|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20065N0701990-11-19019 November 1990 Forwards Final Orau 90/K-53, Confirmatory Radiological Survey of Berkeley Research Reactor Facility Univ of CA at Berkeley Berkeley,Ca ML20217A4391990-11-12012 November 1990 Informs of Contaminated Soil Found on Ivy Beds Outside of Licensed Boundary During NRC Survey During Wk of 900716. Contaminated Soil Removed ML20012D1401990-02-27027 February 1990 Informs That Annual Rept for Reactor Operation for 1989 Will Not Be Submitted.Decommissioning Final Rept & Termination Radiation Survey Results Will Be Submitted to NRR in Washington,Dc on Apr 1990 ML19332D2091989-10-12012 October 1989 Discusses QA for Berkeley Research Reactor Decommissioning. Reg Guide 2.5 Provides Adequate and Relevant Regulatory Basis for Research Reactor Removal Project QA Program ML20248F3081989-09-29029 September 1989 Advises NRC of Proposed Changes in Decommissioning Organization Personnel,Functions & Responsibilities.Bj Mann & Rs Patenaude Resumes Encl ML20247F9561989-09-12012 September 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-101,per 880108 Application & 890131 & 0414 Ltrs.Environ Assessment & Finding of No Impact & Safety Evaluation Also Encl ML20246P4751989-09-0505 September 1989 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re 880108 Request for Authorization to Dismantle & Dispose of Component Parts ML20245H3081989-08-0101 August 1989 Advises That Return & Transfer of Triga III Fuel to DOE or DOE Designated Facilities Completed IR 05000224/19890011989-07-13013 July 1989 Forwards Safeguards & Radiological Protection Insp Rept 50-224/89-01 on 890701 & 06.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20245D1321989-04-14014 April 1989 Responds to 890406 Request for Addl Info Re Facility Decommissioning Plan.Exposure Rate Measurements Will Be Made W/Gamma Scintillation Detector & Pressurized Ionization Chamber ML20248J9951989-04-0606 April 1989 Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity ML20247N5291989-03-14014 March 1989 Forwards 1988 Annual Rept.W/O Encl ML20195J9821988-11-30030 November 1988 Forwards Request for Addl Info Re 881010 Application for Amend to License R-101.Response Requested within 30 Days ML20206G2871988-11-10010 November 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Facility.Alta Bates Hosp in Berkeley Will Provide Emergency Svcs for Contaminated Patients.Revised Pages to Plan Encl ML20205T3411988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20205L0571988-10-18018 October 1988 Approves 880609 Request for Approval of Transportation Route for Spent Reactor Fuel from Berkeley,Ca to Idaho Falls,Id.Route Encl ML20154N8791988-09-23023 September 1988 Advises That Rev 3 to Operator Requalification Program Submitted on 880721 Meets Requirements of Regulations & Acceptable ML20151U7881988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20207E6771988-08-0808 August 1988 Forwards Rev 3 to Facility Requalification Program,Per 880101 Termination of Operation of Reactor ML20153A8931988-07-0505 July 1988 Forwards Amend 5 to License R-101 & Safety Evaluation.Amend Allows Surveillance Requirements That Involves Raising Control Rods to Be Postponed If Reactor Not in Operation for Period of Time That Causes Surveillance to Be Missed ML20150B2101988-06-24024 June 1988 Ack Receipt of Advising NRC of Univ Intent to Prepare Environ Impact Rept Re Decommissioning & Removal of Reactor ML20150A7871988-06-22022 June 1988 Informs of Change in Arrangement Re Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor.Plan Now Calls Upon Herrick Hosp to Provide Emergency Svcs for Contaminated Patients ML20151D7941988-06-22022 June 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Univ of California Triga Mark III Berkeley Research Reactor. Alta Bates Hosp Will Honor Existing Agreement W/Herrick Hosp ML20151A8161988-06-0909 June 1988 Requests Advance Route Approval as Required,Per 10CFR73.37(b)(7) ML20155H4331988-06-0303 June 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in PDR ML20155C4301988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.Certificate of Svc Encl ML20155C4641988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.Svc List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.W/Certificate of Svc ML20154H9311988-05-13013 May 1988 Informs That Univ of California Has Decided Not to Enter Opposition to City of Berkeley,Ca Petition to Intervene & Request for Hearing in Proceeding.Declaration of Svc Encl ML20154E2821988-05-12012 May 1988 Requests to Be Advised If City of Berkeley Petitions to Intervene as Party Intervenor,Per 10CFR2.714,or as Interested Municipality,Per 10CFR2.715(c).Served on 880516 ML20154H9211988-05-10010 May 1988 Forwards Author for Substitution of 880425 Draft Ltr Supporting City of Berkeley Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief.Served on 880523 ML20154J2301988-05-10010 May 1988 Supports City of Berkeley Petition for Intervention in License Amend Proceeding & Request for Hearings & Further Relief ML20154E4711988-05-0303 May 1988 Forwards Request from City of Berkeley,Ca for Adjudicatory Hearing.Request Submitted Per Commission Notice of Consideration of Issuance of Orders Authorizing Disposition of Component Parts & Termination of License ML20154H6211988-04-25025 April 1988 Supports City of Berkely Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief. Served on 880523 ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20147H4481988-03-0404 March 1988 Informs That NRC Requested Ofc of Fr to Publish Encl Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Termination of Facility License, Per 880108 Application ML20151D4311988-01-12012 January 1988 Discusses Changes in Reactor Surveillance,Per Termination of Operation on 880101 ML20147D7441988-01-0808 January 1988 Forwards Environ Rept for Triga Mark III & Decommissioning Plan for Triga Mark III ML20237C7951987-12-0909 December 1987 Informs That Univ of California Decided to Discontinue Operation of Berkeley Research Reactor as of 880101.Reactor Facility Intended to Be Decommissioned & Released by NRC for Unrestricted Use After Termination of License R-101 ML20235K2831987-09-25025 September 1987 Extends Invitation to Attend 871110 Meeting W/Region V in San Francisco,Ca to Discuss Policies & Procedures for Operator Licensing Activity in Region V & NRC Policy & Developments ML20238F3291987-09-10010 September 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License R-101 ML20238B1941987-08-20020 August 1987 Forwards Mn Christensen to Author Informing of Steps Taken to Correct Violations Noted in NRC . Corrective Actions:Frequency of Reactor Operations Audits Corrected & Personnel Advised of Reporting Requirements ML20237H3081987-07-29029 July 1987 Forwards Insp Rept 50-224/87-01 on 870713-16 & Notice of Violation ML20215F5801987-06-11011 June 1987 Informs of Recent NRR Reorganization.Organization Now Called Standardization & Non-Power Reactor Project Directorate. a Adams Is Project Manager ML20214M6631987-05-22022 May 1987 Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 ML20215E2141986-11-15015 November 1986 FOIA Request for Accident or Safety Repts Made to NRC by Univ of California Re Facility ML20214V7511986-09-12012 September 1986 Forwards Exam Rept 50-224/OL-86-01 of Exam Administered on 860902-03 ML20198E6541986-05-16016 May 1986 Forwards Safeguards Insp Repts 50-224/86-01 & 50-224/86-02 on 860422-24 & 0502.No Violations Noted ML20210J5001986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20154S1501986-03-24024 March 1986 Forwards Revised Pages 8 & 10 to 1985 Annual Rept Reflecting Revised Max Concentration at Stack Discharge ML20136D5811985-12-11011 December 1985 Forwards Exam Rept 50-224/OL-85-01 on 851112-13.Exam Scores & Results for Individual Applicants Exempt from Disclosure Per 10CFR2.790(a)(6) 1990-02-27
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20065N0701990-11-19019 November 1990 Forwards Final Orau 90/K-53, Confirmatory Radiological Survey of Berkeley Research Reactor Facility Univ of CA at Berkeley Berkeley,Ca ML20217A4391990-11-12012 November 1990 Informs of Contaminated Soil Found on Ivy Beds Outside of Licensed Boundary During NRC Survey During Wk of 900716. Contaminated Soil Removed ML20012D1401990-02-27027 February 1990 Informs That Annual Rept for Reactor Operation for 1989 Will Not Be Submitted.Decommissioning Final Rept & Termination Radiation Survey Results Will Be Submitted to NRR in Washington,Dc on Apr 1990 ML19332D2091989-10-12012 October 1989 Discusses QA for Berkeley Research Reactor Decommissioning. Reg Guide 2.5 Provides Adequate and Relevant Regulatory Basis for Research Reactor Removal Project QA Program ML20248F3081989-09-29029 September 1989 Advises NRC of Proposed Changes in Decommissioning Organization Personnel,Functions & Responsibilities.Bj Mann & Rs Patenaude Resumes Encl ML20245H3081989-08-0101 August 1989 Advises That Return & Transfer of Triga III Fuel to DOE or DOE Designated Facilities Completed ML20245D1321989-04-14014 April 1989 Responds to 890406 Request for Addl Info Re Facility Decommissioning Plan.Exposure Rate Measurements Will Be Made W/Gamma Scintillation Detector & Pressurized Ionization Chamber ML20247N5291989-03-14014 March 1989 Forwards 1988 Annual Rept.W/O Encl ML20206G2871988-11-10010 November 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Facility.Alta Bates Hosp in Berkeley Will Provide Emergency Svcs for Contaminated Patients.Revised Pages to Plan Encl ML20207E6771988-08-0808 August 1988 Forwards Rev 3 to Facility Requalification Program,Per 880101 Termination of Operation of Reactor ML20150A7871988-06-22022 June 1988 Informs of Change in Arrangement Re Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor.Plan Now Calls Upon Herrick Hosp to Provide Emergency Svcs for Contaminated Patients ML20151D7941988-06-22022 June 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Univ of California Triga Mark III Berkeley Research Reactor. Alta Bates Hosp Will Honor Existing Agreement W/Herrick Hosp ML20151A8161988-06-0909 June 1988 Requests Advance Route Approval as Required,Per 10CFR73.37(b)(7) ML20154H9311988-05-13013 May 1988 Informs That Univ of California Has Decided Not to Enter Opposition to City of Berkeley,Ca Petition to Intervene & Request for Hearing in Proceeding.Declaration of Svc Encl ML20154J2301988-05-10010 May 1988 Supports City of Berkeley Petition for Intervention in License Amend Proceeding & Request for Hearings & Further Relief ML20154H9211988-05-10010 May 1988 Forwards Author for Substitution of 880425 Draft Ltr Supporting City of Berkeley Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief.Served on 880523 ML20154H6211988-04-25025 April 1988 Supports City of Berkely Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief. Served on 880523 ML20151D4311988-01-12012 January 1988 Discusses Changes in Reactor Surveillance,Per Termination of Operation on 880101 ML20147D7441988-01-0808 January 1988 Forwards Environ Rept for Triga Mark III & Decommissioning Plan for Triga Mark III ML20238B1941987-08-20020 August 1987 Forwards Mn Christensen to Author Informing of Steps Taken to Correct Violations Noted in NRC . Corrective Actions:Frequency of Reactor Operations Audits Corrected & Personnel Advised of Reporting Requirements ML20215E2141986-11-15015 November 1986 FOIA Request for Accident or Safety Repts Made to NRC by Univ of California Re Facility ML20154S1501986-03-24024 March 1986 Forwards Revised Pages 8 & 10 to 1985 Annual Rept Reflecting Revised Max Concentration at Stack Discharge ML20099B9231984-11-0909 November 1984 Advises That 840813 Revised Upgraded Emergency Plan Implemented on 841109 ML20096C6041984-08-24024 August 1984 Authorizes Th Lim to Sign Notarized Ltr Transmitting Amended Emergency Plan ML20096C5921984-08-24024 August 1984 Forwards Revised Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor. Plan Will Be Fully Implemented 120 Days from Approval Date ML20024D1081983-07-25025 July 1983 Notifies That Th Pigford Will Replace Sn Kaplan as Administrator,Effective 830801 ML20085E2601983-06-21021 June 1983 Forwards Public Version of Revised Pages & New Attachment to Emergency Plan,In Response to ML20071E8351983-03-0808 March 1983 Forwards Berkeley Research Reactor Annual Rept of Operations ML20028A2021982-10-25025 October 1982 Forwards Public Version of Emergency Response Plan ML20042B7911982-03-18018 March 1982 Forwards Berkeley Research Reactor Annual Rept of Operations,Jan-Dec 1981. ML20009B0461981-07-0707 July 1981 Amends 810611 Request for Change in Feb 1964 SAR Pages 6-8, Lines 21,22, & 23 & Pages 6-9,Line 1.Clarifies Types of Personnel Working Around Reactor Who Must Have Physical Exams Every 24 Months ML20004F1291981-06-11011 June 1981 Requests Changes to Feb 1964 Sar,Mandating Physical Exam for Operators & Supervisors Every 24 Months,But at Intervals Not to Exceed 28 Months.Change Does Not Constitute Unreviewed Safety Question ML19344E4581980-08-25025 August 1980 Forwards Revised Page 15 of Proposed Security Plan.Plan Withheld (Ref 10CFR2.790) ML19344E3591980-08-11011 August 1980 Forwards Revised Emergency Plan,App C, Fuel Element Cladding Failure - Assessment of Exposure Doses, & App D, Direct Radiation Dose at Etcheverry Hall Patio Due to Loss of Pool Water. ML19320B0881980-07-0303 July 1980 Advises NRC That V Schrock Is No Longer Reactor Administrator.S Kaplan Has Been Reactor Administrator Since 791005 ML19305E3081980-04-17017 April 1980 Requests NRC Intentions for Planning Hearings Re Petition to Suspend All Activities of Triga Reactor.Urges Immediate Resolution of Issues Between NRC & Berkeley,Ca ML19305C0551980-03-20020 March 1980 Forwards Annual Rept of Operations,1979. ML19290F1781980-03-0505 March 1980 Forwards Revised Security Plan.Plan Withheld (Ref 10CFR2.790) ML19260D9181980-02-0505 February 1980 Requests That All Amends Re Indemnity Agreements E-15,E-16, E-53 & E-58 Be Forwarded to Univ of CA for Approval ML19291B9471979-12-11011 December 1979 Requests Suspension of All Activities of Triga Reactor, Removal of All Pu & Other Radioactive Matl,Permanent Revocation of OL & Holding of Public Hearings in Berkeley, Ca,Before Any Resumption of Reactor Operations ML19210D9061979-11-21021 November 1979 Forwards Preliminary Draft of Facility Emergency Action Levels.Security Plan Not Received ML19256E8301979-11-0707 November 1979 Notifies That Amend 14 to Indemnity Agreement E-15 Was Signed by Unauthorized Employee.Requests Clean Copy for Execution by Proper Authority ML19260C1301979-10-30030 October 1979 Endorses Friends of the Earth Request for Action Asking Permanent Revocation of Regents of Univ of CA OL ML19260A4951979-10-25025 October 1979 Responds to NRC 791010 Ltr Re Violations Noted in IE Insp Rept 50-224/79-04.Corrective Actions:Required 1979 Rept Will Be Prepared & Stack Monitoring Sys Tests Will Be Noted on Printout Tape ML19254D9321979-10-23023 October 1979 Forwards Executed Amend 14 to Indemnity Agreement E-15 ML19250A0081979-10-0505 October 1979 Informs NRC of Change in Administrative Assignments. Sn Kaplan Is Reactor Administrator for Research Reactor ML20064J7701979-08-15015 August 1979 Forwards Info in Response to 790730 Request.Info Withheld (Ref 10CFR2.790) ML19260C1361979-08-0101 August 1979 Endorses Friends of the Earth Request That Reactor Activity at Etcheverry Hall,Univ of Ca,Be Suspended.Ca Assembly 790911 Endorsement Encl ML19241B3971979-07-0909 July 1979 Notifies That Ve Schrock Will Be Reactor Administrator of Berkeley Research Reactor,As of 790710 ML19241A7151979-06-29029 June 1979 Notifies That s Kaplan Will Continue as Reactor Administrator 1990-02-27
[Table view] |
Text
'
r 4
UNIVERSITY OF CALIFOllNIA, HEllKELEY iiinm n . mm . inviso . im m.nu . nnuuno . un inw . un inunwu
( ) um unnu . um em COLLEGE OF ENGINEERING BERKEl.EY. CALIFORNI A 94720 DEPARTMENT OF NUCLEAR ENGINEERING TELEPHONE:(4t$1642 5010 FAX: (415) 643%R$
Mr. Alexander Adams Nov.12,1990 U. S. Nuclear Regulatory Conurission ATTN: Document Cotrol Desk Docket # 50 224 Washington, D. C. 20555 Lic. # R 101
Subject:
Contaminated soll found on ivy beds west of Etcheverry llall This letter is to report on contaminated soll found on Ivy beds west of Etcheverry IIall during the NRC confirmatory survey the week of July 16, 1990.
m 1. Contaminated soil was found on Ivy beds west of the alley way of Etcheverry llall. It was originally detected during the week of July 16,1990, by the NRC confirmatory survey team. Maximum area radiation levels were approximately 150 microrem per hour at the surface and 15 microrem per hour at a meter. The location of the contaminated area was outside the boundary licensed by the NRC.
- 2. Analysis showed that the contaminated soil material contained elevated unprocessed natural uranium and thorium including its daughters.
- 3. The contaminated soll was removed the next day. Currently there are no remaining radiation levels exceeding unristricted release criteria.
'4. The origin of the material could not be ascertained. We are confident that it was not associated with reactor 00eration or Nactor decommissioning.
Further details are given in the attached letter from the Berkeley Campus Radiation Safety Officer.
i
~~
90112i0070 9O1112 DR ADOCK 0500 '[g4 AOM slo
If you have further questions please call me at (415) 642 7071 or Dr. Tek 11. Lim at (415) 642 5213.
Attachment ec. E. Garcia, NRC Region Y State of California, Dept. of IIcalth Services Campus Radiation Safety Orlicer T.11. Lim Sincerely 9-T. Kenneth Fowler, Reactor A.aministrator
=
l-l l
l I
, BBCEEl.l:va olTICE Or ENvlRoNMLNTAL uEALTH ANo SA' CTv q 2223 I ULTON STREET 4TH ILOOR I
1
(.L i Prof. Kenneth Fowler Nov.9,1990 Reactor Administrator Dept. Nuclear Engineering i University of California, llerkeley -
l gy 9 1990 i Dear Prof. Fowler This is to document activities involving the radioactive sand like innterial found across the I alley west of Etcheverry llall during the NRC confirmatory survey the week of July 16, 1990.
The elevated radiation level was originally detected by the NRC survey team from Oak Ridge Associated Universities, with a ganuna scin:lliation detector. No alpha contamination could be detected by direct monitoring. A sample was counted at the Nuclear Enginecr!ng I Laboratory and it was determined to be mainly a bda. gamma emitter with a very small I alpha component. A sample was sent to Los Alamos National Laboratory for gamma )
spectrum analysis. The analysis showed that the material contained elevated unprocessed 1 natural uranium and thorium with daughters. l l
Maximum area radiation levels were approximately 150 microrem per hour at the surface ,
and 15 microrem per hour at one meter. The material was tan in color and resembled i very line sand. An estimated 3 cubic feet of the material was found spread on top of and just underneath the dirt surface of the ivy beds along the retalning wall direcly across the ;
alley from the west entrance. The affected area was approximately 30 square feet. The following day the contaminated soll discovered was removed by Campus Environmental ;
licalth andl Safety. The contaminated soll was diposed of as radioactive waste. After 1 removal, the area radiation level was less than 5 microrem per hour above background at the surface of the ground, y
In conclusion, the origin of the material could not be ascertained, but I believe that it was sand blasting grit or similar material with natural radioactive components and that it was not associated with reactor operation or decommmissioning. The location of the '
1 contaminated area was outside the boundary lleensed by the NRC. In any event, it was removed and there are no remaining radiation levels exceeding unrestricted release criteria.
ec. T.ll. Lim ,
P. Lavely l
Y W
- Michael R. Schoonover, Radiation Safety Officer, Office of Environmental llcalth and Safety UNIVER$ TTY OF CALIK)RNIA ~(Letterhead for Intedepartmental Vie) i