ML20215F580
ML20215F580 | |
Person / Time | |
---|---|
Site: | Berkeley Research Reactor |
Issue date: | 06/11/1987 |
From: | Berkow H Office of Nuclear Reactor Regulation |
To: | Pigford T CALIFORNIA, UNIV. OF, BERKELEY, CA |
References | |
NUDOCS 8706220452 | |
Download: ML20215F580 (3) | |
Similar Documents at Berkeley Research Reactor | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20045H4281993-06-30030 June 1993
[Table view]Provides Info That Has Become Available Since Revised 10CFR20 Became Effective on 910620 & Forwards Two Press Releases Re Issuance & Implementation of Revised Part 20 ML20044B6991992-11-25025 November 1992 Partial Response to FOIA Request for Records.Portions of App B Records Available in Pdr.App B Records Partially Withheld (Ref FOIA Exemption 5) ML20065N0701990-11-19019 November 1990 Forwards Final Orau 90/K-53, Confirmatory Radiological Survey of Berkeley Research Reactor Facility Univ of CA at Berkeley Berkeley,Ca ML20217A4391990-11-12012 November 1990 Informs of Contaminated Soil Found on Ivy Beds Outside of Licensed Boundary During NRC Survey During Wk of 900716. Contaminated Soil Removed ML20044A9541990-07-12012 July 1990 Advises That M Mendonca Will Be Acting Project Manager on 900723-0921 & 1015-1221 ML20044A7731990-06-27027 June 1990 Forwards Request for Addl Info to Enable NRC to Continue Review of Decommissioning Final Rept & Termination Radiation Survey Results.Response Requested within 15 Days of Ltr Date ML20034A5871990-04-16016 April 1990 Forwards Decommissioning Final Rept & Termination Radiation Survey Results, Per Order Authorizing Dismantling of Facility & Disposition of Component Parts & Results of Final Radiation Survey.Review & Scheduling of Insp Requested ML20012D1401990-02-27027 February 1990 Informs That Annual Rept for Reactor Operation for 1989 Will Not Be Submitted.Decommissioning Final Rept & Termination Radiation Survey Results Will Be Submitted to NRR in Washington,Dc on Apr 1990 ML19325E4621989-10-31031 October 1989 Advises That Licensee 890929 Proposed Changes to Reactor Decommissioning Plan Approved by 890912 Order,Authorizing Dismantling of Facility & Disposition of Component Parts ML19332D2091989-10-12012 October 1989 Discusses QA for Berkeley Research Reactor Decommissioning. Reg Guide 2.5 Provides Adequate and Relevant Regulatory Basis for Research Reactor Removal Project QA Program ML20248F3081989-09-29029 September 1989 Advises NRC of Proposed Changes in Decommissioning Organization Personnel,Functions & Responsibilities.Bj Mann & Rs Patenaude Resumes Encl ML20247F9561989-09-12012 September 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-101,per 880108 Application & 890131 & 0414 Ltrs.Environ Assessment & Finding of No Impact & Safety Evaluation Also Encl ML20246P4751989-09-0505 September 1989 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re 880108 Request for Authorization to Dismantle & Dispose of Component Parts ML20245H3081989-08-0101 August 1989 Advises That Return & Transfer of Triga III Fuel to DOE or DOE Designated Facilities Completed IR 05000224/19890011989-07-13013 July 1989 Forwards Safeguards & Radiological Protection Insp Rept 50-224/89-01 on 890701 & 06.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20245D1321989-04-14014 April 1989 Responds to 890406 Request for Addl Info Re Facility Decommissioning Plan.Exposure Rate Measurements Will Be Made W/Gamma Scintillation Detector & Pressurized Ionization Chamber ML20248J9951989-04-0606 April 1989 Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity ML20247N5291989-03-14014 March 1989 Forwards 1988 Annual Rept.W/O Encl ML20195J9821988-11-30030 November 1988 Forwards Request for Addl Info Re 881010 Application for Amend to License R-101.Response Requested within 30 Days ML20206G2871988-11-10010 November 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Facility.Alta Bates Hosp in Berkeley Will Provide Emergency Svcs for Contaminated Patients.Revised Pages to Plan Encl ML20205T3411988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20205L0571988-10-18018 October 1988 Approves 880609 Request for Approval of Transportation Route for Spent Reactor Fuel from Berkeley,Ca to Idaho Falls,Id.Route Encl ML20154N8791988-09-23023 September 1988 Advises That Rev 3 to Operator Requalification Program Submitted on 880721 Meets Requirements of Regulations & Acceptable ML20151U7881988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20207E6771988-08-0808 August 1988 Forwards Rev 3 to Facility Requalification Program,Per 880101 Termination of Operation of Reactor ML20153A8931988-07-0505 July 1988 Forwards Amend 5 to License R-101 & Safety Evaluation.Amend Allows Surveillance Requirements That Involves Raising Control Rods to Be Postponed If Reactor Not in Operation for Period of Time That Causes Surveillance to Be Missed ML20150B2101988-06-24024 June 1988 Ack Receipt of Advising NRC of Univ Intent to Prepare Environ Impact Rept Re Decommissioning & Removal of Reactor ML20150A7871988-06-22022 June 1988 Informs of Change in Arrangement Re Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor.Plan Now Calls Upon Herrick Hosp to Provide Emergency Svcs for Contaminated Patients ML20151D7941988-06-22022 June 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Univ of California Triga Mark III Berkeley Research Reactor. Alta Bates Hosp Will Honor Existing Agreement W/Herrick Hosp ML20151A8161988-06-0909 June 1988 Requests Advance Route Approval as Required,Per 10CFR73.37(b)(7) ML20155H4331988-06-0303 June 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in PDR ML20155C4301988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.Certificate of Svc Encl ML20155C4641988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.Svc List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.W/Certificate of Svc ML20154H9311988-05-13013 May 1988 Informs That Univ of California Has Decided Not to Enter Opposition to City of Berkeley,Ca Petition to Intervene & Request for Hearing in Proceeding.Declaration of Svc Encl ML20154E2821988-05-12012 May 1988 Requests to Be Advised If City of Berkeley Petitions to Intervene as Party Intervenor,Per 10CFR2.714,or as Interested Municipality,Per 10CFR2.715(c).Served on 880516 ML20154H9211988-05-10010 May 1988 Forwards Author for Substitution of 880425 Draft Ltr Supporting City of Berkeley Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief.Served on 880523 ML20154J2301988-05-10010 May 1988 Supports City of Berkeley Petition for Intervention in License Amend Proceeding & Request for Hearings & Further Relief ML20154E4711988-05-0303 May 1988 Forwards Request from City of Berkeley,Ca for Adjudicatory Hearing.Request Submitted Per Commission Notice of Consideration of Issuance of Orders Authorizing Disposition of Component Parts & Termination of License ML20154H6211988-04-25025 April 1988 Supports City of Berkely Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief. Served on 880523 ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20147H4481988-03-0404 March 1988 Informs That NRC Requested Ofc of Fr to Publish Encl Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Termination of Facility License, Per 880108 Application ML20151D4311988-01-12012 January 1988 Discusses Changes in Reactor Surveillance,Per Termination of Operation on 880101 ML20147D7441988-01-0808 January 1988 Forwards Environ Rept for Triga Mark III & Decommissioning Plan for Triga Mark III ML20237C7951987-12-0909 December 1987 Informs That Univ of California Decided to Discontinue Operation of Berkeley Research Reactor as of 880101.Reactor Facility Intended to Be Decommissioned & Released by NRC for Unrestricted Use After Termination of License R-101 ML20235K2831987-09-25025 September 1987 Extends Invitation to Attend 871110 Meeting W/Region V in San Francisco,Ca to Discuss Policies & Procedures for Operator Licensing Activity in Region V & NRC Policy & Developments ML20238F3291987-09-10010 September 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License R-101 ML20238B1941987-08-20020 August 1987 Forwards Mn Christensen to Author Informing of Steps Taken to Correct Violations Noted in NRC . Corrective Actions:Frequency of Reactor Operations Audits Corrected & Personnel Advised of Reporting Requirements ML20237H3081987-07-29029 July 1987 Forwards Insp Rept 50-224/87-01 on 870713-16 & Notice of Violation ML20215F5801987-06-11011 June 1987 Informs of Recent NRR Reorganization.Organization Now Called Standardization & Non-Power Reactor Project Directorate. a Adams Is Project Manager ML20214M6631987-05-22022 May 1987 Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 1993-06-30 Category:NRC TO EDUCATIONAL INSTITUTION MONTHYEARML20044A9541990-07-12012 July 1990
[Table view]Advises That M Mendonca Will Be Acting Project Manager on 900723-0921 & 1015-1221 ML20044A7731990-06-27027 June 1990 Forwards Request for Addl Info to Enable NRC to Continue Review of Decommissioning Final Rept & Termination Radiation Survey Results.Response Requested within 15 Days of Ltr Date ML19325E4621989-10-31031 October 1989 Advises That Licensee 890929 Proposed Changes to Reactor Decommissioning Plan Approved by 890912 Order,Authorizing Dismantling of Facility & Disposition of Component Parts ML20247F9561989-09-12012 September 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-101,per 880108 Application & 890131 & 0414 Ltrs.Environ Assessment & Finding of No Impact & Safety Evaluation Also Encl ML20246P4751989-09-0505 September 1989 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re 880108 Request for Authorization to Dismantle & Dispose of Component Parts IR 05000224/19890011989-07-13013 July 1989 Forwards Safeguards & Radiological Protection Insp Rept 50-224/89-01 on 890701 & 06.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20248J9951989-04-0606 April 1989 Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity ML20195J9821988-11-30030 November 1988 Forwards Request for Addl Info Re 881010 Application for Amend to License R-101.Response Requested within 30 Days ML20205T3411988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20205L0571988-10-18018 October 1988 Approves 880609 Request for Approval of Transportation Route for Spent Reactor Fuel from Berkeley,Ca to Idaho Falls,Id.Route Encl ML20154N8791988-09-23023 September 1988 Advises That Rev 3 to Operator Requalification Program Submitted on 880721 Meets Requirements of Regulations & Acceptable ML20151U7881988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20153A8931988-07-0505 July 1988 Forwards Amend 5 to License R-101 & Safety Evaluation.Amend Allows Surveillance Requirements That Involves Raising Control Rods to Be Postponed If Reactor Not in Operation for Period of Time That Causes Surveillance to Be Missed ML20150B2101988-06-24024 June 1988 Ack Receipt of Advising NRC of Univ Intent to Prepare Environ Impact Rept Re Decommissioning & Removal of Reactor ML20155C4301988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.Certificate of Svc Encl ML20147H4481988-03-0404 March 1988 Informs That NRC Requested Ofc of Fr to Publish Encl Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Termination of Facility License, Per 880108 Application ML20235K2831987-09-25025 September 1987 Extends Invitation to Attend 871110 Meeting W/Region V in San Francisco,Ca to Discuss Policies & Procedures for Operator Licensing Activity in Region V & NRC Policy & Developments ML20238F3291987-09-10010 September 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License R-101 ML20237H3081987-07-29029 July 1987 Forwards Insp Rept 50-224/87-01 on 870713-16 & Notice of Violation ML20215F5801987-06-11011 June 1987 Informs of Recent NRR Reorganization.Organization Now Called Standardization & Non-Power Reactor Project Directorate. a Adams Is Project Manager ML20214V7511986-09-12012 September 1986 Forwards Exam Rept 50-224/OL-86-01 of Exam Administered on 860902-03 ML20198E6541986-05-16016 May 1986 Forwards Safeguards Insp Repts 50-224/86-01 & 50-224/86-02 on 860422-24 & 0502.No Violations Noted ML20210J5001986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20136D5811985-12-11011 December 1985 Forwards Exam Rept 50-224/OL-85-01 on 851112-13.Exam Scores & Results for Individual Applicants Exempt from Disclosure Per 10CFR2.790(a)(6) ML20127D1241985-06-0404 June 1985 Forwards Insp Rept 50-224/85-01 on 850528.No Violation Noted ML20024A7641983-06-0909 June 1983 Forwards Request for Addl Info Re Univ of CA Research Reactor 821025 Emergency Plan to Continue Review Per App E to 10CFR50,Rev 1 to Reg Guide 2.6 & ANSI/ANS-15.16-1982 Requirements.Info Requested within 30 Days of Ltr Date ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20050B8211982-03-26026 March 1982 Forwards IE Safeguards Insp Rept 50-224/82-02 on 820324. No Noncompliance Noted ML20041B6741982-02-17017 February 1982 Forwards IE Info Notice 80-32,Revision 1, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20040H3491982-01-29029 January 1982 Forwards IE Insp Rept 50-224/82-01 on 820107-08.No Noncompliance Noted ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors ML19341C0901981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19341B3211981-01-19019 January 1981 Forwards Amend 4 to License R-101,revising Physical Security Plan ML19341A9631980-12-19019 December 1980 Forwards IE Insp Rept 50-224/80-03 on 801202-05.No Noncompliance Noted ML20062K1231980-11-19019 November 1980 Forwards Amend 3 to License R-101 & Safety Evaluation ML19320C9151980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19320D2001980-06-11011 June 1980 Forwards IE Insp Rept 50-224/80-01 on 800506-09.No Noncompliance Noted ML19321A4271980-06-0909 June 1980 Forwards IE Insp Rept 50-224/80-02 on 800516.No Noncompliance Noted ML19296C3411980-02-0101 February 1980 Forwards IE Circular 80-02, Nuclear Power Plant Staff Work Hours. No Written Response Required ML19210D7221979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19260A4911979-11-0909 November 1979 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-224/79-04 ML19254E6801979-10-19019 October 1979 Notifies of Commission 790809 Approval to Publish Proposed Amends to 10CFR50 & 70 in Fr,Re Emergency Plans for Nonpower Reactor Licensees.Forwards Transcript of 790827 Meeting Re Impact of Proposed Safeguards Upgrade Rule ML19262A0451979-10-12012 October 1979 Submits NRC Interpretation of Tech Spec 4.3 Re Internal Insp of Fuel Elements ML19260A4971979-10-10010 October 1979 Forwards IE Insp Rept 50-224/79-04 on 790816-17 & Notice of Violation ML19254E4861979-10-10010 October 1979 Forwards Amend 14 to Indemnity Agreement E-15,modifying in Course of Transportation. Requests Return of One Signed Copy ML19254D3881979-09-28028 September 1979 Forwards Amend 2 to License R-101,safety Evaluation & Notice of Issuance & Availability ML19208C4021979-09-10010 September 1979 Forwards IE Info Notice 79-21, Transportation & Commercial Burial of Radioactive Matl. No Action Required ML19249D4181979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19253C8321979-08-22022 August 1979 Forwards Draft Reg Guide 5.XX, Std Format & Content for Licensee Physical Security Plan for Protection of SNM of Moderate or Low Strategic Significance. W/O Encl ML19290A0581979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required 1990-07-12 Category:OUTGOING CORRESPONDENCE MONTHYEARML20045H4281993-06-30030 June 1993
[Table view]Provides Info That Has Become Available Since Revised 10CFR20 Became Effective on 910620 & Forwards Two Press Releases Re Issuance & Implementation of Revised Part 20 ML20044B6991992-11-25025 November 1992 Partial Response to FOIA Request for Records.Portions of App B Records Available in Pdr.App B Records Partially Withheld (Ref FOIA Exemption 5) ML20044A9541990-07-12012 July 1990 Advises That M Mendonca Will Be Acting Project Manager on 900723-0921 & 1015-1221 ML20044A7731990-06-27027 June 1990 Forwards Request for Addl Info to Enable NRC to Continue Review of Decommissioning Final Rept & Termination Radiation Survey Results.Response Requested within 15 Days of Ltr Date ML19325E4621989-10-31031 October 1989 Advises That Licensee 890929 Proposed Changes to Reactor Decommissioning Plan Approved by 890912 Order,Authorizing Dismantling of Facility & Disposition of Component Parts ML20247F9561989-09-12012 September 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-101,per 880108 Application & 890131 & 0414 Ltrs.Environ Assessment & Finding of No Impact & Safety Evaluation Also Encl ML20246P4751989-09-0505 September 1989 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re 880108 Request for Authorization to Dismantle & Dispose of Component Parts IR 05000224/19890011989-07-13013 July 1989 Forwards Safeguards & Radiological Protection Insp Rept 50-224/89-01 on 890701 & 06.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20248J9951989-04-0606 April 1989 Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity ML20195J9821988-11-30030 November 1988 Forwards Request for Addl Info Re 881010 Application for Amend to License R-101.Response Requested within 30 Days ML20205T3411988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20205L0571988-10-18018 October 1988 Approves 880609 Request for Approval of Transportation Route for Spent Reactor Fuel from Berkeley,Ca to Idaho Falls,Id.Route Encl ML20154N8791988-09-23023 September 1988 Advises That Rev 3 to Operator Requalification Program Submitted on 880721 Meets Requirements of Regulations & Acceptable ML20151U7881988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20153A8931988-07-0505 July 1988 Forwards Amend 5 to License R-101 & Safety Evaluation.Amend Allows Surveillance Requirements That Involves Raising Control Rods to Be Postponed If Reactor Not in Operation for Period of Time That Causes Surveillance to Be Missed ML20150B2101988-06-24024 June 1988 Ack Receipt of Advising NRC of Univ Intent to Prepare Environ Impact Rept Re Decommissioning & Removal of Reactor ML20155H4331988-06-0303 June 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in PDR ML20155C4641988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.Svc List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.W/Certificate of Svc ML20155C4301988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.Certificate of Svc Encl ML20154E2821988-05-12012 May 1988 Requests to Be Advised If City of Berkeley Petitions to Intervene as Party Intervenor,Per 10CFR2.714,or as Interested Municipality,Per 10CFR2.715(c).Served on 880516 ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20147H4481988-03-0404 March 1988 Informs That NRC Requested Ofc of Fr to Publish Encl Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Termination of Facility License, Per 880108 Application ML20235K2831987-09-25025 September 1987 Extends Invitation to Attend 871110 Meeting W/Region V in San Francisco,Ca to Discuss Policies & Procedures for Operator Licensing Activity in Region V & NRC Policy & Developments ML20238F3291987-09-10010 September 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License R-101 ML20237H3081987-07-29029 July 1987 Forwards Insp Rept 50-224/87-01 on 870713-16 & Notice of Violation ML20215F5801987-06-11011 June 1987 Informs of Recent NRR Reorganization.Organization Now Called Standardization & Non-Power Reactor Project Directorate. a Adams Is Project Manager ML20214M6631987-05-22022 May 1987 Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 ML20215E2161986-12-16016 December 1986 Final Response to FOIA Request for Accident & Safety Repts Made to NRC by Univ of California Re Facility.Forwards App B Documents.App a Document Available in PDR ML20214V7511986-09-12012 September 1986 Forwards Exam Rept 50-224/OL-86-01 of Exam Administered on 860902-03 ML20198E6541986-05-16016 May 1986 Forwards Safeguards Insp Repts 50-224/86-01 & 50-224/86-02 on 860422-24 & 0502.No Violations Noted ML20210J5001986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20136D5811985-12-11011 December 1985 Forwards Exam Rept 50-224/OL-85-01 on 851112-13.Exam Scores & Results for Individual Applicants Exempt from Disclosure Per 10CFR2.790(a)(6) ML20127D1241985-06-0404 June 1985 Forwards Insp Rept 50-224/85-01 on 850528.No Violation Noted ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20024A7641983-06-0909 June 1983 Forwards Request for Addl Info Re Univ of CA Research Reactor 821025 Emergency Plan to Continue Review Per App E to 10CFR50,Rev 1 to Reg Guide 2.6 & ANSI/ANS-15.16-1982 Requirements.Info Requested within 30 Days of Ltr Date ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20050B8211982-03-26026 March 1982 Forwards IE Safeguards Insp Rept 50-224/82-02 on 820324. No Noncompliance Noted ML20041B6741982-02-17017 February 1982 Forwards IE Info Notice 80-32,Revision 1, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20040H3491982-01-29029 January 1982 Forwards IE Insp Rept 50-224/82-01 on 820107-08.No Noncompliance Noted ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors ML19341C0901981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19341B3211981-01-19019 January 1981 Forwards Amend 4 to License R-101,revising Physical Security Plan ML19341A9631980-12-19019 December 1980 Forwards IE Insp Rept 50-224/80-03 on 801202-05.No Noncompliance Noted ML17250A8481980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML20062K1231980-11-19019 November 1980 Forwards Amend 3 to License R-101 & Safety Evaluation ML19320C9151980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19320D2001980-06-11011 June 1980 Forwards IE Insp Rept 50-224/80-01 on 800506-09.No Noncompliance Noted ML19323H2811980-06-10010 June 1980 Advises That Decision of Ofc of Nuclear Reactor Regulation Director Re Request to Suspend Activities,Revoke Ol,Remove Radioactive Matls & Hold Public Hearings Is Final NRC Action ML19321A4271980-06-0909 June 1980 Forwards IE Insp Rept 50-224/80-02 on 800516.No Noncompliance Noted ML19318B0481980-05-0909 May 1980 Discusses 800414 Decision to Deny Friends of the Earth 791211 Petition Re Facility.Decision Will Constitute Final Action Unless Commission Institutes Review within 20 Days. Forwards Decision,Fr Notice & Related Safety Evaluation 1993-06-30 |
Text
E.
G
- June 11, 1987 Docket No. 50-224 Prof. Thomas'H. Pigford Reactor Administrator Department of Nuclear Engineering i
College of. Engineering University of California, Berkeley Berkeley, California 94720 j
Dear Prof. Pigford:
SUBJECT:
. REORGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION The purpose of this letter is to inform you of the recent reorganization of the Office of Nuclear Reactor. Regulation. We are now the Standardization and Non-Power Reactor. Project Directorate, under the. Division of Reactor Projects III, IV, Y and Special Projects, Office of Nuclear Reactor' Regulation.
The Project Manager for your facility is Al Adams. He can be reached at 301-492-8207.
All correspondence should still be addressed as follows:
U. S. Nuclear Regulatory Coraission Washington, D, C. 20555 ATTN: Document Control Desk Sincerely, NgInni Signed By:
Herbert N. Berkow, Director-Standardization and Non-Power Reactor' Project Directorate Division of Reactor Projects III, IV, Y and Special Projects 0ffice of Nuclear Reactor Regulation ec: See next page 2
DISTRIBUTION kPDSNP Reading /
l[g62ggo$$
h 24 EHylton,
p PDR AAdams NRC & Local:PDR E
h' 06/p/87 06/n/87 0$/l)/87
7
.g'
-4 o
g.
UNITED STATES t
NUCLE AR REGULATORY COMMISSION W
rj WASHINGTON, D. C. 20555
.....,o June 11, 1987 Docket No. 50-224 4
Prof. Thomas H. Pigford Reactor Administrator Department'of Nuclear Engineering College of Engineering University of. California, Berkeley Berkeley, California 94720 q
i 1
Dear Prof. Pigford:
SUBJECT:
REORGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION The purpose of this letter is to inform you of the recent reorEanization of.
'~
the Office of Nuclear Reactor Regulation. We are now the Standardization and Non-Power Reactor Project Directorate, under the Division of Reactor Projects
- i III, IV, Y and Special Projects, Office of Nuclear Reactor' Regulation.
The Project Manager for your facility is Al Adams. He can be reached at 301-492-8207.
..All correspondence should still be addressed as follows:
r-b U. S. Nuclear Regulatory Comission Washington, D, C._20555 4
ATTN: Document Control Desk l
Sincerely, I
erbert N. Berkow, Director Standardization and Non-Power i
Reactor Project Directorate Divi-ion of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation ec: See next page I
l
'i j
1
ft v
l l
?, ' C).
University of California Docket No. 50-224 at Berkeley i
cc: California Department of Health ATTN: Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814 Mr. Tek Lim Reactor Supervisor Department.of Nuclear Engineering University of California at Berkeley College of Engineering Berkeley, California 94720 l
)