Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants
ML24284A312
Person / Time
Site: Diablo Canyon  
Issue date: 10/28/2024
From: Stephen Koenick
NRC/NMSS/DREFS/EPMB1
To: Ting P
US Environmental Protection Agency, Region IX
Shared Package
ML24284A300 List:
References
EPID L-2023-LNE-0004
Download: ML24284A312 (1)


Text

.

Po-Chieh Ting U.S. Environmental Protection Agency Region IX 75 Hawthorne St.

San Francisco, CA 94105

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTICE OF AVAILABILITY OF DRAFT SUPPLEMENT 62 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS (EPID NUMBER: L-2023-LNE-0004) (DOCKET NUMBERS:

50-275, 50-323)

Dear Po-Chieh Ting:

The U.S. Nuclear Regulatory Commission (NRC) staff has prepared an environmental impact statement (EIS), Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 62, Regarding License Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2, Draft Report for Comment (NUREG-1437) (DSEIS). The period to provide comments on this document will end 45 days after the Federal Register Notice of Availability is published, which is expected to be November 1, 2024.

Based on its evaluation in the DSEIS, the NRC staffs preliminary recommendation is that the adverse environmental impacts of license renewal for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Diablo Canyon) are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This preliminary recommendation is based on: (1) the analysis and findings in NUREG-1437; (2) Pacific Gas and Electric Companys environmental report; (3) the NRC staffs consultation with Federal, State, Tribal, and local governmental agencies; (4) the NRC staffs independent environmental review; and (5) the NRC staffs consideration of public comments received during the scoping process.

The DSEIS was submitted to the U.S. Environmental Protection Agency via e-NEPA and copies are also being distributed to interested Federal, State, Tribal, and local agencies, industry organizations, interest groups, and members of the public. The DSEIS will also be available for public review near Diablo Canyon at the San Luis Obispo Library, 995 Palm St, San Luis Obispo, CA 93403, and in the NRCs Agencywide Documents Access and Management System (ADAMS) at https://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession No. for the DSEIS is ML24299A167.

October 28, 2024

P. Ting 2

If further information is required, please contact NRC Senior Environmental Project Manager Kim Conway via email at Kimberly.Conway@nrc.gov.

Sincerely, Stephen S. Koenick, Chief Environmental Project Management Branch 1 Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-275, 50-323 cc: Listserv Signed by Koenick, Stephen on 10/28/24

P. Ting 3

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTICE OF AVAILABILITY OF DRAFT SUPPLEMENT 62 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS (EPID NUMBER: L-2023-LNE-0004) (DOCKET NUMBERS: 50-275, 50-323)

DATED:

DISTRIBUTION:

PUBLIC RidsNrrDnrl Resource RidsNrrPMDiabloCanyonResource BHarris, NRR/DNRL LGibson, NRR/DNRL SKoenick, NMSS/REFS MSampson, NRR/DNRL SLee, NRR/DNRL SLee NRR/DORL DRoth, OGC SBurnell, HQ/OPA AMoreno, OCA DMcIntyre, HQ/OPA VDricks, RIV/OPA RAlexander, RIV/SLO MHayes, RIV, SRI PVossmar, RIV/DRP TDR5@pge.com ADAMS Package Accession No.: ML24284A300; Letter: ML24284A812 OFFICE NMSS/REFS NMSS/REFS:LA OGC NMSS/REFS:BC NAME KConway AWalker-Smith JWachutka SKoenick DATE 10/11/2024 10/11/2024 10/22/2024 10/28/2024 OFFICIAL RECORD COPY October 28, 2024