August 03, 2022

SUBJECT:

DIABLO CANYON POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000275/2022401 AND 05000323/2022401

Dear Ms. Gerfen:

On July 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant. On July 14, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2022401 and 05000323/2022401

Enterprise Identifier:

I-2022-401-0012

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant

Location:

Avila Beach, CA

Inspection Dates:

July 11, 2022 to July 15, 2022

Inspectors:

D. Hostetter, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered in this IP. Specifically, the licensee did not initiate a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP and Physical Security Plan Revision 17 remains current.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) October 1, 2021 through April 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 14, 2022, the inspectors presented the security baseline inspection results to Ms. Paula Gerfen, Site Vice President and Chief Nuclear Officers and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

51132998, 511334664, 51136624, 51136764, 51137149,

51137242, 51137784, 51138393, 51140123, 51141833,

51142439, 51145528, 51147632, 51147738, 51148108,

51148707, 51148869, 51149643, 51149861, 51150555,

51150918, 51152766, 51155218

Multiple

Corrective Action

Documents

Resulting from

Inspection

Corrective

Actions

51158354, 51158376

Multiple

AD3.ID6

Designation & Protection of Security Information

Revision 16

Diablo Canyon

Nuclear Power

Plant Physical

Security Plan

Physical Security Plan, Training & Qualification Plan,

Safeguards Contingency Plan, and Independent Spent Fuel

Storage Installation Security Program

Revision 17

EP-G4

Assembly and Accountability

Revision 31

OM11.ID1

Site Access Process

Revision 51

OM11.ID10

Vehicle Access to Site and Protected Area

Revision 4

OM11.ID9

Visitor Escorts

Revision 5

Security

Procedure 401

Security Access Control & Personnel Identification

Revision 53

Security

Procedure 401,

Form 69-20716, Temporary Card Key Assignment Log

Multiple

Security

Procedure 403

Security Events

Revision 16

Security

Procedure 405

Incoming Package and Material Control

Revision 44A

Security

Procedure 405,

Form 69-11013, Materials Verification

Multiple

71130.02

Procedures

Security

Procedure 405,

Form 69-21130, Point of Origin Search - Tamper Seal Log

Multiple

Dates

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Security

Procedure 405,

Form 69-21885, San Luis Obispo Warehouse Checklist

Multiple

Security

Procedure 406

Site Vehicle Access

Revision 18

Security

Procedure 407

Protected Area Vehicle Control

Revision 30

Security

Procedure 407,

Form 69-10002, Vehicle Control Log

Multiple

Security

Procedure 412

Visitor Check-in & Log-out Process

Revision 44

Security

Procedure 418

Hand Geometry System

Revision 12

Security

Procedure 419

Vehicle Barrier System

Revision 15

Security

Procedure 419A

Vehicle Barrier System & Delay Gate Operation Testing

Revision 21

Security

Procedure 501

Security Lock, Key & Combination Control

Revision 24

Security

Procedure 501,

Form 69-21458, Key Assignment Request

Multiple

Security

Procedure 501,

Form 69-10049, Weekly Key Audit

Multiple

Security

Procedure 501,

Form 69-11011, Quarterly Core and Key Audit

Multiple

Security

Procedure 608,

10

Form 69-11029, Protected and Vital Area Entry Log

Multiple

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Security

Procedure 614

Emergency Key Issue

Revision 9

Security

Procedure 614,

Form 69-21442, Shift Manager's Key Log

Multiple

Security

Procedure 618

Implementation of Two-Person Rule - Vital Areas

Revision 9

Self-Assessments

Diablo Canyon

Self-Assessment

Quick Hit Self-Assessment Report

05/31/2022

Drawings

Diablo Canyon

Security IDS &

CCTV Drawings

PI Normalization Map

71151

Miscellaneous

DCPP Security

KPI Calcs

IDS & CCTV previous 8 quarters