May 11, 2023
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2023010 AND 05000323/2023010
Dear Paula A. Gerfen:
On April 13, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000275 and 05000323 License No. DPR-80 and DPR-82
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000275 and 05000323
License Numbers:
Report Numbers:
05000275/2023010 and 05000323/2023010
Enterprise Identifier:
I-2023-010-0019
Licensee:
Pacific Gas and Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, CA
Inspection Dates:
March 27, 2023 to April 14, 2023
Inspectors:
W. Cullum, Senior Reactor Inspector
D. Reinert, Senior Reactor Inspector
F. Thomas, Reactor Inspector
Approved By:
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (section 03.01)
The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:
- (1) Material Code D956958 Pressure Switch - Plant Location DC-2-23-I-S-PS-5034 - Description - Containment Penetration Area GE/GE Exhaust Damper Pressure Switch
- (2) Material Code D956878 Motor-Operated Valve Long Life (MOVLL) Grease - Plant Location RCS-1-8000A - Description - Pressurizer PORV Block Motor-Operated Valve
- (3) Material Code D952926 O-ring - Plant Location DC-2-45-P-MP-MP66 - Description - Containment Emergency Personnel Hatch
- (4) Material Code D933757 Boot - Plant Location DC-1-21-M-MISC-IS2 - Description - Diesel Generator Combustion Air Intake Silencer 1-2
- (5) Material Code D967224 Valve 1-1/2" Gate 800# CS SW - Plant Location DC-2-04-P-V-MS-2-5399 - Description FCV-41 (MSIV) Inspection Port Test Valve
- (6) Material Code D951344 Refrigerant R-22 - Plant Location DC-1-23-M-BC-CP-36 - Description - Refrigerant for Control Room Air Conditioner CP-36
- (7) Material Code D944750 Actuator Diaphragm - Plant Location - DC-2-08-P-VOA-CVCS-2-8141C - Description - RCP 2-3 Seal Remote Outlet Isolation Valve
- (8) Material Code D955449 Compressor - Plant Location - DC-1-23-M-BC-CP-36 - Description - Control Room Air Conditioner Compressor CP-36
- (9) Material Code D969273 Radiator Core - Plant Location - DC-1/2-21-M-HX-JWR - Description - Diesel Generator Jacket Water Cooling Radiator
- (10) Material Code D967399 Relief Valve Parts Kit - Plant Location - DC-1(2)-P-VR-DEG-1(2)-RV-68, 69, 70 - Description - Diesel Generator Lube Oil Pump Relief Valve
- (11) Material Code D956431 Sleeving 1" Silflex - Plant Location - DC-1-09-I-SV-224 - Description - Accumulator Test Wiring (In Containment)
- (12) Material Code D943598 Relay Multipole 5NO 120VAC 2NC 7P - Plant Location - DC-1-23-E-R-RPAM2-RIS59X - Description - New Fuel Pool Rad Monitor Aux Relay
- (13) Material Code D935255 Motor 400HP 1200RPM 588SU Frame - Plant Location - DC-2-14-E-MTR-CCWP1 - Description - CCW PP 2-1 Motor
- (14) Material Code D963390 Contact Kit 60A 600V 3P F/9560 Starter - Plant Location DC-1-23-E-MTR-CP-36 - Description - CP-36 Control RM Air Conditioner Compressor (North)
- (15) Material Code D965229 Diode 600V 300A - Plant Location DC-2-21-E-GN-DEG3 - Description - Diesel Engine Generator 2-3
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On April 13, 2023, the inspectors presented the NRC inspection results to Paula A.
Gerfen and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
50935656,
50852197,
50854871,
50855151,
51039343,
50882125,
50882140,
50882498,
50883028,
50895624,
50936528,
50936757,
50937717,
50938548,
50938551,
50938554,
50938555,
50938830,
51045394,
51047065,
51048581,
51056200,
51069446,
51092878,
51102209,
51103947,
51148834,
51151119,
51159825,
51175385,
51041761
71111.21N.03
Corrective Action
51187228,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Resulting from
Inspection
51185717,
51185766,
51185983,
51186254,
51186932,
51186951,
51187016,
51187092,
51187135,
51185710,
51185965,
51186289,
51186556,
51187260
050029, Sheet
20A
Misc. [Miscellaneous] Notes (Continued From Sh. 120)
050029, Sheet 70
Notes, Symbols & Typical Details for Raceways & Wire
433130, Sheet 1,
Page 0
Electrical Single Line Diagram, 480V And 120V AC
System, Control Room Pressurization System
445093, Sheet 1,
Page 0
Electrical Schematic Diagram, Control Room Ventilation
System CR-35, CR-36, CP-35, CP-36
496279, Sheet 1,
Page 0
Electrical Schematic Diagram 4160V Diesel Generator
Control No. 23
6001170, Sheet
8, Page 1
I & C Diagram of Connections, Low Level Detector with
Local Indicator
663082, Sheet
54F, Page 1
Electrical Schematic and Interconnection Diagram Series
Boost Exciter Voltage Regulator and Associated Control
Functions for SED 23
663082, Sheet
54F, Page 1
Electrical Schematic and Interconnection Diagram Series
Boost Exciter Voltage Regulator and Associated Control
Functions for SED 23
Drawings
663213, Sheet
2, Page 1
Mechanical Comp [Component] Cooling Water Pump
Motor Outline
Miscellaneous
3501133886
Purchase Order Core Radiator
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
DC-663239-41
Composite Operation Manual for Trance Co. Hermetic
Reciprocating Compressors
09/24/1990
RPE 8000001334
Control Room Air Conditioning Compressor and Parts
RPE 8000001743
DCI, DEG Sleeve Between Air Intake Silencer and
Turbocharger, System 21
RPE 8000003163
Material Substitution for Masoneilan Actuator Diaphragms
for Actuators without Backup Air
RPE 8000004614
Specialty Gas
RPE 8000005086
Replace DEG [Diesel Engine Generator] Rectifier Diodes
RPE 8000005258
U1/U2 Control Room HVAC CP Contactor Replacement
RPE C-0001
Containment Hatch O-Rings
RPE E-0012
Motor, 400 HP, 4 KV, 1200 RPM, Frame 588 SU
RPE E-0016
Resistors
RPE E-5000
Varflex Silflex Sleeving
RPE E-6930
Cutler Hammer Powered Relays
RPE J-7828
Dwyer Instruments Air Flow Pressure Switch (Model 1638)
RPE M-022
Diesel Generator Lube Oil Pump
RPE M-09005
Grease for Safety Related Limitorque Actuators
RPE P-09372
Flowserve - Design Class 1 - 2" and Smaller Valves per
"Small VLV.ADV" Design Specification
AD9
Procurement Control
AD9.ID1
Procurement of Items and Related Services
AD9.ID10
Suspected Vendor Misrepresentation
AD9.ID11
Supplier Evaluation Process
AD9.ID2
Procurement of Services
AD9.ID4
Establishing Procurement Technical and Quality
Requirements
AD9.ID6
Evaluation, Selection, and Control of Suppliers of Items,
and Services
AD9.ID7
Receipt Inspection and Acceptance Testing
AD9.NQ1
Qualified Suppliers List and Supplier QA Requirements
CF3.ID13
Replacement Part Evaluation and CITE
Procedures
CF5.ID1
Receipt of Materials
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OM4.NQ7
Quality Verification External Auditing
5A
OM7.ID1
Problem Identification and Resolution
QCP 10.1
Receipt Inspection Program
QCP 10.2
Inspection Activities
QCP 10.20
Quality Control Laboratory
QCP 10.22
Supplemental Verification Activities at Receipt
1A
STP M-21-RTS.1
Return Diesel Engine to Service Following Outage
Maintenance
Work Orders
60096546,
60090735,
60098039,
60100031,
60100371,
64011577,
64095322,
64132893,
64140120,
64186067,
60091049,
68048766,
68052082,
60143786