This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Jeffrey Digitally signed by Jeffrey Josey Josey Date: 2021.08.02 10:40:22 -05'00'
Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects  
Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82
 
Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000275 and 05000323 License Numbers: DPR-80 and DPR-82 Report Numbers: 05000275/2021002 and 05000323/2021002 Enterprise Identifier: I-2021-002-0105 Licensee: Pacific Gas and Electric Company (PG&E)
Docket Numbers:
Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: Avila Beach, CA Inspection Dates: April 1, 2021, to June 30, 2021 Inspectors: A. Athar, Resident Inspector B. Bergeon, Operations Engineer M. Hayes, Operations Engineer M. Doyle, Operations Engineer S. Hedger, Emergency Preparedness Inspector D. Krause, Senior Resident Inspector Approved By: Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects Enclosure
05000275 and 05000323  
 
License Numbers:
DPR-80 and DPR-82  
 
Report Numbers:
05000275/2021002 and 05000323/2021002  
 
Enterprise Identifier: I-2021-002-0105  
 
Licensee:
Pacific Gas and Electric Company (PG&E)  
 
Facility:
Diablo Canyon Power Plant, Units 1 and 2  
 
Location:
Avila Beach, CA  
 
Inspection Dates:
April 1, 2021, to June 30, 2021  
 
Inspectors:
A. Athar, Resident Inspector  
 
B. Bergeon, Operations Engineer  
 
M. Hayes, Operations Engineer  
 
M. Doyle, Operations Engineer  
 
S. Hedger, Emergency Preparedness Inspector  
 
D. Krause, Senior Resident Inspector  
 
Approved By:
Jeffrey E. Josey, Chief
Reactor Projects Branch A
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 46: Line 85:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 66: Line 104:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions of summer readiness and heat preparations prior to the onset of seasonal high temperatures for the following systems:


===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions of summer readiness and heat preparations prior to the onset of seasonal high temperatures for the following systems:
500 kilovolt (kV) and 230 kV distribution switchyards and Unit 1 and Unit 2 transformer yards on June 30, 2021
500 kilovolt (kV) and 230 kV distribution switchyards and Unit 1 and Unit 2 transformer yards on June 30, 2021


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (4 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
Line 80: Line 116:
: (2) Unit 2 emergency diesel generator 2-3 on May 17, 2021
: (2) Unit 2 emergency diesel generator 2-3 on May 17, 2021
: (3) Unit 1 12 kV switchgear room, 12 kV standby startup busses Units 1 and 2, protected on May 27, 2021
: (3) Unit 1 12 kV switchgear room, 12 kV standby startup busses Units 1 and 2, protected on May 27, 2021
: (4) Unit 1 safety injection pump 1-1 on June 8, 2021
: (4) Unit 1 safety injection pump 1-1 on June 8, 2021  


===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated system configurations during a complete walkdown of the           Unit 2 component cooling water system on May 1, 2021.
: (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 component cooling water system on May 1, 2021.


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 96: Line 131:


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
===Cable Degradation (IP Section 03.02) (1 Sample)===
===Cable Degradation (IP Section 03.02) (1 Sample)===
The inspectors evaluated cable submergence protection in:
The inspectors evaluated cable submergence protection in:
Line 102: Line 136:


==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
: (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from May 10, 2021, through June 18, 2021.
: (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from May 10, 2021, through June 18, 2021.


==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
===Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)===
===Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)===
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered from May 10, 2021, through June 18, 2021.
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered from May 10, 2021, through June 18, 2021.
Line 126: Line 158:


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 main turbine startup and generator parallel to grid on April 17, 2021.
: (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 main turbine startup and generator parallel to grid on April 17, 2021.


===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated Unit 2 just-in-time training for Unit 2 startup           on April 14, 2021.
: (1) The inspectors observed and evaluated Unit 2 just-in-time training for Unit 2 startup on April 14, 2021.


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Unit 1 and 2 review of periodic evaluation of maintenance rule requirements per 10 CFR 50.65(a)(3) on June 11, 2021
: (1) Unit 1 and 2 review of periodic evaluation of maintenance rule requirements per 10 CFR 50.65(a)(3) on June 11, 2021  


===Quality Control (IP Section 03.02) (1 Sample)===
===Quality Control (IP Section 03.02) (1 Sample)===
Line 145: Line 174:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 156: Line 184:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 165: Line 192:


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
Line 176: Line 202:


==71111.20 - Refueling and Other Outage Activities==
==71111.20 - Refueling and Other Outage Activities==
===Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated Refueling Outage 2R22 activities from February 21, 2021, continued from the previous quarter, to April 19, 2021.


===Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated Refueling Outage 2R22 activities from February 21, 2021,          continued from the previous quarter, to April 19, 2021.
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
 
The inspectors evaluated the following surveillance tests:  
The inspectors evaluated the following surveillance tests:


===Surveillance Tests (other) (IP Section 03.01)===
===Surveillance Tests (other) (IP Section 03.01)===
Line 188: Line 213:
: (2) Surveillance Test Procedure P-CCW-22, Unit 2 component cooling water pump 2-2 surveillance on April 7, 2021
: (2) Surveillance Test Procedure P-CCW-22, Unit 2 component cooling water pump 2-2 surveillance on April 7, 2021
: (3) Surveillance Test Procedure M-8G, Unit 2 containment emergency exit leak test surveillance on April 8, 2021
: (3) Surveillance Test Procedure M-8G, Unit 2 containment emergency exit leak test surveillance on April 8, 2021
: (4) Emergency diesel generator 1-3, 24-hour load test, on May 27, 2021
: (4) Emergency diesel generator 1-3, 24-hour load test, on May 27, 2021  


===Inservice Testing (IP Section 03.01) (1 Sample)===
===Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) Unit 1 comprehensive test of auxiliary saltwater pump 1-2 per Surveillance Test           Procedure P-ASW-A12 on June 15, 2021
: (1) Unit 1 comprehensive test of auxiliary saltwater pump 1-2 per Surveillance Test Procedure P-ASW-A12 on June 15, 2021  


===Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)===
===Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)===
: (1) Unit 2 containment isolation valve testing, Surveillance Test Procedure V-662, on           April 8, 2021
: (1) Unit 2 containment isolation valve testing, Surveillance Test Procedure V-662, on April 8, 2021


==71114.04 - Emergency Action Level and Emergency Plan Changes==
==71114.04 - Emergency Action Level and Emergency Plan Changes==
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
: (1) The licensee submitted a summary of emergency plan changes (Section 7, Revision 5.03) to the NRC on February 3, 2021. The inspectors conducted an in-office review of the changes from April 13 to April 30, 2021. This evaluation does not constitute NRC approval.
: (1) The licensee submitted a summary of emergency plan changes (Section 7, Revision 5.03) to the NRC on February 3, 2021. The inspectors conducted an in-office review of the changes from April 13 to April 30, 2021. This evaluation does not constitute NRC approval.


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
: (1) Emergency preparedness drill with drill and exercise performance indicator opportunities on June 23,
: (1) Emergency preparedness drill with drill and exercise performance indicator opportunities on June 23,


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 03.04)===
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 03.04) ===
{{IP sample|IP=IP 71151|count=2}}
{{IP sample|IP=IP 71151|count=2}}
: (1) Unit 1 (April 1, 2020, through March 31, 2021)
: (1) Unit 1 (April 1, 2020, through March 31, 2021)
: (2) Unit 2 (April 1, 2020, through March 31, 2021)
: (2) Unit 2 (April 1, 2020, through March 31, 2021)  


===MS06: Emergency AC Power Systems (IP Section 03.05) (2 Samples)===
===MS06: Emergency AC Power Systems (IP Section 03.05) (2 Samples)===
: (1) Unit 1 (April 1, 2020, through March 31, 2021)
: (1) Unit 1 (April 1, 2020, through March 31, 2021)
: (2) Unit 2 (April 1, 2020, through March 31, 2021)
: (2) Unit 2 (April 1, 2020, through March 31, 2021)  


===MS07: High Pressure Injection Systems (IP Section 03.06) (2 Samples)===
===MS07: High Pressure Injection Systems (IP Section 03.06) (2 Samples)===
Line 224: Line 246:


==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)===
===Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
Line 231: Line 252:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation: Common Unit, Auxiliary Feedwater Piping Corrosion of Exterior             71152 Piping Over the past year there have been several operational vulnerabilities associated with the auxiliary feedwater (AFW) system. During the assessment period another AFW pipe wall thickness being near or below minimum associated with AFW piping corrosion was found that had the potential to impact the supply of feedwater to allow the steam generators to remove primary system stored heat and residual core energy (decay heat). Several instances of significant corrosion and degraded pipe thickness have been found over the past year. The AFW system is designed to automatically start and supply sufficient feedwater to prevent the relief of primary coolant through the pressurizer safety valves. The AFW system has an adequate suction source and flow capacity to maintain the reactor at hot standby for a period of time and then cool the reactor coolant system to a temperature at which the residual heat removal system may be placed in operation. While specific piping areas were near or below minimum wall thickness and heavily corroded, the AFW system met operability requirements but was acknowledged to require repair or replacement.
Observation: Common Unit, Auxiliary Feedwater Piping Corrosion of Exterior Piping 71152 Over the past year there have been several operational vulnerabilities associated with the auxiliary feedwater (AFW) system. During the assessment period another AFW pipe wall thickness being near or below minimum associated with AFW piping corrosion was found that had the potential to impact the supply of feedwater to allow the steam generators to remove primary system stored heat and residual core energy (decay heat). Several instances of significant corrosion and degraded pipe thickness have been found over the past year. The AFW system is designed to automatically start and supply sufficient feedwater to prevent the relief of primary coolant through the pressurizer safety valves. The AFW system has an adequate suction source and flow capacity to maintain the reactor at hot standby for a period of time and then cool the reactor coolant system to a temperature at which the residual heat removal system may be placed in operation. While specific piping areas were near or below minimum wall thickness and heavily corroded, the AFW system met operability requirements but was acknowledged to require repair or replacement.


The inspectors reviewed licensee corrective actions associated with Corrective Action Notification 51112395, 2R22 AFW Line 570 Corrosion; Notification 51091806, 1R22 AFW Pipe Support Degraded 3-40R; and Notification 51086361, 2R22 TDAFWP Line 593. The inspectors assessed the following performance attributes in their review:
The inspectors reviewed licensee corrective actions associated with Corrective Action Notification 51112395, 2R22 AFW Line 570 Corrosion; Notification 51091806, 1R22 AFW Pipe Support Degraded 3-40R; and Notification 51086361, 2R22 TDAFWP Line 593. The inspectors assessed the following performance attributes in their review:
Line 241: Line 262:
* Completion of corrective actions in a timely manner commensurate with the safety significance of the issue The inspectors selected these samples due to the operability impact associated with the auxiliary feedwater system, a safety significant system. Inspectors focused review of the above attributes on the licensees corrective actions associated with the above notifications and several others. Inspectors did not identify any significant trends that might indicate the existence of a more significant safety concern that had not been previously addressed by the licensee, nor did the inspectors identify any performance deficiency with this issue.
* Completion of corrective actions in a timely manner commensurate with the safety significance of the issue The inspectors selected these samples due to the operability impact associated with the auxiliary feedwater system, a safety significant system. Inspectors focused review of the above attributes on the licensees corrective actions associated with the above notifications and several others. Inspectors did not identify any significant trends that might indicate the existence of a more significant safety concern that had not been previously addressed by the licensee, nor did the inspectors identify any performance deficiency with this issue.


Observation: High Nitrogen Usage in Unit 2 Containment                                 71152 Over the past year there have been several operational vulnerabilities associated with questionable containment atmosphere and high nitrogen usage. During the assessment period a leaking accumulator relief valve was found. Several instances of impeded containment atmosphere and accumulator leaks have been found over the past year. The cold leg accumulators consist of four tanks filled with borated water and pressurized with nitrogen that inject borated water into the reactor vessel in the event of a loss of coolant accident. While accumulator nitrogen leakage occurred, the accumulators met operability requirements but were an operational burden, impacting containment atmosphere.
Observation: High Nitrogen Usage in Unit 2 Containment 71152 Over the past year there have been several operational vulnerabilities associated with questionable containment atmosphere and high nitrogen usage. During the assessment period a leaking accumulator relief valve was found. Several instances of impeded containment atmosphere and accumulator leaks have been found over the past year. The cold leg accumulators consist of four tanks filled with borated water and pressurized with nitrogen that inject borated water into the reactor vessel in the event of a loss of coolant accident. While accumulator nitrogen leakage occurred, the accumulators met operability requirements but were an operational burden, impacting containment atmosphere.


The inspectors reviewed licensee corrective actions associated with Corrective Action Notification 51114406, Relief Valve RV-358 in U2 Containment is Leaking Nitrogen; Notification 51107259, Unexpected Drop in U2 Containment O2; Notification 51105994, Low Oxygen Alarm U2 Containment; and Notification 51101151, Continued Declining O2 Levels U2 Containment. The inspectors assessed the following performance attributes in their review:
The inspectors reviewed licensee corrective actions associated with Corrective Action Notification 51114406, Relief Valve RV-358 in U2 Containment is Leaking Nitrogen; Notification 51107259, Unexpected Drop in U2 Containment O2; Notification 51105994, Low Oxygen Alarm U2 Containment; and Notification 51101151, Continued Declining O2 Levels U2 Containment. The inspectors assessed the following performance attributes in their review:
Line 249: Line 270:
* Classification and prioritization of the resolution of the problem commensurate with safety significance
* Classification and prioritization of the resolution of the problem commensurate with safety significance
* Identification of corrective actions, which were appropriately focused to correct the problem
* Identification of corrective actions, which were appropriately focused to correct the problem
* Completion of corrective actions in a timely manner commensurate with the safety significance of the issue The inspectors selected these samples due to the operability impact associated nitrogen accumulator system, a safety significant system. Inspectors focused review of the above attributes on the licensees corrective actions associated with the above notifications and several others. Inspectors did not identify any significant trends that might indicate the existence of a more significant safety concerns that had not been previously addressed by the licensee, nor did the inspectors identify any performance deficiency with this issue.
* Completion of corrective actions in a timely manner commensurate with the safety significance of the issue  
 
The inspectors selected these samples due to the operability impact associated nitrogen accumulator system, a safety significant system. Inspectors focused review of the above attributes on the licensees corrective actions associated with the above notifications and several others. Inspectors did not identify any significant trends that might indicate the existence of a more significant safety concerns that had not been previously addressed by the licensee, nor did the inspectors identify any performance deficiency with this issue.


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
Line 260: Line 283:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation     Description or Title                                     Revision or
Inspection
Procedure                                                                                              Date
Procedure
71111.01   Miscellaneous                     New Operating Plan Goal & Summer (Peak Readiness)       0
Type
Summer Readiness Actions Email                           0
Designation
Procedures       AD7.ID20         Summer Peak Readiness                                   0
Description or Title
71111.04   Corrective Action Notifications    51119764
Revision or
Date
71111.01
Miscellaneous
New Operating Plan Goal & Summer (Peak Readiness)  
 
Summer Readiness Actions Email
Procedures
AD7.ID20
Summer Peak Readiness
71111.04
Corrective Action
Documents
Documents
Procedures       OP B-3A:II       Safety Injection System Alignment Verification for Plant 26B
Notifications
51119764
Procedures
OP B-3A:II
Safety Injection System Alignment Verification for Plant
Startup
Startup
OP F-2:VI       CCW System Alignment Verification for Plant Startup     34
26B
OP J-6B:III-A   Diesel Generator 2-3 - Alignment Checklist               0
OP F-2:VI
OP J-B:II-A     Diesel Generator 2-2 - Alignment Checklist               0
CCW System Alignment Verification for Plant Startup
OP O-35         Bumped Component Protection Program                     17
OP J-6B:III-A
71111.05   Corrective Action Notifications   51118178, 51118179, 51118211, 51118231, 51121823,
Diesel Generator 2-3 - Alignment Checklist
Documents                          51121824, 51121825, 51121826, 51121827, 51121828,
OP J-B:II-A
Diesel Generator 2-2 - Alignment Checklist
OP O-35
Bumped Component Protection Program
71111.05
Corrective Action
Documents
Notifications
51118178, 51118179, 51118211, 51118231, 51121823,
51121824, 51121825, 51121826, 51121827, 51121828,
51121829
51121829
Drawings         111805, Sheet 50 Unit 1 Turbine Building Elevation 85'                   1
Drawings
111805, Sheet 61 Unit 2 Turbine Building Elevation 85'                   1
111805, Sheet 50
11805, Sheet 16 Radiological Control Area (RCA) & H Block Elev. 140'     3
Unit 1 Turbine Building Elevation 85'
RA-31           Containment Building Elevation 91-foot, Unit 2          2
111805, Sheet 61
RA-32           Containment Building Elevation 117-foot, Unit 2          2
Unit 2 Turbine Building Elevation 85'
71111.06   Corrective Action Notifications    51116649
11805, Sheet 16
Radiological Control Area (RCA) & H Block Elev. 140'
RA-31
Containment Building Elevation 91-foot, Unit 2
RA-32
Containment Building Elevation 117-foot, Unit 2
71111.06
Corrective Action
Documents
Documents
71111.11B Corrective Action Notifications    51087528
Notifications
51116649
71111.11B
Corrective Action
Documents
Documents
Corrective Action SAPN 51119933   2021BRQ # Potential ILT Exam Development                 05/18/2021
Notifications
51087528
Corrective Action
Documents
Resulting from
Inspection
SAPN 51119933
21BRQ # Potential ILT Exam Development
05/18/2021
71111.11B
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.11B  Corrective Action SAPN 51120049   2021BRQ: TQ2.ID4 Form Untimely Routing                   05/19/2021
SAPN 51120049
Documents        SAPN 51120067   2021BRQ: Minor Perf Deficiency - TQ2.DC15               05/20/2021
21BRQ: TQ2.ID4 Form Untimely Routing
Resulting from    SAPN 51120120   2021BRQ: Evaluate TQ2.DC15 Caucus                       05/19/2021
05/19/2021
Inspection        SAPN 51120121   2021BRQ: TQ2.DC15 Critical Tasks                         05/19/2021
SAPN 51120067
Miscellaneous                     Simulator Discrepancies Report                           05/13/2021
21BRQ: Minor Perf Deficiency - TQ2.DC15
Inspection Type         Designation     Description or Title         Revision or
05/20/2021
Procedure                                                              Date
SAPN 51120120
Simulator Differences Report 04/20/2021
21BRQ: Evaluate TQ2.DC15 Caucus
Simulator Modification Report 04/26/2021
05/19/2021
20 Annual     First Run                    07/23/2020
SAPN 51120121
21BRQ: TQ2.DC15 Critical Tasks
05/19/2021
Miscellaneous
Simulator Discrepancies Report
05/13/2021  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Simulator Differences Report
04/20/2021
Simulator Modification Report
04/26/2021
20 Annual
Operating Test
Operating Test
20 Annual    Week 1                        07/23/2020
First Run
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Week 2                        07/23/2020
Week 1
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Week 3                        07/23/2020
Week 2
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Week 3X                      07/23/2020
Week 3
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Week 4                        07/23/2020
Week 3X
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Week 5                        07/23/2020
Week 4
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Week 2 JPM Remediation        07/23/2020
Week 5
07/23/2020
20 Annual
Operating Test
Operating Test
20 Annual    Makeup                        07/23/2020
Week 2 JPM Remediation
07/23/2020
20 Annual
Operating Test
Operating Test
21 Annual     JPMs 1, 2, 3, 4, 5, 6        05/17/2021
Makeup
07/23/2020
21 Annual
Operating Test,
Operating Test,
Week 1
Week 1
21 Annual    JPMs 1, 2, 3, 4, 5, 6         05/10/2021
JPMs 1, 2, 3, 4, 5, 6
05/17/2021
21 Annual
Operating Test,
Operating Test,
First Run
First Run
21 Annual    Scenarios 1 and 2             05/10/2021
JPMs 1, 2, 3, 4, 5, 6
05/10/2021
21 Annual
Operating Test,
Operating Test,
First Run
First Run
71111.11B  Miscellaneous 2021 Annual    Scenarios 1 and 2             05/17/2021
Scenarios 1 and 2
05/10/2021
71111.11B
Miscellaneous
21 Annual
Operating Test,
Operating Test,
Week 1
Week 1
21 Biennial  RO Package First Run          05/10/2021
Scenarios 1 and 2
05/17/2021
21 Biennial
Written
Written
Inspection Type             Designation   Description or Title                                   Revision or
RO Package First Run
Procedure                                                                                          Date
05/10/2021
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Examination
Examination
21 Biennial SRO Package First Run                                  05/10/2021
21 Biennial
Written
Written
Examination
Examination
Procedures       CF2.DC1       Configuration Management Plan for the Operator Training 13
SRO Package First Run
05/10/2021
Procedures
CF2.DC1
Configuration Management Plan for the Operator Training
Simulator
Simulator
OP1.DC10     Conduct of Operations                                   64
OP1.DC10
SQA 99-2     Operator Training Simulator Software Quality Assurance 2
Conduct of Operations
SQA 99-2
Operator Training Simulator Software Quality Assurance
Plan
Plan
TQ1.DC28     Simulator Testing                                       5
TQ1.DC28
TQ2.DC15     Licensed Operator Annual/Biennial Exam Development and 13
Simulator Testing
TQ2.DC15
Licensed Operator Annual/Biennial Exam Development and
Administration
Administration
TQ2.DC3       Licensed Operator Continuing Training Program           34
TQ2.DC3
TQ2.ID9       Conduct of Training                                     19
Licensed Operator Continuing Training Program
Self-Assessments SAPN 51078318 NRC 71111.11 Pre-Inspection Self-Assessment Report     03/11/2021
TQ2.ID9
71111.11Q Procedures         OP C-3:II     Unit 2, Main Unit Turbine Startup                       61
Conduct of Training
STP R-17     Estimated Critical Conditions for Initial Startup       22
Self-Assessments SAPN 51078318
71111.12   Corrective Action Notifications 51068560, 51070582, 51092472, 51114120
NRC 71111.11 Pre-Inspection Self-Assessment Report
03/11/2021
71111.11Q
Procedures
OP C-3:II
Unit 2, Main Unit Turbine Startup
STP R-17
Estimated Critical Conditions for Initial Startup
71111.12
Corrective Action
Documents
Notifications
51068560, 51070582, 51092472, 51114120
Miscellaneous
Maintenance Rule Self-Assessment for 10CFR 50.65 (a)(3)
10/14/2020
3501169474
Purchase Order, Switch Pressure 80801, D236541
Work Orders
WO
60136280, 64233883
71111.13
Corrective Action
Documents
Documents
Miscellaneous                  Maintenance Rule Self-Assessment for 10CFR 50.65 (a)(3) 10/14/2020
Notification
3501169474    Purchase Order, Switch Pressure 80801, D236541          0
51114120, 51114430, 51115297, 51116514, 51120302
Work Orders      WO            60136280, 64233883
71111.13
71111.13   Corrective Action Notification  51114120, 51114430, 51115297, 51116514, 51120302
Corrective Action
Documents
Documents
71111.13  Corrective Action Notifications 5111814, 51119143, 51119171
Notifications
5111814, 51119143, 51119171
Procedures
OP O-36
Protected Equipment Postings
71111.15
Corrective Action
Documents
Documents
Procedures        OP O-36      Protected Equipment Postings                            25
Notifications
71111.15  Corrective Action Notifications 51083213, 51083525, 51083526, 51083529, 51083610,
51083213, 51083525, 51083526, 51083529, 51083610,
Documents                      51112395, 51115230, 51120248, 51121229
51112395, 51115230, 51120248, 51121229
Procedures       STP M9-G     Diesel Generator 24 Hour Load Test and Hot Restart Test 59B
Procedures
Work Orders       WO           60130390, 60135944
STP M9-G
71111.19   Procedures       MP M-23-Fan 4 Preventive Maintenance of Ventilation Fans with Dampers 13
Diesel Generator 24 Hour Load Test and Hot Restart Test
and Inlet Vanes
59B
Inspection Type             Designation     Description or Title                                       Revision or
Work Orders
Procedure                                                                                                Date
WO
OP H-1:II       Auxiliary Building Safeguards Ventilation                 11
60130390, 60135944
OP J-9:II       125/250V DC System Operating the Battery Chargers         24A
71111.19
STP M-9A1       Diesel Engine Generator 1-1 Routine Surveillance Test     12
Procedures
STP P-CCW-A13   Comprehensive Pump Test of Component Cooling Water         7
MP M-23-Fan 4
Preventive Maintenance of Ventilation Fans with Dampers
and Inlet Vanes  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP H-1:II
Auxiliary Building Safeguards Ventilation
OP J-9:II
25/250V DC System Operating the Battery Chargers
24A
STP M-9A1
Diesel Engine Generator 1-1 Routine Surveillance Test
STP P-CCW-A13
Comprehensive Pump Test of Component Cooling Water
Pump 1-3
Pump 1-3
Work Orders       WO               60128244, 60137163, 64152403, 64183803, 64204580,
Work Orders
WO
60128244, 60137163, 64152403, 64183803, 64204580,
206530, 64241156, 64245156, 64245460, 64252740
206530, 64241156, 64245156, 64245460, 64252740
71111.20   Corrective Action Notifications    51091739, 51098874, 51099077, 51099292, 51099355,
71111.20
Documents                          51116752, 51116753,
Corrective Action
Procedures        STP M-11B        Station Battery Condition Monitoring                      35
Work Orders      WO              64240628
71111.22  Corrective Action Notifications    50977992
Documents
Documents
Procedures       STP M-66A       Deluge System Nozzle Proof Test Startup Transformers       12
Notifications
STP M8-G         Leak Rate Testing of Emergency Air Lock Seals             11
51091739, 51098874, 51099077, 51099292, 51099355,
71111.22   Procedures       STP P-CCW-22     Routine Surveillance Test of Component Cooling Water
51116752, 51116753,
Procedures
STP M-11B
Station Battery Condition Monitoring
Work Orders
WO
240628
71111.22
Corrective Action
Documents
Notifications
50977992
Procedures
STP M-66A
Deluge System Nozzle Proof Test Startup Transformers
STP M8-G
Leak Rate Testing of Emergency Air Lock Seals
71111.22
Procedures
STP P-CCW-22
Routine Surveillance Test of Component Cooling Water
Pump 2-2
Pump 2-2
STP V-662       Penetration 62 Containment Isolation Valve Leak Testing   11
STP V-662
STP-P-ASW-A12   Comprehensive Test of Auxiliary Saltwater Pump 1-2         10B
Penetration 62 Containment Isolation Valve Leak Testing
Work Orders       WO               64201294, 64205071, 64209172-100, 64236282, 64239818,
STP-P-ASW-A12
Comprehensive Test of Auxiliary Saltwater Pump 1-2
10B
Work Orders
WO
201294, 64205071, 64209172-100, 64236282, 64239818,
252544
252544
71114.04   Miscellaneous     DCL-21-012/DIL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-       02/03/2021
71114.04
21-001          DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-76,
Miscellaneous
DCL-21-012/DIL-
21-001
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-76,
Materials License No. SNM-2511; Diablo Canyon
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Independent Spent Fuel Storage Installation; Emergency
Plan Update
Plan Update
Tracking Number: 50.54(q) Effectiveness Evaluation Form, Proposed Activity: 11/23/2020
2/03/2021
20-41          Revise E-Plan Section 7 to Address Replacement/Upgrade
Tracking Number:
20-41
50.54(q) Effectiveness Evaluation Form, Proposed Activity:
Revise E-Plan Section 7 to Address Replacement/Upgrade
of Diablo Canyon Power Plant Telephone System
of Diablo Canyon Power Plant Telephone System
71114.06   Corrective Action Notifications   51123716, 51123744, 51123764, 51123765
11/23/2020
71114.06
Corrective Action
Documents
Notifications
51123716, 51123744, 51123764, 51123765
Miscellaneous
Team Alpha Limited Scope Drill and Scenario
06/23/2021
71151
Miscellaneous
Annual MSPI Review Package
71152
Corrective Action
Notifications
51101151, 51105994, 51107259, 51086361, 51086368,
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Documents
Miscellaneous                      Team Alpha Limited Scope Drill and Scenario                06/23/2021
51091806, 51111969, 51112130, 51112395, 51114350,
71151      Miscellaneous                      Annual MSPI Review Package
71152      Corrective Action Notifications    51101151, 51105994, 51107259, 51086361, 51086368,
Inspection Type          Designation  Description or Title                              Revision or
Procedure                                                                                Date
Documents                  51091806, 51111969, 51112130, 51112395, 51114350,
51114406
51114406
Miscellaneous SAPN 51083213 Root Cause Evaluation Report                     0
Miscellaneous
16
SAPN 51083213
Root Cause Evaluation Report
0
}}
}}

Latest revision as of 07:11, 29 November 2024

Integrated Inspection Report 05000275/2021002 and 05000323/2021002
ML21208A053
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/02/2021
From: Jeffrey Josey
NRC/RGN-IV/DRP/RPB-A
To: Welsch J
Pacific Gas & Electric Co
References
IR 2021002
Preceding documents:
Download: ML21208A053 (18)


Text

August 2, 2021

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000275/2021002 AND 05000323/2021002

Dear Mr. Welsch:

On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2. On July 15, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects

Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2021002 and 05000323/2021002

Enterprise Identifier: I-2021-002-0105

Licensee:

Pacific Gas and Electric Company (PG&E)

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, CA

Inspection Dates:

April 1, 2021, to June 30, 2021

Inspectors:

A. Athar, Resident Inspector

B. Bergeon, Operations Engineer

M. Hayes, Operations Engineer

M. Doyle, Operations Engineer

S. Hedger, Emergency Preparedness Inspector

D. Krause, Senior Resident Inspector

Approved By:

Jeffrey E. Josey, Chief

Reactor Projects Branch A

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period with the exceptions of reducing power to approximately 50 percent for both intake channel dredging on April 26 through 27, 2021, and on May 27 through 28, 2021, for main condenser tube plugging.

Unit 2 entered the inspection period shut down due to a hydrogen leak in the main turbine generator and a refueling outage. Unit 2 started up on April 16, 2021, and achieved approximately 50 percent power prior to shutting down on April 19, 2021, to address main turbine stator cooling issues. Unit 2 returned to full power on April 29, 2021, and operated at or near rated thermal power for the rest of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk-significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions of summer readiness and heat preparations prior to the onset of seasonal high temperatures for the following systems:

500 kilovolt (kV) and 230 kV distribution switchyards and Unit 1 and Unit 2 transformer yards on June 30, 2021

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 emergency diesel generator 2-2 on April 27, 2021
(2) Unit 2 emergency diesel generator 2-3 on May 17, 2021
(3) Unit 1 12 kV switchgear room, 12 kV standby startup busses Units 1 and 2, protected on May 27, 2021
(4) Unit 1 safety injection pump 1-1 on June 8, 2021

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 component cooling water system on May 1, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2 containment, 91-foot elevation, on April 9, 2021
(2) Unit 2 containment, 117-foot elevation, on April 9, 2021
(3) Unit 1 fuel handling building, 140-foot elevation, on May 4, 2021
(4) Unit 2 turbine building, 85-foot elevation, emergency diesel generator rooms on June 4, 2021
(5) Unit 1 turbine building, 85-foot elevation, emergency diesel generator rooms on June 9, 2021

71111.06 - Flood Protection Measures

Cable Degradation (IP Section 03.02) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Water intrusion in automated vendor selection system security cabinets on April 20, 2021

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from May 10, 2021, through June 18, 2021.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered from May 10, 2021, through June 18, 2021.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by Title 10 of the Code of Federal Regulations (10 CFR) 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 main turbine startup and generator parallel to grid on April 17, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated Unit 2 just-in-time training for Unit 2 startup on April 14, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 1 and 2 review of periodic evaluation of maintenance rule requirements per 10 CFR 50.65(a)(3) on June 11, 2021

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Unit 2 reactor coolant pump 2-4 failure to start on April 5, 2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 rod control capacitor foreign material exclusion (Tin Whiskers found) on April 7, 2021
(2) Residual heat removal 8702 valve packing leak on April 12, 2021
(3) Stator coil cooling water hoses swapped on April 19, 2021
(4) Unit 1 battery charger 1-1 maintenance outage window on May 3, 2021
(5) Unit 2 emergency diesel generator 2-3 troubleshooting on May 12, 2021
(6) Unit 1 main condenser saltwater leak on May 22, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 2 auxiliary feedwater piping corrosion on April 1, 2021
(2) Unit 2 emergency diesel generator 2-3 fuel oil leak on April 12, 2021
(3) Unit 2 steam generator 2-2, LI-527 level control failure, on May 24, 2021
(4) Unit 2 unable to press up accumulator 2-4 pressure above 610 pounds on May 28, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Unit 1 battery charger 1-1 post-maintenance test on May 5, 2021
(2) Unit 1 component cooling water pump 1-3 post-maintenance test on May 12, 2021
(3) Unit 2 auxiliary building exhaust fan E-2 post-maintenance test on May 12, 2021
(4) Unit 1 control room ventilation supply fan post-maintenance test on May 26, 2021
(5) Unit 2 auxiliary building supply fan S-33 post-maintenance test on June 21, 2021
(6) Unit 1 emergency diesel generator 1-1 lube oil cooler post-maintenance test on June 22, 2021

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated Refueling Outage 2R22 activities from February 21, 2021, continued from the previous quarter, to April 19, 2021.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Surveillance Test Procedure M-66A, deluge system nozzle proof test - startup transformers on April 2, 2021
(2) Surveillance Test Procedure P-CCW-22, Unit 2 component cooling water pump 2-2 surveillance on April 7, 2021
(3) Surveillance Test Procedure M-8G, Unit 2 containment emergency exit leak test surveillance on April 8, 2021
(4) Emergency diesel generator 1-3, 24-hour load test, on May 27, 2021

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 1 comprehensive test of auxiliary saltwater pump 1-2 per Surveillance Test Procedure P-ASW-A12 on June 15, 2021

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Unit 2 containment isolation valve testing, Surveillance Test Procedure V-662, on April 8, 2021

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The licensee submitted a summary of emergency plan changes (Section 7, Revision 5.03) to the NRC on February 3, 2021. The inspectors conducted an in-office review of the changes from April 13 to April 30, 2021. This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Emergency preparedness drill with drill and exercise performance indicator opportunities on June 23,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 03.04)===

(1) Unit 1 (April 1, 2020, through March 31, 2021)
(2) Unit 2 (April 1, 2020, through March 31, 2021)

MS06: Emergency AC Power Systems (IP Section 03.05) (2 Samples)

(1) Unit 1 (April 1, 2020, through March 31, 2021)
(2) Unit 2 (April 1, 2020, through March 31, 2021)

MS07: High Pressure Injection Systems (IP Section 03.06) (2 Samples)

(1) Unit 1 (April 1, 2020, through March 31, 2021)
(2) Unit 2 (April 1, 2020, through March 31, 2021)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) High nitrogen usage in Unit 2 containment on June 30, 2021
(2) Common Unit, auxiliary feedwater piping corrosion of exterior piping on June 30,

INSPECTION RESULTS

Observation: Common Unit, Auxiliary Feedwater Piping Corrosion of Exterior Piping 71152 Over the past year there have been several operational vulnerabilities associated with the auxiliary feedwater (AFW) system. During the assessment period another AFW pipe wall thickness being near or below minimum associated with AFW piping corrosion was found that had the potential to impact the supply of feedwater to allow the steam generators to remove primary system stored heat and residual core energy (decay heat). Several instances of significant corrosion and degraded pipe thickness have been found over the past year. The AFW system is designed to automatically start and supply sufficient feedwater to prevent the relief of primary coolant through the pressurizer safety valves. The AFW system has an adequate suction source and flow capacity to maintain the reactor at hot standby for a period of time and then cool the reactor coolant system to a temperature at which the residual heat removal system may be placed in operation. While specific piping areas were near or below minimum wall thickness and heavily corroded, the AFW system met operability requirements but was acknowledged to require repair or replacement.

The inspectors reviewed licensee corrective actions associated with Corrective Action Notification 51112395, 2R22 AFW Line 570 Corrosion; Notification 51091806, 1R22 AFW Pipe Support Degraded 3-40R; and Notification 51086361, 2R22 TDAFWP Line 593. The inspectors assessed the following performance attributes in their review:

  • Complete and accurate identification of the problem in a timely manner commensurate with its safety significance and ease of discovery
  • Consideration of the extent of condition, generic implications, common cause, and previous occurrences
  • Evaluation and disposition of operability/functionality/reportability issues
  • Classification and prioritization of the resolution of the problem commensurate with safety significance
  • Identification of corrective actions, which were appropriately focused to correct the problem
  • Completion of corrective actions in a timely manner commensurate with the safety significance of the issue The inspectors selected these samples due to the operability impact associated with the auxiliary feedwater system, a safety significant system. Inspectors focused review of the above attributes on the licensees corrective actions associated with the above notifications and several others. Inspectors did not identify any significant trends that might indicate the existence of a more significant safety concern that had not been previously addressed by the licensee, nor did the inspectors identify any performance deficiency with this issue.

Observation: High Nitrogen Usage in Unit 2 Containment 71152 Over the past year there have been several operational vulnerabilities associated with questionable containment atmosphere and high nitrogen usage. During the assessment period a leaking accumulator relief valve was found. Several instances of impeded containment atmosphere and accumulator leaks have been found over the past year. The cold leg accumulators consist of four tanks filled with borated water and pressurized with nitrogen that inject borated water into the reactor vessel in the event of a loss of coolant accident. While accumulator nitrogen leakage occurred, the accumulators met operability requirements but were an operational burden, impacting containment atmosphere.

The inspectors reviewed licensee corrective actions associated with Corrective Action Notification 51114406, Relief Valve RV-358 in U2 Containment is Leaking Nitrogen; Notification 51107259, Unexpected Drop in U2 Containment O2; Notification 51105994, Low Oxygen Alarm U2 Containment; and Notification 51101151, Continued Declining O2 Levels U2 Containment. The inspectors assessed the following performance attributes in their review:

  • Complete and accurate identification of the problem in a timely manner commensurate with its safety significance and ease of discovery
  • Consideration of the extent of condition, generic implications, common cause, and previous occurrences
  • Evaluation and disposition of operability/functionality/reportability issues
  • Classification and prioritization of the resolution of the problem commensurate with safety significance
  • Identification of corrective actions, which were appropriately focused to correct the problem
  • Completion of corrective actions in a timely manner commensurate with the safety significance of the issue

The inspectors selected these samples due to the operability impact associated nitrogen accumulator system, a safety significant system. Inspectors focused review of the above attributes on the licensees corrective actions associated with the above notifications and several others. Inspectors did not identify any significant trends that might indicate the existence of a more significant safety concerns that had not been previously addressed by the licensee, nor did the inspectors identify any performance deficiency with this issue.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 30, 2021, the inspectors presented the emergency plan in-office review inspection results to Mr. M. Ginn, Manager, Emergency Preparedness, and other members of the licensee staff.
  • On May 20, 2021, the inspectors presented the technical debrief inspection results to Mr. P. Gerfen, Site Vice President, and other members of the licensee staff.
  • On June 21, 2021, the inspectors presented the exit Meeting inspection results to Mr. A. Kadir, Simulator and Exam Development Supervisor, and other members of the licensee staff.
  • On July 15, 2021, the inspectors presented the integrated inspection results to Mr. J. Welsch, Senior Vice President and Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Miscellaneous

New Operating Plan Goal & Summer (Peak Readiness)

Summer Readiness Actions Email

Procedures

AD7.ID20

Summer Peak Readiness

71111.04

Corrective Action

Documents

Notifications

51119764

Procedures

OP B-3A:II

Safety Injection System Alignment Verification for Plant

Startup

26B

OP F-2:VI

CCW System Alignment Verification for Plant Startup

OP J-6B:III-A

Diesel Generator 2-3 - Alignment Checklist

OP J-B:II-A

Diesel Generator 2-2 - Alignment Checklist

OP O-35

Bumped Component Protection Program

71111.05

Corrective Action

Documents

Notifications

51118178, 51118179, 51118211, 51118231, 51121823,

51121824, 51121825, 51121826, 51121827, 51121828,

51121829

Drawings

111805, Sheet 50

Unit 1 Turbine Building Elevation 85'

111805, Sheet 61

Unit 2 Turbine Building Elevation 85'

11805, Sheet 16

Radiological Control Area (RCA) & H Block Elev. 140'

RA-31

Containment Building Elevation 91-foot, Unit 2

RA-32

Containment Building Elevation 117-foot, Unit 2

71111.06

Corrective Action

Documents

Notifications

51116649

71111.11B

Corrective Action

Documents

Notifications

51087528

Corrective Action

Documents

Resulting from

Inspection

SAPN 51119933

21BRQ # Potential ILT Exam Development

05/18/2021

71111.11B

Corrective Action

Documents

Resulting from

Inspection

SAPN 51120049

21BRQ: TQ2.ID4 Form Untimely Routing

05/19/2021

SAPN 51120067

21BRQ: Minor Perf Deficiency - TQ2.DC15

05/20/2021

SAPN 51120120

21BRQ: Evaluate TQ2.DC15 Caucus

05/19/2021

SAPN 51120121

21BRQ: TQ2.DC15 Critical Tasks

05/19/2021

Miscellaneous

Simulator Discrepancies Report

05/13/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Simulator Differences Report

04/20/2021

Simulator Modification Report

04/26/2021

20 Annual

Operating Test

First Run

07/23/2020

20 Annual

Operating Test

Week 1

07/23/2020

20 Annual

Operating Test

Week 2

07/23/2020

20 Annual

Operating Test

Week 3

07/23/2020

20 Annual

Operating Test

Week 3X

07/23/2020

20 Annual

Operating Test

Week 4

07/23/2020

20 Annual

Operating Test

Week 5

07/23/2020

20 Annual

Operating Test

Week 2 JPM Remediation

07/23/2020

20 Annual

Operating Test

Makeup

07/23/2020

21 Annual

Operating Test,

Week 1

JPMs 1, 2, 3, 4, 5, 6

05/17/2021

21 Annual

Operating Test,

First Run

JPMs 1, 2, 3, 4, 5, 6

05/10/2021

21 Annual

Operating Test,

First Run

Scenarios 1 and 2

05/10/2021

71111.11B

Miscellaneous

21 Annual

Operating Test,

Week 1

Scenarios 1 and 2

05/17/2021

21 Biennial

Written

RO Package First Run

05/10/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Examination

21 Biennial

Written

Examination

SRO Package First Run

05/10/2021

Procedures

CF2.DC1

Configuration Management Plan for the Operator Training

Simulator

OP1.DC10

Conduct of Operations

SQA 99-2

Operator Training Simulator Software Quality Assurance

Plan

TQ1.DC28

Simulator Testing

TQ2.DC15

Licensed Operator Annual/Biennial Exam Development and

Administration

TQ2.DC3

Licensed Operator Continuing Training Program

TQ2.ID9

Conduct of Training

Self-Assessments SAPN 51078318

NRC 71111.11 Pre-Inspection Self-Assessment Report

03/11/2021

71111.11Q

Procedures

OP C-3:II

Unit 2, Main Unit Turbine Startup

STP R-17

Estimated Critical Conditions for Initial Startup

71111.12

Corrective Action

Documents

Notifications

51068560, 51070582, 51092472, 51114120

Miscellaneous

Maintenance Rule Self-Assessment for 10CFR 50.65 (a)(3)

10/14/2020

3501169474

Purchase Order, Switch Pressure 80801, D236541

Work Orders

WO 60136280, 64233883

71111.13

Corrective Action

Documents

Notification

51114120, 51114430, 51115297, 51116514, 51120302

71111.13

Corrective Action

Documents

Notifications

5111814, 51119143, 51119171

Procedures

OP O-36

Protected Equipment Postings

71111.15

Corrective Action

Documents

Notifications

51083213, 51083525, 51083526, 51083529, 51083610,

51112395, 51115230, 51120248, 51121229

Procedures

STP M9-G

Diesel Generator 24 Hour Load Test and Hot Restart Test

59B

Work Orders

WO 60130390, 60135944

71111.19

Procedures

MP M-23-Fan 4

Preventive Maintenance of Ventilation Fans with Dampers

and Inlet Vanes

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OP H-1:II

Auxiliary Building Safeguards Ventilation

OP J-9:II

25/250V DC System Operating the Battery Chargers

24A

STP M-9A1

Diesel Engine Generator 1-1 Routine Surveillance Test

STP P-CCW-A13

Comprehensive Pump Test of Component Cooling Water

Pump 1-3

Work Orders

WO 60128244, 60137163, 64152403, 64183803, 64204580,

206530, 64241156, 64245156, 64245460, 64252740

71111.20

Corrective Action

Documents

Notifications

51091739, 51098874, 51099077, 51099292, 51099355,

51116752, 51116753,

Procedures

STP M-11B

Station Battery Condition Monitoring

Work Orders

WO 240628

71111.22

Corrective Action

Documents

Notifications

50977992

Procedures

STP M-66A

Deluge System Nozzle Proof Test Startup Transformers

STP M8-G

Leak Rate Testing of Emergency Air Lock Seals

71111.22

Procedures

STP P-CCW-22

Routine Surveillance Test of Component Cooling Water

Pump 2-2

STP V-662

Penetration 62 Containment Isolation Valve Leak Testing

STP-P-ASW-A12

Comprehensive Test of Auxiliary Saltwater Pump 1-2

10B

Work Orders

WO 201294, 64205071, 64209172-100, 64236282, 64239818,

252544

71114.04

Miscellaneous

DCL-21-012/DIL-

21-001

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-76,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

2/03/2021

Tracking Number:

20-41

50.54(q) Effectiveness Evaluation Form, Proposed Activity:

Revise E-Plan Section 7 to Address Replacement/Upgrade

of Diablo Canyon Power Plant Telephone System

11/23/2020

71114.06

Corrective Action

Documents

Notifications

51123716, 51123744, 51123764, 51123765

Miscellaneous

Team Alpha Limited Scope Drill and Scenario

06/23/2021

71151

Miscellaneous

Annual MSPI Review Package

71152

Corrective Action

Notifications

51101151, 51105994, 51107259, 51086361, 51086368,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

51091806, 51111969, 51112130, 51112395, 51114350,

51114406

Miscellaneous

SAPN 51083213

Root Cause Evaluation Report

0