October 23, 2024

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000275/2024404 AND 05000323/2024404

Dear Adam Peck:

On September 26, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2, and discussed the results of this inspection with Justin Rogers, Diablo Canyon Power Plant Station Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Douglas E. Dodson, II, Acting Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2024404 and 05000323/2024404

Enterprise Identifier:

I-2024-404-0018

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, CA

Inspection Dates:

September 23, 2024, to September 26, 2024

Inspectors:

C. Jewett, Senior Physical Security Inspector

Approved By:

Douglas E. Dodson, II, Acting Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated January 1, 2024:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 26, 2024, the inspector presented the security baseline inspection results to Justin Rogers, Diablo Canyon Power Plant Station Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

51170665; 51177733; 51198566; 5120666; 51235581;

241234

71130.04

Corrective Action

Documents

Resulting from

Inspection

255517; 51255580; 51255662

71130.04

Procedures

MP I-44-

CAMOCA

Owner Controlled Area Security Camera Systems

Maintenance and Testing

71130.04

Procedures

MP I-44-DOOR

Security Doors, Gates, and Covers Tamper Testing

71130.04

Procedures

MP I-44-

DOORMAINT

Security Door Maintenance

71130.04

Procedures

MP I-44-

MICROWAVE

Microwave Links and Transceiver Maintenance and

Tamper Testing

71130.04

Procedures

MP M-44-

GATE20C

[Gate 20C] Routine Maintenance

71130.04

Procedures

OM11.ID7

Safety/Security Interface Program

71130.04

Procedures

OM7.ID1

Problem Identification and Resolution

60A

71130.04

Procedures

SP 308A

Performance Testing of Site Microwave Intrusion Alarm

System

71130.04

Procedures

SP 312

Security Emergency Power System Monthly Test

71130.04

Procedures

SP 312B

Security Emergency Power System Annual Test

71130.04

Procedures

SP-303

Testing Security Communications Equipment

71130.04

Procedures

SP-305A

OCA Operation and Testing

71130.04

Work Orders

258069

Security emergency Power Supply

09/16/2024

71130.04

Work Orders

258071

Security PM: DR 194-2

09/16/2024