FR.Z.2 RESPONSE TO CONTAINMENT FLOODING Rev. 1 3.
A.
PURPOSE nis procedure provides actions to respond to containment flooding.
B.
SYMPTOMS OR ENTRY CONDITIONS m.
i This procedure is entered from F-0.5. COSTAINMENT Cridcal Safety Function Status Tre on an ORANGE condition, 4
i f'
l l
l l
I I
l l
[
[
i i
(
4 Page 1 of 2 8810250331 001007 PDR ADOCK 05000213 P
PDR t
 
NUMBER TTC.E REV. ISSUE /DATE FR.Z.2 RESPONSE TO CONTAINMENT FLOODING Rev,1 I
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 1
TRY TOIDE?mFY UNEXPECI1!D SOURCE OF WATER INPlJrTO SUMP:
: a. Check CARFAN service water
: a. Isolate service water to CARFAN(s) 8!
flows NORMAL with abnormal service water flow,
: b. Check CCW surge tank level-
: b. Attempt to idenify and isolate source STABG ofleakage.
: c. Check primary water to containment,
: c. Close PW V 141.
PW V 141 CLOSED
: d. Check SG levels and feedwater
: d. Attempt to identify and isolate source flowindications NORMAL ofleakage.
2 CHECK CONTAINMENT SUMP ACITVITY EVEL:
: a. Draw local grab sample t
IE containment entry is possible i
3 NOTIFY PLANT ENGINEERING STAFF OF SUMP LEVEL AND ACITVITY LEVELTO OBTAIN RECOMMENDED ACITON 4
RETURN IQ PROCEDURE AND STEP IN EFFECT END l
t r
Page 2 of 2 e. _. _ - - _ _ _. _ - _,
_-}}

Latest revision as of 19:33, 7 December 2024

Rev 1 to Emergency Operating Procedure FR-Z.2, Response to Containment Flooding
ML20204K067
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 06/03/1988
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
FR-Z.2, NUDOCS 8810250331
Download: ML20204K067 (2)


Text

_ _ _ _ _ _ _ _ _ _.

REY. ISSUE /DATE NUMBER TmJ!

FR.Z.2 RESPONSE TO CONTAINMENT FLOODING Rev. 1 3.

A.

PURPOSE nis procedure provides actions to respond to containment flooding.

B.

SYMPTOMS OR ENTRY CONDITIONS m.

i This procedure is entered from F-0.5. COSTAINMENT Cridcal Safety Function Status Tre on an ORANGE condition, 4

i f'

l l

l l

I I

l l

[

[

i i

(

4 Page 1 of 2 8810250331 001007 PDR ADOCK 05000213 P

PDR t

NUMBER TTC.E REV. ISSUE /DATE FR.Z.2 RESPONSE TO CONTAINMENT FLOODING Rev,1 I

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 1

TRY TOIDE?mFY UNEXPECI1!D SOURCE OF WATER INPlJrTO SUMP:

a. Check CARFAN service water
a. Isolate service water to CARFAN(s) 8!

flows NORMAL with abnormal service water flow,

b. Check CCW surge tank level-
b. Attempt to idenify and isolate source STABG ofleakage.
c. Check primary water to containment,
c. Close PW V 141.

PW V 141 CLOSED

d. Check SG levels and feedwater
d. Attempt to identify and isolate source flowindications NORMAL ofleakage.

2 CHECK CONTAINMENT SUMP ACITVITY EVEL:

a. Draw local grab sample t

IE containment entry is possible i

3 NOTIFY PLANT ENGINEERING STAFF OF SUMP LEVEL AND ACITVITY LEVELTO OBTAIN RECOMMENDED ACITON 4

RETURN IQ PROCEDURE AND STEP IN EFFECT END l