
ML12030A209
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/05/2012
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0112-05, TAC ME6527
Download: ML12030A209 (13)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 January 5, 2012 3F01 12-05 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Technical Review of the CR-3 Extended Power Uprate LAR (TAC No. ME6527)

References:

1. CR-3 to NRC letter dated June 15, 2011, "Crystal River Unit 3 - License Amendment Request #309, Revision 0, Extended Power Uprate" (Accession No. ML112070659)
2. NRC to CR-3 letter dated December 7, 2011, "Crystal River Unit 3 Nuclear Generating Plant - Request for Additional Information for Extended Power SUpate License Amendment Request (TAC No. ME6527)" (Accession No.

Ml11326A23 1)

Dear Sir:

By letter dated June 15, 2011, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., requested a license amendment to increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to 3014 MWt. On December 7, 2011, the NRC provided a request for additional information (RAI) required to complete its evaluation of the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR).

The attachment, "Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Technical Review of the CR-3 EPU LAR," provides the CR-3 formal response to the RAI needed to support the Instrumentation and Controls Branch (EICB) technical review of the CR-3 EPU LAR.

In support of the EICB technical review RAI response, an enclosure, "Drawings of ICCMS, FCS, and ADV Indication and Controls," provides current design diagrams that show the controls and indications in the main control room available to the operator to monitor and control the Inadequate Core Cooling Mitigation System, Fast Cooldown System, and atmospheric dump valves.

This correspondence contains no new regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs at (352) 563-4796.

Jon *.Franke V' e President rystal River Nuclear Plant JAF/gwe

,4oo!

Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

U.S. Nuclear Regulatory Commission Page 2 of 3 3F0112-05

Attachment:

Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Technical Review of the CR-3 EPU LAR

Enclosure:

Drawings of ICCMS, FCS, and ADV Indication and Controls xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector State Contact

U.S. Nuclear Regulatory Commission Page 3 of 3 3F0112-05 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

),6n'A.Franke XZ Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this ___ day of 2012, by Jon A. Franke.

Signature of Notary Public State of Florida fCHARLEN MILLER, My Comm Expires Nov 12. 2012 ~'rie' a/

'*"" BodedThrougs Nationa N~ta yAssn. (Print, type, or stamp Commissioned Name of Notary Public)

Personally Produced Known ___ -OR- Identification

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 /LICENSE NUMBER DPR-72 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT NRC INSTRUMENTATION AND CONTROLS BRANCH TECHNICAL REVIEW OF THE CR-3 EPU LAR

U. S. Nuclear Regulatory Commission Attachment 3F01 12-05 Page 1 of 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT NRC INSTRUMENTATION AND CONTROLS BRANCH TECHNICAL REVIEW OF THE CR-3 EPU LAR By letter dated June 15, 2011, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., requested a license amendment to increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to 3014 MWt. On December 7, 2011, the NRC provided a request for additional information (RAI) required to complete its evaluation of the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR). The following provides the CR-3 formal response to the RAI needed to support the Instrumentation and Controls Branch (EICB) technical review of the CR-3 EPU LAR. For tracking purposes, each item related to this RAI is uniquely identified as EICB X-Y, with X indicating the RAI set and Y indicating the sequential item number.

Instrumentation and Controls Branch (EICB)

10. (EICB 1-1)

Provide the diagrams or photographs of all inadequate core cooling mitigation system (ICCMS),

fast cooldown system, and atmospheric dump valves related controls and indications in the main control room, showing the information the operators have available to monitor and control.

Response

Current design diagrams are provided in the attached enclosure, "Drawings of ICCMS, FCS, and ADV Indication and Controls," that show the controls and indications in the main control room available to the operator to monitor and control the ICCMS, Fast Cooldown System, and atmospheric dump valves.

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 ENCLOSURE DRAWINGS OF ICCMS, FCS, AND ADV INDICATION AND CONTROLS

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-201-151 "ELECTRICAL MAIN CONTROL BOARD PRIMARY SECONDARY AUXILIARIES ASSEMBLY",

REV. 12, SHEET 3 WITHIN THIS PACKAGE D-01

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-201-151 "ELECTRICAL MAIN CONTROL BOARD PRIMARY SECONDARY AUXILIARIES ASSEMBLY",

REV. 11, SHEET 5 WITHIN THIS PACKAGE D-02

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-201-151 "ELECTRICAL MAINCONTROL BOARD PRIMARY SECONDARY AUXILIARIES ASSEMBLY",

REV. 20, SHEET 8 WITHIN THIS PACKAGE D-03

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-201-426 "ELECTRICAL MAIN CONTROL BOARD PRIMARY & SECONDARY AUXILIARIES SECTION ABOVE ANNUNCIATORS",

REV. 1 WITHIN THIS PACKAGE D-04

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-224-048 "ELECTRICAL MAIN CONTROL BOARD ANNUNCIATOR WINDOW ENGRAVINGS",

REV. 59 WITHIN THIS PACKAGE D-05

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-201-141 "ELECTRICAL MAIN CONTROL BOARD INTEG. CONT. SYSTEM ASSY.",

REV. 11, SHEET 14 WITHIN THIS PACKAGE D-06

THIS PAGE IS AN OVERSIZED DRAWING OR FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:

DRAWING NO.: E-201-141 "ELECTRICAL MAIN CONTROL BOARD INTEG. CONT. SYSTEM ASSY.",

REV. 8, SHEET 8 WITHIN THIS PACKAGE D-07