ML20085E260: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20085E260
| number = ML20085E260
| issue date = 06/21/1983
| issue date = 06/21/1983
| title = Forwards Public Version of Revised Pages & New Attachment to Emergency Plan,In Response to 830609 Ltr
| title = Forwards Public Version of Revised Pages & New Attachment to Emergency Plan,In Response to
| author name = Lim T
| author name = Lim T
| author affiliation = CALIFORNIA, UNIV. OF, BERKELEY, CA
| author affiliation = CALIFORNIA, UNIV. OF, BERKELEY, CA
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8308010114
| document report number = NUDOCS 8308010114
| title reference date = 06-09-1983
| package number = ML20085E250
| package number = ML20085E250
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE

Latest revision as of 21:26, 25 September 2022

Forwards Public Version of Revised Pages & New Attachment to Emergency Plan,In Response to
ML20085E260
Person / Time
Site: Berkeley Research Reactor
Issue date: 06/21/1983
From: Lim T
CALIFORNIA, UNIV. OF, BERKELEY, CA
To: Thomas C
Office of Nuclear Reactor Regulation
Shared Package
ML20085E250 List:
References
NUDOCS 8308010114
Download: ML20085E260 (1)


Text

'

l

. .e, UNIVERSITY OF CALIFORNIA. BERKELEY

.E.Ez!.ET

  • DAVIS
  • IRVINE
  • RIVER $IDE
  • SAN DIEGO
  • SAN FRANCISCO SWM BARRARA
  • SWM CRUZ COLLECE OF ENGINEERING BEREELEY, CALIFORNIA 94720 DEPARTMENT OF NUCLEAR ENGINEERLNG Docket No. 50-224 June 21, 1983 Cecil 0. Thomas, Chief '

Standardization 6 Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Thomas:

Subject:

Berkeley Research Reactor Emergency Plan In response to your letter of June 9,1983, enclosed are eleven revised pages and a copy of a new attachment to the Berkeley Research Reactor Emergency Plan. The revised pages and attachment correspcnd to your review comments as follows:

Your Review Coninen:

Page Number (Section 3 ANSI /ANS-15.16-1982)

New Attachment (#4) Item 1 of Section 3.3 Page 14 Item 2 of Section 3.3 Page 23 Item 1 of Section 3.4 Page 16 Item 1 of Section 3.5 Page 17 Item 1 of Section 3.6 Page 22 and 24 Items 1 and 3 of Section 3.7 Page 20 Item 2 of Section 3.7 Page 25 Item 1 of Section 3.8 Page 26 Item 1 of Section 3.9

) Page 27 Items 1 and 2 of Section 3.10 l Page iv Revised listing of attachments i

If you have further questions, please do not hesitate to contact me at (415) 642-5213.

Sincerpjy, l

Tek H. Lim EL: irs Acting Reactor Administrator l copy, without attacients: Chainnan, Reactor Hazards Connittee Office of Environmental Health 6 Safety Chainnan, Department of Nuclear Engineering

~

L 830801011'4 8307'19 in PDR ADOCK 05000224 l 8 F PDR LL