IR 05000275/2024003

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001
ML24298A035
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/30/2024
From: Patricia Vossmar
NRC/RGN-IV/DORS/PBA
To: Peck A
Pacific Gas & Electric Co
References
IR 2024003, IR 2024001
Download: ML24298A035 (1)


Text

October 30, 2024

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000275/2024003 AND 05000323/2024003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200026/2024001

Dear Adam Peck:

On September 30, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2. On October 3, 2024, the NRC inspectors discussed the results of this inspection with Maureen Zawalick, Vice President Business and Technical Services, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket Nos. 05000275, 05000323, and 07200026 License Nos. DPR-80, DPR-82, and SNM-2511

Enclosure:

As stated

Inspection Report

Docket Nos:

05000275, 05000323, and 07200026 License Nos:

DPR-80, DPR-82, and SNM-2511 Report Nos:

05000275/2024003, 05000323/2024003 and 07200026/2024001 Enterprise Identifier:

I-2024-003-0008 and I-2024-001-0014 Licensee:

Pacific Gas and Electric Company Facility:

Diablo Canyon Power Plant, Units 1 and 2 and ISFSI Location:

Avila Beach, CA Inspection Dates:

July 1, 2024, to September 30, 2024 Inspectors:

B. Baca, Health Physicist G. Birkemeier, Resident Inspector L. Brookhart, Senior Spent Fuel Storage Inspector L. Carson, Senior Health Physicist K. Clayton, Senior Operations Engineer J. Copeland, Reactor Inspector B. Edwards, Health Physicist J. Freeman, Spent Fuel Storage Inspector N. Garcia, Resident Inspector C. Harrington, Operations Engineer M. Hayes, Senior Resident Inspector S. Hedger, Senior Emergency Preparedness Inspector N. Hernandez, Senior Operations Engineer Z. Hollcraft, Senior Reactor Operations Engineer S. Lichvar, Technical Assistant J. O'Donnell, Senior Health Physicist C. Smith, Senior Reactor Inspector D. You, Operations Engineer Approved By:

Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On August 31, 2024, the unit reduced power to 47 percent to support condenser cleaning. The unit returned to full power on September 2, 2024. On September 14, 2024, the unit reduced power to 50 percent to support condenser cleaning. The unit returned to full power on September 16, 2024. On September 28, 2024, the unit reduced power to 45 percent to support condenser cleaning.

On September 30, 2024, the unit returned to full power.

Unit 2 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal hot temperatures for the following systems:
  • 4 kV switchgear, cable spreading room ventilation, main transformers and auxiliary transformers on July 9, 2024

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 auxiliary feedwater trains 1-2 and 1-3 on July 24, 2024
(2) Unit 1 component cooling water pump 1-3 on September 25, 2024
(3) Unit 1 residual heat removal pump 1-1 on September 26, 2024

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 125 Vdc battery 12 system on July 15, 2024.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2 radiological control area, 73-foot elevation, on July 23, 2024 (2)cable spreading room, 128-foot elevation, on July 25, 2024
(3) Unit 1 and 2 radiological control area, 54-foot and 64-foot elevations, on September 16, 2024
(4) Unit 1 radiological control area, 73-foot elevation, on September 17, 2024
(5) Unit 1 and 2 radiological control area, 85-foot elevation, on September 18, 2024
(6) Unit 1 radiological control area, 115-foot elevation, on September 23, 2024

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the:
  • intake structure and auxiliary saltwater pump vaults on September 30, 2024

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (2 Samples)

The inspectors evaluated readiness and performance of:

(1) Unit 1 component cooling water 1-1 and 1-2 heat exchangers on September 16, 2024
(2) Unit 2 emergency diesel generator 2-2 jacket water cooling radiator on September 16, 2024

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a crew of licensed operators during simulator training on August 6, 2024.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (6 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2 auxiliary saltwater train 2-2 50.65(a)(1) determination on August 2, 2024 (2)intake structure on August 12, 2024 (3)anticipated transient without scram mitigating system actuation circuitry on August 14, 2024
(4) Unit 2 125 Vdc on August 16, 2024
(5) Unit 1 condenser fouling on August 22, 2024
(6) Unit 2 auxiliary saltwater pump 2-2 motor replacement on August 22, 2024

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 auxiliary saltwater pump 2-2 motor replacement on August 19, 2024
(2) Unit 1 50 percent downpower for condenser repairs on August 31, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 unable to raise pressure in safety injection accumulators on July 29, 2024
(2) Units 1 and 2 degraded pull box for auxiliary saltwater cross tie valve on August 8, 2024
(3) Unit 2 auxiliary building ventilation exhaust fan E-1 running amps above nameplate on August 20, 2024
(4) Unit 1 atmospheric dump valve PCV-19 opens faster than action low value on September 4, 2024

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (8 Samples)

(1) Unit 2 line 1140 replacement on July 22, 2024
(2) Unit 2 residual heat removal valve RHR-V-8702 replacement on July 22, 2024
(3) Unit 2 centrifugal charging pump 2-2 return to service following maintenance on July 23, 2024
(4) Unit 1 auxiliary feedwater pump 1-1 return to service following relief valve replacement on July 25, 2024
(5) Unit 1 auxiliary building ventilation supply fan S-32 return to service from planned maintenance on July 29, 2024
(6) Unit 2 auxiliary building ventilation supply fan S-34 return to service from unplanned maintenance on July 29, 2024
(7) Units 1 and 2 containment spray 1-1 and 2-1 return to service following maintenance on August 5, 2024
(8) Unit 2 auxiliary saltwater pump 2-2 following motor replacement on August 27, 2024

Surveillance Testing (IP Section 03.01) (1 Sample)

(1) Unit 2 emergency diesel generator 2-1 monthly surveillance test on August 8, 2024

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Unit 2 auxiliary feedwater pump 2-2 testing on April 27, 2024

Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) Unit 1 reactor coolant system leakage calculation on August 13, 2024

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1)raw water reservoir supply pump 1 on July 10, 2024

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise conducted on July 31, 2024. The exercise scenario simulated a reactor coolant system leak which degraded to the point where safety injection actuation was necessary. This was followed by a loss of power to two reactor coolant pumps; a temperature monitoring system train failure; a small break loss of coolant accident; and electrical system failures which limited use of safety buses to one train. A simulated radiological release occurred via a containment penetration failure, including loss of containment spray capability. Changing meteorological conditions resulted in changes over time to the protective action recommendations.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Plan changes:
  • Diablo Canyon Power Plant Emergency Plan, appendices E, and G, revision 5.00, with implementing procedure changes (notified December 13, 2023)
  • Diablo Canyon Power Plant Emergency Plan, sections 2, 3, 10, appendix A (revision 5.00); section 4 (revision 5.02) (notified July 3, 2024)

Several screenings and evaluations associated with the 10 CFR 50.54(q) emergency plan change process were reviewed as well. These evaluations do not constitute NRC approval.

71114.06 - Drill Evaluation

Additional Drill and/or Training Evolution (1 Sample)

The inspectors evaluated:

(1) The inspectors evaluated a tabletop emergency preparedness drill on August 29,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (8 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1)115-foot elevation, South Gate frisker, Ludlum 177, 01.14.030 (2)laundry building exhaust gooseneck air monitor, 4.48.002

(3) Unit 2 main steam monitor, 2-RE-73
(4) Unit 2 containment atmosphere air monitor, 2-RE-11
(5) Unit 1 and Unit 2, (shared monitor) auxiliary control room area radiation monitor, RE-10
(6) Technical Support Center (TSC) area radiation monitor, RE-60
(7) TSC box air sampler, 04.40.45
(8) TSC continuous air monitor, 04.36.010

Calibration and Testing Program (IP Section 03.02) (13 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) Tri Carb 2910TR, liquid scintillation counter, LSC-1
(2) Mirion Lynx, gamma spectroscopy, Lynx-02
(3) Helgeson HPGe Bed, whole body counter, 200925016
(4) Mirion FastScan, whole body counter, 03018782
(5) Mirion Telepole, 03.42.011
(6) Unit 1 containment high range monitor, RM-30
(7) Unit 2 containment purge exhaust monitor, 2-RE-44A
(8) Unit 2 containment purge exhaust monitor, 2-RE-44B
(9) Unit 2 steam generator blowdown tank monitor, 2-RM-23
(10) Unit 1 spent fuel pool area radiation monitor, 1-RM-58
(11) Unit 2 spent fuel pool area radiation monitor, 2-RM-28
(12) Unit 1 control room vent radiation monitor, 1-RE-25
(13) Unit 2 control room vent radiation monitor, 2-RE26 Effluent Monitoring Calibration and Testing Program Sample (IP Section 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Unit 2 115-foot elevation penetration room Canberra air monitor, 04.16.002
(2) Unit 1 115-foot elevation penetration room Canberra air monitor, 04.16.002

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (5 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Units 1 and 2 fuel building high efficiency particulate effluent ventilation systems
(2) Units 1 and 2 auxiliary building effluent and ventilation sampling system
(3) Unit 2 process waste receiver tank and liquid radwaste treatment system
(4) Units 1 and 2 containment hydrogen purge system
(5) Units 1 and 2 plant and turbine building effluent ventilation and sampling systems

Sampling and Analysis (IP Section 03.02) (3 Samples)

Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:

(1) Units 1 and 2, laundry and liquid radioactive waste (LRW) batch process gamma isotopic and tritium sampling dated August 13, 2024
(2) Unit 2 routine plant vent exhaust gamma isotopic, particulate and iodine filter air samples, and tritium sampling dated August 15, 2024
(3) Unit 2 LRW process waste receiver tank gamma isotopic and tritium sampling dated August 14, 2024

Dose Calculations (IP Section 03.03) (4 Samples)

The inspectors evaluated the following dose calculations:

(1) Unit 1 liquid effluent discharge permit, L-20210324-040-B
(2) Unit 1 plant vent discharge permits, 4th quarter 2022: G-2022-0286, 0287, 0302, 0318, and 0327
(3) Unit 2 plant vent discharge permit, G-2024-0209, dated July 25, 2024
(4) Units 1 and 2 liquid radwaste batch discharge, process waste receiver tank permit, L-2024-0511, dated August 15, 2024 Abnormal Discharges (IP Section 03.04)

The inspectors evaluated the inspection period and identified no abnormal discharges to review.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative (GPI) program to identify incomplete or discontinued program elements.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage (IP Section 03.01)

The inspectors evaluated the licensees performance in controlling, labeling, and securing the following radioactive materials:

(1)radwaste storage building, 115-foot elevation - vaults and bays (2)auxiliary building, 64-foot/100-foot/115-foot elevations - tanks. demineralizers, and filters (3)turbine building mezzanine, 119-foot elevation - portable instrument calibration laboratory

Radioactive Waste System Walkdown (IP Section 03.02) (3 Samples)

The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality:

(1) Units 1 and 2 dry active waste
(2) Units 1 and 2 mechanical filters
(3) Units 1 and 2 ion exchange resin

Waste Characterization and Classification (IP Section 03.03) (3 Samples)

The inspectors evaluated the following characterization and classification of radioactive waste:

(1)2022 and 2023 dry active waste (2)2022 and 2023 spent cartridge filters (3)2022 and 2023 spent ion exchange and filter media Shipment Preparation (IP Section 03.04)

The shipment observation was completed in a previous inspection in April 2024.

Shipping Records (IP Section 03.05) (5 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1) RWS-22-001 (SR-2172-0032), shipped dewatered resin (LSA-II) in a metal liner (21-J-001) on July 19, 2022
(2) RWS-23-001 (SR-2172-0034), shipped dewatered resin (Type-B) in a metal liner (22-R-001) on January 27, 2023
(3) RWS-23-002 (SR-2172-0035), shipped cement encapsulated mechanical filters (LSA-II) in a metal liner (21-F-001) on April 4, 2023
(4) RWS-24-001 (SRM1137002), shipped dewatered resin (LSA-II) in a metal liner (22-J-001) on February 27, 2024
(5) RWS-24-002 (SRM11370003), shipped dewatered resin (LSA-II) in a metal liner (23-F-001) on June 18,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (July 1, 2023, through June 30, 2024)
(2) Unit 2 (July 1, 2023, through June 30, 2024)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2023, through June 30, 2024)
(2) Unit 2 (July 1, 2023, through June 30, 2024)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (July 1, 2023, through June 30, 2024)
(2) Unit 2 (July 1, 2023, through June 30, 2024)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) July 1, 2023, through June 30, 2024 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) July 1, 2023, through June 30, 2024 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) July 1, 2023, through June 30,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===60855 - Operation Of An ISFSI The inspectors performed a review of the licensees independent spent fuel storage installation (ISFSI) activities to verify compliance with requirements of the site-specific License SNM-2511, License Amendment 5, and the Diablo Canyon ISFSI Final Safety Analysis Report (FSAR),revision 10. The inspectors reviewed selected procedures, corrective action reports, and records to verify ISFSI operations were compliant with the site-specific technical specifications, requirements in the FSAR, and NRC regulations.

Operation Of An ISFSI===

(1) The inspectors evaluated the licensees dry cask storage operations, from July 29 through August 2, 2024, during an on-site inspection. The Diablo Canyon ISFSI consisted of seven concrete pads for a total area of 49,980 square feet. Each pad was designed to hold 20 Holtec International HI-STORM 100SA storage casks which are securely anchored to steel embedment plates in the concrete. At the time of the inspection, the ISFSI contained 59 storage casks (out of 140 total possible) loaded with multi-purpose canisters, each with 32 spent fuel assemblies (MPC-32) and the licensee was in the process of loading and processing the 60th canister.

During the on-site inspection, the inspectors evaluated and observed the following activities:

  • walk-down of the ISFSI pad and heavy haul path
  • fuel loading operations
  • heavy load lifts using the cask handling crane to remove the transfer cask with the loaded canister from spend fuel pool to the canister processing area
  • processing of the spent nuclear fuel for storage, including bulk water removal, forced helium dehydration, and helium backfill operations
  • heavy load lifts using the cask handling crane to remove the transfer cask with the loaded canister from the canister processing area to the cask transporter
  • transportation of the 60th canister on the vertical cask transporter from the spent fuel building to the ISFSI using the cask transporter
  • heavy load lifts to transfer the canister from the transfer cask to the HI-STORM The inspectors reviewed and evaluated the following documentation during the inspection:
  • fuel contents for the canisters loaded since the last NRC ISFSI inspection, the inspectors reviewed the contents of casks 59-60 against the license's technical specifications for approved contents
  • radiation surveys for dose at the owner-controlled boundary to verify compliance with the requirements of 10 CFR 72.104 for calendar years 2021, 2022, and 2023
  • selected ISFSI related condition reports (CRs) issued since the last NRC ISFSI inspection (January 2021)
  • quality assurance (QA) program implementation, including recent QA audits, surveillances, receipt inspection, and quality control activities related to ISFSI operations
  • compliance to technical specifications for operational surveillance activities and FSAR required annual maintenance activities
  • documentation of annual maintenance activities for the sites cask handling crane and vertical cask transporter
  • selected licensee design changes and program changes to the ISFSI performed under the site's 10 CFR 72.48 program
  • changes made by the licensee in the ISFSI FSAR from revision 8 to revision

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 1, 2024, the inspectors presented the independent spent fuel storage installation inspection results to Adam Peck, Acting Senior Vice President, Generation and Chief Nuclear Officer, and other members of the licensee staff.
  • On August 21, 2024, the inspectors presented the public radiation safety inspection results to Adam Peck, Acting Senior Vice President, Generation and Chief Nuclear Officer, and other members of the licensee staff.
  • On October 3, 2024, the inspectors presented the emergency preparedness exercise inspection results to Maureen Zawalick, Vice President, Business and Technical Services and other members of the licensee staff.
  • On October 3, 2024, the inspectors presented the integrated inspection results to Maureen Zawalick, Vice President Business and Technical Services, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

60855

Corrective Action

Documents

Notifications 1-1-

21 to 8-1-2024

List of Corrective Action Reports Generated since Last

NRC ISFSI Inspection

60855

Corrective Action

Documents

Resulting from

Inspection

249057

ISFSI Lifts Design and Licensing Review Regarding

Heavy Lifts of Overpack Lid and Mating Device

60855

Engineering

Evaluations

Cask 08-01_U1

Fuel Selection Packet for Cask 08-01

60855

Engineering

Evaluations

Cask 08-02_U1

Fuel selection packet for Cask 08-02

60855

Miscellaneous

160407, Amendment

No. 5

Amendment No. 5 To Materials License No. SNM-2511

For The Diablo Canyon Independent Spent Fuel Storage

Installation

60855

Miscellaneous

23-IA-09 2023

ISFSI and Fuel

Management Audit

23 ISFSI and Fuel Management Audit Report

60855

Miscellaneous

DIL-23-011 ISFSI

FSAR

Materials License No. SNM-2511, Docket No. 72-26

Diablo Canyon Independent Spent Fuel Storage

Installation Biennial Submittal of Diablo Canyon

Independent Spent Fuel Storage Installation Updated

Final Safety Analysis Report

60855

Miscellaneous

Response-RFI-009

List of ISFSI Related Modifications/72.48 Screenings

60855

Procedures

23 FHB Crane

Annual PM

Fuel Handing Building Overhead Crane PM Required by

ASME B30.2

60855

Procedures

STP_I-1-Au1R145

Routine Shift Checks Required by Licenses - Vent

Surveillances

145

60855

Radiation

Surveys

87085 ISFSI Pad

Annual

Annual Survey of ISFSI Pad Area

71111.01

Procedures

AD7.ID20

Summer Peak Period Readiness

71111.01

Procedures

CP M-16

Severe Weather

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Corrective Action

Documents

Notifications

51151588, 51205737, 51223174

71111.04

Drawings

106710-2

Residual Heat Removal System

71111.04

Drawings

106714-2

Component Cooling Water Pumps, Heat Exchanger &

Surge Tank

71111.04

Drawings

437639

Unit 1, Electrical Schematic Diagram, 125 Volt DC

System

71111.04

Miscellaneous

106703

P&ID of Unit 1 Auxiliary Feedwater System

71111.04

Miscellaneous

S-67 DOC

Design Criteria Memorandum S67 125V and 250V DC

System

71111.04

Procedures

OP B-2:I

RHR System Alignment Verification for Plant Startup

71111.04

Procedures

OP D-1:I

Auxiliary Feedwater System - Make Available

71111.04

Procedures

OP D-1:II

Auxiliary Feedwater System - Alignment Verification for

Plant Startup

71111.04

Procedures

OP F-2:VI

CCW System Alignment Verification for Plant Startup

71111.04

Work Orders

WO 64199950, 64225865, 64248751, 64278695, 64282582,

285825, 64292703, 64293954, 64295363

71111.05

Drawings

111805-10

Radiological Control Area (RCA) Elev. 85'

71111.05

Drawings

111805-14

Radiological Control Area (RCA) & H Block Elev. 115'

71111.05

Drawings

111805-6

Radiological Control Area (RCA) Elev. 54' & 64'

71111.05

Drawings

111805-8

Radiological Control Area (RCA) Elev. 73'

71111.05

Fire Plans

111805-26

H Block Elevation 128', 154', & 164'

71111.06

Calculations

Intake Structure Water Tight Doors

01/30/1982

71111.06

Corrective Action

Documents

Notifications

51164470, 51164522, 51220638, 51220692

71111.06

Miscellaneous

RPE Number: 8000000434, Part: 3, Version: 0, PIMS

Legacy No: C-1001

09/27/2018

71111.06

Miscellaneous

Specification No.

26

Specification for Furnishing and Developing of Intake

Structure Watertight Doors for Units 1 and 2

10/15/1970

71111.06

Work Orders

WO 6015286, 6050595, 6426621-0100, 60147661,

60152585, 60157766, 64147172, 64148027, 64257992-

0010, 64257992-0020, 64257992-0030, 64257992-0040,

258005-0020, 64258005-0030, 64258005-0040,

264530-0100, 64264935, 64265025-0100, 64265026-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0100, 64271131, 64271639, 64274887, 64275888,

277421, 64278931-0010, 64278931-0020, 64278931-

0300, 64278931-0400, 64278952-0010, 64278952-0020,

278952-0030, 64278952-0040, 64286552-0100,

290475, 64290508

71111.07A

Engineering

Evaluations

20DC-23.22

DCPP CCW 1-1 and 1-2 Heat Exchanger Test

2/27/2023

71111.07A

Work Orders

201059

71111.11Q

Procedures

TQ2.DC15

Licensed Operator Annual/Biennial Exam Development

and Administration

71111.11Q

Procedures

TQ2.DC3

Licensed Operator Continuing Training Program

71111.11Q

Procedures

TQ2.ID4

Training Program Implementation

and 57

71111.12

Corrective Action

Documents

Notifications

50505451, 50505452, 50505453, 50505454, 51057902,

201169, 51225736, 51230333, 51237786, 51240081,

249401

71111.12

Miscellaneous

CMR-2.5

Maintenance Rule Monitoring Per 10CFR50.65, Intake

Structure and Intake Control Building

71111.12

Miscellaneous

PC-17B-01

Units 1&2 ASW Maintenance Rule Performance Criteria

Worksheet

71111.12

Miscellaneous

PC-35-01

Units 1&2 AMSAC Maintenance Rule Performance

Criteria Worksheet

71111.12

Miscellaneous

Report #

VL_22005_041322

Diablo Canyon Power Plant Test and Analysis of

Structural Concrete During 1R23, Inspection of the

Circulating Water Conduits TS, CWP, and ASW

Forebays, Discharge Conduits, Intake Structure and

Associated Structures

04/13/2022

71111.12

Miscellaneous

Report #

VL_22022_082522

Diablo Canyon Power Plant Test and Analysis of Non-

Submerged Structural Concrete of the Intake Structure

08/25/2022

71111.12

Miscellaneous

Report # VL_DCPP

2R23_22057_020223

Diablo Canyon Power Plant Test and Analysis of

Structural Concrete During 2R23, Inspection of the

Circulating Water Conduits TS, CWP, and ASW

Forebays, Discharge Conduits, Intake Structure and

Associated Structures

2/02/2023

71111.12

Procedures

AWP E-016

Inspection Guide - Maintenance Rule Structural

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Monitoring Programs - Civil

71111.12

Procedures

MA1.ID17

Maintenance Rule Monitoring Program

71111.12

Procedures

MA1.NE1

Maintenance Rule Monitoring Program - Civil

Implementation

71111.12

Procedures

MP I-9.2-1

AMSAC Maintenance

71111.12

Procedures

TS1.ID4

Saltwater System Aging Management Program

71111.13

Corrective Action

Documents

Notifications

242607, 51252637

71111.13

Procedures

AD7.ID14

Assessment of Integrated Risk

71111.13

Procedures

B-42

Selecting RMA(s) for Specific RMTS RICT Configurations

71111.13

Procedures

OP AP-10

Loss of Auxiliary Salt Water

71111.13

Procedures

OP O-36

Protected Equipment Postings

71111.13

Procedures

OP1.DC44

Risk Informed Completion Time Program

71111.15

Corrective Action

Documents

Notifications

51077391, 51221141, 51241451, 51242057, 51248173,

248288, 51250722, 51250806

71111.15

Miscellaneous

SC-I-9-L950

Accumulator Narrow Range Level Channel L950 through

L957

71111.15

Miscellaneous

TV-9-1

Scaling Calculation for Accumulator Volume

71111.24

Corrective Action

Documents

Notifications

51040620, 51070772, 51096718, 51163281, 51192449,

211179, 51221732, 51242800, 51248173

71111.24

Procedures

MP E-53.10A

Preventive Maintenance of Limitorque Motor Operators

71111.24

Procedures

MP M-51.5

Testing and Maintenance of Safety/Relief Valves

71111.24

Procedures

OP B-1A:V

CVCS - Transfer Charging Pumps

71111.24

Procedures

OP E-5:II

Auxiliary Saltwater System Two CCW Heat Exchanger

Operation

71111.24

Procedures

STP I-1B

Routine Daily Checks Required by Licenses

136

71111.24

Procedures

STP M-26

ASW System Flow Monitoring

71111.24

Procedures

STP M09A1

Diesel Engine Generator 2-1 Routine Surveillance Test

71111.24

Procedures

STP P-AFW-11

Routine Surveillance Test of Turbine-Driven Auxiliary

Feedwater Pump 1-1

71111.24

Procedures

STP P-AFW-22

Routine Surveillance Test of Motor-Driven Auxiliary

Feedwater Pump 2-2

71111.24

Procedures

STP P-ASW-12

Routine Surveillance Test of Auxiliary Saltwater Pump 1-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.24

Procedures

STP P-ASW-A

Performance Test of Auxiliary Saltwater Pumps

2B

71111.24

Procedures

STP P-CSP-11

Routine Surveillance Test of Containment Spray Pump 1-

21B

71111.24

Procedures

STP P-CSP-21

Routine Surveillance Test of Containment Spray Pump 2-

71111.24

Procedures

STP V-2B

Exercising and Position Verification of Valves 9001A and

9001B

11A

71111.24

Procedures

STP V-2U2D

Exercising SG 2-2 AFW Supply Valves LCV-107 and

LCV-111

71111.24

Procedures

STP V-3I3A

Full Stroke Exercise of Containment Spray Valve CS-

9001A

71111.24

Procedures

STP V-3P5

Exercising Valves LCV-106, 107, 108, and 109 Auxiliary

Feedwater Pump Discharge

71111.24

Procedures

STP V-3P6A

Exercising Valves LCV-110 and LCV-111 Auxiliary

Feedwater Pump Discharge

71111.24

Work Orders

WO 60150734, 60155449, 60160297, 64117602, 64262193,

272329, 64273807, 64276980, 64283834, 64284428,

284677, 64285637, 64286511, 64286518, 64287707,

287734, 64291705, 64291728, 64297837

71114.01

Corrective Action

Documents

Notifications

51145089, 51145525, 51143787, 51149293, 51160172,

51163473, 51164074, 51164376, 51165497, 51165698,

51170459, 51180236, 51180312, 51184118, 51186644,

200527, 51200956, 51203485, 51203781, 51204562,

204723, 51218970, 51245707, 51245817, 51250334,

249372

71114.01

Corrective Action

Documents

Resulting from

Inspection

Notifications

248637, 51252987

71114.01

Miscellaneous

July 31, 2024 Evaluated Exercise Performance

Summary, Diablo Canyon Power Plant, Management

Critique and Debrief

08/15/2024

71114.01

Procedures

EP EF-3

Activation and Operation of the Emergency Operations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Facility

71114.01

Procedures

EP G-3

Emergency Notification of Offsite Agencies

71114.01

Procedures

EP G-4

Assembly and Accountability

71114.01

Procedures

EP G-5

Evacuation of Non-Essential Site Personnel

71114.01

Procedures

EP RB-10

Protective Action Recommendations

71114.01

Procedures

EP RB-16

Operating Instructions for the EARS Computer Program

71114.01

Procedures

EP RB-8

Instructions for Field Monitoring Teams

71114.04

Miscellaneous

DCL-23-128, DIL-23-

010

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

2/13/2023

71114.04

Miscellaneous

DCL-24-068; DIL-24-

008

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

07/03/2024

71114.04

Miscellaneous

Tracking Number:

23-14

50.54(q) Effectiveness Evaluation - Evaluate the

Differences Between the 2012 and 2022 DCPP ETE

Reports

09/26/2023

71114.04

Miscellaneous

Tracking Number:

23-15

Revise EP RB-10, Protective Action Recommendations

11/15/2023

71114.04

Miscellaneous

Tracking Number:

23-16

Revise Procedure EP G-3 to Address Change in RPSA

Ocean PAR Strategy

11/15/2023

71114.04

Miscellaneous

Tracking Number:

23-17

50.54(q) Effectiveness Evaluation - Revise the Method to

Determine 5 or 10 Nautical Mile Ocean Areas for the

Rapidly Progressing Severe Accident (RPSA) Scenario

09/26/2023

71114.04

Miscellaneous

Tracking Number:

23-18

Revise Appendix G to the Emergency Plan

09/26/2023

71114.04

Miscellaneous

Tracking Number:

24-07

50.54(q) Effectiveness Evaluation - Recovery and Re-

entry Plan Changes

04/24/2024

71114.04

Procedures

OM10.ID2

Emergency Plan Revision and Review

13A

71124.05

Calculations

Annual verification of calibration for the JL Shepherd

model 89 irradiator 260Ci Cs-137 RS-001

06/06/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.05

Calculations

Annual verification of calibration for the JL Shepherd

model 89 irradiator 400Ci Cs-137 RS-002

2/28/2024

71124.05

Calibration

Records

Calibration of the Bed IN VIVO Counting System

07/03/2024

71124.05

Calibration

Records

Calibration of the Mirion Fast Scan WBC System

05/20/2024

71124.05

Calibration

Records

03.32.103

Calibration of portable instrument

03/22/2024

71124.05

Calibration

Records

04.16.001

Calibration of Continuous Air Monitor

09/14/2023

71124.05

Calibration

Records

249448

Containment High Range Calibration of RM-30

08/17/2022

71124.05

Corrective Action

Documents

SAPN

51163436, 51164003, 51170813, 51181901, 51187879,

51189557, 51192351, 51198075, 51200267, 51202004,

217207, 51221407, 51227240, 51227709, 51230214,

238041

71124.05

Procedures

CAP B-50:I

Liquid Scintillation Analyzer Model 2910 Operation

71124.05

Procedures

CAP B-53:III

Operation of the Canberra APEX Gamma Spectroscopy

System

71124.05

Procedures

MP I-RC28

Calibration of Ludlum 177 Count Rate Meter

71124.05

Procedures

MP I-RD44

Mirion TelePole II Calibration

71124.05

Procedures

RCP D-353

Canberra Fastscan Whole Body Counter Operation

71124.05

Procedures

RCP D-363

Canberra/Helgeson Bed Counter Operation

71124.05

Procedures

RCP D-900

Performance Tests for Radiation Protection Instruments

71124.05

Procedures

RCP D-936

Canberra GEM-5 Portal Monitor Operation

71124.05

Procedures

RCP D-937

Canberra Argos-5 Contamination Monitor Operation

71124.05

Procedures

RCP D-980

Operation of the J.L. Shepherd Model 89 Calibrator

71124.05

Procedures

STP I-18N1

Functional Test of Containment High Range Area

Radiation Monitors RM-30 & RM-31

71124.06

Calculations

Liquid Effluents Error Calculation Bases

08/01/2024

71124.06

Calculations

Continuous Release Gross Alpha Error

08/14/2024

71124.06

Calculations

SBC-2022-004

Radiation Monitor Basis and Calculation (SBC) RM-14

and RM-18

2/20/2024

71124.06

Corrective Action

SAPN

51185282, 51215549, 51239823, 51249378, 51249507,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

2153538

71124.06

Corrective Action

Documents

Resulting from

Inspection

SAPN

250547, 51250549,

71124.06

Drawings

CAP A-8 Attachment

Gaseous Releases Monitored for Radioactivity

71124.06

Drawings

FSAR Figure 11.2-2

Liquid Radwaste Process Flow Diagram

71124.06

Miscellaneous

23

23 Diablo Canyon Power Plant Land Use Census

Report

2/26/2023

71124.06

Miscellaneous

DCL-22-017

21 Annual Radioactive Effluent Release Report

04/21/2022

71124.06

Miscellaneous

DCL-23-025

22 Annual Radioactive Effluent Release Report

05/01/2023

71124.06

Miscellaneous

DCL-24-027

23 Annual Radioactive Effluent Release Report

04/28/2024

71124.06

Miscellaneous

G-2022-0286

Unit-1 Plant Vent Discharge Permit

10/22/2022

71124.06

Miscellaneous

G-2022-0287

Unit-1 Plant Vent Discharge Permit

10/31/2022

71124.06

Miscellaneous

G-2022-0288

Unit-2 Plant Vent Discharge Permit

11/01/2022

71124.06

Miscellaneous

G-2024-0209

Discharge of Plant Vent U2

07/25/2024

71124.06

Miscellaneous

L-2024-0511

Unit 2 Processed Waste Receiver Tank

08/16/2024

71124.06

Procedures

CAP A-5

Liquid Radwaste Management Discharge

71124.06

Procedures

CAP A-5:1

Liquid Radwaste Management Infrequent Discharges and

Processes

71124.06

Procedures

CY2.1D1

Radioactive Liquid & Gaseous Effluent Monitoring

16A

71124.06

Procedures

CY2.DC1

Radiation Monitoring System High Alarm Setpoint Control

Program

71124.06

Procedures

OP G-1: II

Liquid Radwaste System - Discharge of Liquid Radwaste

71124.06

Procedures

PEP M-2

U-2 Containment Hydrogen Purge Ventilation System -

DOP and Halide Penetrations Test

2D

71124.06

Procedures

PEP M2

U-1 Containment Hydrogen Purge Ventilation System -

DOP and Halide Penetrations Test

2B

71124.06

Procedures

U1 STP M-3A

Auxiliary Building Ventilation System - DOP and Halide

Penetrations Test

71124.06

Procedures

U1 STP M-41

Fuel Handling Building Ventilation System - DOP and

Halide Penetrations Test

21A

71124.06

Procedures

U2 STP M-3A

Auxiliary Building Ventilation System - DOP and Halide

17A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Penetrations Test

71124.06

Procedures

U2 STP M-41

Fuel Handling Building Ventilation System - DOP and

Halide Penetrations Test

71124.06

Self-

Assessments

23-IA-01

23 Chemistry and Environmental Operations Audit

2/08/2023

71124.06

Self-

Assessments

NUPIC Audit/Survey

Number 25092

Mirion Technologies (Canberra) Incorporated

2/10/2021

71124.06

Self-

Assessments

NUPIC Audit/Survey

Number 25226

Gel Laboratories, LLC

05/05/2022

71124.06

Self-

Assessments

WO 51212473

Quick Hit: Radioactive Gaseous and Liquid Effluents

Treatment

05/02/2024

71124.06

Self-

Assessments

Work Order No.

664668

Gel Labs LLC QC Part 61 Sample Analysis

05/24/2024

71124.06

Work Orders

WO 64282134

U2 CCW Liquid Radiation Monitor 2RM-17B

05/15/2024

71124.06

Work Orders

WO 64285550

U1 Steam Generator Blowdown 1-RM-23

05/17/2024

71124.06

Work Orders

WO 64285559

Functional Test Steam Generator Blowdown 1-RM-19

05/17/2024

71124.06

Work Orders

WO 64285823

Functional Test Liquid Radwast2 0-RM-18

05/16/2024

71124.07

Corrective Action

Documents

SAPN

51131543, 51132123, 51132124, 51132125, 51133810,

51140164, 51147904, 51155074, 51157011, 51160198,

214949,

71124.07

Corrective Action

Documents

SAPN -

Meteorological

Equipment

51124808, 51126056, 51127383, 51127972, 51128495,

51129600, 51131240, 51135262, 51135843, 51136017,

51136971, 51137053, 51139141, 51140978, 51140978,

51140979, 51143121, 51150244, 51153935, 51154602,

51159767, 51162364, 51163483, 51163650, 51165489,

51167578, 51167599, 51173405, 51180944, 51182741,

51183117, 51183180, 51183353, 51184562, 51184883,

51185612, 51193639, 51196438, 51198493, 51199441,

51199443, 51199711, 51202672, 51205803, 51206280,

211916, 51220449, 51220476, 51222020, 51223244,

223899, 51224435, 51225198, 51230903, 51236732,

241982, 51244606, 51246964, 51247628

71124.07

Miscellaneous

21 Annual Quality Assurance Report for The

Radiological Environmental Monitoring Program (REMP)

03/01/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.07

Miscellaneous

22 Annual Quality Assurance Report for The

Radiological Environmental Monitoring Program (REMP)

03/17/2023

71124.07

Miscellaneous

23 Annual Quality Assurance Report for The

Radiological Environmental Monitoring Program (REMP)

2/28/2024

71124.07

Miscellaneous

21 Annual Radiological Environmental Operating

Report - Diablo Canyon Power Plant: January 1, 2021 -

December 31, 2021

04/07/2022

71124.07

Miscellaneous

22 Annual Radiological Environmental Operating

Report - Diablo Canyon Power Plant: January 1, 2022 -

December 31, 2022

04/26/2023

71124.07

Miscellaneous

23 Annual Radiological Environmental Operating

Report - Diablo Canyon Power Plant: January 1, 2023 -

December 31, 2023

04/29/2024

71124.07

Miscellaneous

Diablo Canyon Power Plant - XOQDOQ Analysis for

Calendar Year 2023 Based on the 2019-2023 Joint

Frequency Distribution of Wind and Stability

71124.07

Miscellaneous

Updated Site Conceptual Model Report - Diablo Canyon

Power Plant

06/21/2024

71124.07

Miscellaneous

22-SA-003

Joint Utility Audit of F&J Specialty Products

2/17/2022

71124.07

Procedures

RCP EM-1

Radiological Environmental Biological Sampling

71124.07

Procedures

RCP EM-2

Radiological Environmental Air Sampling

71124.07

Procedures

RCP EM-3

Use of Environmental Thermoluminescent Dosimeters

71124.07

Procedures

RCP EM-5

DCPP Groundwater Sampling

71124.07

Procedures

RCP EM-6

Radiological Environmental Carbon-14 Air Sampling

71124.07

Procedures

RP1.ID11

Environmental Radiological Monitoring Procedure

71124.07

Procedures

RP1.ID13,

DCPP Ground Water Protection Initiative Program

71124.07

Procedures

STP I-40-M559.B

Primary Meteorology Wind Direction, Wind Speed, and

Air Temperature/DT Cal

71124.07

Procedures

STP I-40-M569.B

Backup Meteorology Wind Direction, Wind Speed, and

Air Temperature/Delta-T

71124.07

Self-

Assessments

SAPN 51162114

Groundwater Protection Initiative (GPI) Self-Assessment

01/25/2024

71124.08

Corrective Action

Documents

SAPN

51160713, 51164094, 51169372, 51178823, 51179046,

51187916, 51188032, 51189637, 51198588, 51198717,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

210813, 51212476, 51215724, 51217373, 51225805,

226348, 51230411, 51230571, 51236858

71124.08

Miscellaneous

230173

National Source Tracking Inventory - 2022

01/04/2022

71124.08

Miscellaneous

246082

National Source Tracking Inventory - 2023

01/17/2023

71124.08

Miscellaneous

261930

National Source Tracking Inventory - 2024

01/18/2024

71124.08

Miscellaneous

272271

STP G-19 Radioactive Source Leak Testing

10/10/2023

71124.08

Miscellaneous

OSGSF Activity

Storage Records

01/06/2024

71124.08

Procedures

RCP D-620

Radioactive Source Control Program

71124.08

Procedures

RCP D-631

Radioactive Material Shipments

71124.08

Procedures

RCP RW-13

Storage and Accountability of Low-Level Radioactive

Waste

8A

71124.08

Procedures

RP1.DC2

Advance Notification of High Level RAM Shipments

4A

71124.08

Procedures

RP1.ID14

Radioactive Material Control

71124.08

Procedures

RP1.ID18

Transportation Security Plan

71124.08

Procedures

RP2

Solid Low-Level Radioactive Waste Management

8D

71124.08

Procedures

RP2.DC2

Radwaste Solidification Process Control Program

71124.08

Radiation

Surveys

73812

Entered OSGSF with NRC to perform inspection

08/25/2020

71124.08

Radiation

Surveys

87667

23-R-001 Spent Resin Liner survey for shipment

07/12/2023

71124.08

Radiation

Surveys

93965

115 Backyard Vault 24 and 25 RM-84 and was

transported to the 119 Cal. Facility for Calibration

05/16/2024

71124.08

Radiation

Surveys

94480

RW Monthly

07/08/2024

71124.08

Radiation

Surveys

94562

24-K-023 U2 SFP Pit Filter change and spent filter

storage

07/16/2024

71124.08

Self-

Assessments

22

Radiation Protection Section Annual Review

10/06/2023

71124.08

Self-

Assessments

212476

Quick Hit Self-Assessment: Radioactive Solid Waste

Processing and Radioactive Material Handling, Storage

and Transportation

07/10/2024

71124.08

Self-

Assessments

215724

23 Part 37

2/07/2023

71124.08

Self-

217373

Annual Part 37 Security Review

05/02/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Assessments

71151

Corrective Action

Documents

Notifications

51161238, 51203661, 51205659, 51216912

71151

Miscellaneous

Bravo Team Full Scope Drill, 8/16/2023, Narrative

Summary

08/16/2023

71151

Miscellaneous

RHR, CCW, AFW, and ASW Technical Specification

Reports (Q3 2023-Q2 2024)

71151

Miscellaneous

DEPI PEG-02

Drill and Exercise Performance Indicator (DEPI)

Performance Evaluation Guide (PEG)

04/25/2023

71151

Miscellaneous

DEPI PEG-04

Drill and Exercise Performance Indicator (DEPI)

Performance Evaluation Guide (PEG)

04/25/2023

71151

Miscellaneous

DEPI PEG-10

Drill and Exercise Performance Indicator (DEPI)

Performance Evaluation Guide (PEG)

04/25/2023

71151

Miscellaneous

DEPI PEG-16

Drill and Exercise Performance Indicator (DEPI)

Performance Evaluation Guide (PEG)

04/25/2023

71151

Miscellaneous

ROP-MSPI-CWS

MSPI Indicator Margin, Units 1 and 2

07/11/2024

71151

Miscellaneous

ROP-MSPI-CWS

MSPI Derivation Report, Units 1 and 2

07/11/2024

71151

Miscellaneous

ROP-MSPI-HRS

MSPI Indicator Margin, Units 1 and 2

07/11/2024

71151

Miscellaneous

ROP-MSPI-HRS

MSPI Derivation Report, Units 1 and 2

07/11/2024

71151

Miscellaneous

ROP-MSPI-RHR

MSPI Indicator Margin, Units 1 and 2

07/11/2024

71151

Miscellaneous

ROP-MSPI-RHR

MSPI Derivation Report, Units 1 and 2

07/11/2024

71151

Procedures

AWP EP-001

Emergency Preparedness Performance Indicators

24