IR 07200026/2024401

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401
ML24310A190
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 11/06/2024
From: Jesse Rollins
NRC/RGN-IV/DRSS/PSB
To: Gerfen P
Pacific Gas & Electric Co
Rollins J
References
IR 2024401
Download: ML24310A190 (6)


Text

November 06, 2024

SUBJECT:

DIABLO CANYON POWER PLANT - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200026/2024401

Dear Paula A. Gerfen:

On October 10, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Diablo Canyon Power Plant Independent Spent Fuel Storage Installation and discussed the results of this inspection with Justin Rogers, Station Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 07200026 License No. SNM 2511

Enclosure:

As stated

Inspection Report

Docket Number:

07200026

License Number:

SNM 2511

Report Number:

07200026/2024401

Enterprise Identifier:

I-2024-401-0023

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant

Location:

Avila Beach, CA

Inspection Dates:

October 7, 2024, to October 10, 2024

Inspectors:

T. Weir, Physical Security Inspector

Approved By:

Jesse M. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security inspection at the Diablo Canyon Power Plant Independent Spent Fuel Storage Installation in accordance with Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, independent spent fuel storage installation security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packings. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations

The inspection was conducted using section 02.09 of IP 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, applicable to 10 CFR Part 50 or Part 52 licensees issued a specific license for an independent spent fuel storage installation.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 10, 2024, the inspector presented the independent spent fuel storage installation security inspection results to Justin Rogers, Station Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

81311

Corrective Action

Documents

2245214, 51253072, 51245662, 51252988, 51252426,

241263, 50798387, 51251175

81311

Corrective Action

Documents

Resulting from

Inspection

257345, 51257142, 50705430

81311

Miscellaneous

PSP, SCP, T&Q

Physical Security Plan, Safeguards Contingency Plan,

Training and Qualification Plan

81311

Procedures

AD3.ID6

Designation and Protection of Security Information

81311

Procedures

MPI-44-

Microwave

Microwave Links and Transceiver Maintenance and Tamper

Testing

81311

Procedures

OM11.ID1

Site Access Process

81311

Procedures

OM11.ID10

Vehicle Access to Site and Protected Area

81311

Procedures

SP 304

Operability Testing of Intrusion Alarm System

81311

Procedures

SP 401

Security Access Control and Personnel Identification

81311

Procedures

SP 403

Security Escorts

81311

Procedures

SP 405

Incoming Package and Material Control

81311

Procedures

SP 407

Protected Area Vehicle Control

81311

Procedures

SP 412

Visitor Check in and Log out Process

81311

Procedures

SP 419A

Vehicle Barrier and Delay Gate Operation and Testing

81311

Procedures

SP 501

Security Lock, Key, and Combination Control

81311

Self-Assessments

NRC Security Baseline Inspection Readiness Assessment

Checklist

IP 81311, Physical Security Requirements for ISFSIs

08/29/24

81311

Self-Assessments

246129

Pre-Inspection Self-Assessment Access Control

09/16/2024