March 10, 2023

SUBJECT:

DIABLO CANYON POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000275/2023403 AND 05000323/2023403

Dear Paula A. Gerfen:

On March 2, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant. and discussed the results of this inspection with Ryan West, Director, Nuclear Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000275, 05000323 License Nos. DPR-80, DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2023403 and 05000323/2023403

Enterprise Identifier:

I-2023-403-0000

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant

Location:

Avila Beach, CA

Inspection Dates:

February 27, 2023, to March 02, 2023

Inspectors:

D. Hostetter, Physical Security Inspector

R. Lanfear, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All requirements

Tier II: All requirements

Tier III: All requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC inspection of this program area, Security Plan Revision 17 to18 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) February 28, 2021, through February 28,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 2, 2023, the inspectors presented the security baseline inspection results to Ryan West, Director, Nuclear Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective

Action

Documents

Corrective Actions

CR-51140694, CR-511114583, CR-51144913,

CR-51145490, CR-51145634, CR-51146195,

CR-51146434, CR-51146816, CR-51149600,

CR-51149729, CR-51152510, CR-5112779,

CR-51163919, CR-51164105, CR-51164468

Multiple

71130.01

Corrective

Action

Documents

Resulting from

Inspection

Corrective Actions

CR-51182593

03/01/2023

71130.01

Miscellaneous

DCPP Form 69-20556

PADS

Multiple

71130.01

Miscellaneous

DCPP Form 69-20663

Affidavit-Return Keycard to Active Service

Multiple

71130.01

Miscellaneous

DCPP Form 69-21852

Unescorted Access Authorization Administrative

Withdrawal Checklist

Multiple

71130.01

Miscellaneous

DCPP Form 69-21853

Unescorted Access Authorization Pre-Access Denial

Checklist

Multiple

71130.01

Miscellaneous

DCPP Form 69-21854

UAA Unfavorable Termination Revocation UAA/UA

Checklist

Multiple

71130.01

Miscellaneous

DCPP Form 69-20667

Behavioral Observation Program

Multiple

71130.01

Procedures

OM11.ID1

Site Access Process

Revision 53

71130.01

Procedures

OM11.ID5

PADS Data Transfer

Revision 20

71130.01

Procedures

OM11.ID12

Process for Unescorted Access Authorization

Revision 12

71130.01

Procedures

OM11.ID4

Safety and Security for the Managed Access Program

Revision 6

71130.01

Procedures

OM14.ID3

Fitness for Duty Program

Revision 32

71130.01

Procedures

SP-105A

Access Authorization and Control of Classified Information

Revision 2

71130.01

Procedures

SP-107

Protected Area Identification Badge and Card Key Control

Revision 16

71130.01

Procedures

SP-401

Security Access Control and Personnel Identification

Revision 54

71130.01

Procedures

SP-409

Authorization of Unescorted Access Status

Revision 53

71130.01

Procedures

SP-413

Access Authorization for

NRC Personnel

Revision 12

71130.02

Corrective

Action

Documents

Corrective Actions

CR-51102713, CR-51177251, CR-51138577,

CR-51166704, CR-51166703, CR-51176356,

CR-51175416, CR-51175459

Multiple

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective

Action

Documents

Resulting from

Inspection

Corrective Actions

CR-51182504, CR-51182503, CR-51181962

Multiple

71130.02

Miscellaneous

DCPP Form 69-21565

Escort Responsibilities

06/29/2021

71130.02

Miscellaneous

DCPP Form 69-21852

Unescorted Access Authorization Administrative Withdraw

Checklist

05/17/2021

71130.02

Miscellaneous

DCPP Form 69-21885

San Luis Obispo Warehouse Checklist

2/28/2023

71130.02

Procedures

AD3.ID6

Designation and Protection of Security Information

71130.02

Procedures

SP-403

Security Escorts

71130.02

Procedures

SP-405

Incoming Package and Material Control

44A

71130.02

Procedures

SP-407

Protect Area Vehicle Control

71130.02

Procedures

SP-501

Security Lock, Key, Combination Control

24